CN103088790B - Steel outlet for power plant circulating water and construction method thereof - Google Patents

Steel outlet for power plant circulating water and construction method thereof Download PDF

Info

Publication number
CN103088790B
CN103088790B CN201110331263.7A CN201110331263A CN103088790B CN 103088790 B CN103088790 B CN 103088790B CN 201110331263 A CN201110331263 A CN 201110331263A CN 103088790 B CN103088790 B CN 103088790B
Authority
CN
China
Prior art keywords
steel
pipe
water
power plant
anchor block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110331263.7A
Other languages
Chinese (zh)
Other versions
CN103088790A (en
Inventor
朱威
张珂
闫文周
赵银会
徐灿兵
吴迷芳
朱艳梅
汪雪娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Henan Electric Power Survey and Design Institute Co Ltd
Original Assignee
Hennan Electric Power Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hennan Electric Power Survey and Design Institute filed Critical Hennan Electric Power Survey and Design Institute
Priority to CN201110331263.7A priority Critical patent/CN103088790B/en
Publication of CN103088790A publication Critical patent/CN103088790A/en
Application granted granted Critical
Publication of CN103088790B publication Critical patent/CN103088790B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

A steel outlet for power plant circulating water comprises a drainage master pipe. An equal diameter transverse pipe is welded to the tail end of the drainage master pipe. Diffusion pipes are distributed on the drainage transverse pipe at equal intervals. Steel cases are welded at anchored piers on the drainage transverse pipe. The steel outlet for power plant circulating water has the advantages that diffusion of hot water is facilitated by arranging the diffusion pipes on the master pipe; the use of the steel outlet compared with the way of tunnel and open-channel drainage needs no cofferdam construction, construction period is shortened evidently when conditions are proper; cold- and hot-water mixing and vertical diffusion are enhanced for the outlet by wide water area and large water depth, the requirement for environment protection is met, investment is also saved; the construction process is effective in diffusion as compared with the conventional tunnel drainage or drainage by open concrete ditch outlets, operating fleets are easy to organize, construction period can be shortened, and construction investment is decreased.

Description

A kind of electric power plant circulating water steel outlet and construction method
Technical field
What the present invention relates to is the power plant adopting direct cooling, comprises the steel outlet that offshore is arranged under the geological conditions of nearly lake, strand such as fire coal, fuel oil, combustion gas, nuclear power and construction method, belongs to power generation plant technology field.
Background technology
Along with the fast development of China's economy, power plant of China installation total amount and single-machine capacity also increase fast, the particularly construction of Large Copacity nuclear power plant, makes power plant also increasing to the requirement of the circulating cooling water yield, and strand and large-size lake, reservoir direct cooling water supply plant project get more and more.Recirculated water direct drainage mouth design scheme common at present mainly contains bank open type draining, tunnel type draining etc., adopts reinforced concrete structure more.
The open type outfall adopting bank to arrange and tunnel type outfall, go out flow velocity large, need be aided with kinds of artificial energy dissipater or fall bank formula absorption basin and carry out energy dissipating.For preventing washing away, needing to process the soft foundation under outfall and reinforce, implementing necessary block protect bottom of the reservior bank slope, when constructing as adopted nonirrigated farmland method, coffering amount is larger; Environmental requirement is at present comparatively strict in addition, all requires in outfall certain distance, reach certain water temperature requirement.Adopt the water outlet of this patent, namely the piping be made up of draining mother pipe, dewatering horizontal tube and anemostat, offshore 100m ~ 500m is arranged in the bottom, the middle of a lake, utilize vast expanse of waters and larger depth of water reinforced platoon mouth of a river hot and cold water blending and vertically spread, meet environmental requirement, in some cases also can reduction of erection time and reducing investment outlay.
Summary of the invention
Object of the present invention provides a kind of easy construction, the recirculated water outfall new structure of small investment and construction method.
For achieving the above object, the present invention is by the following technical solutions:
A kind of electric power plant circulating water steel outlet, it comprises draining mother pipe, is welded isometrical dewatering horizontal tube, dewatering horizontal tube equidistantly lays anemostat at the female pipe end of draining; And on dewatering horizontal tube corresponding anchor block position weldable steel casing.
The suitable for reading of described steel jacket box, anchor block end face reinforced mesh is set.
Described draining mother pipe, dewatering horizontal tube and anemostat are steel work.
A construction method for electric power plant circulating water steel outlet, it comprises the steps:
The first step: channel excavation, adopts dredger underwater excavation groove to design elevation;
Second step: on the coast draining mother pipe, dewatering horizontal tube and anemostat are made complete, then corresponding anchor block position weldable steel casing on dewatering horizontal tube, each steel pipe of pouring water after adopting boats and ships water surface stringing location;
3rd step: adopt operation fleet to carry out steel pipe water surface location;
4th step: the assembling of steel pipe system, transportation by driving water-filling sinks down into assigned address;
5th step: adopt tremie method to use Grouting Pipe to carry out anchor block underwater concreting; As the depth of water is greater than 15m, then use prepacked aggregate grouting concrete construction technology in anchor block steel jacket box instead;
6th step: trench backfill is to design elevation; Bottom of the reservior, local jackstone is reinforced.
The suitable for reading of described steel jacket box arranges anchor block end face reinforced mesh, adopts underwater concreting method to carry out anchor block and builds.
Adopt the present invention of technique scheme, have the following advantages:
(1) adopt the method for female Guan Shangshe anemostat, be conducive to the diffusion of hot water;
(2) contrast tunnel and open tunnel type drainage pattern, the present invention, without the need to construction cofferdam, obviously can shorten construction period during conditions being possessed;
(3) utilize vast expanse of waters and larger depth of water reinforced platoon mouth of a river hot and cold water blending and vertically spread, meeting environmental requirement, also can reduce investment outlay;
(4) draining of Construction Process Comparison conventional tunnel formula or open type concrete ditch outfall, diffusion effect is good, can the reduction of erection time when operation fleet easily organizes, cost saving;
(5) contrast traditional with mixer, aggregate and cement, water etc. are stirred after, carry out outside on-the-spot underwater casting and the mode of making firm by ramming with conduit and concrete mixer, prepacked aggregate slip casting method advantage of the present invention is as follows: a, can in flowing water concreting; B, the profundal zone concreting of 20m can be greater than in the depth of water; C, preferablyly to apply in the filling Underwater Engineering such as crib and the hole of caisson inside, the hole of basement bottom of the building and hole.
Accompanying drawing explanation
Fig. 1 is recirculated water outfall top view of the present invention.
Fig. 2 be in Fig. 1 A-A to sectional view.
Detailed description of the invention
As shown in Figure 1 and Figure 2, the present invention forms piping by draining female pipe 1, dewatering horizontal tube 2 and anemostat 3, and offshore 100m ~ 500m is arranged in the bottom, the middle of a lake.Its entirety is steel work, is welded isometrical dewatering horizontal tube 2 at female pipe 1 end of draining, and equidistant laying anemostat 3 on dewatering horizontal tube 2, to accelerate the mixing and diffusion of current.Weldable steel casing 4 in recirculated water outfall, as transverse tube anchor block side form under water, immersed tube rear employing underwater grouting in place builds anchor block concrete, is fixed steel pipe.Wherein, steel jacket box 4, should with dewatering horizontal tube 2 firm welded with tight as the template under water of anchor block; prevent from toppling over, disintegrate and conjugating; before bearing initial set concrete mix lateral pressure and prevent running pulp, ensure concrete pouring quality, it also can be used as the permanent protective layer outside anchor block.
The construction method of above-mentioned outfall is as follows:
The first step: channel excavation, adopts dredger underwater excavation groove to design elevation, grabs to dig smooth, and it is levelling suitably to repair slope.
Second step: on the coast female for draining pipe 1, dewatering horizontal tube 2 and anemostat 3 are made complete, then corresponding anchor block position weldable steel casing 4 on dewatering horizontal tube 2, wherein, anchor block steel jacket box 4 adopts steel sheet to make, then preservative treatment is carried out to each steel pipe, each steel pipe of pouring water after finally adopting boats and ships water surface stringing location.
3rd step: adopt operation fleet to carry out steel pipe water surface location.Specifically, boats and ships are under the external force of environment effects such as wind, wave, stream, and can produce revolution, drift about and the coupled motions such as sway, need balance various external force of environment by pre-add anchor holding power and anchor cable tension force, in anchorage water, buoyancy aid is in specified point.In marine environment, radial anchor cable and anchor should be arranged along the different directions of buoyancy aid, most by 8 ~ 10 anchor hawser anchorings; Buoyancy aid in inland waters, normal by flowing downstream and arranging anchor and anchor cable perpendicular to current both direction.After fleet waterborne anchorage, ship upper warp and woof instrument and direction peg is adopted to carry out location of pipeline, crane ship sinking.
4th step: the assembling of steel pipe system, transportation by driving water-filling sinks down into assigned address.
5th step: adopt tremie method to use and carry out anchor block underwater concreting; As the depth of water is greater than 15m, then use Grouting Pipe 5 instead and carry out prepacked aggregate grouting concrete construction in anchor block steel jacket box.Usually the steel pipe of internal diameter DN25 ~ 50mm is selected to be Grouting Pipe 5; The intensity injecting mortar generally should be greater than 1.3 ~ 1.5 times of concrete design class; Different according to prepacked aggregate (block stone, cobble, rubble etc.) kind, the maximum effect radius that slip casing by pressure allows mostly is 2.5 ~ 4.0m, requires higher grouting concrete for design strength and workmanship, and the spacing of Grouting Pipe 5 is arranged by being not more than 2.0m.
6th step: trench backfill is to design elevation; Bottom of the reservior, local jackstone is reinforced.
Steel jacket box is suitable for reading arranges anchor block end face reinforced mesh 6 depending on calculated case, adopts suitable underwater concreting method to carry out anchor block and builds.

Claims (5)

1. an electric power plant circulating water steel outlet, is characterized in that: it comprises draining mother's pipe (1), is welded isometrical dewatering horizontal tube (2), dewatering horizontal tube (2) is equidistantly laid anemostat (3) at draining mother pipe (1) end; And upper corresponding anchor block position weldable steel casing (4) of dewatering horizontal tube (2).
2. electric power plant circulating water steel outlet according to claim 1, is characterized in that: arrange anchor block end face reinforced mesh (6) the suitable for reading of described steel jacket box (4).
3. electric power plant circulating water steel outlet according to claim 1, is characterized in that: described draining mother's pipe (1), dewatering horizontal tube (2) and anemostat (3) are steel work.
4. a construction method for electric power plant circulating water steel outlet as claimed in claim 3, it is characterized in that, it comprises the steps:
The first step: channel excavation, adopts dredger underwater excavation groove to design elevation;
Second step: on the coast draining mother's pipe (1), dewatering horizontal tube (2) and anemostat (3) are made complete, then upper corresponding anchor block position weldable steel casing (4) of dewatering horizontal tube (2), each steel pipe of pouring water after adopting boats and ships water surface stringing location;
3rd step: adopt operation fleet to carry out steel pipe water surface location;
4th step: the assembling of steel pipe system, transportation by driving water-filling sinks down into assigned address;
5th step: adopt tremie method to use Grouting Pipe (5) to carry out anchor block underwater concreting; As the depth of water is greater than 15m, then use prepacked aggregate grouting concrete construction technology in anchor block steel jacket box instead;
6th step: trench backfill is to design elevation; Bottom of the reservior, local jackstone is reinforced.
5. the construction method of electric power plant circulating water steel outlet according to claim 4, is characterized in that: the suitable for reading of described steel jacket box (4) arranges anchor block end face reinforced mesh (6), adopts underwater concreting method to carry out anchor block and builds.
CN201110331263.7A 2011-10-27 2011-10-27 Steel outlet for power plant circulating water and construction method thereof Expired - Fee Related CN103088790B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110331263.7A CN103088790B (en) 2011-10-27 2011-10-27 Steel outlet for power plant circulating water and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110331263.7A CN103088790B (en) 2011-10-27 2011-10-27 Steel outlet for power plant circulating water and construction method thereof

Publications (2)

Publication Number Publication Date
CN103088790A CN103088790A (en) 2013-05-08
CN103088790B true CN103088790B (en) 2015-07-01

Family

ID=48201881

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110331263.7A Expired - Fee Related CN103088790B (en) 2011-10-27 2011-10-27 Steel outlet for power plant circulating water and construction method thereof

Country Status (1)

Country Link
CN (1) CN103088790B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09217332A (en) * 1996-02-09 1997-08-19 Hitachi Ltd Garbage-proof equipment for drainage system
CN1206058A (en) * 1997-07-18 1999-01-27 胡鸣群 Water drainage method and belt drainage component used therein
JP2001329520A (en) * 2000-05-22 2001-11-30 Ishikawajima Harima Heavy Ind Co Ltd Tailrace facilities and discharge method
CN201025228Y (en) * 2007-04-10 2008-02-20 李电学 A device for power generation based on recycling water
CN101775790A (en) * 2010-01-11 2010-07-14 广东省电力设计研究院 Arrangement structure of circulating water taking and draining structure of power plant
CN201952835U (en) * 2010-11-19 2011-08-31 浙江省电力设计院 Water inlet pipe and water outlet pipe duct superposition arrangement structure for circulation water of power plant

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09217332A (en) * 1996-02-09 1997-08-19 Hitachi Ltd Garbage-proof equipment for drainage system
CN1206058A (en) * 1997-07-18 1999-01-27 胡鸣群 Water drainage method and belt drainage component used therein
JP2001329520A (en) * 2000-05-22 2001-11-30 Ishikawajima Harima Heavy Ind Co Ltd Tailrace facilities and discharge method
CN201025228Y (en) * 2007-04-10 2008-02-20 李电学 A device for power generation based on recycling water
CN101775790A (en) * 2010-01-11 2010-07-14 广东省电力设计研究院 Arrangement structure of circulating water taking and draining structure of power plant
CN201952835U (en) * 2010-11-19 2011-08-31 浙江省电力设计院 Water inlet pipe and water outlet pipe duct superposition arrangement structure for circulation water of power plant

Also Published As

Publication number Publication date
CN103088790A (en) 2013-05-08

Similar Documents

Publication Publication Date Title
CN205152976U (en) Marine precast concrete cushion cap wind turbine foundation
CN103362113B (en) Offshore wind farm, bridge and marine works local buoyancy ocean platform and construction method
CN102561371B (en) Steel caisson enclosure structure at island-tunnel combination part and construction method thereof
CN104389318B (en) Reinforced concrete-steel structure hybrid gravity foundation for offshore wind power and construction method thereof
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN100510281C (en) Semi-reverse construction method for ultra-large-diameter and ultra-buried depth storage tank
CN102839681A (en) Combined steel pipe pile cofferdam used under condition of no cover layer in deep water and construction method thereof
CN206234474U (en) A kind of seabed HDPE pipeline saddle weights
CN203977437U (en) The anti-cofferdam structure of breaking through water under a kind of built hydropower complex dam
CN204715364U (en) A kind of foundation pit support device
CN106049520A (en) Method for combining concrete base of offshore supporting structure and steel pipe pile
CN110130270B (en) Multifunctional breakwater and dredging balance self-adjusting method suitable for high-sand-content sea area
CN103088790B (en) Steel outlet for power plant circulating water and construction method thereof
CN102031821B (en) Pile-wall type draining hole of circular water of seaside power plant with soft soil foundation
CN201883453U (en) Combined pipe jacking working well
CN111350208A (en) Immersed tube tunnel pipe section prefabricating method
RU2401356C1 (en) Method of block-modular construction of hydraulic structures in underwater pits
KR101290920B1 (en) Turbine structure for tidal power plant
CN103711115B (en) A kind of ground stabilization of overall transportation by driving formula water-fetching head and joint and construction method
CN210315585U (en) Sleeve valve pipe slip casting structure of excavation supporting
CN106120958A (en) Combined steel case pedestal water intake structure
CN201567608U (en) Artificial island fire-fighting water intake well structural member
CN205822331U (en) Combined steel case pedestal water intake structure
CN203684205U (en) Foundation reinforcement and joint for integral floating intake head
CN217870585U (en) Raft gravity type jacket offshore wind turbine foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 450007 Zhengzhou Zhongyuan Road, Henan, No. 212

Patentee after: China Electric Power Construction Group Henan electric survey and Design Institute Co., Ltd.

Address before: 450007 Zhengzhou Zhongyuan Road, Henan, No. 212

Patentee before: Hennan Electric Power Survey & Design Institute

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150701

Termination date: 20191027