Bathroom heating device with new wind function
Technical field
The invention belongs to heating installation, specifically a kind of bathroom heating device with new wind function.
Background technology
Existing bathroom heating device, there are no new wind function, when behind bathroom heating, room air is difficult to upgrade.
Summary of the invention
The technical assignment of the technical problem to be solved in the present invention and proposition is to overcome the defective that existing bathroom heating device can not upgrade room air, and a kind of bathroom heating device with new wind function is provided.
For this reason, the bathroom heating device with new wind function of the present invention, it has a shell, it is characterized in that:
Described shell inner route clapboard is divided into the first chamber arranged side by side, the second chamber;
Settle the first blower fan in described the first chamber, the air outlet of described the first blower fan is arranged in the outside of described the first chamber, and return air inlet is established in the indoor of described the first chamber;
Settle the second blower fan in described the second chamber, the air outlet of described the second blower fan is provided with heating installation and is arranged in the indoor of described the second chamber, and fresh wind port is established in the outside of described the second chamber;
Described dividing plate is provided with the control air-flow by first air door of the first chamber to the circulation of the second chamber, is provided with the control air-flow between described fresh wind port and the second blower fan by second air door of fresh wind port to the circulation of the second blower fan.
As the optimization technique means: the front side of described the first air door or rear side are established the first air filter.Further, described the first air filter comprises at least a in antibiotic filter screen, Electrostatic Absorption filter, the anion generator.
As the optimization technique means: the front side of described the second air door or rear side are established the second air filter.Further, described the second air filter comprises at least a in antibiotic filter screen, Electrostatic Absorption filter, the anion generator.
As the optimization technique means: described the first blower fan, the second blower fan consist of by spiral case, the motor that places the wind wheel in the described spiral case and drive described wind wheel.
The invention has the beneficial effects as follows: the function that has ventilation and replenish new wind, can purify air, and can effectively protect heating element, improve service life and the efficient of heating element.
Description of drawings
Fig. 1 is principle schematic of the present invention;
Fig. 2 is that A-A among Fig. 1 is to cutaway view;
Number in the figure explanation: 1-shell, 2-dividing plate, 3-the first chamber, 4-the second chamber, 5-the first blower fan, the air outlet of 6-the first blower fan, the 7-return air inlet, 8-the second blower fan, the air outlet of 9-the second blower fan, the 10-heating installation, 11-fresh wind port, 12-the first air door, 13-the second air door, 14-the first air filter, 15-the second air filter, the 16-spiral case, 17-wind wheel, 18-motor.
The specific embodiment
The present invention will be further described below in conjunction with Figure of description.
Bathroom heating device with new wind function of the present invention, as shown in Figure 1, 2, it has a shell 1, and shell 1 inner route clapboard 2 is divided into the first chamber 3 arranged side by side, the second chamber 4; The air outlet 6 of the first chamber 3 interior arrangement the first blower fan 5, the first blower fans 5 is arranged in the outside of the first chamber 3, and return air inlet 7 is established in the indoor of the first chamber 3; The air outlet 9 of the second chamber 4 interior arrangement the second blower fan 8, the second blower fans 8 is provided with heating installation 10(such as PTC) and be arranged in the indoor of the second chamber 4, fresh wind port 11 is established in the outside of the second chamber 4; Dividing plate 2 is provided with the control air-flow by first air door 12 of the first chamber 3 to 4 circulations of the second chamber, is provided with the control air-flow between fresh wind port 11 and the second blower fan 8 by second air door 13 of fresh wind port 11 to 8 circulations of the second blower fan.
The present invention can work in following pattern:
1, ventilation: closed ventilation switch, the first blower fan 5 starts, and the second blower fan 8 is not worked, and room air advances the first chamber 3 by return air inlet 7, and the air outlet 6 through the first blower fan 5, the first blower fan drains into outdoor again;
2, heating: closed heating switch, the second blower fan 8 starts, and the first blower fan 5 is not worked, and the first air door 12 is opened, the second air door 14 is closed, and flow through the successively air outlet 9 of return air inlet 7, the first chamber 3, the first air door 12, the second chamber 4, the second blower fan 8, the second blower fan of indoor air flow flows back to indoor; Therebetween, air-flow is through heating installation 10 heating; Because the air outlet 9 of return air inlet 7, the second blower fan, forms the systemic circulation heating all in the indoor, heating effect is good;
3, inletting fresh air: closed new wind switch, the second blower fan 8 starts, and the first blower fan 5 is not worked, and the first air door 12 is closed, the second air door 14 is opened, and flow through the successively air outlet 9 of fresh wind port 11, the second air door 13, the second chamber 4, the second blower fan 8, the second blower fan of outdoor airflow enters indoor;
4, indoor seasoning: make the warmer alternation can realize indoor seasoning in heating pattern, ventilatory pattern regular hour.
During enforcement, the front side of the first air door 12 or rear side are established the first air filter 14, the first air filters 14 and are comprised at least a in antibiotic filter screen, Electrostatic Absorption filter, the anion generator.The front side of the second air door 13 or rear side are established the second air filter 15, the second air filters 15 and are comprised at least a in antibiotic filter screen, Electrostatic Absorption filter, the anion generator.The first blower fan, the second blower fan consist of by spiral case 16, the motor 18 that places the wind wheel 17 in the spiral case 16 and drive wind wheel 17.