CN103089172A - Drilling system special for coal mine underground tunnel water control - Google Patents

Drilling system special for coal mine underground tunnel water control Download PDF

Info

Publication number
CN103089172A
CN103089172A CN2013100205859A CN201310020585A CN103089172A CN 103089172 A CN103089172 A CN 103089172A CN 2013100205859 A CN2013100205859 A CN 2013100205859A CN 201310020585 A CN201310020585 A CN 201310020585A CN 103089172 A CN103089172 A CN 103089172A
Authority
CN
China
Prior art keywords
rig
coal mine
drilling
front clamp
harnessing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100205859A
Other languages
Chinese (zh)
Inventor
徐鸿祥
郑龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Xianglong Drilling Equipment Co Ltd
Original Assignee
Hangzhou Xianglong Drilling Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Xianglong Drilling Equipment Co Ltd filed Critical Hangzhou Xianglong Drilling Equipment Co Ltd
Priority to CN2013100205859A priority Critical patent/CN103089172A/en
Publication of CN103089172A publication Critical patent/CN103089172A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a drilling system special for coal mine underground tunnel water control. The drilling system special for the coal mine underground tunnel water control comprises a drilling machine, a main chuck and a front clamp holder are arranged on the drilling machine, a blowout preventer is arranged on a position of a drilling hole of the drilling machine, an oil way which controls movement of the blowout preventer is connected with a hydraulic oil way of the drilling machine, and the front clamp holder and the main chuck form a linkage. The drilling system special for the coal mine underground tunnel water control has the advantages that when the main chuck clamps a drill stem to drill, the main chuck needs to be loosened for avoiding the fact that a user is injured due to the fact that the stem slipping off the drilling hole because the stem is stressed by water in the drilling hole or dead load of a drilling tool when the drill stem is mounted. Due to the fact that the drill stem ids clamped by the front clamp holder, accidents are avoided. Besides, in the process of drilling, when the pressure in the drilling hole reaches to a certain value, the drilling machine stops working immediately and the blowout preventer is enabled to close the drilling hole, and thus the fact that high pressure water does not pour out is guaranteed.

