CN103115217A - Pressure plugging unit - Google Patents
Pressure plugging unit Download PDFInfo
- Publication number
- CN103115217A CN103115217A CN2013100592245A CN201310059224A CN103115217A CN 103115217 A CN103115217 A CN 103115217A CN 2013100592245 A CN2013100592245 A CN 2013100592245A CN 201310059224 A CN201310059224 A CN 201310059224A CN 103115217 A CN103115217 A CN 103115217A
- Authority
- CN
- China
- Prior art keywords
- hole
- welding
- connecting plate
- guide tube
- auxiliary connecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Pipe Accessories (AREA)
Abstract
A pressure plugging unit comprises a guiding pipe and an auxiliary connecting plate. One end of the guiding pipe is hermetically communicated with a stop valve while the other end of the same is communicated with a welding slip, the welding slip corresponds to a medium pipe and is shaped in an arc plate, a through hole is reserved on the welding slip, the guiding pipe is communicated with the though hole, an elastic sealing groove is reserved on the side, around the through hole, of the welding slip, an elastic sealing ring is arranged in the elastic sealing groove, the elastic sealing ring and the guiding pipe are respectively positioned on two sides of the welding slip, and hooks are fixedly connected on the upper edge and the lower edge of the side, wherein the welding slip located, of the guiding pipe. A fastening nut is fixedly connected on one side of the auxiliary connecting plate, a fastening bolt is connected in the fastening nut in a threaded manner, a through hole is reserved on the auxiliary connecting plate and communicated with the fastening nut, a fastening connection chain is fixedly connected on the upper edge and the lower edge of the auxiliary connecting plate, and free ends of the fastening connection chain correspond to the hooks.
Description
Technical field
The present invention relates to a kind of mining device, relate in particular to a kind of pressurized plugging-up device.
Background technique
When the urgency of power plant operational outfit burst dielectric leakage, conventional repair method is all at first to carry out equipment to isolate even system shutdown, and then overhauls welding, certainly will affect so the normal production of power plant, gives to produce and life is made troubles.Technique and technology point commonly used are as follows:
1. cold welding technique: this is the welding procedure that a kind of specific adaptation is not got angry in low, middle pressure pressure container.
A. material forms: the high-strength strapping strand of oil resistant, leak-stopping rubber etc.;
B. using scope: pipeline, flange, elbow etc.;
C. applying pressure: 0~2.0 MPa;
D. adaptive temperature: temperature-30~160 ℃.
2. tie up technique: the technique that is bound in leak and repairs pipeline with the direct multilayer of chemical high-strength band.
A. material forms: high-strength magnetic arogel, metal repairing agent, leak-stopping evil spirit rod etc.;
B. using scope: tank body, valve body, equipment etc.;
C. applying pressure: 0~2.0 MPa; D. adaptive temperature: temperature-30~180 ℃.
3. steel band technique: stainless steel belt is coordinated the direct harness of oil resistant leak-stopping rubber cushion and leak source, make the rubber cushion distortion form new sealing gasket.
A. material forms: steel-strip strainer, steel band, oil resisting rubber jointing, stainless steel patch etc.;
B. using scope: pipeline, flange, elbow, threeway, valve body etc.;
C. applying pressure: 0~2.5 MPa; D. adaptive temperature: temperature-30~400 ℃.
4. high-pressure injection plastic sealing: by high-pressure service pump, with colloid-injecting gun, leak-stopping glue rod is injected in the jig Seal cage and reach the leak-stopping requirement.
A. material forms: high pressure oil pump, colloid-injecting gun head, leak-stopping are robbed rod, jig, high pressure line;
B. using scope: high-pressure oil-gas well, well,, flange, elbow, threeway, pipeline etc.;
C. applying pressure: 2.0~50 MPa; D. adaptive temperature: temperature-40~800 ℃.
Above process engineering content is high, complicated operation, need to carry out special training, and maintenance cost is high, system idle time is long.
Summary of the invention
The purpose of this invention is to provide a kind of simple in structure, easy for operation and do not affect the normal pressurized plugging-up device of producing of power plant.
For achieving the above object, the technical solution used in the present invention is:
A kind of pressurized plugging-up device, comprise guide tube, guide tube is the airtight shutoff valve that is communicated with of an end wherein, it is characterized in that: the airtight welding slips that is communicated with of the guide tube the other end, the welding slips is corresponding with medium pipeline, the welding slips is arc plate, have through hole on the welding slips, guide tube communicates with this through hole, the flexible seal groove of welding slips side opening around this through hole, be provided with elastic seal ring in the elastic packing groove, elastic seal ring and guide tube lay respectively at the both sides of welding slips, are fixedly connected with below hook on the guide tube side of welding slips place side; This pressurized plugging-up device also comprises auxiliary connecting plate, auxiliary connecting plate one side is fixedly connected with tightening nut, the tightening nut internal thread is connected with clamping bolt, also have through hole on auxiliary connecting plate, this through hole communicates with tightening nut, upper being fixedly connected with below of auxiliary connecting plate is fastenedly connected chain, and the free end that is fastenedly connected chain is corresponding with hook.
When using the present invention to carry out shutoff to the leakage point of medium pipeline, at first with polishing machine with the polishing of leakage point place, so that during welding, welding slips and medium pipeline are sturdy, then elastic seal ring is positioned in the elastic packing groove, to weld slips is buckled on medium pipeline, make the mouth of pipe of guide tube aim at leakage point, make the water of leakage or steam can pass through the guide tube drainage.Then securing means is fixed on the medium pipeline opposite side, screws clamping bolt, until welding slips place no longer includes medium and spills, the water of all leakages or steam are all by the fairlead drainage.To weld slip seals with electric welding be welded on outside medium pipeline this moment, weld and close shutoff valve with the guide tube shutoff after completing, and just no longer include water or steam spills, and maintenance is finished dealing with.
Adopt the urgency for the treatment of of Power operational outfit burst dielectric leakage of the present invention; can with pressurely carry out; do not affecting under the normal prerequisite of producing of power plant; to being with temperature, leakage equipment with pressure to carry out shutoff, reparation; the problems such as run, drip, leak of pipeline be can eliminate rapidly, unit load down that conventional repair method may cause, shutdown avoided and the tremendous economic loss that brings.
Compare with traditional leak stopping mode, adopt the present invention to have the following advantages:
1, simple to operate, with low content of technology, do not need special training, common service worker can operate.
2, maintenance cost is low, expense is few, has eliminated the time that system stops transport.
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is use state reference map of the present invention;
Fig. 3 is the plan structure schematic diagram of Fig. 2;
Fig. 4 is the A-A sectional structure schematic diagram of Fig. 2.
In accompanying drawing:
1, clamping bolt; 2, tightening nut; 3, auxiliary connecting plate; 4, be fastenedly connected chain; 5, welding slips; 6, hook; 7, guide tube; 8, shutoff valve; 9, leak point; 10, medium pipeline; 11, elastic seal ring.
Embodiment
The invention will be further described below in conjunction with the drawings and specific embodiments:
a kind of pressurized plugging-up device, as shown in Figures 1 to 4, comprise guide tube 7, guide tube 7 is the airtight shutoff valve 8 that is communicated with of an end wherein, the airtight welding slips 5 that is communicated with of guide tube 7 the other ends, welding slips 5 is corresponding with medium pipeline, welding slips 5 is arc plate, have through hole on welding slips 5, guide tube 7 communicates with this through hole, the welding slips 5 flexible seal grooves of side opening around this through hole, be provided with elastic seal ring 11 in the elastic packing groove, elastic seal ring 11 and guide tube 7 lay respectively at the both sides of welding slips 5, be fixedly connected with below hook 6 on guide tube 7 sides of welding slips 5 place sides, this pressurized plugging-up device also comprises auxiliary connecting plate 3, auxiliary connecting plate 3 one sides are fixedly connected with tightening nut 2, tightening nut 2 internal threads are connected with clamping bolt 1, also have through hole on auxiliary connecting plate 3, this through hole communicates with tightening nut 2, upper being fixedly connected with below of auxiliary connecting plate 3 is fastenedly connected chain 4, and the free end that is fastenedly connected chain 4 is corresponding with hook 6.
Embodiment recited above is described the preferred embodiment of the present invention; be not that the spirit and scope of the present invention are limited; under the prerequisite that does not break away from design concept of the present invention; various modification and improvement that in related domain, common engineers and technicians make technological scheme of the present invention; all should fall into protection scope of the present invention; the technology contents that the present invention asks for protection all is documented in claims.
Use of the present invention mainly in, low pressure, vapour, waterpipe point-like leaks, in the situation that do not stop transport, pipeline overhauled processing.This pressurized plugging-up device mainly comprises welding slips, elastic seal ring, clamping bolt and auxiliary connecting plate, is fastenedly connected several parts such as chain, guide tube, shutoff valve.The arc tile fragment with certain radian that the welding slips processes for the pipe diameter size according to leakage pipe, perforate in the middle of it, the inboard in hole is processed with the elastic ring seal groove along the center in hole, is provided with the elastic ring seal ring in the elastic ring seal groove, and the outside in hole is welded with guide tube; Two edges up and down of welding slips are welded with hook, and the free end that is fastenedly connected chain is connected with hook.By fastening chain and the welding slips of being fastenedly connected of rotation clamping bolt, realize the sealing of welding slips and leakage point.One end of guide tube is welded on the welding slips, and the other end inboard is processed with the spiral silking, is used in conjunction with shutoff valve.
Claims (1)
1. pressurized plugging-up device, comprise guide tube (7), guide tube (7) is the airtight shutoff valve (8) that is communicated with of an end wherein, it is characterized in that: the airtight welding slips (5) that is communicated with of guide tube (7) the other end, welding slips (5) is corresponding with medium pipeline, welding slips (5) is arc plate, have through hole on welding slips (5), guide tube (7) communicates with this through hole, the flexible seal groove of welding slips (5) side opening around this through hole, be provided with elastic seal ring (11) in the elastic packing groove, elastic seal ring (11) and guide tube (7) lay respectively at the both sides of welding slips (5), be fixedly connected with below hook (6) on guide tube (7) side of welding slips (5) place side, this pressurized plugging-up device also comprises auxiliary connecting plate (3), auxiliary connecting plate (3) one sides are fixedly connected with tightening nut (2), tightening nut (2) internal thread is connected with clamping bolt (1), also have through hole on auxiliary connecting plate (3), this through hole communicates with tightening nut (2), upper being fixedly connected with below of auxiliary connecting plate (3) is fastenedly connected chain (4), and the free end that is fastenedly connected chain (4) is corresponding with hook (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100592245A CN103115217A (en) | 2013-02-26 | 2013-02-26 | Pressure plugging unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100592245A CN103115217A (en) | 2013-02-26 | 2013-02-26 | Pressure plugging unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103115217A true CN103115217A (en) | 2013-05-22 |
Family
ID=48413632
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013100592245A Pending CN103115217A (en) | 2013-02-26 | 2013-02-26 | Pressure plugging unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103115217A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104455908A (en) * | 2014-10-24 | 2015-03-25 | 无锡乐华自动化科技有限公司 | Method for stopping leakage under pressure |
CN109994958A (en) * | 2019-04-17 | 2019-07-09 | 深圳供电局有限公司 | Sealing method for gas-insulated totally-enclosed combined electrical apparatus |
CN113847506A (en) * | 2021-12-01 | 2021-12-28 | 天津天地龙管业股份有限公司 | Heating pipeline leaking stoppage device with pressure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1617812A (en) * | 1925-06-06 | 1927-02-15 | Joseph L Hutchings | Repair tool |
US2182258A (en) * | 1937-07-26 | 1939-12-05 | Cecil E Kirk | Repair clamp |
CN101586730B (en) * | 2009-07-08 | 2010-11-10 | 贾亮亮 | Quick high-pressure no transmission stoppage urgent repair method and jig |
CN201803050U (en) * | 2010-08-05 | 2011-04-20 | 新余泰达长林管道技术有限公司 | Leakage blocking cover plate with pressure of steel pipeline |
CN102606847A (en) * | 2012-03-29 | 2012-07-25 | 广西壮族自治区特种设备监督检验院 | Flow guiding type pressure leaking stoppage technology |
CN203082452U (en) * | 2013-02-26 | 2013-07-24 | 枣庄矿业(集团)有限责任公司柴里煤矿 | Plugging device under pressure |
-
2013
- 2013-02-26 CN CN2013100592245A patent/CN103115217A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1617812A (en) * | 1925-06-06 | 1927-02-15 | Joseph L Hutchings | Repair tool |
US2182258A (en) * | 1937-07-26 | 1939-12-05 | Cecil E Kirk | Repair clamp |
CN101586730B (en) * | 2009-07-08 | 2010-11-10 | 贾亮亮 | Quick high-pressure no transmission stoppage urgent repair method and jig |
CN201803050U (en) * | 2010-08-05 | 2011-04-20 | 新余泰达长林管道技术有限公司 | Leakage blocking cover plate with pressure of steel pipeline |
CN102606847A (en) * | 2012-03-29 | 2012-07-25 | 广西壮族自治区特种设备监督检验院 | Flow guiding type pressure leaking stoppage technology |
CN203082452U (en) * | 2013-02-26 | 2013-07-24 | 枣庄矿业(集团)有限责任公司柴里煤矿 | Plugging device under pressure |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104455908A (en) * | 2014-10-24 | 2015-03-25 | 无锡乐华自动化科技有限公司 | Method for stopping leakage under pressure |
CN109994958A (en) * | 2019-04-17 | 2019-07-09 | 深圳供电局有限公司 | Sealing method for gas-insulated totally-enclosed combined electrical apparatus |
CN113847506A (en) * | 2021-12-01 | 2021-12-28 | 天津天地龙管业股份有限公司 | Heating pipeline leaking stoppage device with pressure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106594451A (en) | Pipe pressure leakage blockage device and leakage blockage method | |
CN202176874U (en) | Sealing head type leak stopping body for rush-repair of pipeline and pipeline rush-repair clamp | |
US20160069501A1 (en) | Fluid leakage counteraction instrument upon damage of fluid conveying pipe | |
CN103115217A (en) | Pressure plugging unit | |
CN105909915A (en) | Device for repairing pipeline leakage | |
CN104006263A (en) | Leakage hole plugging tool and method | |
CN203671240U (en) | Liquefied petroleum gas tank emptying device | |
CN203082452U (en) | Plugging device under pressure | |
CN105179873B (en) | A kind of pipeline grows thing repairing leakage cover | |
CN202327077U (en) | Temporary plugging device of pressure container or pipeline | |
CN204042317U (en) | Cable wire hoop tool does not stop work seal fixture | |
CN201218385Y (en) | Under-pressure leak-stopping apparatus for energy resource medium pipe | |
CN104019324B (en) | The quick maintenance device of Underwater Two-layer oil transport pipeline | |
CN101649946A (en) | Method for atmospheric leakage stopping | |
CN2648235Y (en) | Pressure leakage stopper with oil and gas | |
CN202188264U (en) | Additional plate type leaking stoppage body and clamping tool for rush repair of pipelines | |
CN206694735U (en) | Spliced pipeline maintenance dedicated connecting sleeve | |
CN102128326B (en) | Pipeline leak stopping device with anti-freeze function | |
CN101706028A (en) | Plugging method | |
CN106969232A (en) | A kind of new leak stoppers with pressure | |
CN201666429U (en) | Pressurized plugging clamp for pipelines | |
CN203757287U (en) | Pressure leaking stoppage clamp for 90-degree bend pipeline | |
CN202598020U (en) | Pipeline quick leaking stoppage device using winding sealing filler | |
CN101354104B (en) | Chain pipe plugging chucking tools | |
CN205101772U (en) | Pipeline is sent forth thing and leak to be repaired cover |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130522 |