CN103134136B - The region of air-conditioner system divides processing method and control method and device - Google Patents

The region of air-conditioner system divides processing method and control method and device Download PDF

Info

Publication number
CN103134136B
CN103134136B CN201110387968.0A CN201110387968A CN103134136B CN 103134136 B CN103134136 B CN 103134136B CN 201110387968 A CN201110387968 A CN 201110387968A CN 103134136 B CN103134136 B CN 103134136B
Authority
CN
China
Prior art keywords
region
air
area
instruction
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110387968.0A
Other languages
Chinese (zh)
Other versions
CN103134136A (en
Inventor
宋海川
林成霖
郝景岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201110387968.0A priority Critical patent/CN103134136B/en
Publication of CN103134136A publication Critical patent/CN103134136A/en
Application granted granted Critical
Publication of CN103134136B publication Critical patent/CN103134136B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The region that the invention provides a kind of air-conditioner system divides processing method and control method and device, and the region of this air-conditioner system divides processing method and includes: receive the first instruction of user's input;Searching region corresponding with the first instruction in air-conditioner system, air-conditioner system is divided into one or more region, and each region includes one or more air-conditioner;When finding the region corresponding with the first instruction, showing first area, wherein, first area is the region that the first instruction is corresponding;Receive the second instruction of user's input;And according to the second instruction modification first area.By the present invention, air-conditioner system carrying out region division, and amendment further to region so that the control of air-conditioner system can control simple by Region control, and the physical extent in region and size set according to the actual condition of system, control mode is flexible.

Description

The region of air-conditioner system divides processing method and control method and device
Technical field
The present invention relates to air-conditioner field, the region in particular to a kind of air-conditioner system divides processing method and control method and device.
Background technology
At present in air-conditioning tele-control system, many employings group control mode, by group management apparatus, the multiple air-conditioning equipments being arranged in multiple building are managed as multiple groups, control the multiple air-conditioning equipments in this building by the device that controls in building.Use this group of control mode, there is the deficiency on controlling: project installation is complicated, centrality is poor, control mode is free, can not realize across building control etc., such as, equipment in all of building in one community is carried out control of shutting down, if the building in this community is too much, then a lot of solitary buildings are controlled respectively, it is impossible to Nei Duodong building, community is carried out centralized Control, causes the complexity of control.
Control complicated, the comfortless problem of control mode for air-conditioner system in correlation technique, the most not yet propose effective solution.
Summary of the invention
Present invention is primarily targeted at and provide the region of a kind of air-conditioner system to divide processing method and control method and device, to solve air-conditioner system control complexity, the comfortless problem of control mode.
To achieve these goals, according to an aspect of the invention, it is provided the region of a kind of air-conditioner system divides processing method.
The region of the air-conditioner system according to the present invention divides processing method and includes: receive the first instruction of user's input;Searching region corresponding with the first instruction in air-conditioner system, air-conditioner system is divided into one or more region, and each region includes one or more air-conditioner;When finding the region corresponding with the first instruction, showing first area, wherein, first area is the region that the first instruction is corresponding;Receive the second instruction of user's input;And according to the second instruction modification first area.
Further, the method also includes: in lookup less than when instructing corresponding region with described first, create the region corresponding with described first instruction.
Further, include according to the second instruction modification first area: create the second area in first area;Or the second area in deletion first area, wherein, first area includes one or more second area.
Further, first area or second area include one below respectively: a floor that the building that the community that one or more buildings are constituted, one or more floor are constituted, one or more room are constituted and a room.
Further, it is community in first area, when second area is the building in community, after creating the second area in first area, the method also includes: receiving the 3rd instruction of user's input, wherein, the 3rd instruction is for defining title and the floor quantity of building;And according to the 3rd instruction and prestore building model display building information, wherein, the information of building includes the title of building and the three-dimensional view of building.
Further, being building in first area, when second area is the floor of building, after creating the second area in first area, the method also includes: receiving the 4th instruction of user's input, wherein, the 4th instruction is for defining title and the plane figure of floor;And according to the 4th instruction and the information of default floor models show floor, wherein, the information of floor includes the title of floor and the plan view of floor.
Further, being floor in first area, when second area is the room of floor, after creating the second area in first area, the method also includes: receiving the 5th instruction of user's input, wherein, the 5th instruction is for defining title and the plane figure in room;And according to the 5th instruction and the information in default models show room, room, wherein, the information in room includes the title in room and the plan view in room.
To achieve these goals, according to an aspect of the invention, it is provided a kind of air-conditioner system control method.
Air-conditioner system control method according to the present invention includes: receiving the control command of user's input, wherein, control command is for being controlled the air-conditioner in region;Inquiring about the region corresponding with control command, wherein, the region of any one air-conditioner system provided by the present invention is divided processing method and air-conditioner system is divided into multiple region, and each region includes one or more air-conditioner;And control the air-conditioner in corresponding region by control command.
Further, behind the region that inquiry is corresponding with control command, this control method also includes: the air-conditioner quantity in the region that display is corresponding and the running status of each air-conditioner, and wherein, running status includes being currently running, out of service, communication failure and operation troubles.
To achieve these goals, according to an aspect of the invention, it is provided a kind of air-conditioner system controls device.
Air-conditioner system according to the present invention controls device and includes: receiver module, and for receiving the control command of user's input, wherein, control command is for being controlled the air-conditioner in region;Enquiry module, for the inquiry region corresponding with control command, wherein, air-conditioner system is divided into multiple region by the region division processing method of any one air-conditioner system provided by the present invention, and each region includes one or more air-conditioner;And control module, for being controlled the air-conditioner in corresponding region by control command.
Pass through the present invention, the region using the air-conditioner system comprised the following steps divides processing method: receive the first instruction of user's input, wherein, the first corresponding first area of instruction, air-conditioner system is divided into one or more region, and each region includes one or more air-conditioner;Search the region corresponding with the first instruction;When finding the region corresponding with the first instruction, show first area;Receive the second instruction of user's input;And according to the second instruction modification first area, air-conditioner system is carried out region division, and amendment further to region, the control making air-conditioner system can control simple, wherein by Region control, physical extent and the size in region set according to the actual condition of system, control mode freely, solves air-conditioner system and controls complicated, the comfortless problem of control mode, and then has reached air-conditioner system and control simple, control mode effect flexibly.
Accompanying drawing explanation
The accompanying drawing of the part constituting the application is used for providing a further understanding of the present invention, and the schematic description and description of the present invention is used for explaining the present invention, is not intended that inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of the region division processing method of air-conditioner system according to embodiments of the present invention;
Fig. 2 is that the region of air-conditioner system according to embodiments of the present invention divides the first schematic diagram;
Fig. 3 is that the region of air-conditioner system according to embodiments of the present invention divides the second schematic diagram;
Fig. 4 is that the region of air-conditioner system according to embodiments of the present invention divides the 3rd schematic diagram;
Fig. 5 is that the region of air-conditioner system according to embodiments of the present invention divides the 4th schematic diagram;
Fig. 6 is that the region of air-conditioner system according to embodiments of the present invention divides the 5th schematic diagram;
Fig. 7 is that the region of air-conditioner system according to embodiments of the present invention divides the 6th schematic diagram;
Fig. 8 is that the region of air-conditioner system according to embodiments of the present invention divides the 7th schematic diagram;
Fig. 9 is the flow chart of air-conditioner system control method according to embodiments of the present invention;
Figure 10 is that the region of air-conditioner system according to embodiments of the present invention divides the 8th schematic diagram;
Figure 11 is that the region of air-conditioner system according to embodiments of the present invention divides the 9th schematic diagram;
Figure 12 is that the region of air-conditioner system according to embodiments of the present invention divides the tenth schematic diagram;
Figure 13 is that the region of air-conditioner system according to embodiments of the present invention divides the 11st schematic diagram;
Figure 14 is that the region of air-conditioner system according to embodiments of the present invention divides the 12nd schematic diagram;And
Figure 15 is the block diagram that air-conditioner system according to embodiments of the present invention controls device.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can be mutually combined.Describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
Fig. 1 is the flow chart of the region division processing method of air-conditioner system according to embodiments of the present invention, as it is shown in figure 1, the method includes that steps S102 is to step S110:
Step S102: receive the first instruction of user's input.
Step S104: searching region corresponding with the first instruction in air-conditioner system, air-conditioner system is divided into one or more region, and each region includes one or more air-conditioner.
Step S106: when finding the region corresponding with the first instruction, shows first area, wherein, first area is the region that the first instruction is corresponding, search less than with the first region corresponding to instruction, then create and instruct corresponding region with first, and by the region after establishment as first area.
Step S108: receive the second instruction of user's input.
Step S110: according to the second instruction modification first area.
Use this embodiment, air-conditioner system is carried out region division, and amendment further to region, the control making air-conditioner system can control simple, wherein by Region control, physical extent and the size in region set according to the actual condition of system, and control mode is flexible.
Wherein, step S110 includes: increase the second area in first area;Reduce the second area in first area, i.e. delete the second area in first area;Or the second area in establishment first area, wherein, first area includes one or more second area.
Wherein, first area or second area include one below respectively: a floor that the building that the community that one or more buildings are constituted, one or more floor are constituted, one or more room are constituted and a room, specifically, including following several situations:
First area is community A, and second area is after building a: user inputs the first instruction, if this community A deposits, then shows this community, i.e. shows the community A information prestored, including cell name and the floor map of community;If this community A does not exists, create a Ge Xin community as community A;After user inputs the second instruction, community A is modified, including: in the community A do not exist building a, create building a, in the community A include building a, building a is deleted, or replace building b with building a in the community A include building b.
First area is building a, and second area is after floor S1: user inputs the first instruction, if this building a deposits, then shows this building, i.e. shows the building a information prestored, including building name and the floor map of building;If this building a does not exists, then create a new building as building a;After user inputs the second instruction, building a is modified, including: in the building a do not exist floor S1, create floor S1, in the building a include floor S1, floor S1 is deleted, or build floor S2 with floor S1 replacement in the building a include floor S2.
First area is floor S1, and second area is room 101: after user inputs the first instruction, if this floor S1 deposits, then shows this floor, i.e. shows the floor S1 information prestored, including floor name and the floor map of floor;If this floor S1 does not exists, then create a new floor as floor S1;After user inputs the second instruction, floor S1 is modified, including: in the floor S1 do not exist room 101, create room 101, in the floor S1 include room 101, room 101 is deleted, or replace room 102 with room 101 in the floor S1 include room 102.
Use this preferred implementation, air-conditioner system is divided into different levels according to physical region relation, such as the air-conditioner system that all air-conditioners in a Ge Youmou community are constituted is carried out region division, the air-conditioner system model of a stratification can be obtained, this model from whole community to building, floor, room is until the management on levels model of air-conditioner device, so that the manager of air-conditioner system can control centralized and unified to the air-conditioner device in zones of different, and the air-conditioner of any region can carry out layering system control, make control mode flexible.
Preferably, being community in first area, when second area is the building in community, the method also includes: receiving the 3rd instruction of user's input, wherein, the 3rd instruction is for defining title and the floor quantity of building;And according to the 3rd instruction and prestore building model display building information, wherein, the information of building includes the title of building and the three-dimensional view of building.
Use this preferred implementation, it is possible to display is created the specifying information of building, increase visual information, facilitate user that the air-conditioner device in this building is controlled.
Preferably, being building in first area, when second area is the floor of building, the method also includes: receiving the 4th instruction of user's input, wherein, the 4th instruction is for defining title and the plane figure of floor;And according to the 4th instruction and the information of default floor models show floor, wherein, the information of floor includes the title of floor and the plan view of floor.
Use this preferred implementation, it is possible to display is created the specifying information of floor, increase visual information, facilitate user that the air-conditioner device in this floor is controlled.
Preferably, being floor in first area, when second area is the room of floor, the method also includes: receiving the 5th instruction of user's input, wherein, the 5th instruction is for defining title and the plane figure in room;And according to the 5th instruction and the information in default models show room, room, wherein, the information in room includes the title in room and the plan view in room.
Use this preferred implementation, it is possible to display is created the specifying information in room, increase visual information, facilitate user that the air-conditioner device in this floor is controlled.
Fig. 2 is that the region of air-conditioner system according to embodiments of the present invention divides the first schematic diagram, the figure shows the overall structure figure that the region of air-conditioner system divides, system includes the multiple buildings being distributed in an engineering of company A, owing to building is the most, so managing for convenience, first will the system have been the division of community, be divided into 4 communities.Level scope from top to bottom is gradually lowered, thus the air-conditioner device comprised also gradually decreases.
Realizing the embodiment of the present invention by software system and provide the region partitioning method of air-conditioner system, user can be realized by following steps when system carries out region division:
In software system, create 4 communities, be named including community A, Bing Duige community;
Preset building object model is utilized to create the icon in a building in cell a, as it is shown on figure 3, preset building object model can be this building CAD diagram sheet when design;
Preset building object model is utilized to create two solitary buildings in cell a, including meeting building and the club of 8 floor of a two-layer, as shown in Figure 4;
After having divided building for community A, define the details of 8 layers of club in this community, and show the 3D view of this building, as shown in Figure 5.
After defining building, generate the 3D view in this building, this upstairs certain layer enter this layer carrying out edit, define details and the background of this floor, if multiple floors have identical preset model background picture, can the most all import, as shown in Figure 6, import the preset model background picture of multiple floor.
After defining floor information and background picture, this floor background picture is sketched the contours of room and defines the details in room, and in room, pull air-conditioner device into, this room can be entered by the room sketched the contours and show its interior equipment after having configured, as shown in Figure 7, sketching the contours of a room in floor background picture and pull air-conditioning equipment wherein into, Fig. 8 is the number of devices in one room of display.
After defining the information of the hierarchical models such as engineering, community, building, the air-conditioner device in above-mentioned model can be detected and manages.
By the air-conditioner system being made up of company A is carried out region division, can obtain including 4 communities, wherein, community A includes 3 buildings, includes 8 floors in No. 3, includes the air-conditioner system regional model in 2 rooms in third story layer.
If using this system for the first time, system can provide use guide as required so that user can carry out simple allocation project information.
1. cell configuration guide, engineering can be divided conceptually in some communities by this guide, to reduce the complexity of engineering management.
2. select building type, the community defined by the first step, can be its interpolation building, and the icon in this building is set, clearly show the position in this building, shape and size.
3. input building information: user can arrange the specifying information in the building of second step configuration, the title in input building and the number of plies.
4. import floor design drawing: the building configuration floor information such as floor configured in the 3rd step is called by user, floor plan.
By above go-ahead mode, it is possible to make user be familiar with the workflow of this system, lay a good foundation for later management.
If user simply configures according to the mode of guide, then user can carry out the detailed management to this engineering hierarchical model according to the needs of oneself.
Cell management: the community defined in engineering is mainly listed in this management, and can be that engineering increases a new cell pattern;
Building manages: if newly increasing Liao Yige community in cell management, be directly entered in this management, this management mainly increases a new building and defines the information such as the outward appearance in building, the number of plies, thus manage, system can generate the three-dimensional visualization figure in this building according to above-mentioned information, in order to can carry out visual configuration in remaining management;
Floor manages: floor management is to arrange the information such as number of floor levels, floor background on the basis of newly-built building further;
Room operations: after importing floor Background in floor manages, can operate at room, place apparatus etc. defined in this Background.
By this process, user can define intuitively room and in room driven equipment, facilitate user's definition to room, if user has the Excel information table that this engineering is detailed, user can not carry out configuring and being introduced directly into Excel form.
Fig. 9 is the flow chart of air-conditioner system control method according to embodiments of the present invention, as it is shown in figure 9, this control method comprises the steps that S202 is to step S206:
Step S202, receives the control command of user's input, and wherein, control command is for being controlled the air-conditioner in region.
Step S204, inquires about the region corresponding with control command, and wherein, the region of any one air-conditioner system provided by this detailed description of the invention is divided processing method and air-conditioner system is divided into multiple region, and each region includes one or more air-conditioner.
Step S206: control the air-conditioner in corresponding region by control command.
In this embodiment, after receiving the control command that user sends, inquire the region corresponding with this order, ready-portioned air-conditioner system can be carried out Region control, all air-conditionings of one community can be controlled by this control command, can also in a building any which floor be controlled so that the control mode of air-conditioner system is more flexible, and control mode is simple.
Preferably, behind the region that inquiry is corresponding with control command, this control method also includes: the air-conditioner quantity in the region that display is corresponding and the running status of each air-conditioner, wherein, running status includes being currently running, out of service, communication failure and operation troubles, use this preferred implementation, it is possible to the air-conditioner device implementing monitoring in whole air-conditioner system, directly perceived must recognize the ruuning situation of air-conditioner device in arbitrary region.
As a example by the described herein above air conditioning system being made up of company A:
When the control command received is the order controlling whole company A, four communities of display company A, and show all devices ruuning situation of the said firm, the air-conditioning switch machine of whole company and other operational factor can be configured, as shown in Figure 10 by this order.
When the control command received is the order controlling whole community in company A, show three buildings in this community: No. 1 building, No. 2 building, No. 3 building, and show all devices ruuning situation of this community, the air-conditioning switch machine of whole community and other operational factor can be configured, as shown in figure 11 by this order.
When the control command received is the order controlling whole No. 3 building, the three-dimensional view in No. 3 building of display, including 8 floors, and shows all devices ruuning situation in this building, the air-conditioning switch machine in whole building and other operational factor can be configured, as shown in figure 12 by this order.
When the control command received is the order controlling a certain floor (such as 3 floor) in No. 3 building, show the plan view of 3 floors, this floor is divided into five rooms, and show all devices ruuning situation in this floor, the air-conditioning switch machine of whole floor and other operational factor can be configured, as shown in figure 13 by this order.
When the order that the control command received is some room (room such as 02) controlling 3 floors, show the plan view in this room, and show all devices ruuning situation in this room, 4 air-conditioning switch machines in room and other operational factor can be configured, as shown in figure 14 by this order.
Realize the embodiment of the present invention by software system and the region partitioning method of air-conditioner system is provided, after user achieves the region division process of air-conditioner system in systems, user can be by entering the air-conditioner system regional model of the stratification configured, the equipment monitoring and managing in each region:
Enter engineering model: system demonstrates ready-portioned cell pattern in whole engineering, go out ruuning situation and the quantity of all of equipment in engineering side by side: be currently running, stop, communication failure, operation troubles etc., can all devices in engineering model, under this engineering of centralized Control.
Enter cell pattern: system demonstrates the quantity of building in whole community, and list ruuning situation and the quantity of all devices in this community: it is currently running, stops, communication failure, operation troubles etc., can all devices in cell pattern, under this region of centralized Control.
Enter building model: system demonstrates the quantity of floor in whole building, and list ruuning situation and the quantity of all devices in this building: it is currently running, stops, communication failure, operation troubles etc., can be in building model, this big all devices downstairs of centralized Control.
Enter floor model: system demonstrates the quantity of equipment in whole floor, and list ruuning situation and the quantity of all devices in this floor: it is currently running, stops, communication failure, operation troubles etc., can all devices in floor model, under this floor of centralized Control.
Enter room model: system demonstrates the quantity of equipment in whole room, and list ruuning situation and the quantity of all devices in this room: it is currently running, stops, communication failure, operation troubles etc., can all devices in room model, under this room of centralized Control.
Figure 15 is the block diagram that air-conditioner system according to embodiments of the present invention controls device, and as shown in figure 15, this control device includes: receiver module 10, and for receiving the control command of user's input, wherein, control command is for being controlled the air-conditioner in region;Enquiry module 20, for the inquiry region corresponding with control command, wherein, air-conditioner system is divided into multiple region by the region division processing method of any one air-conditioner system provided by detailed description of the invention, and each region includes one or more air-conditioner;And control module 30, for being controlled the air-conditioner in corresponding region by control command.
In this embodiment, after receiver module 10 receives the control command that user sends, enquiry module 20 inquires the region corresponding with this order, control module 30 can carry out Region control to ready-portioned air-conditioner system, all air-conditionings of one community can be controlled by this control command, can also in a building any which floor be controlled so that the control mode of air-conditioner system is more flexible, and control mode is simple.
From above description, can be seen that, present invention achieves following technique effect: air-conditioner system is carried out region division, and amendment further to region so that the control of air-conditioner system can control simple by Region control, wherein, physical extent and the size in region set according to the actual condition of system, and control mode is freely so that air-conditioner system controls simply, control mode is flexible.
It should be noted that, can perform in the computer system of such as one group of computer executable instructions in the step shown in the flow chart of accompanying drawing, and, although showing logical order in flow charts, but in some cases, can be to be different from the step shown or described by order execution herein.
Obviously, those skilled in the art should be understood that, each module of the above-mentioned present invention or each step can realize with general calculating device, they can concentrate on single calculating device, or it is distributed on the network that multiple calculating device is formed, alternatively, they can realize with calculating the executable program code of device, thus, can be stored in storing in device and be performed by calculating device, or they are fabricated to respectively each integrated circuit modules, or the multiple modules in them or step are fabricated to single integrated circuit module realize.So, the present invention is not restricted to the combination of any specific hardware and software.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included within the scope of the present invention.

Claims (9)

1. the region of an air-conditioner system divides processing method, it is characterised in that including:
Receive the first instruction of user's input;
Searching region corresponding with described first instruction in described air-conditioner system, described air-conditioner system is divided into one or more region, and each region includes one or more air-conditioner;
When finding the region corresponding with described first instruction, showing first area, wherein, described first area is the region that described first instruction is corresponding;
Receive the second instruction of user's input;
According to first area described in described second instruction modification,
Wherein, include according to first area described in described second instruction modification: create the second area in described first area;Or, delete the second area in described first area, wherein, described first area includes one or more described second area.
Processing method the most according to claim 1, it is characterised in that also include:
In lookup less than when instructing corresponding region with described first, create the region corresponding with described first instruction.
Processing method the most according to claim 1, it is characterised in that described first area or described second area include one below respectively:
A floor that the building that the community that one or more buildings are constituted, one or more floor are constituted, one or more room are constituted and a room.
Processing method the most according to claim 3, it is characterised in that be community in described first area, when described second area is the building in described community, after creating the second area in described first area, described method also includes:
Receiving the 3rd instruction of user's input, wherein, described 3rd instruction is for defining title and the floor quantity of described building;And
The building model instructed according to the described 3rd and prestore shows the information of described building, and wherein, the information of described building includes title and the three-dimensional view of described building of described building.
Processing method the most according to claim 3, it is characterised in that be building in described first area, when described second area is the floor of described building, after creating the second area in described first area, described method also includes:
Receiving the 4th instruction of user's input, wherein, described 4th instruction is for defining title and the plane figure of described floor;And
According to the information of floor described in described 4th instruction and default floor models show, wherein, the information of described floor includes title and the plan view of described floor of described floor.
Processing method the most according to claim 3, it is characterised in that be floor in described first area, when described second area is the room of described floor, after creating the second area in described first area, described method also includes:
Receiving the 5th instruction of user's input, wherein, described 5th instruction is for defining title and the plane figure in described room;And
According to the information in room described in described 5th instruction and default room models show, wherein, the information in described room includes title and the plan view in described room in described room.
7. an air-conditioner system control method, it is characterised in that including:
Receiving the control command of user's input, wherein, described control command is for being controlled the air-conditioner in region;
Inquiring about the region corresponding with described control command, wherein, divide processing method by the region of the air-conditioner system according to any one of claim 1 to 6 and air-conditioner system is divided into multiple region, each region includes one or more air-conditioner;And
The air-conditioner in corresponding region is controlled by described control command.
Control method the most according to claim 7, it is characterised in that behind the region that inquiry is corresponding with described control command, described method also includes:
Air-conditioner quantity in the region that display is corresponding and the running status of each air-conditioner, wherein, described running status includes being currently running, out of service, communication failure and operation troubles.
9. an air-conditioner system controls device, it is characterised in that including:
Receiver module, for receiving the control command of user's input, wherein, described control command is for being controlled the air-conditioner in region;
Enquiry module, for inquiring about the region corresponding with described control command, wherein, dividing processing method by the region of the air-conditioner system according to any one of claim 1 to 6 and air-conditioner system is divided into multiple region, each region includes one or more air-conditioner;And
Control module, for controlling the air-conditioner in corresponding region by described control command.
CN201110387968.0A 2011-11-28 2011-11-28 The region of air-conditioner system divides processing method and control method and device Expired - Fee Related CN103134136B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110387968.0A CN103134136B (en) 2011-11-28 2011-11-28 The region of air-conditioner system divides processing method and control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110387968.0A CN103134136B (en) 2011-11-28 2011-11-28 The region of air-conditioner system divides processing method and control method and device

Publications (2)

Publication Number Publication Date
CN103134136A CN103134136A (en) 2013-06-05
CN103134136B true CN103134136B (en) 2016-08-03

Family

ID=48494307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110387968.0A Expired - Fee Related CN103134136B (en) 2011-11-28 2011-11-28 The region of air-conditioner system divides processing method and control method and device

Country Status (1)

Country Link
CN (1) CN103134136B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104930668B (en) * 2015-07-08 2018-08-17 中国电信股份有限公司南京分公司 A kind of precise machine room air conditioner cluster control method
CN106210118A (en) * 2016-07-29 2016-12-07 三维通信股份有限公司 A kind of flattening intelligent building precise control system and method
CN108282367A (en) * 2018-01-23 2018-07-13 北京悦畅科技有限公司 Configuration method and server on a kind of line of parking lot business information
CN112041618A (en) * 2018-03-13 2020-12-04 贝利莫控股有限公司 HVAC system with relative control, HVAC method, and computer program for HVAC system
CN110703708B (en) * 2019-10-12 2021-02-05 杭州行至云起科技有限公司 Management method and system for hierarchical intelligent equipment group
CN110887485A (en) * 2019-10-16 2020-03-17 武汉卓目科技有限公司 Equipment positioning method and device in high-rise building
CN112214238B (en) * 2020-10-15 2022-02-22 上海顺舟智能科技股份有限公司 Internet of things service system configuration method based on intelligent application scene
CN112361567B (en) * 2020-10-21 2022-05-10 珠海格力电器股份有限公司 Multi-connected system control method and device and multi-connected system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101983539A (en) * 2008-04-04 2011-03-02 宗拓贝尔照明器材有限公司 Computer-assisted system for managing and/or controlling a building management system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3495191B2 (en) * 1996-01-18 2004-02-09 東芝キヤリア株式会社 Air conditioning management device

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101983539A (en) * 2008-04-04 2011-03-02 宗拓贝尔照明器材有限公司 Computer-assisted system for managing and/or controlling a building management system

Also Published As

Publication number Publication date
CN103134136A (en) 2013-06-05

Similar Documents

Publication Publication Date Title
CN103134136B (en) The region of air-conditioner system divides processing method and control method and device
CN103477326B (en) Infrastructure control fabric system and method
CN103339611B (en) Remote access appliance having mss functionality
CN103616876B (en) The establishment method of a kind of intelligence household centralized control equipment and intelligence home scene pattern
CN103329109B (en) For combining the system and method that manageability subsystem monitors in real time and manages data center resource
CN102707693B (en) Method for building spatio-temporal cooperative control system of multiple unmanned aerial vehicles
KR101108924B1 (en) Remote management device and remote management system
US20200004279A1 (en) Hvac system configuration and zone management
CN103329063A (en) System and method for monitoring and managing data center resources in real time
CN105117835A (en) A power grid information machine room three-dimensional visualized management platform based on a B/S framework
CN101820532A (en) Method for realizing full three-dimensional intelligent virtual computer room
US9863658B2 (en) Room management apparatus and method for assigning rooms based on air conditioner state and room temperature
CN107179701A (en) A kind of intelligent home device self-adapting linkage rule generating method
CN105094011A (en) House chore management robot and task processing method
CN102307106A (en) Method and device for managing and showing station energy consumption
CN104883377B (en) Control method, control system and the social network server of air-conditioning
CN106384192A (en) 3D command and scheduling system based on GIS and realization method thereof
CN109787826A (en) A kind of Internet of Things virtual configuration control platform and method
CN114039856B (en) Network topology structure display system and method
CN108983624A (en) A kind of control method and terminal device of smart home device
CN100361121C (en) A universal object modeling method and universal object management system
CN105205857A (en) Full-three-dimension house design system and method
JPH0785166A (en) Building management equipment
CN104299068A (en) Cabin display control information management system and method based on ARINC 661
CN114024948A (en) Intelligent building integration management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803

CF01 Termination of patent right due to non-payment of annual fee