CN103118405A - Test system and test method of UE (User Experience) moving between communities - Google Patents

Test system and test method of UE (User Experience) moving between communities Download PDF

Info

Publication number
CN103118405A
CN103118405A CN2013100886272A CN201310088627A CN103118405A CN 103118405 A CN103118405 A CN 103118405A CN 2013100886272 A CN2013100886272 A CN 2013100886272A CN 201310088627 A CN201310088627 A CN 201310088627A CN 103118405 A CN103118405 A CN 103118405A
Authority
CN
China
Prior art keywords
cell
minizone
management station
bts management
serving cell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100886272A
Other languages
Chinese (zh)
Other versions
CN103118405B (en
Inventor
杨岚君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN201310088627.2A priority Critical patent/CN103118405B/en
Publication of CN103118405A publication Critical patent/CN103118405A/en
Application granted granted Critical
Publication of CN103118405B publication Critical patent/CN103118405B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a test system and a test method of UE (User Experience) moving between communities and relates to the wireless communication field. In the test system of the UE moving between the communities, a base station is connected with at least two remote radio units and connected with a core network through a local area network switch which is connected with a management station of the base station as well; the at least two remote radio units are respectively connected with at least two fixing attenuators which are connected with a power divider; the power divider is connected with the UE; the base station is used for establishing at least two communities, one community of the at least two communities serves as a service community of the UE, and the rest communities serve as neighboring communities; and the management station of the base station is used for dynamically adjusting community reference signal power of the service community or the neighboring communities to trigger the UE to perform reselection or switch between the communities. The test system and the test method of the UE moving between the communities have the advantage of reducing the test complexity and the test costs.

Description

The test macro that UE moves in the minizone and method of testing
Technical field
The present invention relates to the mobile communication technology field, particularly a kind of UE(User Equipment, subscriber equipment) test macro and the method for testing that move in the minizone.
Background technology
LTE(Long Term Evolution, Long Term Evolution) in system, it is an important function that UE moves in the minizone.Being in the idle(free time) UE of attitude moves in the minizone and is referred to as the minizone gravity treatment; The UE that is in connected state moves in the minizone and is referred to as the minizone switching.The success rate of UE gravity treatment and the success rate of switching are that China Mobile investigates the important KPI(Key Performance Indicator of LTE equipment) index, so at LTE equipment research and development and test phase, LTE equipment producer can build in the laboratory test environment that UE moves in the minizone and carry out functional test and performance test.
The trigger condition that UE moves in the minizone is the RSRP(Reference Signal Received Power of UE, Reference Signal Received Power) or RSRQ(Reference Signal Received Quality, Reference Signal Received Quality) satisfy the eNB(base station) gravity treatment that arranges or the condition of switching.Referring to the 3GPP36.304 standard, the trigger condition that UE switches in the minizone is referring to the 3GPP36.331 standard in the measurement criterion of minizone gravity treatment and reselection criterion for UE.From the trigger condition of UE in minizone gravity treatment and switching, make UE carry out minizone gravity treatment or switching, the most basic method of testing is exactly to adjust RSRP or the RSRQ of UE, makes it satisfy the condition of gravity treatment or switching.And the RSRP of existing adjustment UE or the method for RSRQ are exactly tester's manual adjustments RRU(Radio Remote Unit, Remote Radio Unit) and UE between the pad value of the adjustable attenuator that connects with radio frequency line.
Fig. 1 is the test system structure figure that existing UE moves in the minizone.As shown in Figure 1, two base stations 130 connect core net 110 by LAN switch 120, the parameter of BTS management station 190 configurating base stations 130, and a residential quarter is set up in each base station 130.for saving the test space and reducing the signal interference of other residential quarters, eat dishes without rice or wine generally to adopt RRU and the UE direct-connected method of radio frequency line, the main antenna mouth of UE180 passes through radio frequency line, through power splitter 170, adjustable attenuator 160 is connected with an antenna opening of two Remote Radio Unit 140 respectively with fixed attenuator 150 is rear, the purpose that adjustable attenuator 160 is installed is exactly artificially to regulate the pad value of adjustable attenuator 160 by the tester, thereby adjust RSRP or the RSRQ of UE, make it satisfy the trigger condition of gravity treatment or switching, reach the purpose that UE carries out minizone gravity treatment or switching.
From above-mentioned existing testing scheme, when carrying out the functional test of moving the minizone, adjustable attenuator is absolutely necessary, and the testing scheme cost is high, and test system structure is complicated, builds complexity high; Need tester's Manual Adjust Attenuation device in test process, test is inconvenient, can't reach the purpose of remote testing.
Summary of the invention
The technical problem that (one) will solve
The technical problem to be solved in the present invention is: how test macro that a kind of UE moves in the minizone and switching, gravity treatment method of testing are provided, to reduce testing cost, facilitate the tester to operate.
(2) technical scheme
For solving the problems of the technologies described above, the invention provides the test macro that a kind of UE moves in the minizone, comprising: core net, LAN switch, base station, BTS management station, at least two Remote Radio Unit, at least two fixed attenuators, power splitter and UE;
Described base station connects described at least two Remote Radio Unit, and connects described core net by described LAN switch;
Described LAN switch also connects described BTS management station;
Described at least two Remote Radio Unit also connect respectively described at least two fixed attenuators;
Described at least two fixed attenuators connect described power splitter;
Described power splitter connects described UE;
Described base station is used for setting up at least two residential quarters, and one of them residential quarter remains the residential quarter as adjacent cell as the Serving cell of described UE;
Described BTS management station is used for the dynamic cell reference signals power of adjusting described Serving cell or adjacent cell, carries out minizone gravity treatment or switching to trigger described UE.
Wherein, described system also comprises: controller;
Described controller connects described BTS management station, is used for controlling described BTS management station and reads configuration file, and make described BTS management station dynamically adjust the cell reference signals power of described Serving cell or adjacent cell according to described configuration file according to predetermined policy.
Wherein, between described at least two Remote Radio Unit and described at least two fixed attenuators, between described at least two fixed attenuators and described power splitter, and between described power splitter and described UE, all connect by radio frequency line.
Wherein, be connected by optical fiber between described base station and described at least two Remote Radio Unit.
Wherein, described LAN switch connects described core net, base station and BTS management station by netting twine.
Wherein, the test macro that moves in the minizone for the UE that is used for the laboratory of described system.
The method of testing that the present invention also provides a kind of UE to switch in the minizone, it comprises step:
At least two residential quarters are set up in the base station;
The switch test relevant parameter of described at least two residential quarters of configuration, BTS management station;
UE searches Serving cell from described at least two residential quarters, connect described Serving cell, with the residential quarter that do not connect as adjacent cell;
The cell reference signals power of described Serving cell or adjacent cell is dynamically adjusted at described BTS management station, triggers described UE and carries out the minizone switching.
Wherein, the cell reference signals power of described Serving cell or adjacent cell is dynamically adjusted at described BTS management station, triggers described UE and carries out the minizone switching and be specially:
Configuration file is read at described BTS management station, dynamically adjusts the cell reference signals power of described Serving cell or adjacent cell according to described configuration file according to the first predetermined policy, triggers described UE and carries out the minizone switching.
The present invention also provides the method for testing of a kind of UE in the minizone gravity treatment, and it comprises step:
At least two residential quarters are set up in the base station;
The gravity treatment test relevant parameter of described at least two residential quarters of configuration, BTS management station;
UE searches Serving cell from described at least two residential quarters, connect described Serving cell, with the residential quarter that do not connect as adjacent cell;
UE discharges described Serving cell, remains in idle condition;
The cell reference signals power of described Serving cell or adjacent cell is dynamically adjusted at described BTS management station, triggers described UE and carries out the minizone gravity treatment.
Wherein, the dynamic cell reference signals power of adjusting described Serving cell or adjacent cell in described BTS management station triggers described UE and carries out the minizone gravity treatment, is specially:
Configuration file is read at described BTS management station, dynamically adjusts the cell reference signals power of described Serving cell or adjacent cell according to described configuration file according to the second predetermined policy, triggers described UE and carries out the minizone gravity treatment.
(3) beneficial effect
The test macro that UE of the present invention moves in the minizone and method of testing, by the dynamic cell reference signals power of adjusting described Serving cell or adjacent cell in BTS management station, and then make UE satisfy the condition of gravity treatment or switching, compare existing scheme and omitted adjustable attenuator, thereby effectively reduce complexity and the cost of test macro, reduced test macro and built the time.Simultaneously, described switching, gravity treatment method of testing can remote controls, also can automation carry out, and facilitated the tester, improved testing efficiency.
Description of drawings
Fig. 1 is the test system structure figure that existing UE moves in the minizone;
Fig. 2 is the structural representation of the test macro that moves in the minizone of the described UE of the embodiment of the present invention 1;
Fig. 3 is the structural representation of the test macro that moves in the minizone of the described UE of the embodiment of the present invention 2;
Fig. 4 is the method for testing flow chart that the UE of the embodiment of the present invention 3 switches in the minizone;
Fig. 5 is that the UE of the embodiment of the present invention 4 is at the method for testing flow chart of minizone gravity treatment.
Embodiment
Below in conjunction with drawings and Examples, the specific embodiment of the present invention is described in further detail.Following examples are used for explanation the present invention, but are not used for limiting the scope of the invention.
The testing scheme that moves in the minizone from existing test UE, Center for architecture is RSRP or the RSRQ that controls UE, is except controlling these two parameter values by artificial adjusting adjustable attenuator, the method that has other or not controlled RSRP or the RSRQ of UE so?
Answer has.It is cell reference signals power (RsPower) that individual parameter is arranged in the LTE cell parameter, the implication of cell reference signals power is the EPRE(Energy Per Resource Element on the public reference signal single port of residential quarter, be the transmitting power on single sub-carrier), span is-60 to 50dBm, affects residential quarter covering, down-run survey, descending power distribution etc.This parameter is by the configuration of the referenceSignalPower IE in the PDSCH-ConfigCommon in the SystemInformationBlockType2 signaling of 3GPP36.331 regulation, and parameter corresponding in 3GPP36.213 is cell-specific RS EPRE.This parameter has realized and can dynamically adjust by the BTS management station at present, when this parameter value changes, the down transmitting power of residential quarter also changes thereupon, therefore RSRP or the RSRQ of this residential quarter UE also can change, the reference signal power of the residential quarter amplitude (db) that increases or reduce in theory, the amplitude that increases or reduce with the RSRP of UE is consistent.And the base station can be notified the referenceSignalPower parameter value to UE by the SystemInformation signaling, so that UE uses this calculation of parameter path loss, determines the transmitted power of upward signal.
From above analysis, by adjusting the cell reference signals power of residential quarter, just can adjust RSRP or the RSRQ of UE, thereby make the RSRP of UE or the condition that RSRQ satisfies cell reselection or switching, trigger UE and carry out minizone gravity treatment or switching.Below divide embodiment that the present invention program is described in detail.
Embodiment 1
Fig. 2 is the structural representation of the test macro that moves in the minizone of the described UE of the embodiment of the present invention 1, as shown in Figure 2, described system comprises: core net 210, LAN switch 220, two base stations 230, BTS management station 290, two Remote Radio Unit 240, two fixed attenuators 250, power splitter 270 and UE280.
Described two base stations 230 connect described two Remote Radio Unit 240, and connect described core net 210 by described LAN switch 220.Described LAN switch 220 also connects described BTS management station 290.Described two Remote Radio Unit 240 also connect respectively described two fixed attenuators 250.Described two fixed attenuators 250 connect described power splitter 270.Described power splitter 270 connects described UE280.
Particularly, described core net 210 is with service supplier and Access Network, and perhaps, the network with Access Network and other Access Networks link together is often referred to the network portion except Access Network and the local network of users.The access port of described core net 210 is generally less, and it is connected with described two base stations 230 after by described LAN switch 220 expansion interfaces.Wherein, described LAN switch 220 connects described core net 210, two base stations 230 and BTS management station 290 by netting twine.
Described two base stations 230 are used for setting up two corresponding with it residential quarters, and one of them residential quarter remains the residential quarter as adjacent cell as the Serving cell of described UE280.The role of described server residential quarter and described adjacent cell is fixing, when described UE280 in the minizone again or when switching, the role of described server residential quarter and described adjacent cell can change mutually.
Described BTS management station 290 manages by described LAN switch 220 pairs of described two base stations 230, particularly, is used for dynamically adjusting the cell reference signals power of described Serving cell or adjacent cell, carries out minizone gravity treatment or switching to trigger described UE.Particularly, when the cell reference signals power of described Serving cells or adjacent cell is dynamically adjusted in described BTS management station 290, trigger condition that described UE280 satisfies gravity treatment at RSRP or the RSRQ of adjacent cell or Serving cell or the report condition of handover measurement report be can make, minizone gravity treatment or switching carried out thereby trigger described UE280.
Described two Remote Radio Unit 240 are used for respectively converting the baseband signal of described two base stations 230 to radiofrequency signal.Wherein, be connected by optical fiber between described two Remote Radio Unit 240 and described two base stations 230.
Described two fixed attenuators 250 are used for carrying out attenuation processing to carrying out described UE280 signal before, in order to avoid the described UE280 of the too high damage of signal strength signal intensity; Described power splitter 270 is exported to described UE280 after merging for the signal with two residential quarters; The main antenna mouth of described UE280 connects described power splitter 270, be used for receiving the signal of two residential quarters, and the trigger condition that satisfies gravity treatment with RSRP or the RSRQ of adjacent cell or Serving cell or the report condition of handover measurement report, carry out minizone gravity treatment or switching and be triggered.Wherein, between described two fixed attenuators 250 and described power splitter 270, and between described power splitter 270 and described UE280, all connect by radio frequency line, to guarantee the anti-interference of signal transmission.
Need to prove, the quantity of base station described in the present invention is not limited to two, its can also be one, three or more.When base station number was 1, this 1 base station connected at least two Remote Radio Unit, to set up at least two residential quarters; When described base station number is 3 or when more, its can each base station correspondence establishment a residential quarter, the quantity of described Remote Radio Unit and fixed attenuator also wants correspondence to increase.Wherein, the quantity of described Remote Radio Unit and fixed attenuator should be consistent with the quantity that will set up the residential quarter.
The test macro that the described UE of the present embodiment moves in the minizone, by the dynamic cell reference signals power of adjusting described Serving cell or adjacent cell in BTS management station, and then make UE satisfy the condition of gravity treatment or switching, compare existing scheme and omitted adjustable attenuator, thereby effectively reduce complexity and the cost of test macro, reduced test macro and built the time, simultaneously the tester can remote testing based on this test macro, has facilitated tester's work.The test macro that described UE moves in the minizone can be used as the test macro that the UE for the laboratory moves in the minizone and applies.
Embodiment 2
Fig. 3 is the structural representation of the test macro that moves in the minizone of the described UE of the embodiment of the present invention 2, as shown in Figure 3, the described system of the present embodiment is described based on a upper embodiment described system, in the present embodiment, described system is except comprising: core net 310, LAN switch 320, two base stations 330, BTS management station 390, two Remote Radio Unit 340, two fixed attenuators 350, power splitter 370 and UE380, also comprise controller 360.
Described controller 360 connects described BTS management station 390, be used for controlling described BTS management station 390 and read configuration file, and make described BTS management station 390 dynamically adjust the cell reference signals power of described Serving cell or adjacent cell according to described configuration file according to predetermined policy.Wherein, in described configuration file with the program code of the cell reference signals power of the described Serving cell of automatic adjustment or adjacent cell, after described program code is read at described BTS management station 390, can automatically adjust the cell reference signals power of described Serving cell or adjacent cell, thereby avoid the manually described BTS management of control station 390 of tester, reduce tester's the amount of labour.
Embodiment 3
Fig. 4 is the method for testing flow chart that the UE of the embodiment of the present invention 3 switches in the minizone, and as shown in Figure 4, described method comprises step:
S410: at least two residential quarters are set up in the base station.
S420: the switch test relevant parameter of described at least two residential quarters of configuration, BTS management station.Particularly, described BTS management station needs the configuring adjacent cell relation, is used for the measurement event of switching, the decision parameter of handoff algorithms etc.
S430:UE searches Serving cell from described at least two residential quarters, connect described Serving cell, with the residential quarter that do not connect as adjacent cell.Search service residential quarter after described UE starts begins to adhere to described Serving cell after searching for successfully, then adheres to successfully, namely is connected to described Serving cell.This moment, described UE was in connection status.
S440: the dynamic cell reference signals power of adjusting described Serving cell or adjacent cell in described BTS management station, trigger described UE and carry out the minizone switching.Described BTS management station is by adjusting the cell reference signals power of described Serving cell or adjacent cell, can make described UE satisfy the report condition of handover measurement report at RSRP or the RSRQ of adjacent cell or Serving cell, carry out the minizone switching thereby trigger described UE280.
The present embodiment said method can be realized based on the system of described embodiment 1, dynamically adjust the cell reference signals power of described Serving cell or adjacent cell by the BTS management station in the method, and then make UE satisfy the condition of switching, compare existing scheme and omitted adjustable attenuator, thereby effectively reduce complexity and the cost of test macro; In addition, owing to need not that adjustable attenuator is carried out manual control, the present embodiment said method can be used for remote testing, facilitates the tester to operate.
In addition, when adopting the system of described embodiment 2, step 440 described in said method can be further: configuration file is read at described BTS management station, dynamically adjust the cell reference signals power of described Serving cell or adjacent cell according to described configuration file according to the first predetermined policy, trigger described UE and carry out the minizone switching.That is to say, described BTS management station need not artificial input control parameter, can automatically read configuration file, and automatically adjust the cell reference signals power of described Serving cell or adjacent cell according to the program code of finishing writing in advance in configuration file, and then trigger described UE and carry out the minizone switching.Like this, can avoid the manually described BTS management of control station of tester, reduce tester's the amount of labour.
Embodiment 4
Fig. 5 be the UE of the embodiment of the present invention 4 at the method for testing flow chart of minizone gravity treatment, as shown in Figure 5, described method comprises step:
S510: at least two residential quarters are set up in the base station.
S520: the gravity treatment test relevant parameter of described at least two residential quarters of configuration, BTS management station.Particularly, described BTS management station needs configuring adjacent cell relation, cell reselection parameters etc.
S530:UE searches Serving cell from described at least two residential quarters, connect described Serving cell, with the residential quarter that do not connect as adjacent cell.Search service residential quarter after described UE starts begins to adhere to described Serving cell after searching for successfully, then adheres to successfully, namely is connected to described Serving cell.This moment, described UE was in connection status.
S540:UE discharges described Serving cell, remains in idle condition.For the follow-up reselection operation of carrying out, described UE must be in free time (idle) state, and therefore, described UE also will discharge described Serving cell after connecting described service area, remain in idle condition.At this moment, although described UE and described service area without being connected,, still store the information of described UE in described service area.
S550: the dynamic cell reference signals power of adjusting described Serving cell or adjacent cell in described BTS management station, trigger described UE and carry out the minizone gravity treatment.Described BTS management station can make described UE in the trigger condition that RSRP or the RSRQ of adjacent cell or Serving cell satisfy gravity treatment by adjusting the cell reference signals power of described Serving cell or adjacent cell, carries out the minizone gravity treatment thereby trigger described UE.
The present embodiment said method can be realized based on the system of described embodiment 1, dynamically adjust the cell reference signals power of described Serving cell or adjacent cell by the BTS management station in the method, and then make UE satisfy the condition of gravity treatment, compare existing scheme and omitted adjustable attenuator, thereby effectively reduce complexity and the cost of test macro.In addition, owing to need not that adjustable attenuator is carried out manual control, the present embodiment said method can be used for remote testing, facilitates the tester to operate.
In addition, when adopting the system of described embodiment 2, step 550 described in said method can be further: configuration file is read at described BTS management station, dynamically adjust the cell reference signals power of described Serving cell or adjacent cell according to described configuration file according to the second predetermined policy, trigger described UE and carry out the minizone gravity treatment.That is to say, described BTS management station need not artificial input control parameter, can automatically read configuration file, and automatically adjust the cell reference signals power of described Serving cell or adjacent cell according to the program code of finishing writing in advance in configuration file, and then trigger described UE and carry out the minizone gravity treatment.Like this, can avoid the manually described BTS management of control station of tester, reduce tester's the amount of labour.
Test macro and method of testing that the described UE of the embodiment of the present invention moves in the minizone, by the dynamic cell reference signals power of adjusting described Serving cell or adjacent cell in BTS management station, and then make UE satisfy the condition of gravity treatment or switching, compare existing scheme and omitted adjustable attenuator, thereby effectively reduce complexity and the cost of test macro, reduced test macro and built the time.Simultaneously, described method of testing can remote control, also can automation carry out, and has facilitated the tester, has improved testing efficiency.
Above execution mode only is used for explanation the present invention; and be not limitation of the present invention; the those of ordinary skill in relevant technologies field; without departing from the spirit and scope of the present invention; can also make a variety of changes and modification; therefore all technical schemes that are equal to also belong to category of the present invention, and scope of patent protection of the present invention should be defined by the claims.

Claims (10)

1. the test macro that UE moves in the minizone, is characterized in that, comprising: core net, LAN switch, base station, BTS management station, at least two Remote Radio Unit, at least two fixed attenuators, power splitter and UE;
Described base station connects described at least two Remote Radio Unit, and connects described core net by described LAN switch;
Described LAN switch also connects described BTS management station;
Described at least two Remote Radio Unit also connect respectively described at least two fixed attenuators;
Described at least two fixed attenuators connect described power splitter;
Described power splitter connects described UE;
Described base station is used for setting up at least two residential quarters, and one of them residential quarter remains the residential quarter as adjacent cell as the Serving cell of described UE;
Described BTS management station is used for the dynamic cell reference signals power of adjusting described Serving cell or adjacent cell, carries out minizone gravity treatment or switching to trigger described UE.
2. the system as claimed in claim 1, is characterized in that, described system also comprises: controller;
Described controller connects described BTS management station, is used for controlling described BTS management station and reads configuration file, and make described BTS management station dynamically adjust the cell reference signals power of described Serving cell or adjacent cell according to described configuration file according to predetermined policy.
3. the system as claimed in claim 1, it is characterized in that, between described at least two Remote Radio Unit and described at least two fixed attenuators, between described at least two fixed attenuators and described power splitter, and between described power splitter and described UE, all connect by radio frequency line.
4. the system as claimed in claim 1, is characterized in that, is connected by optical fiber between described base station and described at least two Remote Radio Unit.
5. the system as claimed in claim 1, is characterized in that, described LAN switch connects described core net, base station and BTS management station by netting twine.
6. system as described in claim 1 to 5 any one, is characterized in that, the test macro that described system moves in the minizone for the UE that is used for the laboratory.
7. a method of testing of switching in the minizone based on the UE of claim 1 to 6 any one described system, is characterized in that, comprises step:
At least two residential quarters are set up in the base station;
The switch test relevant parameter of described at least two residential quarters of configuration, BTS management station;
UE searches Serving cell from described at least two residential quarters, connect described Serving cell, with the residential quarter that do not connect as adjacent cell;
The cell reference signals power of described Serving cell or adjacent cell is dynamically adjusted at described BTS management station, triggers described UE and carries out the minizone switching.
8. the method for testing switched in the minizone of UE as claimed in claim 7, is characterized in that, the cell reference signals power of described Serving cell or adjacent cell is dynamically adjusted at described BTS management station, triggers described UE and carry out the minizone switching and be specially:
Configuration file is read at described BTS management station, dynamically adjusts the cell reference signals power of described Serving cell or adjacent cell according to described configuration file according to the first predetermined policy, triggers described UE and carries out the minizone switching.
9. one kind based on the UE of claim 1 to the 6 any one described system method of testing in the minizone gravity treatment, it is characterized in that, comprises step:
At least two residential quarters are set up in the base station;
The gravity treatment test relevant parameter of described at least two residential quarters of configuration, BTS management station;
UE searches Serving cell from described at least two residential quarters, connect described Serving cell, with the residential quarter that do not connect as adjacent cell;
UE discharges described Serving cell, remains in idle condition;
The cell reference signals power of described Serving cell or adjacent cell is dynamically adjusted at described BTS management station, triggers described UE and carries out the minizone gravity treatment.
10. UE as claimed in claim 9 in the method for testing of minizone gravity treatment, is characterized in that, the dynamic cell reference signals power of adjusting described Serving cell or adjacent cell in described BTS management station triggers described UE and carries out the minizone gravity treatment, is specially:
Configuration file is read at described BTS management station, dynamically adjusts the cell reference signals power of described Serving cell or adjacent cell according to described configuration file according to the second predetermined policy, triggers described UE and carries out the minizone gravity treatment.
CN201310088627.2A 2013-03-19 2013-03-19 Test system and test method of UE (User Experience) moving between communities Active CN103118405B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310088627.2A CN103118405B (en) 2013-03-19 2013-03-19 Test system and test method of UE (User Experience) moving between communities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310088627.2A CN103118405B (en) 2013-03-19 2013-03-19 Test system and test method of UE (User Experience) moving between communities

Publications (2)

Publication Number Publication Date
CN103118405A true CN103118405A (en) 2013-05-22
CN103118405B CN103118405B (en) 2015-05-20

Family

ID=48416648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310088627.2A Active CN103118405B (en) 2013-03-19 2013-03-19 Test system and test method of UE (User Experience) moving between communities

Country Status (1)

Country Link
CN (1) CN103118405B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016070600A1 (en) * 2014-11-07 2016-05-12 中兴通讯股份有限公司 Method and apparatus for constructing test environment
CN105704793A (en) * 2014-11-28 2016-06-22 中兴通讯股份有限公司 Base station control method and base station
CN105764073A (en) * 2014-12-18 2016-07-13 中兴通讯股份有限公司 Testing device and testing method
CN106028366A (en) * 2015-03-27 2016-10-12 安立股份有限公司 Mobile terminal testing apparatus and interference state simulating method for use in same
CN106375138A (en) * 2015-07-20 2017-02-01 深圳市中兴微电子技术有限公司 Testing apparatus and method for interoperability between different network types
CN107659462A (en) * 2016-07-25 2018-02-02 普天信息技术有限公司 Method and apparatus based on LTE terminal comprehensive tester test eICIC
CN108934038A (en) * 2017-05-23 2018-12-04 中国移动通信有限公司研究院 A kind of base station state test method, device, base station testing system and terminal
CN110856230A (en) * 2019-11-13 2020-02-28 维沃移动通信有限公司 Network switching method and electronic equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002252588A (en) * 2001-02-26 2002-09-06 Nec Saitama Ltd Cdma base station testing device and base station testing method
CN101080084A (en) * 2006-05-24 2007-11-28 鸿富锦精密工业(深圳)有限公司 Roaming function test system, device and method
CN102395151A (en) * 2011-06-29 2012-03-28 中兴通讯股份有限公司 Test method, system and device of mobile terminal switching

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002252588A (en) * 2001-02-26 2002-09-06 Nec Saitama Ltd Cdma base station testing device and base station testing method
CN101080084A (en) * 2006-05-24 2007-11-28 鸿富锦精密工业(深圳)有限公司 Roaming function test system, device and method
CN102395151A (en) * 2011-06-29 2012-03-28 中兴通讯股份有限公司 Test method, system and device of mobile terminal switching

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016070600A1 (en) * 2014-11-07 2016-05-12 中兴通讯股份有限公司 Method and apparatus for constructing test environment
CN105704793A (en) * 2014-11-28 2016-06-22 中兴通讯股份有限公司 Base station control method and base station
CN105764073A (en) * 2014-12-18 2016-07-13 中兴通讯股份有限公司 Testing device and testing method
CN106028366A (en) * 2015-03-27 2016-10-12 安立股份有限公司 Mobile terminal testing apparatus and interference state simulating method for use in same
CN106028366B (en) * 2015-03-27 2019-06-11 安立股份有限公司 Mobile terminal test device and its disturbance state virtual method
CN106375138A (en) * 2015-07-20 2017-02-01 深圳市中兴微电子技术有限公司 Testing apparatus and method for interoperability between different network types
CN106375138B (en) * 2015-07-20 2019-10-18 深圳市中兴微电子技术有限公司 The test device and method of Interoperability between different network formats
CN107659462A (en) * 2016-07-25 2018-02-02 普天信息技术有限公司 Method and apparatus based on LTE terminal comprehensive tester test eICIC
CN108934038A (en) * 2017-05-23 2018-12-04 中国移动通信有限公司研究院 A kind of base station state test method, device, base station testing system and terminal
CN110856230A (en) * 2019-11-13 2020-02-28 维沃移动通信有限公司 Network switching method and electronic equipment
CN110856230B (en) * 2019-11-13 2021-06-04 维沃移动通信有限公司 Network switching method and electronic equipment

Also Published As

Publication number Publication date
CN103118405B (en) 2015-05-20

Similar Documents

Publication Publication Date Title
CN103118405B (en) Test system and test method of UE (User Experience) moving between communities
CN102625389B (en) A kind of cut-in method of mobile communications network, device and system
Li et al. Green heterogeneous cloud radio access networks: Potential techniques, performance trade-offs, and challenges
CN102573010B (en) Data transmission method and device based on Multi net voting
EP2373093B1 (en) Method and device for configuring neighbor cell
CN103428748B (en) A kind of band measurement method, equipment and system
CN101959292B (en) Method, equipment and system for saving energy for base station
CN102378311B (en) The system of selection of Serving cell and multicarrier system in a kind of multicarrier system
CN102711164A (en) Intelligent management method for data communication link of mobile terminal
WO2012045328A1 (en) Network control by transferring traffic between operation layers based on monitored traffic status
CN103974350B (en) A kind of switching method of adaptive threshold decision
CN101801049A (en) Switching optimization method between macro cell and family base station cell
CN102510564A (en) Self-optimization method for improving concentrated clustering type self-organization network (SON)
CN104010315B (en) A kind of cell selecting method based on user experience quality
US11528667B2 (en) SON accounting for max geographical distance
CN103686973A (en) Power adjustment method and device of remote radio unit
CN103188715B (en) The method of Radio Resource automatic monitoring scheduling and device
Zhu et al. QoS-aware user association based on cell zooming for energy efficiency in cellular networks
CN108076489A (en) A kind of method and device of cell selection
Luketić et al. Optimization of coverage and capacity of self-organizing network in LTE
CN104519526B (en) Network access point, network controller, the network equipment and its load control method
CN103313320B (en) A kind of method of switching between different types of community
CN104105174A (en) Communication system comprising small cell base station, device and method
WO2014139576A1 (en) A method and apparatus for selecting a cell of a communications network
CN102364980A (en) Method and user equipment (UE) for dynamically controlling inner-loop power

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant