CN103068011B - The method and apparatus of power deratng in multi-frequency network - Google Patents

The method and apparatus of power deratng in multi-frequency network Download PDF

Info

Publication number
CN103068011B
CN103068011B CN201110318274.1A CN201110318274A CN103068011B CN 103068011 B CN103068011 B CN 103068011B CN 201110318274 A CN201110318274 A CN 201110318274A CN 103068011 B CN103068011 B CN 103068011B
Authority
CN
China
Prior art keywords
community
capacity
power
station
transmitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110318274.1A
Other languages
Chinese (zh)
Other versions
CN103068011A (en
Inventor
张舜卿
杭海存
张伟
吴晔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201110318274.1A priority Critical patent/CN103068011B/en
Priority to PCT/CN2012/082664 priority patent/WO2013056624A1/en
Publication of CN103068011A publication Critical patent/CN103068011A/en
Application granted granted Critical
Publication of CN103068011B publication Critical patent/CN103068011B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/06TPC algorithms
    • H04W52/14Separate analysis of uplink or downlink
    • H04W52/143Downlink power control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/30TPC using constraints in the total amount of available transmission power
    • H04W52/34TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading
    • H04W52/343TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading taking into account loading or congestion level
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/18TPC being performed according to specific parameters
    • H04W52/26TPC being performed according to specific parameters using transmission rate or quality of service QoS [Quality of Service]
    • H04W52/265TPC being performed according to specific parameters using transmission rate or quality of service QoS [Quality of Service] taking into account the quality of service QoS

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the invention discloses the method and apparatus of power deratng in a kind of multi-frequency network.Described method includes: obtains the first load capacity and the second load capacity of capacity station community covering community, station, and determines the transmitting changed power requirement of capacity station community based on described first load capacity and the second load capacity according to predetermined judgment criterion;Transmitting changed power according to described capacity station community requires to utilize Business Processing mode to process customer service;And require the transmitting power of capacity station community is processed according to the changed power of launching of described capacity station community.Owing to, in the scheme of the embodiment of the present invention, reducing the transmitting power of capacity station community according to business, thus significantly reducing the actual power loss of base station.It addition, the diversity being also directed to user and business in the scheme of the embodiment of the present invention processes, therefore systematic function and Consumer's Experience are affected less.

Description

The method and apparatus of power deratng in multi-frequency network
Technical field
The present invention relates to communication technical field.In particular to the method and apparatus of power deratng in a kind of multi-frequency network.
Background technology
Along with increasing rapidly of mobile communications network number of users, the continuous dilatation of network, some areas have occurred the resource of frequency range The phenomenons such as anxiety, traffic density are excessive.The demand of network capacity sharply increases, the finiteness of frequency resource and wireless channel The deficiency of capacity has become as the important bottleneck of network Development, in being the introduction of multiple frequency network, MFN technology.Multiple frequency network, MFN technology refers to same One mobile network uses different radio band, and allows different frequency ranges reasonably carry out business to share.The master of multiple frequency network, MFN at present Apply is that the time division multiple acess that GSM900 Yu DCS1800 system is constituted accesses (TDMA) digital mobile network, UMTS R99 The network etc. that (HSDPA) system is constituted is accessed with down high speed packet.Dual Band network is the one of multiple frequency network, MFN technology, is also One of technology being most widely used in multiple frequency network, MFN technology.
Fig. 1 shows in Dual Band network two alien frequencies schematic diagram with coverage cell F1, F2, wherein in order to illustrate See, two are shown respectively with coverage cell.User can carry out between two community F1, F2 community selection, gravity treatment and Switching.The communities based on two frequency ranges of Dual Band network can independently carry out frequency planning, has different spectral ranges, Different radio transmission rules, different coverages etc., and on networking mode, it is not necessary to change the whole of legacy network Body structure, the device resource of different communities can be shared, and simultaneously according to demand and the traffic distribution situation of capacity, also may be used To be gradually introducing multiple alien-frequency district.
In multi-frequency network, usual You Yige community mainly serves for ensuring area coverage, is referred to as covering station, being used for of other The community improving capacity is referred to as capacity station.Capacity station is mainly used in improving power system capacity.In existing universal mobile communications system In system (UMTS) network, the Dual Band network that UMTS R99 and HSDPA system are constituted is a kind of typical Dual Band network;Many Frequently network accounts for the 90% of UMTS network, and the most most importantly Dual Band network accounts for 40%~50%, next to that three frequency networks, four Frequently network etc..Wherein, UMTS R99 center frequency point is 2100MHz, mainly as covering station, meets and covers requirement, and HSDPA system is mainly as capacity station, and its center frequency point can be 2100MHz or 900MHz, is mainly used in raising system Capacity.
Fig. 2 shows the distribution of traffic situation of base station under the typical scene of existing network.Visible, the base of about 50% Portfolio of standing is below 5%, i.e. portfolio is extremely low, and the site traffic of nearly 40% is below 45%, i.e. portfolio is medium. It is to say, the load of most base stations is not the highest.
When portfolio is extremely low, Intelligent carrier turn-off technique of the prior art can be used energy-conservation.But, work as business Amount is for, time medium, there is presently no relevant power-saving mechanism, thus base station is always to maintain higher transmitting power, and energy consumption is relatively Greatly.
Summary of the invention
The embodiment of the present invention provides the method and apparatus of power deratng in a kind of multi-frequency network.
According to an aspect, it is proposed that a kind of method carrying out power deratng in multi-frequency network, including: obtain covering station little First load capacity in district and the second load capacity of capacity station community, and based on described first load capacity and the second load capacity according to Predetermined judgment criterion determines the transmitting changed power requirement of capacity station community;Transmitting according to described capacity station community Changed power requires to utilize Business Processing mode to process customer service;And the transmitting according to described capacity station community Changed power requires to process the transmitting power of capacity station community.
According to another aspect, it is proposed that a kind of power deratng device, including: launch changed power and determine unit, be used for Obtain and cover station the first load capacity of community and the second load capacity of capacity station community, and based on described first load capacity and the Two load capacity determine the transmitting changed power requirement of capacity station community according to predetermined judgment criterion;Customer service processes Unit, requires to utilize Business Processing mode to carry out customer service for the transmitting changed power according to described capacity station community Process;And transmitting power processing unit, require capacity station for the transmitting changed power according to described capacity station community The transmitting power of community processes.
Owing to, in the scheme of the embodiment of the present invention, reducing the transmitting power of capacity station community according to business, thus significantly reducing The actual power loss of base station.It addition, the diversity being also directed to user and business in the scheme of the embodiment of the present invention processes, Therefore systematic function and Consumer's Experience are affected less.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, will make required in embodiment below Accompanying drawing be briefly described, it should be apparent that, below describe in accompanying drawing be only some embodiments of the present invention, for From the point of view of those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other according to these accompanying drawings Accompanying drawing.
Fig. 1 shows in Dual Band network two alien frequencies schematic diagram with coverage cell.
Fig. 2 shows the distribution of traffic situation of base station under the typical scene of existing network.
Fig. 3 shows the flow chart of the method carrying out power deratng according to an embodiment of the invention.
Fig. 4 shows the flow chart that the transmitting changed power of community, constant volume station the most really requires.
Fig. 5 shows the flow chart processing user and/or business according to embodiments of the present invention.
Fig. 6 shows and uses voltage adjustment of the power amplifier technology and do not use the situation of voltage adjustment of the power amplifier technology.
Fig. 7 shows the flow chart of the method carrying out power deratng according to another embodiment of the invention.
Fig. 8 shows the schematic diagram of power deratng device according to embodiments of the present invention.
Fig. 9 shows the schematic diagram of power deratng device according to another embodiment of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete retouching State, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments.Based on the present invention In embodiment, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, Broadly fall into the scope of protection of the invention.
As mentioned above, in multi-frequency network, cover community, station and mainly serve for ensuring area coverage, and capacity station Community is used for improving power system capacity.When the load capacity in multi-frequency network is higher, covers community, station and capacity station community is all pressed Launch according to peak power, to ensure the service in each community;When business load declines, then keep covering community, station Transmitting power constant, simultaneously can reduce the transmitting power of capacity station community with energy-conservation.
In the following embodiments, in the case of additionally not illustrating, representing community, covering station with CELL1, CELL2 represents Capacity station community.
Fig. 3 shows the flow chart of the method carrying out power deratng in Dual Band network according to an embodiment of the invention.Can Seeing, the method comprises the steps.
Step 310, the first load capacity obtaining community, covering station and the second load capacity of capacity station community, and based on described first Load capacity and the second load capacity determine the transmitting changed power requirement of capacity station community CELL2 according to predetermined judgment criterion. In embodiments of the present invention, this term of load capacity represents the occupation condition in community.One skilled in the art will appreciate that negative Carrying capacity can be reflected by different indexs according to actual needs, such as, can be reflected by portfolio, these indexs of number of users, Therefore can correspondingly select judgment criterion to determine the transmitting changed power requirement of capacity station community CELL2.Launch changed power Require may is that and improve launching power and needing the transmission power level improved, the transmitting power reducing CELL2 and permit of CELL2 The transmitting power being permitted transmission power level and the holding CELL2 reduced is constant.About specifically how determining that transmitting changed power is wanted Ask, specifically describe hereinafter in connection with Fig. 4.
Step 320, require to utilize Business Processing mode to user according to the transmitting changed power of capacity station community CELL2 and/or Business processes.Here, the processing mode used can determine according to actual needs, include but not limited to: to Gao You First level Business Processing, low priority traffice processed and double small district (DC) user is processed, its purpose is to drop as far as possible Low systematic function and Consumer's Experience are affected.About specifically how customer service being processed, have hereinafter in connection with Fig. 5 Body describes.
Step 330, launching at the transmitting power that changed power requires capacity station community according to capacity station community CELL2 Reason.
Preferably, above-mentioned power deratng method can periodically carry out, and such as, can be provided with timing in a base station for this Device, periodically to trigger said method.For example, it is possible to every 100ms performs the most above-mentioned power deratng method.
If it addition, use load capacity based on QoS of survice to determine the transmitting changed power requirement of CELL2 in the step 310, The most preferably, based on QoS of survice, the user in capacity station community CELL2 was first processed before step 310.Specifically For, process according to the diversity of user and the priority of business.For high-priority users and dedicated channel (DCH) User, still ensures its business, i.e. remains unchanged, and for low priority traffice, reduces speed and only ensure that it is basic Bit rate (GBR), and do not guarantee that real time rate.By reducing low priority traffice in advance based on QoS of survice Speed, thus reduce load capacity L2 in CELL2 so that in step 310 subsequently, load capacity based on QoS is come Determine when the transmitting changed power of CELL2 requires there is bigger being likely to be obtained and reduce the requirement launching power of CELL2, from And be conducive to saving the power consumption of base station.
In the method for the present embodiment, adjust the transmitting power of capacity station community according to the load capacity of community, thus solve existing Have in technology cannot be energy-conservation for moderate traffic amount problem, significantly reduce the actual power loss of base station.It addition, it is real in the present invention Execute and the scheme of example is also directed to the diversity of user and business processes, therefore systematic function and Consumer's Experience are affected less.
Fig. 4 shows that load capacity based on covering community, station and capacity station community according to embodiments of the present invention is according to predetermined Judgment criterion determine capacity station community launch the flow chart that requires of changed power.As seen from Figure 4, true according to cell load amount The transmitting changed power of constant volume station community CELL2 requires to specifically include:
Step 410, acquisition cover first load capacity L1 of station community CELL1, by the first load capacity L1 and the first threshold value Th1 compares.As described in embodiment above, load capacity can be reflected by different indexs according to actual needs, Such as can be reflected by portfolio, these indexs of number of users, therefore can correspondingly select the first used threshold value Th1.Such as, in the case of carrying out reflected load amount by portfolio, it is assumed that the total business volume that CELL1 can carry is A, set Th1 is A*80%.Or, in the case of carrying out reflected load amount by number of users, it is assumed that the number of users that CELL1 can accommodate is B, Set Th1 as B*80%.The most here 80% is merely possible to example and is given, and those skilled in the art can be according to reality Situation specifically sets.First threshold T h1 is relevant with the transmitting power P 1 covering station community CELL1.Such as, covering is worked as The transmitting power P 1 of community of standing is the biggest, then total business volume A that CELL1 can carry is the biggest, or open ended number of users B The most, etc..
Step 420, when the first load capacity L1 more than the first threshold T h1 time, determine capacity station community CELL2 need improve Launch power, and correspondingly determine the transmission power level needing to improve.As L1 > Th1, show to cover station community CELL1's Load capacity is the biggest, it is therefore desirable to improve the transmitting power of capacity station community CELL2, in order to meet the capacity requirement of business.When Determine when capacity station community CELL2 needs to improve transmitting power, the transmitting power of capacity station community CELL2 is improved to institute Need performance number.For this transmitting power of capacity station community CELL2 can be divided into N number of grade (according to N it needs to be determined that Natural number), according to hardware limitation such as power amplifiers, it is assumed that the maximum transmission power of capacity station community CELL2 is P2MAX, then power divides After Ji, it is launched power and is designated as P respectively2,0, P2,1, P2,2..., P2, N(wherein P2,0=P2MAX, P2, N> 0).Here, each grade it Between difference power can be as desired to determine, and it is identical to be not necessarily to Seeking Truth.When improving transmitting power, merit will be launched Rate improves according to grade.Do not require that it is to improve step by step the most yet, but can according to practical situation determine raising one or Several grades of person, in order to meet the capacity requirement of business.Owing to there is the situation of burst service, therefore improving transmitting merit Preferably directly improve launching power to the maximum P being capable of during rate2MAX, can not meet avoiding the occurrence of power system capacity The situation of business demand.
Step 430, when the first load capacity L1 is below the first threshold T h1, obtain capacity station community CELL2 second Load capacity L2, compares the second load capacity L2 and the second threshold T h2.Owing to when L1 is at below Th1, showing to cover The load capacity of Gai Zhan community CELL1 is little, whether therefore can determine whether the transmitting power of capacity station community CELL2 Need to adjust.As described above, it is also possible to correspondingly select the second used threshold value according to the index of reflected load amount Th2.Such as, in the case of carrying out reflected load amount by portfolio, it is assumed that the total business volume that CELL2 can carry is B, set Th2 is B*20%.Or, in the case of carrying out reflected load amount by number of users, it is assumed that the number of users that CELL2 can accommodate is B, Set Th2 as B*20%.Here 20% is also merely possible to example and is given, and those skilled in the art can be according to actual feelings Condition specifically sets.Second threshold T h2 is the most relevant with the transmitting power P 2 of capacity station community CELL2.
Step 440, when the second load capacity L2 less than the second threshold T h2 time, determine capacity station community CELL2 allow fall Low transmitting power, and correspondingly determine the transmission power level allowing to reduce.As L2 < Th2, capacity station community CELL2 is described Load capacity less, therefore can reduce the transmitting power of CELL2 to save power consumption.To this end, can determine whether to hold Whether second load capacity L2 of Liang Zhan community CELL2 is less than the 3rd threshold T h3, if the second load capacity L2 is less than the Three threshold T h3, it is determined that allow to turn off the transmitting power of capacity station community, otherwise determine that permission will be launched power and be reduced Predetermined grade.Here, the 3rd threshold T h3 is value set in advance.When the second load capacity is less than the 3rd thresholding During value Th3, illustrate that the business load amount of this capacity station community is the least, carrier wave shutoff can be carried out.Turn off carrier wave namely pass Disconnected community, including the pilot frequency information turned off in this district common channel, broadcast message etc..Carrier wave turn-off technique is existing skill Art, is not detailed herein.If the second load capacity L2 is more than the 3rd threshold T h3, it is impossible to carry out carrier wave pass Disconnected, in order to avoid the impact on user as far as possible, determine and use, when reducing and launching power, the method gradually reduced.Here, The grade classification being the most set can be used, it would however also be possible to employ different grade classification.Each grade it Between difference power can be as desired to determine, and it is identical to be not necessarily to Seeking Truth.When reducing transmitting power, merit will be launched Rate reduces according to grade.Do not require that it is to reduce step by step the most yet, but can according to practical situation determine reduction by one or Several grades of person.
Step 450, when the second load capacity L2 is more than the second threshold T h2, show to cover station community CELL1 and appearance Liang Zhan community CELL2, all in suitable duty, is i.e. in stable duty, it is thus determined that capacity station community CELL2 Keep launching power constant.
Visible, according in the scheme of the present embodiment, utilize corresponding based on the load capacity covering community, station and capacity station community Threshold value judge, such that it is able to exactly the duty of community is classified, in order to further control capability Stand the transmitting power of community.
Fig. 5 show according to embodiments of the present invention, require to utilize industry according to the transmitting changed power of capacity station community CELL2 The flow chart that user and/or business are processed by business processing mode.From figure 5 it can be seen that to user and/or business Reason comprises the following steps.
Step 510, the transmitting changed power requirement of acquisition capacity station community CELL2.Here, can be from combining described by Fig. 4 Method in obtain above-mentioned transmitting changed power requirement.
Step 520, when determine capacity station community CELL2 allow reduce launch power, and correspondingly determine allow reduce During transmission power level, the transmission power level reduced according to this permission is revised the community of the graphical user in capacity station community and is cut Change threshold value so that the user being in connection status in graphical user switches to cover in the community stood, and is in idle shape State user, after power reduces, reselects to cover community, station automatically.In embodiments of the present invention, graphical user is meant that, Originally in the coverage of capacity station community CELL2, but do not locate after reducing the transmitting power of capacity station community User in its coverage.Therefore, it can according to allowing the transmission power level reduced to determine graphical user and to it Community handoff threshold value is modified.For the user of switching, for example, it is possible to come by radio network controller (RNC) The community handoff threshold value of amendment user.When reducing due to the transmitting power of CELL2, CELL2 coverage reduces accordingly, Belong to the graphical user in the coverage of CELL2 originally may not continue to be attached in CELL2, therefore by revising this The handoff threshold value of a little graphical user, so that these users think that the signal intensity of CELL2 can not meet communicating requirement, Thus Pre-handoff is to covering in the community CELL1 of station, thus avoid the follow-up adjustment impact launching power on CELL2 Graphical user.
Step 530, other users in addition to graphical user in capacity station community CELL2 are classified, and according to The classification at family carries out respective handling.For example, it is possible to switch to high-priority service cover in the community CELL1 of station, thus Ensure the service of high-priority service;Low priority traffice can be reduced speed and ensure its basic bit speed, thus After reducing the transmitting power of capacity station community CELL2, it is reduced as far as the capacity to capacity station community CELL2 Impact;And so that double small district (DC) user select cover station community CELL1 as its main plot, due to DC User uses Liang Ge community simultaneously, by using covering station community CELL1 as main plot, equally make as auxiliary little The transmitting power of capacity station community CELL2 in district reduces the impact for DC user and is reduced to minimum.
If it is determined that capacity station community CELL2 transmitting power need increase or keep constant, then without to user and/ Or business carries out above-mentioned process.
Visible, according in the scheme of the present embodiment, before changing the transmitting power of capacity station community CELL2 to user and/ Or business is processed, so that the impact for systematic function and Consumer's Experience is less.
It addition, inventors noted that the work efficiency of power amplifier is relevant with the output of power amplifier, the output of power amplifier is the lowest, The work efficiency of power amplifier is the lowest.Voltage adjustment of the power amplifier technology can dynamically adjust power amplifier according to the output numerical value of power amplifier reality Running voltage, it is ensured that power amplifier always works under the most appropriate voltage.Fig. 6 shows use voltage adjustment of the power amplifier technology and does not makes diligent Put the power amplifier output of voltage-regulating technique and the relation of power amplifier work efficiency.Visible, the output in particular for power amplifier compares Little situation, voltage adjustment of the power amplifier technology can promote the work efficiency of power amplifier.To this end, in an embodiment of the present invention, when determining appearance Liang Zhan community CELL2 allows to reduce when launching power, it is possible to use voltage adjustment of the power amplifier technology, according to the output that power amplifier is actual Numerical value, dynamically adjusts the running voltage of the power amplifier of base station, when capacity station community CELL2 needs to increase power, makes diligent Put voltage-regulating technique so that the performance number improved as required adjusts the running voltage of base station.For example, it is possible to notified base by RNC Stand in when power is launched in reduction and use voltage adjustment of the power amplifier technology.
Visible, in power adjustment procedure, improve to maximum by power directly will be launched when improving and launching power, and Reduce and carry out according to predetermined grade when launching power, it is to avoid power system capacity can not meet the situation of business demand, and Can avoid reducing the power impact on user.It addition, by using voltage adjustment of the power amplifier technology, even if at the transmitting power of CELL2 When being reduced to reduced levels, the work efficiency of power amplifier also will not be the lowest so that power amplifier is fully used, thus saves power Resource.
When multi-frequency network comprising 2 alien frequencies with coverage cell, can directly use the scheme of embodiment above.And when depositing When alien frequencies more than 3 is with coverage cell, need further design.Fig. 7 shows another enforcement according to the present invention Example including the flow chart that carries out the method for power deratng during the alien frequencies of more than 3 is with the multi-frequency network of coverage cell.It is visible, The method comprises the steps:
Step 710, the first load capacity obtaining community, covering station and the second load capacity of each capacity station community, based on described first According to predetermined judgment criterion, second load capacity of load capacity and the highest capacity station community of priority determines that priority is the highest The transmitting changed power requirement of capacity station community.When there is the alien frequencies of more than 3 with coverage cell, except covering community of standing Outside there is also multiple capacity station community, therefore, it can capacity station community is arranged priority, and select the appearance that priority is the highest Liang Zhan community carries out launching power and adjusts.For example, it is possible to arrange priority based on portfolio size, portfolio is the least, says This capacity station community bright is the biggest by the probability of power deratng, therefore can its priority be set to the highest.Can also be based on business Service quality QoS priority is set.After processing certain customers if based on QoS, portfolio is the least, then say This capacity station community bright is the biggest by the probability of power deratng, therefore can its priority be set to the highest.Retouched combining Fig. 4 The embodiment stated understands, the second threshold T h2 is previously provided with for each capacity station community, this second threshold value and phase The transmitting power answering capacity station community is relevant, therefore according to a form of implementation of the present invention, and can be little according to i-th capacity station Second threshold T h in district2iLoad capacity L with this capacity station community2iDetermine priority.For example, it is possible to be set to priority Pri=Th2i/L2i.Thus, in step 720, determine for the capacity station community (being assumed to CELL2i) that priority is the highest Launch changed power requirement.
Step 720, require to utilize Business Processing mode to user according to the transmitting changed power of capacity station community CELL2i and/or Business processes.
Step 730, changed power of launching according to capacity station community CELL2i require to carry out the transmitting power of capacity station community Process.
Step 720 with 730 with the step 320 in preceding embodiment, 330 identical, repeat no more here.
The scheme provided by this embodiment, when multi-frequency network comprising the alien frequencies of more than 3 with coverage cell, Ke Yiyou Effect ground selects suitable capacity station community to carry out power adjustment, therefore can reduce the power consumption of base station.
Method according to embodiments of the present invention may be used for omni cell, it is also possible to for directional cell, and may be used for various The multi frequency system of standard, such as global system for mobile communications (GSM), UMTS (UMTS), Long Term Evolution system System (LTE), WiMax system etc., including multi frequency system and the multi frequency system of different standard of same standard.
Correspondingly, according to one embodiment of present invention, it is also proposed that a kind of power deratng device.Fig. 8 shows basis One schematic diagram of the power deratng device of one embodiment.Visible, this device includes: launch changed power true Cell 810, for obtaining the first load capacity and the second load capacity of capacity station community covering community, station, and based on institute State the first load capacity and the second load capacity and determine that the transmitting changed power of capacity station community is wanted according to predetermined judgment criterion Ask;Customer service processing unit 820, requires to utilize at business for the transmitting changed power according to described capacity station community Customer service is processed by reason mode;And launch power processing unit 830, for according to described capacity station community Launch changed power to require the transmitting power of capacity station community is processed.
According to a form of implementation, launch changed power and determine that unit 810 is further used for: obtain and cover the of community, station One load capacity, compares the first load capacity with the first threshold value, when the first load capacity is more than the first threshold value, determines appearance Liang Zhan community needs to improve launches power, and correspondingly determines the transmission power level needing to improve;When the first load capacity is Time below one threshold value, obtain the second load capacity of capacity station community, the second load capacity is compared with the second threshold value, when When second load capacity is less than the second threshold value, determines that capacity station community allows to reduce and launch power, and correspondingly determine permission The transmission power level reduced, when the second load capacity is more than the second threshold value, determines that capacity station community keeps launching power Constant.
According to a form of implementation, launch changed power and determine that unit 810 is further used for: determine sending out capacity station community Penetrate power and improve predetermined grade, or determine the power of launching of capacity station community is directly improved to being capable of Maximum.
According to a form of implementation, launch changed power and determine that unit 810 is further used for: judge that the second load capacity is the least In the 3rd threshold value, if the second load capacity is less than the 3rd threshold value, it is determined that turn off the transmitting power of capacity station community, Otherwise determine and transmitting power is reduced predetermined grade.
According to a form of implementation, customer service processing unit 820 is further used for: when determining that capacity station community allows fall During low transmitting power, according to the community switching allowing the transmission power level reduced to revise the graphical user in capacity station community Threshold value so that described graphical user switches to cover in the community stood;And in capacity station community except graphical user it Other outer users classify, and carry out respective handling according to the classification of user.
According to a form of implementation, customer service processing unit 820 is further used for: switch to cover by high-priority service In Gai Zhan community, low priority traffice is reduced speed and ensures its basic bit speed, and double community user is selected Cover community, station as its main plot.
Fig. 9 shows the schematic diagram of the power deratng device according to another embodiment.Visible, power deratng fills Put and also include pretreatment unit 840, for processing user based on service quality, for high-priority users and dedicated channel User ensures its business, reduces its speed for low priority traffice and only ensures basic bit speed.
According to a form of implementation, power deratng device also includes voltage adjustment of the power amplifier unit 850, for determining that capacity station is little District allows to reduce when launching power, enables voltage adjustment of the power amplifier function, moves with the output numerical value actual according to power amplifier in base station State adjusts the running voltage of power amplifier.
According to a form of implementation, launch changed power and determine that unit also includes priority determining unit (not shown), use The priority of capacity station community is determined in the transmitting power according to capacity station community and load capacity.
According to a form of implementation, power deratng device also includes timing unit 860, for periodically triggering described merit The work of rate fall volume device.
It should be appreciated by those skilled in the art that in the embodiment of the present invention, the function that is divided into of apparatus module divides, actual concrete Structure can be fractionation or the merging of above-mentioned functions module.
The invention described above embodiment sequence number, just to describing, does not represent the quality of embodiment.
The scheme that the content of claim is recorded also is the protection domain of the embodiment of the present invention.
One of ordinary skill in the art will appreciate that all or part of process the in above-described embodiment method can be by journey Sequence instructs relevant hardware and completes, and described program can be stored in a kind of computer-readable recording medium.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit protection scope of the present invention.All at this Within the spirit of invention and principle, any modification, equivalent substitution and improvement etc. made, should be included in the guarantor of the present invention Within the scope of protecting.

Claims (19)

1. the method carrying out power deratng in multi-frequency network, including:
Obtain the first load capacity and the second load capacity of capacity station community covering community, station, and based on described First load capacity and the second load capacity determine the transmitting of capacity station community according to predetermined judgment criterion Changed power requirement, including: obtain the first load capacity covering community, station, by the first load capacity and first Threshold value compares, and when the first load capacity is below the first threshold value, the second of acquisition capacity station community is negative Carrying capacity, compares the second load capacity with the second threshold value, when the second load capacity is less than the second threshold value, Determine that capacity station community allows to reduce and launch power, and correspondingly determine the transmission power level allowing to reduce, And when the second load capacity is more than the second threshold value, determine that capacity station community keeps launching power constant, Wherein, launch changed power to require to include: improve launching power and needing that improves to send out of capacity station community Penetrate performance number, reduce launching power and allowing the transmission power level reduced and keep of capacity station community The transmitting power of capacity station community is constant;
Transmitting changed power according to described capacity station community requires to utilize Business Processing mode to user's industry Business processes;And
Changed power of launching according to described capacity station community requires to enter the transmitting power of capacity station community Row processes.
Method the most according to claim 1, wherein said acquisition covers the first load capacity of community, station With the second load capacity of capacity station community, and based on described first load capacity and the second load capacity according to the most true Fixed judgment criterion determines that the transmitting changed power of capacity station community requires also to include:
When the first load capacity is more than the first threshold value, determines that capacity station community needs to improve and launch power, And correspondingly determine the transmission power level needing to improve.
Method the most according to claim 2, wherein determines that capacity station community needs to improve and launches merit Rate, and correspondingly determine that the transmission power level needing to improve specifically includes:
Determine and the transmitting power of capacity station community is improved predetermined grade, or determine capacity Stand community launch power directly improve to the maximum being capable of.
Method the most according to claim 2, wherein determines that capacity station community allows to reduce and launches merit Rate, and correspondingly determine that the transmission power level allowing to reduce specifically includes:
Judge whether the second load capacity is less than the 3rd threshold value, if the second load capacity is less than the 3rd thresholding Value, it is determined that turn off the transmitting power of capacity station community, otherwise determines predetermined for the reduction of transmitting power Grade.
Method the most according to claim 2, the wherein said transmitting according to described capacity station community Changed power requires that utilizing Business Processing mode that customer service is carried out process includes:
When determining that capacity station community allows to reduce transmitting power, according to the transmission power level allowing reduction Revise the community handoff threshold value of graphical user in capacity station community so that described graphical user switches To the community covering station;And other users in addition to graphical user in capacity station community are carried out point Class, and carry out respective handling according to the classification of user.
Method the most according to claim 5, the wherein said classification according to user carries out corresponding position Reason includes: switches to high-priority service cover in community, station, low priority traffice reduces speed and protects Hinder its basic bit speed, and make double community user select to cover community, station as its main plot.
Method the most according to claim 1, wherein covers the first negative of community, station described acquisition Carrying capacity and the second load capacity of capacity station community, and based on described first load capacity and the second load capacity according to pre- Before the judgment criterion first determined determines that the transmitting changed power of capacity station community requires, also include:
Process user based on service quality, its industry is ensured for high-priority users and dedicated channel user Business, reduces its speed for low priority traffice and only ensures basic bit speed.
Method the most according to claim 2, is wherein determining that capacity station community allows to reduce transmitting During power, enable voltage adjustment of the power amplifier function, dynamically adjust with the output numerical value actual according to power amplifier in base station The running voltage of whole power amplifier.
Method the most according to claim 1, wherein when there is more than two alien frequencies with the appearance covered During Liang Zhan community, the capacity station community high first against priority processes, wherein little according to capacity station The transmitting power in district and load capacity determine the priority of capacity station community.
10. a power deratng device, including:
Launch changed power and determine unit, for obtaining the first load capacity and capacity station community covering community, station The second load capacity, and based on described first load capacity and the second load capacity according to predetermined judgment criterion Determine the transmitting changed power requirement of capacity station community, be further used for: the first of community, acquisition covering station is negative Carrying capacity, compares the first load capacity with the first threshold value, when the first load capacity is below the first threshold value, Obtain the second load capacity of capacity station community, the second load capacity is compared with the second threshold value, when second is negative When carrying capacity is less than the second threshold value, determines that capacity station community allows to reduce and launch power, and correspondingly determine Allow the transmission power level reduced, when the second load capacity is more than the second threshold value, determine that capacity station is little It is constant that district keeps launching power, wherein, launches changed power and requires to include: improves sending out of capacity station community Penetrate power and the transmission power level of needs raising, reduce launching power and allowing reduction of capacity station community The transmitting power of transmission power level and holding capacity station community is constant;
Customer service processing unit, requires profit for the transmitting changed power according to described capacity station community By Business Processing mode, customer service is processed;And
Launching power processing unit, it is right to require for the transmitting changed power according to described capacity station community The transmitting power of capacity station community processes.
11. devices according to claim 10, wherein said transmitting changed power determines that unit enters One step is used for:
When the first load capacity is more than the first threshold value, determines that capacity station community needs to improve and launch power, And correspondingly determine the transmission power level needing to improve.
12. devices according to claim 11, wherein said transmitting changed power determines that unit enters One step is used for:
Determine and the transmitting power of capacity station community is improved predetermined grade, or determine capacity Stand community launch power directly improve to the maximum being capable of.
13. devices according to claim 11, wherein said transmitting changed power determines that unit enters One step is used for:
Judge whether the second load capacity is less than the 3rd threshold value, if the second load capacity is less than the 3rd thresholding Value, it is determined that turn off the transmitting power of capacity station community, otherwise determines predetermined for the reduction of transmitting power Grade.
14. devices according to claim 11, wherein said customer service processing unit is further For:
When determining that capacity station community allows to reduce transmitting power, according to the transmission power level allowing reduction Revise the community handoff threshold value of graphical user in capacity station community so that described graphical user switches To the community covering station;And other users in addition to graphical user in capacity station community are carried out point Class, and carry out respective handling according to the classification of user.
15. devices according to claim 14, wherein said customer service processing unit is further For: switch to high-priority service cover in community, station, low priority traffice is reduced speed guarantee Its basic bit speed, and make double community user select to cover community, station as its main plot.
16. devices according to claim 10, also include pretreatment unit, for based on service Quality treatment user, ensures its business for high-priority users and dedicated channel user, for low preferentially Level business reduces its speed and only ensures basic bit speed.
17. devices according to claim 11, also include voltage adjustment of the power amplifier unit, for determining Capacity station community allows to reduce when launching power, enables voltage adjustment of the power amplifier function, with real according to power amplifier in base station The output numerical value on border dynamically adjusts the running voltage of power amplifier.
18. devices according to claim 10, wherein said transmitting changed power determines that unit is also Including priority determining unit, for determining capacity station according to transmitting power and the load capacity of capacity station community The priority of community.
19. according to the device one of claim 10 to 18 Suo Shu, also includes timing unit, for week Phase property ground triggers the work of described power deratng device.
CN201110318274.1A 2011-10-19 2011-10-19 The method and apparatus of power deratng in multi-frequency network Active CN103068011B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110318274.1A CN103068011B (en) 2011-10-19 2011-10-19 The method and apparatus of power deratng in multi-frequency network
PCT/CN2012/082664 WO2013056624A1 (en) 2011-10-19 2012-10-10 Method and device for power derating in multi-frequency network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110318274.1A CN103068011B (en) 2011-10-19 2011-10-19 The method and apparatus of power deratng in multi-frequency network

Publications (2)

Publication Number Publication Date
CN103068011A CN103068011A (en) 2013-04-24
CN103068011B true CN103068011B (en) 2016-08-24

Family

ID=48110432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110318274.1A Active CN103068011B (en) 2011-10-19 2011-10-19 The method and apparatus of power deratng in multi-frequency network

Country Status (2)

Country Link
CN (1) CN103068011B (en)
WO (1) WO2013056624A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015089840A1 (en) * 2013-12-20 2015-06-25 华为技术有限公司 Method, centralized controller, and device for radio resource optimization management
CN107846727B (en) * 2016-09-21 2021-01-15 中国移动通信有限公司研究院 Power control method and device

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1355625A (en) * 2000-11-28 2002-06-26 华为技术有限公司 Method and control system for balancing loads between common frequency small regions in CDMA communication system
CN101322326A (en) * 2005-10-14 2008-12-10 高通股份有限公司 Methods and apparatus for controlling a base station's transmission power
CN101686497A (en) * 2008-09-24 2010-03-31 华为技术有限公司 Cell load equalization method, and cell load evaluation method and device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010039908A1 (en) * 2008-09-30 2010-04-08 Spridercloud Wireless Methods and apparatus for generating, reporting and/or using interference cancellation information

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1355625A (en) * 2000-11-28 2002-06-26 华为技术有限公司 Method and control system for balancing loads between common frequency small regions in CDMA communication system
CN101322326A (en) * 2005-10-14 2008-12-10 高通股份有限公司 Methods and apparatus for controlling a base station's transmission power
CN101686497A (en) * 2008-09-24 2010-03-31 华为技术有限公司 Cell load equalization method, and cell load evaluation method and device

Also Published As

Publication number Publication date
CN103068011A (en) 2013-04-24
WO2013056624A1 (en) 2013-04-25

Similar Documents

Publication Publication Date Title
CN102026287B (en) Method for cooperative transmission within heterogeneous stations
CN203708499U (en) Mobile end system supporting narrowband and wideband dual-mode fusion
CN103874072A (en) Communication interference processing method and wireless router
WO2021097698A1 (en) Uplink access method, electronic device and storage medium
CN102497658A (en) Multimode switching method for heterogeneous network
WO2020098640A1 (en) Multi-standard network control method, and network management device
US20210289384A1 (en) Method for controlling function of terminal device, terminal device and network device
CN111818620A (en) Network selection method and system for multi-mode terminal
US9414284B2 (en) Methods and an apparatus for applying radio-access network-selection and traffic-routing policies in a communication device
CN104703241A (en) Cell handover method and device
CN111786764B (en) Method, system, terminal device and computer readable storage medium for selecting main carrier
CN111698738B (en) Boundary switching method and device for 5G shared carrier
WO2016082228A1 (en) Method and apparatus for adjusting air interface capacity density
CN109792606A (en) A kind of data transfer optimization method, terminal and the network equipment
CN102076044B (en) Switching method and equipment
CN105744592A (en) Service Access Method, Device and System Based on Heterogeneous Wireless Network
CN103068011B (en) The method and apparatus of power deratng in multi-frequency network
CN112672364B (en) Policy configuration method, device, related equipment and storage medium
US20160204925A1 (en) Filter-Based Guardband Determination and Subcarrier Selection
EP3026975A1 (en) Method and device for channel bandwidth selection
WO2022151454A1 (en) Method for cell selection or reselection, terminal device, and network device
CN111698737B (en) Method and device for reselecting boundary of shared carrier
Wang et al. Key technologies of green communication for 5G mobile network
CN1555145A (en) Method and device for using cross time slot resource in time division duplex CDMA system
CN112105059B (en) Shunting method and shunting control base station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant