CN103073233B - Patching material for potholes of anti-icing road surface and preparation method of patching material - Google Patents

Patching material for potholes of anti-icing road surface and preparation method of patching material Download PDF

Info

Publication number
CN103073233B
CN103073233B CN201310037310.6A CN201310037310A CN103073233B CN 103073233 B CN103073233 B CN 103073233B CN 201310037310 A CN201310037310 A CN 201310037310A CN 103073233 B CN103073233 B CN 103073233B
Authority
CN
China
Prior art keywords
parts
road surface
asphalt
cold
stirring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310037310.6A
Other languages
Chinese (zh)
Other versions
CN103073233A (en
Inventor
张红梅
常明勋
靳红欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Agricultural University
Original Assignee
Henan Agricultural University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Agricultural University filed Critical Henan Agricultural University
Priority to CN201310037310.6A priority Critical patent/CN103073233B/en
Publication of CN103073233A publication Critical patent/CN103073233A/en
Application granted granted Critical
Publication of CN103073233B publication Critical patent/CN103073233B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Repair (AREA)

Abstract

The invention discloses a patching material for potholes of an anti-icing road surface and a preparation method of the patching material, and belongs to the technical field of building materials. The patching material for the potholes comprises the following components in parts by weight: 88.5-89.5 parts of aggregate, 5-5.5 parts of cold-patch asphalt liquid and 5.5-6 parts of anti-icing agent Verglimit-260, wherein the cold-patch asphalt liquid comprises the following components in parts by weight: 77-80 parts of asphalt, 17-20 parts of diesel oil and 2.5-3 parts of cold-patch agent Ad-here 260L. The preparation method comprises the following steps: 1) stirring the asphalt while heating, and stopping heating when the asphalt reaches 165-175 DEG C, adding the diesel oil and the cold-patch agent in sequence, stirring uniformly, and obtaining the cold-patch asphalt liquid, (2) mixing the asphalt liquid with the aggregate uniformly, keeping on stirring, adding the anti-icing agent at 10-15 seconds before the stirring is finished, and discharging after the stirring is finished. The patching material can be stored at a room temperature for a long time after packaged in small bags, can be taken at any time for use and is convenient to use; the anti-icing temperature of the patching material can reach subzero 20 DEG C; the anti-icing performance can be comparable to that of the original anti-icing road surface; the traffic can be opened after patching; and an unimpeded road is ensured.

Description

A kind of freezing road surface pit repairing material and preparation method thereof
Technical field
The invention belongs to building material technical field, be specifically related to a kind of freezing road surface pit repairing material, also relate to the preparation method of this material simultaneously.
Background technology
Highway transportation network is the important infrastructure ensureing that passenger traffic is quick and logistics is unobstructed.At present, highway in China construction has entered the on national network stage, and motorway has become the trunk main of highway network system.But, the security of highway communication and the easy climate impact of conveying efficiency.Especially in cold season, road surface, once freeze, not only can make the security of highway communication and conveying efficiency have a greatly reduced quality, and also road pavement (bridge floor) and attached structure can cause major injury.When time icy on road, pavement skid resistance condition significantly reduces, and automobile easily skids out of control, even needs close traffic time serious, causes traffic paralysis.2008, Hunan ice disaster once caused traffic paralysis, had had a strong impact on the normal operation of local economy activity.Along with the progress of science and technology, freezing road surface occurs gradually in China's motorway, and constantly plays its freezing performance.
The same with conventional road surface, freezing road surface is rolled with under various effect of natural environment at vehicle, also can produce disease such as hole groove, crack etc.Timely pot holes mend can stop hole groove area to expand effectively, is conducive to prolonging service life of pavement, saves maintenance costs.But for freezing road surface, still lack a kind of suitable patching material at present: if use the hot-laid mixture identical with former ground surface material, just need during construction to start mixing station.The asphalt amount once produced of blending station is comparatively large, and the demand of general pit repairing to compound is less, and residue compound cannot long storage time, will certainly cause great waste, raise repairing cost.In addition, the transport of hot-laid mixture is also very inconvenient.Although conventional cold-repairing material can solve the storage problem of hot-laid mixture, the problem that repairing face froze in cold season can not be solved.In other words, repair the hole groove on freezing road surface according to conventional cold-repairing material, freeze to ice and snow face of repairing in season, local, road surface cling property can be caused poor, affect traffic safety all the better.Further, when road surface is by snow and ice cover, repairs position and not easily determine, ice-melt cannot be carried out by local salting.Visible, solve local, road surface slippage problems and there is great difficulty.
Summary of the invention
Object of the present invention aims to provide a kind of freezing road surface pit repairing material, additionally provides the preparation method of this material simultaneously.
Based on above-mentioned purpose, the technical scheme that the present invention takes is: a kind of freezing road surface pit repairing material, it consists of by weight: gather materials 88.5 ~ 89.5 parts, asphalt cold repairing liquid 5 ~ 5.5 parts, deicing agent Verglimit-260 5.5 ~ 6 parts, wherein the weight of asphalt cold repairing liquid consists of: pitch 77 ~ 80 parts, diesel oil 17 ~ 20 parts, cold-patch agent Ad-here 260L 2.5 ~ 3 parts.
Described diesel oil is-10# diesel oil.
Described pitch is SBS modifying asphalt.
Described weight of gathering materials consists of: the building stones 14 ~ 16 parts of particle diameter 9.5 ~ 16.5mm, the building stones 21 ~ 28 parts of particle diameter 6 ~ 9.5mm, the building stones 21 ~ 25 parts of particle diameter 2.75 ~ 6mm, particle diameter are less than building stones 30 ~ 38 parts, the breeze 2 parts of 2.75mm.
The preparation method of described freezing road surface pit repairing material, step is: 1) heat while stirring pitch, stops heating when asphalt temperature reaches 165 DEG C ~ 175 DEG C, adds diesel oil, cold-patch agent stirring successively, obtains asphalt cold repairing liquid; 2) asphalt cold repairing liquid and aggregate blending is even, continue to stir and also within 10 ~ 15 seconds before stirring terminates, add deicing agent, stir and terminate rear discharging.
At present, what freezing road surface adopted when laying is all hot-laid mixtures, needs to start mixing station, and single output is very large, and repair hole, freezing road surface groove according to this pattern, material once cannots be used up and can cause great waste, and directly cost is repaired in impact.And existing hole groove cold-repairing material does not possess freezing performance, use rear surface to freeze and local, road surface can be caused to skid, traffic safety cannot ensure.Salting deicing not only can corrode bridge pavement, contaminate environment, and under snow and ice cover, the ice forming locations on road surface is also difficult to determine.
Freezing road surface provided by the invention pit repairing material can solve the problem just.The freezing temperature of this patching material is-20 DEG C, and face of repairing is also not-easy-to-freeze for season at ice and snow, can keep same freezing performance with original freezing road surface.This pit repairing material, as the anti-icing shaped material of active, can substitute salting deicing completely, effectively can avoid the detrimentally affects such as the pollution because salting causes, erosion.
After packing, freezing road surface of the present invention pit repairing material at normal temperatures can long-term storage, and the safe storage phase is not less than 12 months; Pouch-packaged, convenient to use, repair and completely get final product open to traffic, fully meet the requirement ensureing the coast is clear.
Embodiment
Below in conjunction with embodiment, the present invention will be further described.
embodiment 1:a kind of freezing road surface pit repairing material, it consists of by weight: gather materials 89.5 parts, asphalt cold repairing liquid 5 parts, deicing agent Verglimit-260 5.5 parts; Wherein the weight of asphalt cold repairing liquid consists of: pitch 77 parts, diesel oil 20 parts, cold-patch agent 3 parts; The weight of gathering materials consists of: the building stones 14 parts of particle diameter 9.5 ~ 16.5mm, the building stones 21 parts of particle diameter 6 ~ 9.5mm, the building stones 25 parts of particle diameter 2.75 ~ 6mm, particle diameter are less than building stones 38 parts, the breeze 2 parts of 2.75mm.