Description

The anti-special jewel of harnessing the river of a kind of coal mine gallery is visited system
Technical field
The present invention relates to drilling system under coal mine, the anti-special jewel of harnessing the river of especially a kind of coal mine gallery is visited system.
Background technology
When coal mine test waterproof is drilled, may meet water under high pressure gushes out suddenly and causes water leak accident, prior art can not be when water under high pressure be outstanding moment quick closed orifices, and in water exploring drill spy process, rig did not contain the front clamp device in the past, can cause the hole to the moment landing of drilling tool when beating the big-elevation hole, cause casualty accident.
Summary of the invention
The present invention will solve the shortcoming of above-mentioned prior art, provides that a kind of safety is good, the anti-special jewel of harnessing the river of the coal mine gallery of reliable operation visits system.
The present invention solves the technical scheme that its technical problem adopts: the anti-special jewel of harnessing the river of this coal mine gallery is visited system, comprise rig, rig is provided with main card dish and front clamp device, the position, aperture that rig is drilled is provided with preventer, control the oil circuit of preventer action and the hydraulic circuit of rig and link together, front clamp device and main card dish form interlock.
As preferably, described preventer comprises casing, the casing both sides are connected with lid by fastening bolt, and the locking closure of both sides is connected double threaded screw and is connected with lid with nut with oil cylinder, be provided with piston in oil cylinder, the piston outer end is connected with screw mandrel by screw thread, the outer end of screw mandrel is flat square structure, and piston the inner is located in the groove of flashboard, and casing is provided with two tubing interfaces, be respectively equipped with the oil circuit that connects two side cylinders, the flashboard of both sides works in coordination when oil-feed and cuts out.Described flashboard inboard is provided with gate rubber core.
as preferably, described front clamp device comprises cylinder body, cylinder body, back cylinder cover is connected four soket head cap screws and connects with side plate, be provided with piston body in cylinder body, slips is connected with piston body by T-slot, back cylinder cover is provided with hinged screw and articulated joint body, hinged screw is connected with the articulated joint body and is provided with the oil circuit that connects the external side of cylinder body inner carrier, upper cover is connected with side plate by screw, the cylinder body below is provided with crossbeam, the front clamp device is fixed on rig by crossbeam, side plate is provided with union, union is provided with the oil circuit that connects cylinder body inner carrier body inboard, spacing on upper cover and crossbeam carry out axially to slips.
As preferably, described front clamp device and main card dish are connected with the clamper control valve by two sequence valves respectively, and the clamper control valve is connected with fuel tank.Described clamper control valve is connected with overflow valve, and overflow valve reads the numerical value on the rig pressure gauge, and is connected with fuel tank by gear pump.
As preferably, the position, aperture that described rig is drilled is provided with a flow transmitter, flow transmitter respectively with rig on rig gearbox and feed mechanism control valve and the preventer control valve of controlling preventer be connected.
Inventing useful effect is: when rig main card dish is clamped drilling rod and drilled, when adding drilling rod, the main card dish need to unclamp, at this moment hurt sb.'s feelings in order to prevent that drilling rod from skidding off in the hole because of the deadweight of the pressure that is subject to hole internal pressure water or drilling tool, the front clamp device is clamped drilling rod, and Accident prevention occurs, when drilling process reaches certain value for the hole internal pressure, at once rig stops boring and preventer is sealed and eats dishes without rice or wine, and guarantees that water under high pressure do not gush out.
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of preventer;
Fig. 3 is the structural representation of front clamp device;
Fig. 4 is the oil circuit connection diagram of front clamp device and main card dish;
Description of reference numerals: preventer 1, casing 11, double threaded screw 12, oil cylinder 13, locking closure 14, fastening bolt 15, piston 16, flashboard 17, screw mandrel 18, tubing interface 19, lid 110, gate rubber core 111, nut 112, front clamp device 2, slips 21, upper cover 22, back cylinder cover 23, articulated joint body 24, hinged screw 25, piston body 26, crossbeam 27, cylinder body 28, side plate 29, union 210, main card dish 3, rig 4, sequence valve 5, clamper control valve 6, overflow valve 7, pressure meter 8, gear pump 9, fuel tank 10.
The specific embodiment
The invention will be further described below in conjunction with accompanying drawing:
Embodiment: as Fig. 1, the anti-special jewel of harnessing the river of this coal mine gallery is visited system, comprise rig 4, rig 4 is provided with main card dish 3 and front clamp device 2, the position, aperture that rig 4 is drilled is provided with preventer 1, control the oil circuit of preventer 1 action and the hydraulic circuit of rig and link together, front clamp device 2 and main card dish 3 form interlock.
In boring procedure particularly when " falling bar; add bar " work the main card dish 3 of rig 4 to unclamp drilling rod, can make drilling rod moment fall in the hole or skid off outside the hole and cause the accident this moment, when running into press water especially when prying into the water hole, drilling rod causes larger casualty accident together with being subject to the pressure in the hole, and front clamp device 2 can effectively be avoided the generation of above accident.
as shown in Figure 3, described front clamp device 2 comprises cylinder body 28, cylinder body 28, back cylinder cover 23 is connected with side plate by four soket head cap screws connections, be provided with piston body 26 in cylinder body 28, slips 21 is connected with piston body 26 by T-slot, back cylinder cover 23 is provided with hinged screw 25 and articulated joint body 24, hinged screw 25 be provided with the oil circuit that connects cylinder body 28 inner carrier body 26 outsides in the articulated joint body is connected, upper cover 22 is connected with side plate 29 by screw, cylinder body 28 belows are provided with crossbeam 27, front clamp device 2 is fixed on rig 4 by crossbeam 27, side plate 29 is provided with union 210, union 210 is provided with the oil circuit that connects cylinder body 28 inner carrier body 26 inboards.When hydraulic oil entered oil cylinder from hinged screw 25 and articulated joint body 24, pushing piston body 26 was to intermediary movements, and slips 21 also is synchronized with the movement along with piston body 26, clamps drilling rod.Slips 21 can only be done radial motion under upper cover 22 and crossbeam 27 spacing.When hydraulic oil entered oil cylinder from union 210, piston body 26 moved laterally and namely drives slips 21 and move laterally, and front clamp device 2 unclamps drilling rod.
As shown in Figure 4, front clamp device 2 is connected with the main card dish respectively and is connected with clamper control valve 6 by two sequence valves 5, and clamper control valve 6 is connected with fuel tank 10.Main card dish 3 and front clamp device 2 adopt fluid pressure linkage to control.When big-elevation boring and spy discharge water boring, often need down bar, add bar, unload bar work, for preventing that unclamping the beginning drilling rod at the main card dish skids off or fall in the hole in the hole and cause the accident, front clamp device 2 main card dish 3 is with it realized interlock control, be before main card dish 3 unclamps drilling rod, front clamp device 2 clamps drilling rod; Before main card dish 3 clamped drilling rod, front clamp device 2 unclamped, and by adjusting sequence valve, can adjust the time difference of front clamp device 2 and 3 interlocks of main card dish, to guarantee the safety of rig working environment.Only need to operate a hydraulic handle during operation gets final product.
Clamper control valve 6 is connected with overflow valve 7, and overflow valve 7 is connected with fuel tank 10 by gear pump 9.By giving overflow valve 7 default pressure value, the numerical value of the pressure meter 8 on rig just starts overflow valve 7 greater than this numerical value, and oil is got back in fuel tank 10 by gear pump 9, plays the protective effect to hydraulic system.
The anti-regulation of harnessing the river in country colliery, to use special-purpose equipment when prying into the water hole, special-purpose equipment refers to that the aperture safety device is often arranged, make preventer 1 closed orifices by the hydraulically operated valve on the operation rig, prevent that water under high pressure from leaking outside, avoid water leak accident, separately can tighten the screw mandrel 18 of preventer 1 both sides, can make it lock the aperture without hydraulic power tool on opportunity.
As shown in Figure 2, described preventer 1 comprises casing 11, casing 11 both sides are connected with lid 110 by fastening bolt 15, the locking closure 14 of both sides is connected with oil cylinder and is connected with nut and is connected with lid 110 by double threaded screw 12, be provided with piston 16 in oil cylinder 13, piston 16 outer ends are connected with screw mandrel 18 by screw thread, the outer end of screw mandrel 18 is flat square structure, piston 16 the inners are located in the groove of flashboard 17, casing 11 is provided with two tubing interfaces 19, be respectively equipped with the oil circuit that connects two side cylinders 13, the flashboard 17 of both sides works in coordination when oil-feed and cuts out.When hydraulic oil flows in oil cylinder 13 from tubing interface 19, the flashboard 17 of both sides inwardly moves, and clamps drilling rod and closed orifices, prevents that the high-rise Shuitu in the hole from going out.Flashboard 17 inboards are provided with gate rubber core 111, have increased the sealing between flashboard 17 and drilling rod, more effectively prevent gushing out of water under high pressure.
The position, aperture that described rig 4 is drilled is provided with a flow transmitter, flow transmitter respectively with rig 4 on rig gearbox and feed mechanism control valve and the preventer control valve of controlling preventer 1 be connected.When the flow that records position, the aperture water of flowing through when flow transmitter surpasses setting value, sensor is successively given rig gearbox emergency stop switch, feed mechanism control valve, preventer control valve send signal, make rig stop the work of creeping into, then make preventer 1 closed orifices block water under high pressure, whole being swift in motion.
In addition to the implementation, the present invention can also have other embodiments.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection domain of requirement of the present invention.

Claims (7)

1. the anti-special jewel of harnessing the river of coal mine gallery is visited system, comprise rig (4), rig (4) is provided with main card dish (3) and front clamp device (2), it is characterized in that: the position, aperture that rig (4) is drilled is provided with preventer (1), control the oil circuit of preventer (1) action and the hydraulic circuit of rig and link together, front clamp device (2) and main card dish (3) form interlock.
2. the anti-special jewel of harnessing the river of coal mine gallery according to claim 1 is visited system, it is characterized in that: described preventer (1) comprises casing (11), casing (11) both sides are connected with lid (110) by fastening bolt (15), the locking closure of both sides (14) is connected 13 with oil cylinder) be connected 112 by double threaded screw (12) with nut) be connected with lid (110), be provided with piston (16) in oil cylinder (13), piston (16) outer end is connected with screw mandrel (18) by screw thread, the outer end of screw mandrel (18) is flat square structure, piston (16) the inner is located in the groove of flashboard (17), casing (11) is provided with two tubing interfaces (19), be respectively equipped with the oil circuit that connects two side cylinders (13), the flashboard of both sides (17) works in coordination when oil-feed and cuts out.
3. the anti-special jewel of harnessing the river of coal mine gallery according to claim 2 is visited system, it is characterized in that: described flashboard (17) inboard is provided with gate rubber core (111).
4. the anti-special jewel of harnessing the river of coal mine gallery according to claim 1 is visited system, it is characterized in that: described front clamp device (2) comprises cylinder body (28), cylinder body (28), back cylinder cover (23) is connected 29 with side plate) connect by four soket head cap screws, be provided with piston body (26) in cylinder body (28), slips (21) is connected with piston body (26) by T-slot, back cylinder cover (23) is provided with hinged screw (25) and articulated joint body (24), hinged screw (25) is connected 24 with the articulated joint body) in be provided with the oil circuit that connects cylinder body (28) inner carrier body (26) outside, upper cover (22) is connected with side plate (29) by screw, cylinder body (28) below is provided with crossbeam (27), front clamp device (2) is fixed on rig (4) by crossbeam (27), side plate (29) is provided with union (210), union (210) is provided with and connects the inboard oil circuit of cylinder body (28) inner carrier body (26), spacing on upper cover (22) and crossbeam (27) carry out axially to slips (21).
5. the anti-special jewel of harnessing the river of according to claim 1-4 any described coal mine galleries is visited system, it is characterized in that: described front clamp device (2) is connected 3 with the main card dish) be connected with clamper control valve (6) by two sequence valves (5) respectively, clamper control valve (6) is connected with fuel tank (10).
6. the anti-special jewel of harnessing the river of any described coal mine gallery is visited system according to claim 5, it is characterized in that: described clamper control valve (6) is connected with overflow valve (7), overflow valve (7) reads the numerical value on rig (4) pressure gauge (8), and is connected with fuel tank (10) by gear pump (9).
7. the anti-special jewel of harnessing the river of coal mine gallery is visited system according to claim 1 or 5, it is characterized in that: the position, aperture that described rig (4) is drilled is provided with a flow transmitter, flow transmitter respectively with rig (4) on rig gearbox and feed mechanism control valve and the preventer control valve of controlling preventer (1) be connected.
CN2013100205859A 2013-01-18 2013-01-18 Drilling system special for coal mine underground tunnel water control Pending CN103089172A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100205859A CN103089172A (en) 2013-01-18 2013-01-18 Drilling system special for coal mine underground tunnel water control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100205859A CN103089172A (en) 2013-01-18 2013-01-18 Drilling system special for coal mine underground tunnel water control

Publications (1)

Publication Number Publication Date
CN103089172A true CN103089172A (en) 2013-05-08

Family

ID=48202251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100205859A Pending CN103089172A (en) 2013-01-18 2013-01-18 Drilling system special for coal mine underground tunnel water control

Country Status (1)

Country Link
CN (1) CN103089172A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453710A (en) * 2014-11-24 2015-03-25 平顶山市铁福来机电设备有限公司 Drilling equipment for coal seam large-diameter boring construction
CN105156042A (en) * 2015-08-18 2015-12-16 淮南矿业(集团)有限责任公司 Hydraulic drilling rig
CN107083936A (en) * 2017-04-25 2017-08-22 中煤科工集团重庆研究院有限公司 Automatically reset hole packer
CN107702909A (en) * 2017-10-30 2018-02-16 天津市汇点机电设备开发有限公司 Quick-locking device
CN114109291A (en) * 2020-08-31 2022-03-01 中国石油化工股份有限公司 Low-height anti-jacking anti-twisting pressurizing clamping device and method
CN114183089A (en) * 2021-12-14 2022-03-15 河南能源化工集团研究总院有限公司 Novel blowout preventer for underground drilling of coal mine
CN115492548A (en) * 2022-11-08 2022-12-20 安徽省皖北煤电集团有限责任公司 Hydrogeology drilling drill way hydraulic pressure prevents spouting back pressure chucking device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4554976A (en) * 1983-05-12 1985-11-26 Hydril Company Test tool for subsea blowout preventer stack
CN202510026U (en) * 2012-03-30 2012-10-31 中煤科工集团重庆研究院 Linkage hydraulic system for coal mine all-hydraulic drill
CN202520274U (en) * 2012-01-20 2012-11-07 杭州祥龙钻探设备有限公司 Water detection safety anti-blowout device in coal mine
CN203129988U (en) * 2013-01-18 2013-08-14 杭州祥龙钻探设备有限公司 Drilling system for coal mine underground tunnel water prevention and control

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4554976A (en) * 1983-05-12 1985-11-26 Hydril Company Test tool for subsea blowout preventer stack
CN202520274U (en) * 2012-01-20 2012-11-07 杭州祥龙钻探设备有限公司 Water detection safety anti-blowout device in coal mine
CN202510026U (en) * 2012-03-30 2012-10-31 中煤科工集团重庆研究院 Linkage hydraulic system for coal mine all-hydraulic drill
CN203129988U (en) * 2013-01-18 2013-08-14 杭州祥龙钻探设备有限公司 Drilling system for coal mine underground tunnel water prevention and control

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104453710A (en) * 2014-11-24 2015-03-25 平顶山市铁福来机电设备有限公司 Drilling equipment for coal seam large-diameter boring construction
CN104453710B (en) * 2014-11-24 2016-08-24 河南铁福来装备制造股份有限公司 A kind of drilling equipment for drilling of coal seam large-diameter borehole construction
CN105156042A (en) * 2015-08-18 2015-12-16 淮南矿业(集团)有限责任公司 Hydraulic drilling rig
CN105156042B (en) * 2015-08-18 2017-07-25 淮南矿业(集团)有限责任公司 Hydraulic drill rig
CN107083936A (en) * 2017-04-25 2017-08-22 中煤科工集团重庆研究院有限公司 Automatically reset hole packer
CN107702909A (en) * 2017-10-30 2018-02-16 天津市汇点机电设备开发有限公司 Quick-locking device
CN114109291A (en) * 2020-08-31 2022-03-01 中国石油化工股份有限公司 Low-height anti-jacking anti-twisting pressurizing clamping device and method
CN114109291B (en) * 2020-08-31 2024-03-01 中国石油化工股份有限公司 Low-profile anti-top anti-torsion pressurizing clamping device and method
CN114183089A (en) * 2021-12-14 2022-03-15 河南能源化工集团研究总院有限公司 Novel blowout preventer for underground drilling of coal mine
CN114183089B (en) * 2021-12-14 2024-03-12 河南能源化工集团研究总院有限公司 Novel colliery is beaten in pit and is bored blowout preventer
CN115492548A (en) * 2022-11-08 2022-12-20 安徽省皖北煤电集团有限责任公司 Hydrogeology drilling drill way hydraulic pressure prevents spouting back pressure chucking device

Similar Documents

Publication Publication Date Title
CN103089172A (en) Drilling system special for coal mine underground tunnel water control
US4671353A (en) Apparatus for releasing a cementing plug
CN208502721U (en) Coiled tubing complex function double ram type preventer
CN105947551B (en) A kind of hydraulic control system and its application for scrapper conveyor tail auto-tensioning and self-locking
CN204944764U (en) Preventer hermetic seal test unit
CN203129988U (en) Drilling system for coal mine underground tunnel water prevention and control
NO20201191A1 (en) Device and procedure for pipe hanger installation
CN108489722A (en) The multi-functional load test device of preventer
CN102996535A (en) Pressure testing hydraulic-pressurizing device
CN201306119Y (en) Pressurized petroleum wellhead driller
CN208982002U (en) A kind of unidirectional shearing preventer
CN204094186U (en) High pressure manual hole making drill
CN203614088U (en) Gas-well two-layer fracturing tool
CN201347728Y (en) Hydraulic pressure pilot circuit of tube block underground
CN103806872B (en) A kind of control oil guiding device for marine oil and gas blowout
CN203175445U (en) Well mouth pressurization plug drilling device
CN2551765Y (en) Pressure operator for water injection well
CN205918378U (en) Portable type drilling machine prevents running drilling rod holder
CN201367858Y (en) Pressurized drilling device for drilling rod
CN102444390A (en) Emergency rescuing device for incontrollable blowout
CN202100810U (en) Direct immersion electromagnetic pilot valve
CN2916112Y (en) Dual ship gate type pressurized blowout preventer for workover
CN203321418U (en) Near-bit downhole blowout preventer
CN201016290Y (en) Hydraulic double-gate flat-type oil-test blow-out preventer
CN204024609U (en) Play long well section perforation gun apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130508