CN103061315B - 一种监测仪器埋设保护装置 - Google Patents
一种监测仪器埋设保护装置 Download PDFInfo
- Publication number
- CN103061315B CN103061315B CN201310009798.1A CN201310009798A CN103061315B CN 103061315 B CN103061315 B CN 103061315B CN 201310009798 A CN201310009798 A CN 201310009798A CN 103061315 B CN103061315 B CN 103061315B
- Authority
- CN
- China
- Prior art keywords
- monitoring instrument
- qian shape
- shape plate
- protective device
- underground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
本发明公开了一种监测仪器埋设保护装置,包括两块第一凵型板和两块第二凵型板,所述第二凵型板在贯穿直角处设有L型卡槽,每个第一凵型板的两个直角分别嵌入两个第二凵型板的卡槽后构成矩形保护框架,所述L型卡槽的宽度与所述第一凵型板的厚度相适配;本发明巧妙地利用凵型板和带卡槽的凵型板互相嵌套形成一个矩形保护框架,结构简单,成本低,且拼接方法便捷,在保护框架提升的过程中,只需采用人力或简易的起吊装置便能将保护框架提升至新的高程,而不用使用大型的起吊设备,达到了降低费用,减少施工干扰,加快施工进度的目的;本发明只需根据监测仪器的高度选择保护框架的数量,通过叠加对埋设的监测仪器进行保护,使用灵活,施工简便。
Description
技术领域
本发明涉及一种监测仪器,具体涉及一种监测仪器埋设保护装置。
背景技术
为监控堤坝施工及运行状态往往要埋设及安置大量的监测仪器,大量的内观仪器需伴随堤坝施工同时埋设,由于施工过程中所用大型机械的自重及巨大的冲击力,因而需在埋设仪器周边设置相应的防护装置。现有的防护装置主要是在仪器外围放置一个大型的圆柱形钢筒,钢筒外侧坝体碾压结束后,放入监测仪器,再将筒内坝土用小型振动器械分层碾压密实,碾压完成后再将钢筒用起重器械吊装拔出,单点仪器完成埋设过程完成;测压管等长条状仪器则需配合坝体逐层往上碾压而重复这一过程,直到达到埋设高程。
采用以上装置主要存在以下两点不足:首先,钢筒自重和体积较大,转运、安装及吊拔均要用到较大型的机械,施工较繁琐,费用较高;其次,起重设备与施工机械互相干扰,影响施工进度。
实用新型发明内容
发明目的:本发明的目的在于针对现有技术的不足,提供一种结构简单且施工便捷的监测仪器埋设保护装置。
技术方案:本发明提供了一种监测仪器埋设保护装置,包括两块第一凵形板和两块第二凵形板,所述第二凵形板在贯穿直角处设有L形卡槽,故每个第二凵形板共有2个L形卡槽,每个第一凵形板的两个直角分别嵌入两个第二凵形板的L形卡槽后构成矩形保护框架,将监测仪器置于矩形保护框架的中心,通过将矩形保护框架内外的坝土碾压密实,矩形保护框架可有效防止堤坝施工过程中外来冲击力,组装过程快速简单,以达到对监测仪器的保护作用。
优选地,所述L形卡槽的宽度与所述第一凵形板的厚度相适配,以便第一凵形板插入第二凵形板的卡槽后结合更加紧密,形成的矩形保护框架强度大且更加牢固,抗击冲击力时更加稳定。
为了进一步增强矩形保护框架的坚固性,所述第二凵形板在L型卡槽处设有加厚层,避免第二凵形板因设置卡槽而造成强度降低,保证了矩形保护框架各处都满足抗冲击需求,提升整体结构的稳定性。
为了便于将所述矩形保护框架拔吊到所需高程,所述第一凵形板和第二凵形板在顶部边缘设有突出的环状的起吊点,可使用人力或简易起吊装置钩住起吊点,将两块第一凵形板和两块第二凵形板分别拔高;因矩形保护框架自重小且结构简单,故矩形保护框架和内外土坯的摩擦力小,不需要大型起重设备即可吊起,施工过程便捷,不影响堤坝建设进度。优选地,所述起吊点在所述第一凵形板和第二凵形板的长边顶部均匀设置1~3个,此时起吊省力。
为了使矩形保护框架吊拔至坝土碾压高程,在所述第一凵形板和第二凵形板的内表面和外表面同一高度上做高程标示,在往上拔起的过程中露出高程标示时停止起吊,此时所在位置为新的碾压高程。
在保护长条状的监测仪器时,该监测仪器埋设保护装置由两组以上矩形保护框架在高程上重复叠加形成以增加所述监测仪器埋设保护装置的高度,具体地,在原矩形保护框架的碾压高程处再次拼接一个矩形保护框架,向上吊拔形成新的高程,如此反复,根据监测仪器的高度完成整个监测仪器的埋设工作,因此不论监测仪器的高度,只需累积拼接矩形保护框架即可达到保护的目的。
有益效果:1、本发明巧妙地利用凵形板和带卡槽的凵形板互相嵌套形成一个矩形保护框架,结构简单,成本低,且拼接方法便捷,在保护框架提升的过程中,只需采用人力或简易的起吊装置便能将保护框架提升至新的高程,而不用使用大型的起吊设备,达到了降低费用,减少施工干扰,加快施工进度的目的;2、本发明只需根据监测仪器的高度选择保护框架的数量,通过叠加对埋设的监测仪器进行保护,使用灵活,施工简便。
附图说明
图1为本发明的俯视结构示意图;
图2为本发明所述第一凵形板的结构示意图;
图3为本发明所述第二凵形板的结构示意图;
图4为图1中沿A-A的剖面图。
具体实施方式
下面对本发明技术方案进行详细说明,但是本发明的保护范围不局限于所述实施例。
实施例:如图1所示,一种监测仪器埋设保护装置,包括两块第一凵形板1和两块第二凵形板2,如图2所示,每个第二凵形板2在贯穿直角处设有L形卡槽3,起吊如图3所示的第一凵形板1,将其直角从顶部由上至下插入第二凵形板2的L形卡槽3的底部,起吊另一块第二凵形板2卡住第一凵形板1的另一个直角,最后起吊另一块第一凵形板1由顶部同时插入两块第二凵形板2的L形卡槽3的底部构成矩形保护框架,将监测仪器置于矩形保护框架的中心,通过将矩形保护框架内外的坝土碾压密实,矩形保护框架可有效防止堤坝施工过程中外来冲击力,组装过程快速简单,以达到对监测仪器的保护作用。
所述L形卡槽3的宽度与所述第一凵形板1的厚度相等,使第一凵形板1插入第二凵形板2的卡槽后结合更加紧密,形成的矩形保护框架强度大且更加牢固,抗击冲击力时更加稳定;第二凵形板2在L型卡槽3处设有加厚层4,进一步增强矩形保护框架的坚固性,避免第二凵形板2因设置卡槽而造成强度降低,保证了矩形保护框架各处都满足抗冲击需求,提升整体结构的稳定性。
所述第一凵形板1和第二凵形板2分别在长边的顶部边缘均匀地设有两个突出的环状的起吊点,在完成整个矩形保护框架的组装工作后,将保护框架外的坝土进行碾压,对保护框架内覆盖监测仪器的坝土用小型振动器械分层碾压密实,直到与外围坝土达到同一高程,使用人力或简易起吊装置钩住起吊点,将两块第一凵形板1和两块第二凵形板2分别拔高,将所述矩形保护框架拔吊到所需高程,因矩形保护框架自重小且结构简单,故矩形保护框架和内外土坯的摩擦力小,起吊省力,不需要大型起重设备即可吊起,施工过程便捷,不影响堤坝建设进度。
如图4所示,在第二凵形板2的内表面的同一水平线上做三个高程标示5,外表面相同高度上也做三个高程标示5,同理,第一凵形板1和另一块第二凵形板2的内外表面也分别做三个高程标示5,在往上起吊的过程中直到露出高程标示5时停止,此时所在位置为新的碾压高程;在该新的碾压高程上重复叠加矩形保护框架,再向上吊拔形成新的高程,如此反复,根据监测仪器的高度完成整个监测仪器的埋设工作,用以保护长条状的监测仪器,因此不论监测仪器的高度,只需累积拼接矩形保护框架即可完成整个保护装置的埋设工作,达到对监测仪器的保护目的。
如上所述,尽管参照特定的优选实施例已经表示和表述了本发明,但其不得解释为对本发明自身的限制。在不脱离所附权利要求定义的本发明的精神和范围前提下,可对其在形式上和细节上作出各种变化。
Claims (7)
1.一种监测仪器埋设保护装置,包括两块第一凵形板(1)和两块第二凵形板(2),其特征在于:每个所述第二凵形板(2)在贯穿直角处设有L形卡槽(3),每个所述第一凵形板(1)的两个直角分别嵌入两个第二凵形板(2)的L形卡槽(3)后构成矩形保护框架。
2.根据权利要求1所述的监测仪器埋设保护装置,其特征在于:所述L形卡槽(3)的宽度与所述第一凵形板(1)的厚度相适配。
3.根据权利要求1所述的监测仪器埋设保护装置,其特征在于:所述第二凵形板(2)在L型卡槽(3)处设有加厚层(4)。
4.根据权利要求1所述的监测仪器埋设保护装置,其特征在于:所述第一凵形板(1)和第二凵形板(2)在顶部边缘设有突出的环状的起吊点。
5.根据权利要求4所述的监测仪器埋设保护装置,其特征在于:所述起吊点在所述第一凵形板(1)和第二凵形板(2)的长边顶部均匀设置1~3个。
6.根据权利要求1所述的监测仪器埋设保护装置,其特征在于:在所述第一凵形板(1)和第二凵形板(2)的内表面和外表面同一高度上做高程标示(5)。