Above-mentioned freezing road surface pit repairing material obtains by following method: 1) heat while stirring pitch, stops heating when asphalt temperature reaches 165 DEG C ~ 175 DEG C, adds diesel oil, cold-patch agent stirring successively, obtains asphalt cold repairing liquid; 2) asphalt cold repairing liquid and aggregate blending is even, continue to stir and also within 10 ~ 15 seconds before stirring terminates, add deicing agent, stir and terminate rear discharging.
embodiment 2:a kind of freezing road surface pit repairing material, it consists of by weight: gather materials 89 parts, asphalt cold repairing liquid 5.2 parts, deicing agent Verglimit-260 5.8 parts; Wherein the weight of asphalt cold repairing liquid consists of: pitch 78 parts, diesel oil 19.5 parts, cold-patch agent 2.5 parts; The weight of gathering materials consists of: the building stones 15 parts of particle diameter 9.5 ~ 16.5mm, the building stones 28 parts of particle diameter 6 ~ 9.5mm, the building stones 21 parts of particle diameter 2.75 ~ 6mm, particle diameter are less than building stones 34 parts, the breeze 2 parts of 2.75mm.
Above-mentioned freezing road surface pit repairing material obtains by following method: 1) heat while stirring pitch, stops heating when asphalt temperature reaches 165 DEG C ~ 175 DEG C, adds diesel oil, cold-patch agent stirring successively, obtains asphalt cold repairing liquid; 2) asphalt cold repairing liquid and aggregate blending is even, continue to stir and also within 10 ~ 15 seconds before stirring terminates, add deicing agent, stir and terminate rear discharging.
embodiment 3:a kind of freezing road surface pit repairing material, it consists of by weight: gather materials 88.5 parts, asphalt cold repairing liquid 5.5 parts, deicing agent Verglimit-260 6 parts; Wherein the weight of asphalt cold repairing liquid consists of: pitch 80 parts, diesel oil 17 parts, cold-patch agent 2.5 parts; The weight of gathering materials consists of: the building stones 16 parts of particle diameter 9.5 ~ 16.5mm, the building stones 27 parts of particle diameter 6 ~ 9.5mm, the building stones 25 parts of particle diameter 2.75 ~ 6mm, particle diameter are less than building stones 30 parts, the breeze 2 parts of 2.75mm.
Above-mentioned freezing road surface pit repairing material obtains by following method: 1) heat while stirring pitch, stops heating when asphalt temperature reaches 165 DEG C ~ 175 DEG C, adds diesel oil, cold-patch agent stirring successively, obtains asphalt cold repairing liquid; 2) asphalt cold repairing liquid and aggregate blending is even, continue to stir and also within 10 ~ 15 seconds before stirring terminates, add deicing agent, stir and terminate rear discharging.
embodiment 4: the fundamental property test of product
Following fundamental property test is carried out to the freezing road surface pit repairing material of embodiment 2:
4.1 rut experiments
4.2 immersion Marshall test
4.3 indirect tensile test on frozen-thaw
4.4 freezing performance tests
A, one group of (3) freezing road surface pit repairing material Marshall standard specimen is chilled to-15 DEG C, to be then stored in damp camera 3 minutes, observe, can not there is bloom because of the increase of time in test specimen simultaneously.
B, by one group of (3) freezing road surface pit repairing material test specimen [sample dimensions is: (300 × 300 × 50) mm], put into tank and add the dark water of 30mm, be placed in the refrigeration chamber of-20 DEG C, took out after 100 hours, test specimen can easily take out from the tank frozen, and surface of test piece is not frozen.
Conclusion: freezing road surface pit repairing material is under-20 DEG C of low temperature, and surface does not freeze.
with reference to the test method of 4.1-4.4, respectively fundamental property test is carried out to the pit repairing material of embodiment 1 and embodiment 3, all meet code requirement.
embodiment 5:for the construction effect experiment that the freezing road surface pit repairing material of embodiment 2 carries out
Engineering time: on October 16th, 2011;
Place to use: Zhengzhou City's road bridge over Yellow river bridge floor hole groove;
Surface temperature: 27 DEG C;
Constructional method: the freezing road surface pit repairing materials repairing hole groove using embodiment 2, cutting hole groove is of a size of: long 80cm, wide 60cm, dark 4cm, cuts complete high-pressure air and will cheat groove blowing totally, non-loosening without assorted dirt such as aggregate chips, without moisture; A coating emulsified asphalt is brushed subsequently in hole groove surrounding and bottom, after emulsified bitumen breakdown of emulsion, pour freezing road surface pit repairing material into hole groove, pave evenly with spades, and ensure that hole groove surrounding material is sufficient, but be not scattering into groove surrounding road surface, hole, material spreader exceeds road surface and is about 1cm, then 2 times are rolled, then vibroroller cmpacting 5 times with the hand steered single-drum road roller of use amplitude 0.5mm, weight 0.5t.Open to traffic immediately after construction.
Construction effect observing time: on January 20th, 2012, slight snow weather;
Surface temperature :-2 DEG C;
Observations: hole groove is filled up and kept better, without rut, without passing, leakless, freezes without loose and surperficial nothing.
embodiment 6:for the construction effect experiment that the freezing road surface pit repairing material of embodiment 3 carries out
Engineering time: on May 16th, 2012;
Place to use: the few high speed K 18+200 of Zhengzhou Zheng, runway;
Surface temperature: 33 DEG C;
Constructional method: the freezing road surface pit repairing materials repairing of use embodiment 3 cheats groove, cutting hole groove is of a size of: long 80cm, wide 80cm, dark 4.5cm, and cut complete high-pressure air and will cheat groove purging totally, non-loosening is without assorted dirt such as aggregate chips, without moisture; A coating emulsified asphalt is brushed subsequently in hole groove surrounding and bottom, after emulsified bitumen breakdown of emulsion, pour freezing road surface pit repairing material into hole groove, pave evenly with spades, and ensure that hole groove surrounding material is sufficient, but be not scattering into groove surrounding road surface, hole, material spreader exceeds road surface and is about 1cm, then 2 times are rolled, then vibroroller cmpacting 5 times with the hand steered single-drum road roller of use amplitude 0.5mm, weight 0.5t.Open to traffic immediately after construction.
Construction effect observing time: on December 27th, 2012, snow shower weather;
Surface temperature :-2 DEG C;
Observations: hole groove is filled up and kept better, without rut, without passing, leakless, freezes without loose and surperficial nothing.

Claims (4)

1. a freezing road surface pit repairing material, it consists of by weight: gather materials 88.5 ~ 89.5 parts, asphalt cold repairing liquid 5 ~ 5.5 parts, deicing agent Verglimit-260 5.5 ~ 6 parts, wherein the weight of asphalt cold repairing liquid consists of: pitch 77 ~ 80 parts, diesel oil 17 ~ 20 parts, cold-patch agent Ad-here 260L 2.5 ~ 3 parts; Described weight of gathering materials consists of: the building stones 14 ~ 16 parts of particle diameter 9.5 ~ 16.5mm, the building stones 21 ~ 28 parts of particle diameter 6 ~ 9.5mm, the building stones 21 ~ 25 parts of particle diameter 2.75 ~ 6mm, particle diameter are less than building stones 30 ~ 38 parts, the breeze 2 parts of 2.75mm.
2. freezing road surface as claimed in claim 1 pit repairing material, it is characterized in that, described diesel oil is-10# diesel oil.
3. freezing road surface as claimed in claim 1 or 2 pit repairing material, it is characterized in that, described pitch is SBS modifying asphalt.
4. the preparation method of freezing road surface pit repairing material described in claim 1, it is characterized in that, step is: 1) heat while stirring pitch, stops heating when asphalt temperature reaches 165 DEG C ~ 175 DEG C, add diesel oil, cold-patch agent stirring successively, obtain asphalt cold repairing liquid; 2) asphalt cold repairing liquid and aggregate blending is even, continue to stir and also within 10 ~ 15 seconds before stirring terminates, add deicing agent, stir and terminate rear discharging.
CN201310037310.6A 2013-01-31 2013-01-31 Patching material for potholes of anti-icing road surface and preparation method of patching material Expired - Fee Related CN103073233B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310037310.6A CN103073233B (en) 2013-01-31 2013-01-31 Patching material for potholes of anti-icing road surface and preparation method of patching material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310037310.6A CN103073233B (en) 2013-01-31 2013-01-31 Patching material for potholes of anti-icing road surface and preparation method of patching material

Publications (2)

Publication Number Publication Date
CN103073233A CN103073233A (en) 2013-05-01
CN103073233B true CN103073233B (en) 2015-02-18

Family

ID=48149957

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310037310.6A Expired - Fee Related CN103073233B (en) 2013-01-31 2013-01-31 Patching material for potholes of anti-icing road surface and preparation method of patching material

Country Status (1)

Country Link
CN (1) CN103073233B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104929011A (en) * 2015-04-23 2015-09-23 江苏燕宁新材料科技发展有限公司 Cold repairing material for asphalt road surfaces as well as preparation method and application of cold repairing material
CN105198282A (en) * 2015-11-05 2015-12-30 东莞市超逸建材有限公司 Cold patch asphalt mixture for road and production technology of cold patch asphalt mixture
CN108264267A (en) * 2017-12-27 2018-07-10 重庆岚海扬帆科技有限公司 A kind of pitch cold-repairing material
CN110540384B (en) * 2019-08-23 2021-12-07 湖北大学 Quick-hardening high-strength asphalt cold-patch material and preparation method thereof
CN112624668B (en) * 2020-12-31 2022-07-19 武汉理工大学 Antiskid and anti-icing night visible asphalt pavement material and preparation method thereof
CN114016354A (en) * 2021-12-20 2022-02-08 甘肃省白银公路事业发展中心景泰公路段 Asphalt cold-patch material for pavement repair and preparation method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1554708A (en) * 2003-12-28 2004-12-15 大连市政设施修建总公司材料综合加工 Method for preparing cold stirring cold laying road asphalt
CN102276188A (en) * 2011-06-15 2011-12-14 江苏省交通规划设计院股份有限公司 Bituminous pavement cold patch material, and production method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1554708A (en) * 2003-12-28 2004-12-15 大连市政设施修建总公司材料综合加工 Method for preparing cold stirring cold laying road asphalt
CN102276188A (en) * 2011-06-15 2011-12-14 江苏省交通规划设计院股份有限公司 Bituminous pavement cold patch material, and production method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"冷补沥青混合料结构组成和材料特性研究";毛传义;《城市道桥与防洪》;20100531(第5期);160-163,170 *

Also Published As

Publication number Publication date
CN103073233A (en) 2013-05-01

Similar Documents

Publication Publication Date Title
CN103073233B (en) Patching material for potholes of anti-icing road surface and preparation method of patching material
CN107721262B (en) A kind of road cold repairing asphalt mixture and preparation method thereof
Giuliani et al. Effectiveness of sodium chloride-based anti-icing filler in asphalt mixtures
US8647709B2 (en) Anti-icing coatings and methods
CN102408873B (en) Powder and paint for inhibiting road from freezing and preparation methods thereof
CN108753132B (en) Preparation method of super-hydrophobic ice-suppressing coating for road
Cuelho et al. Establishing best practices of removing snow and ice from California roadways
EP1694921A1 (en) Method for reconstructing a bituminous-surfaced pavement
CN108485604B (en) Environment-friendly and non-corrosive road snow melting agent
Arabi et al. The environmental impact of anti-icing materials on asphalt surfaces (commonly used anti-icing agents)
CN103275500A (en) Preparation method of ice and snow melting modified emulsified-asphalt
US7556742B1 (en) Deicing and anti-icing composition having anti-corrosion properties and method for making same
RU2367630C1 (en) Method of hot asphalt concrete mix granulation and method of mix application in asphalt concrete blanket repair in winter
CN106290053A (en) A kind of test method testing storage salt asphalt deicing or snow melting ability
Akin et al. Snow removal at extreme temperatures
Akin et al. Pavement surface treatments for ice-prone locations in the Illinois highway system
Meng et al. Study of the active anti-icing properties of modified biological antifreeze protein micro-surfacing
CN113582589A (en) Cold-patch asphalt mixture suitable for airport runways and processing method thereof
RU2364675C2 (en) Method for repair of asphalt concrete coats in winter conditions and composite mixture of materials for its realisation
CN111533490A (en) Preparation method and construction process of high-performance low-freezing-point colored asphalt mixture
Wegman et al. Ultra-Thin Bonded Wearing Course (UTBWC) Snow, Ice, and Wind Effects: Transportation Research Synthesis
Xie et al. Comparing the direct costs and infrastructure implications of anti-icing strategies
Flintsch Assessment of the performance of several roadway mixes under rain, snow, and winter maintenance activities
Root Investigation of the use of open-graded friction courses in Wisconsin
CN117186840A (en) Liquid deicing salt and application thereof in asphalt pavement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150218

Termination date: 20160131