CN103130130A - Belt winding displacement method used for well drilling winch - Google Patents

Belt winding displacement method used for well drilling winch Download PDF

Info

Publication number
CN103130130A
CN103130130A CN 201110405119 CN201110405119A CN103130130A CN 103130130 A CN103130130 A CN 103130130A CN 201110405119 CN201110405119 CN 201110405119 CN 201110405119 A CN201110405119 A CN 201110405119A CN 103130130 A CN103130130 A CN 103130130A
Authority
CN
China
Prior art keywords
belt
winding displacement
limit switch
winch
well drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110405119
Other languages
Chinese (zh)
Inventor
李超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201110405119 priority Critical patent/CN103130130A/en
Publication of CN103130130A publication Critical patent/CN103130130A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a belt winding displacement method used for a well drilling winch. The method comprises that (a) at first, a motor is started and drives a winding displacement belt to run through a belt wheel; (b) a limit switch is controlled, due to an electromagnetic force effect, a clamping element is clamped on one side of the winding displacement belt which drives a movable support to move, and the movable support drives a winding displacement guide roller mounted on the movable support to move; (c) after the movable support reaches to a position limited by the limit switch, under the action of the limit switch, an electromagnet is released, another electromagnet is on motion, and the clamping element is clamped on the other side of the winding displacement belt again; and (d) the winding displacement guide roller moves toward the opposite direction under driving of the movable support again, a steel wire rope is arranged sequentially on the other side of a take-up reel, and the reciprocating winding displacement process is finished. According to the method, a belt is adopted for transmission, so winding displacement positions and height can be adjusted, and winding displacement pitch size can be adjusted.

Description

The belt wire-arranging method that is used for well drilling hoist
Technical field
The present invention relates to a kind of belt wire-arranging method for well drilling hoist.
Background technology
In the middle of Process of Oil Well Drilling, the radical function of winch shows:
(1) drilling tool (comprise grief joint, drilling rod, brill very, drill bit etc.) is lowered to hundreds of rice to several kms, even surpasses the shaft bottom of myriametre.
(2) with drilling tool from hundreds of rice to several kms, the shaft bottom of even going up myriametre trips out.
(3) in drilling well, foil portion drilling tool weight, be pressed in pressure on drill bit with control.
(4) in drilling well, as down-hole accident occurs, need to be lowered to or to trip out the various downhole tools of processing the down-hole fault in pit shaft.
(5) install at rig, when dismantling, need derrick integral body is stood up or transferred.
(6) in cement job, need to be lowered to sleeve pipe etc. in well.
Although of all kinds on various winch structure, generally all consist of the following components in essence:
(1) cylinder, drum shaft assembly, this is the core work parts of winch.Cylinder should have enough Rong Shengliang, guarantees that rope woolding is in good condition to extend rope service-life;
(2) winch has sensitive failure-free main brake mechanism and well behaved assist brake, can regulate exactly the pressure of the drill, evenly sends drilling tool to, arbitrarily controls running speed and effortlessly the heaviest drill string load is checked in going down process;
(3) cat head and cat shaft assembly are in order to satisfy the needs with shackle on tong and other auxiliary lifting.Bailing drum also is housed, in order to extract core barrel on some cat shafts;
(4) transmission gear shift system introduces and distributed power and transmit motion, and enough shelves speed is provided;
(5) control system comprises dental inlay, tooth-like, pneumatic clutch.Their general subordinates are in the component part of control system of rig;
(6) lubricating system comprises that butter is lubricated, drip feed lubrication and sealing, splashes or positive lubrication;
(7) support system has frame bracket or the closed box shell-type mounting of welding.Medium-sized winch integral transportation, its weight is in 10 tons; Heavy and superduty winch will be broken into shipped, and the unit of transportation should be in 15 tons, so that movement.
According to function and the characteristics of winch, in general, the well borer does that winch is had following requirement:
(1) in order to guarantee the heaviest drilling tool that hoists, require each parts of winch to satisfy in intensity, rigidity under the prerequisite of its in-use performance, winch will have enough power.
(2) variation and the raising effect in order to adapt to hoisting capacity, winch should have enough hoist gear number or speed change scope of compromise.
(3) winch drum should have enough sizes and Rong Shengliang.
(4) winch should have sensitive failure-free brake system, in order to check maximum load, accurately regulates the pressure of the drill, evenly sends drilling tool to.
(5) the winch control part is answered convenient operation, and is safe and reliable.
The transmission scheme of winch has determined its structure type, can be divided into single shaft, twin shaft, three axles, multiaxis and major-minor winch by the winch number of axle.The first two is planted winch and generally all needs change speed gear box in addition
1. single drum shaft winch
The characteristics of this class winch are that cat head directly is contained in drum shaft two ends, and cylinder is contained on drum shaft.For different lifting velocities is provided, change speed gear box transmission winch and rotating disk respectively are set outside winch.This winch structure is simple, and power is little, and is lightweight, and movement is convenient, is exactly this type as C-1500 type boring winch.Its shortcoming is that the cat head rotating speed is higher, and the position is too low, operation inconvenience, and cylinder shelves speed can not independently arrange, the impact speed that makes a trip.
2. twin-roll axle winch
Double shaft drawworks is comprised of cat shaft and drum shaft, due to cat head and cylinder split axle, the speed of cat head and position is all improved, and has solved the operation inconvenience problem of cat head.It still takes outer speed change scheme.Adopt this scheme as ZJ15D and ZJ20-2 ton type rig, lightweight so that winch structure is simple, be convenient to movement.
3. three drum shaft winches
The characteristics of this class winch are to have increased the transmission shaft of introducing power on the basis of double shaft drawworks, and cat shaft is also participated in gear.The JC1-14.5 winch that grand celebration 130 rigs and ZJ130-1 adopt namely belongs to this type of, and it can realize separate three low gears and a high speed gear.Because space between three axles is larger, reverse gear can not be set, this type rig is provided with reverse gift gearing box at machine room.Because speed-changing mechanism is also taken into account rotating disk, cancelled outer change speed gear box, but winch itself is complicated.Weigh 20 tons, be converted into four shipped of three axles during movement, movement and installation are all inconvenient.
4. multiple-roll axle winch
Winch more than four axles is called multiaxial drawworks, is characterized in that cat shaft do not participate in gear, the position that is available in the middle of cat head can install auxiliary bailing drum additional, and separately establishes the requirement that tween drive shaft solves speed change and transmission.Generally can realize 6 positive 2 drum speeds that fall, the domestic drillings such as ZJ32J, ZJ45, ZJ45J, ZJ60D all adopt this scheme.
5. major-minor winch
Multiaxial drawworks has solved many-sided contradictions such as variable speed operation, shipment preferably on organization plan.But the climbing of long winch, chain has become the weakest link in the rig transmission.Modern deep-well, superdeep well drill floor get up higher (9m as high in the ZJ60L rig floor), the winch of 20 tons of left and right of weighing on the one hand hangs to rise and becomes difficulty, long-chain is climbed up rig floor and will do not increased not 1~2 tween drive shaft and center base on the other hand, makes its transmission complicated, and efficient is low.So independent cat shaft-main winch organization plan occurred.
The main winch power demand is large, is contained on the machine room base, and cat shaft and rotary table transmission device consist of separate unit and be placed on rig floor.Greatly improved the service conditions of climbing chain (or versatile spindle) because Rotary Table Power is less, facilitated and install and movement.
Make a general survey of the developing history of rig, rig has experienced one from simple to complex, and low to the high development and change process of automatization level by automatization level, the evolution of drilling well whim is like this too.Along with making rapid progress of the up-to-date technologys such as Eltec, hydraulic technique, petroleum drilling winch will develop towards the following aspects.
(1) further to electric driving direction development.Reason is that direct current SCR controls and AC frequency conversion is controlled rig and winch, and the incomparable preceence of other many drill outfits is arranged.Except a handful of countries such as the U.S., other country is still relatively backward aspect the development electric drilling machine at present, is still the megatrend of following rig research and development, general orientation.
(2) further to automation, intelligent direction effort.For safety, efficient, scientific and rational drilling well, abroad oneself has developed hydraulic drive rig, full automatic drilling rig etc., and this can produce great impact to China's Future Development automation, product that intelligent level is higher.
(3) continue to the maximization future development.Oneself has developed the drill outfit of upper myriametre present, ConUS one Ai Musike company developed 5000 horsepowers of winches of the first in the world platform in 1997, be described as the 5th generation electric lifting device, so, for further improving domestic drilling tech, the trend of development high-power winch is inevitable.
(4) to split type, single axle future development.At present, main winch and the catworks of many rigs have adopted Split type structure, are placed in respectively on drill floor face and background base, by independently actuating unit driving.The single axle winch is popular in the west in recent years, and the common feature of these two kinds of winches is simple in structure, and volume is little, and is lightweight, is convenient to transportation installation etc.
(5) to seriation, normalisation, the effort of modularization direction.Along with the further normalization of world market, drill outfit is inevitable to the trend of the future developments such as seriation, normalisation, universalization, and this is conducive to increase the interchangeability of equipment and the stability of properties of product, and can save a large amount of productive costss.
(6) to the high-adaptability future development.Restriction owing to being subjected to the drilling conditions such as desert, ocean, polar region wants to expand the oil production market segment, and the drill outfit that adapts to these harsies environment and weather just must be arranged, therefore, the drill outfit of exploitation high-adaptability be from now on the inevitable requirement in future.
When the fast line of petroleum drilling machine winch is wrapped in end on cylinder, there is angle between fast line and plumb bob vertical, the fast line leaning angle must be controlled in certain scope, if leaning angle is excessive, the drift angle that steel rope is entangled to cylinder will increase, thereby cause strengthening along the cylinder axial force between fast line and adjacent fake, must impact the normal winding of steel rope at cylinder.In addition, along with the increase of leaning angle, the race of steel rope and crown sheave just might wear and tear, and along with the increase of leaning angle, it is serious all the more that wearing and tearing can become, and causes great impact this service life on steel rope.
Boring winch is one of core component of oil-well rig.Used well drilling hoist system does not generally have rope guide, cause many rig cylinder steel ropes the sequence disorder to occur, cause disorder cable, steel cable to push mutually, make steel rope produce gross distortion, distortion, bending, knotting, have to scrap in advance, not only cause significant wastage, more seriously may bury thus serious potential safety hazard, especially in the use of deep-well, superdeep well winch, this phenomenon is very general especially.At present, although have the guiding steamboat on winch, this guiding steamboat also just plays the effect that prevents that steel rope from swinging, and is difficult to tackle the problem at its root.
Summary of the invention
The object of the invention is to overcome the shortcoming and defect of above-mentioned prior art, a kind of belt wire-arranging method for well drilling hoist is provided, the belt wire-arranging method that should be used for well drilling hoist adopts belt-driving, thereby can the row of regulating restricts position and width, and the size of the pitch of can the row of adjusting restricting.
Purpose of the present invention is achieved through the following technical solutions: be used for the belt wire-arranging method of well drilling hoist, comprise the following steps:
(a) at first, open motor, motor drives the running of winding displacement belt by belt pulley;
(b) control limit switch, due to electromagnetic force, clamping element is clamped in a side of winding displacement belt, and the winding displacement belt drives traversing carriage and moves, and traversing carriage drives cable guide pulley mounted thereto and moves,
(c) after traversing carriage reaches the position of limit switch restriction, under the effect of limit switch, electromagnet discharges, another electromagnet action, and clamping element is clamped in again the opposite side of winding displacement belt;
(d) cable guide pulley moves under the drive of traversing carriage again in the opposite direction, with the opposite side in-line arrangement of steel rope to take-up reel, completes the reciprocating rope-arranging process.
The restrict change of position of described row realizes by the position of adjusting limit switch.
Described row restricts, and the size of pitch realizes by the kinematic velocity of regulating the winding displacement belt.
The restrict change of width of described row realizes by the position of adjusting limit switch.
The belt wire-arranging system that the present invention is used, mainly by belt transmission structure, the motor that is connected with belt transmission structure, be arranged on the mobile clamping device on belt transmission structure and the cable guide pulley that is arranged on mobile clamping device consists of.
Described belt transmission structure mainly is made of at least two belt pulleys and the winding displacement belt that is arranged on belt pulley, and described motor is connected with one of them belt pulley.
Mainly by being arranged on traversing carriage on the winding displacement belt, being arranged on the fixing device on traversing carriage and the limit switch that is connected with fixing device consists of, cable guide pulley is arranged on traversing carriage described mobile clamping device.
Described fixing device mainly is made of the clamping element that is arranged on the groups of electromagnets on traversing carriage and is arranged on winding displacement belt inner ring.
Described groups of electromagnets mainly is made of two electromagnets, and two electromagnets lay respectively at the top and bottom of winding displacement belt.
In sum, the invention has the beneficial effects as follows: adopt belt-driving, thereby can the row of regulating restrict position and width, and the size of the pitch of can the row of adjusting restricting.
Description of drawings
Fig. 1 is the structural representation of equipment therefor of the present invention.
The specific embodiment
Below in conjunction with embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited only to this.
Embodiment:
The belt wire-arranging method that is used for well drilling hoist that the present invention relates to comprises the following steps:
(a) at first, open motor 8, motor 8 drives 2 runnings of winding displacement belt by belt pulley 1;
(b) control limit switch 7, due to electromagnetic force, clamping element 5 is clamped in a side of winding displacement belt 2, and winding displacement belt 2 drives traversing carriage 3 and moves, and traversing carriage 3 drives cable guide pulley 4 mounted thereto and moves,
(c) after traversing carriage 3 reaches the position of limit switch 7 restrictions, under the effect of limit switch 7, electromagnet 6 discharges, another electromagnet 6 actions, and clamping element 5 is clamped in again the opposite side of winding displacement belt 2;
(d) cable guide pulley 4 moves under the drive of traversing carriage 3 again in the opposite direction, with the opposite side in-line arrangement of steel rope to take-up reel, completes the reciprocating rope-arranging process.
The restrict change of position of described row realizes by the position of adjusting limit switch 7.
Described row restricts, and the size of pitch realizes by the kinematic velocity of regulating winding displacement belt 2.
The restrict change of width of described row realizes by the position of adjusting limit switch 7.
The present invention belt wire-arranging system used as shown in Figure 1, mainly by belt transmission structure, the motor 8 that is connected with belt transmission structure, be arranged on the mobile clamping device on belt transmission structure and the cable guide pulley 4 that is arranged on mobile clamping device consists of.
Described belt transmission structure mainly is made of at least two belt pulleys 1 and the winding displacement belt 2 that is arranged on belt pulley 1, and described motor is connected with one of them belt pulley 1.
Mainly by being arranged on traversing carriage 3 on winding displacement belt 2, being arranged on the fixing device on traversing carriage 3 and the limit switch 7 that is connected with fixing device consists of, cable guide pulley 4 is arranged on traversing carriage 3 described mobile clamping device.
Described fixing device mainly is made of the clamping element 5 that is arranged on the groups of electromagnets on traversing carriage 3 and is arranged on winding displacement belt 2 inner rings.
Described groups of electromagnets mainly is made of two electromagnets 6, and two electromagnets 6 lay respectively at the top and bottom of winding displacement belt 2.
The above is only preferred embodiment of the present invention, is not the present invention is done any pro forma restriction, and every foundation technical spirit of the present invention, any simple modification, equivalent variations that above embodiment is done are within all falling into protection scope of the present invention.

Claims (4)

1. be used for the belt wire-arranging method of well drilling hoist, it is characterized in that, comprise the following steps:
(a) at first, open motor (8), motor (8) drives winding displacement belt (2) running by belt pulley (1);
(b) control limit switch (7), due to electromagnetic force, clamping element (5) is clamped in a side of winding displacement belt (2), it is mobile that winding displacement belt (2) drives traversing carriage (3), it is mobile that traversing carriage (3) drives cable guide pulley (4) mounted thereto
(c) after traversing carriage (3) reaches the position of limit switch (7) restriction, under the effect of limit switch (7), electromagnet (6) discharges, another electromagnet (6) action, clamping element (5) is clamped in again the opposite side of winding displacement belt (2);
(d) cable guide pulley (4) moves under the drive of traversing carriage (3) again in the opposite direction, with the opposite side in-line arrangement of steel rope to take-up reel, completes the reciprocating rope-arranging process.
2. the belt wire-arranging method method for well drilling hoist according to claim 1, is characterized in that, the restrict change of position of described row realizes by the position of adjusting limit switch (7).
3. the belt wire-arranging method for well drilling hoist according to claim 1, is characterized in that, described row restricts, and the size of pitch realizes by the kinematic velocity of regulating winding displacement belt (2).
4. the belt wire-arranging method for well drilling hoist according to claim 1, is characterized in that, the restrict change of width of described row realizes by the position of adjusting limit switch (7).
CN 201110405119 2011-11-28 2011-11-28 Belt winding displacement method used for well drilling winch Pending CN103130130A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110405119 CN103130130A (en) 2011-11-28 2011-11-28 Belt winding displacement method used for well drilling winch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110405119 CN103130130A (en) 2011-11-28 2011-11-28 Belt winding displacement method used for well drilling winch

Publications (1)

Publication Number Publication Date
CN103130130A true CN103130130A (en) 2013-06-05

Family

ID=48490661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110405119 Pending CN103130130A (en) 2011-11-28 2011-11-28 Belt winding displacement method used for well drilling winch

Country Status (1)

Country Link
CN (1) CN103130130A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114472435A (en) * 2022-03-03 2022-05-13 河南英拓智能科技有限公司 Laboratory is with safe type fume chamber

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114472435A (en) * 2022-03-03 2022-05-13 河南英拓智能科技有限公司 Laboratory is with safe type fume chamber
CN114472435B (en) * 2022-03-03 2023-03-14 河南英拓智能科技有限公司 Laboratory is with safe type fume chamber

Similar Documents

Publication Publication Date Title
CN103130133A (en) Winch rolling spiral rope arranging method
EP3155206B1 (en) Winches and hoisting systems with heave compensation
KR20160022893A (en) System for hoisting a load on an offshore rig
CN103130121A (en) Hydraulic rope guiding system applicable to drill well winch and hydraulic rope guiding method applicable to drill well winch
CN203655147U (en) Power head for deep-hole core drilling machine
CN103291210B (en) Gate-type double-tower gear-driven drilling machine
CN202300240U (en) Single-guide rail dual-hydraulic cylinder high-accuracy bit feeding system
CN103130135A (en) Winch rolling spiral rope arranging device and rope arranging method thereof
CN103130130A (en) Belt winding displacement method used for well drilling winch
CN103130123A (en) Belt arrangement system used for well drilling winch and belt arrangement method thereof
CN206359160U (en) High-power Active Compensation double-drum winch
CN103130126A (en) Method for lead screw rope arrangement of well drilling winch
CN103130124A (en) Hydraulic rope guiding system applicable to drill well winch
CN103130129A (en) Feed rod rope aligning system applied to well drilling winch
CN103130138A (en) Bidirectional spiral rope guiding system applicable to drill well winch and bidirectional spiral rope guiding system applicable to drill well winch
CN103130136A (en) Bi-directional spiral rope arranging system applicable to well drilling winch
CN103130137A (en) Winch rolling spiral rope arranging device
CN103130132A (en) Belt winding displacement system used for well drilling winch
JPH03119284A (en) Down-the-hole drilling excavator
CN103130128A (en) Feed rod rope aligning system applied to well drilling winch and feed rod rope aligning method thereof
CN103130122A (en) Method for cam rope arrangement of well drilling winch
CN209721441U (en) A kind of multi-directional rotation Guiding wheel structure
CN103130120A (en) System and method for cam rope arrangement of well drilling winch
CN103130127A (en) System and method for lead screw rope arrangement of well drilling winch
CN103130119A (en) Feed rod rope aligning method applied to well drilling winch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130605