7.根据权利要求1所述的监测仪器埋设保护装置,其特征在于:该监测仪器埋设保护装置由两组以上所述矩形保护框架在高程上重复叠加形成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310009798.1A CN103061315B (zh) | 2013-01-11 | 2013-01-11 | 一种监测仪器埋设保护装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310009798.1A CN103061315B (zh) | 2013-01-11 | 2013-01-11 | 一种监测仪器埋设保护装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103061315A CN103061315A (zh) | 2013-04-24 |
CN103061315B true CN103061315B (zh) | 2014-07-09 |
Family
ID=48104181
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310009798.1A Active CN103061315B (zh) | 2013-01-11 | 2013-01-11 | 一种监测仪器埋设保护装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103061315B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120644A (zh) * | 2016-08-17 | 2016-11-16 | 扬州大学 | 一种监测仪器埋设保护装置 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4775009A (en) * | 1986-01-17 | 1988-10-04 | Institut Francais Du Petrole | Process and device for installing seismic sensors inside a petroleum production well |
CN1114377A (zh) * | 1994-12-15 | 1996-01-03 | 电力工业部南京自动化研究所 | 一种在碾压混凝土中埋设成组应变计的方法 |
CN1558182A (zh) * | 2004-01-17 | 2004-12-29 | 湖北清江水布垭工程建设公司 | 坝体面板挠度或坝体内部水平及垂直变形的测量系统 |
CN101231164A (zh) * | 2007-12-28 | 2008-07-30 | 中国水电顾问集团中南勘测设计研究院 | 碾压混凝土监测仪器埋设的装置及方法 |
CN101660898A (zh) * | 2009-09-24 | 2010-03-03 | 宁波杉工结构监测与控制工程中心有限公司 | 一种光纤光栅路面应变传感器 |
CN101915094A (zh) * | 2010-08-04 | 2010-12-15 | 煤炭科学研究总院重庆研究院 | 矿层采动过程覆岩位移连续监测系统及其构建方法 |
CN201679025U (zh) * | 2010-04-24 | 2010-12-22 | 云峰发电厂 | 大坝双金属标位移自动化监测系统 |
CN203096700U (zh) * | 2013-01-11 | 2013-07-31 | 河海大学 | 一种监测仪器埋设保护装置 |
-
2013
- 2013-01-11 CN CN201310009798.1A patent/CN103061315B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4775009A (en) * | 1986-01-17 | 1988-10-04 | Institut Francais Du Petrole | Process and device for installing seismic sensors inside a petroleum production well |
CN1114377A (zh) * | 1994-12-15 | 1996-01-03 | 电力工业部南京自动化研究所 | 一种在碾压混凝土中埋设成组应变计的方法 |
CN1558182A (zh) * | 2004-01-17 | 2004-12-29 | 湖北清江水布垭工程建设公司 | 坝体面板挠度或坝体内部水平及垂直变形的测量系统 |
CN101231164A (zh) * | 2007-12-28 | 2008-07-30 | 中国水电顾问集团中南勘测设计研究院 | 碾压混凝土监测仪器埋设的装置及方法 |
CN101660898A (zh) * | 2009-09-24 | 2010-03-03 | 宁波杉工结构监测与控制工程中心有限公司 | 一种光纤光栅路面应变传感器 |
CN201679025U (zh) * | 2010-04-24 | 2010-12-22 | 云峰发电厂 | 大坝双金属标位移自动化监测系统 |
CN101915094A (zh) * | 2010-08-04 | 2010-12-15 | 煤炭科学研究总院重庆研究院 | 矿层采动过程覆岩位移连续监测系统及其构建方法 |
CN203096700U (zh) * | 2013-01-11 | 2013-07-31 | 河海大学 | 一种监测仪器埋设保护装置 |
Non-Patent Citations (5)
Title |
---|
张猛等.戈兰滩碾压混凝土坝内观监测仪器安装埋设.《水利水电工程设计》.2009,(第2期),第32-34、50页. |
戈兰滩碾压混凝土坝内观监测仪器安装埋设;张猛等;《水利水电工程设计》;20090630(第2期);第32-34、50页 * |
碾压混凝土大坝中应变计组埋设方法的研究;郭金根等;《大坝观测与土工测试》;20001020(第5期);第37-39页 * |
郭金根等.碾压混凝土大坝中应变计组埋设方法的研究.《大坝观测与土工测试》.2000,(第5期),第37-39页. |
魏德荣等.混凝土坝安全监测技术规范DL/T 5178-2003.《混凝土坝安全监测技术规范DL/T 5178-2003》.2003,附录E第E.3章监测仪器埋设. * |
Also Published As
Publication number | Publication date |
---|---|
CN103061315A (zh) | 2013-04-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206502579U (zh) | 电杆起吊装置 | |
CN203173681U (zh) | 地下连续墙超长钢筋笼整体吊装装置 | |
CN103427373A (zh) | 多用途电缆转角保护性敷设滑轮组 | |
CN103061315B (zh) | 一种监测仪器埋设保护装置 | |
CN203096700U (zh) | 一种监测仪器埋设保护装置 | |
CN204401395U (zh) | 一种路基箱 | |
CN204185880U (zh) | 一种防止连续墙混凝土回流的接头箱 | |
CN205954572U (zh) | 一种新型大坝安全监测仪器埋设保护装置 | |
CN206457791U (zh) | 一种大坝监测仪器埋设保护装置 | |
CN203434534U (zh) | 多用途电缆转角保护性敷设滑轮组 | |
CN203938396U (zh) | 一种工程吊装设备 | |
CN203997424U (zh) | 悬挂式管材堆放装置 | |
CN106120644A (zh) | 一种监测仪器埋设保护装置 | |
CN203278108U (zh) | 电力电缆敷设器 | |
CN104963329A (zh) | 一种软基孔压计埋设方法 | |
CN208022649U (zh) | 用于大型机械设备的起吊运输装置 | |
CN206827969U (zh) | 单臂起重机 | |
CN205397923U (zh) | 一种建筑施工用悬吊装置 | |
CN201794060U (zh) | 一种悬挂式潜孔钢闸门 | |
CN202052809U (zh) | 矫直机升降装置 | |
CN204897252U (zh) | 一种简易抱杆起重机 | |
CN203601760U (zh) | 砖架 | |
CN203625935U (zh) | 电缆井盖防坠保护装置 | |
CN204400487U (zh) | 悬挂式吊臂机 | |
CN203976260U (zh) | 一种可移动桅杆式起重机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |