CN103057666A - Ship mooring hole plate - Google Patents

Ship mooring hole plate Download PDF

Info

Publication number
CN103057666A
CN103057666A CN2013100334205A CN201310033420A CN103057666A CN 103057666 A CN103057666 A CN 103057666A CN 2013100334205 A CN2013100334205 A CN 2013100334205A CN 201310033420 A CN201310033420 A CN 201310033420A CN 103057666 A CN103057666 A CN 103057666A
Authority
CN
China
Prior art keywords
plate
web
ship mooring
ship
mooring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100334205A
Other languages
Chinese (zh)
Inventor
冯波
周宝先
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
COSCO (DALIAN) SHIPYARD Co Ltd
Original Assignee
COSCO (DALIAN) SHIPYARD Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by COSCO (DALIAN) SHIPYARD Co Ltd filed Critical COSCO (DALIAN) SHIPYARD Co Ltd
Priority to CN2013100334205A priority Critical patent/CN103057666A/en
Publication of CN103057666A publication Critical patent/CN103057666A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a ship mooring hole plate comprising a longitudinal web plate (1), a transverse web plate (2), a cover plate (3) and a transverse plate (4). The longitudinal web plate (1) and the transverse web plate (2) are crossly welded, the cover plate (3) is mounted on the longitudinal web plate (1), and the transverse plate (4) is mounted on the transverse web plate (2). The ship mooring hole plate has the advantages that mooring cost is reduced, cable using efficiency is improved and working difficulty is lowered.

Description

A kind of ship mooring eye plate
Technical field
The present invention relates to a kind of ship mooring eye plate.
Background technology
In the prior art, construction at boats and ships, in repairing and the retrofit process, terminal operation occupies the most of operations time, have repeatedly shifting berth and mooring operation according to the progress of engineering during this time, conventional way is to arrange a plurality of berthing accommodations such as checking bollard and mooring pipe of temporarily leading at the boats and ships main deck, this kind way need to be purchased berthing accommodations such as leading specially checking bollard and mooring pipe, and be installed to main deck and reinforced structure for installation, cost is higher, needs man-hour more, and because ship deck identity distance harbour is higher, the hawser point of action is far away apart from the boats and ships center of gravity, the hawser Occupation coefficient is not high, often arranges fixedly boats and ships of a lot of root hawsers, and the mooring process of untying the mooring rope is also wasted a large amount of man-hours.
Summary of the invention
The purpose of this invention is to provide a kind of reduction mooring cost, improve the service efficiency of hawser, reduce the ship mooring eye plate of task difficulty.
The technical scheme that the present invention adopts for achieving the above object is: a kind of ship mooring eye plate, comprise vertical web (1), transversal web (2), cladding plate (3) and transverse panel (4), described vertical web (1) and transversal web (2) right-angled crossing weld together, described cladding plate (3) is installed on vertical web (1), and described transverse panel (4) is installed on the transversal web (2).
Have through hole on described vertical web (1).
Have the hole corresponding with the upper through hole of vertical web (1) on the described cladding plate (3).
A kind of ship mooring eye plate of the present invention, that adopts self-control traction mooring eye plate to substitute to need special buying leads the berthing accommodations such as checking bollard and mooring pipe, the eye plate material adopts shipyard high strength AH36 grade steel plate commonly used, can use clout or waste-material-preparing, reduces the cost of equipment purchase aspect; This ship mooring eye plate is arranged in side plating, near boats and ships center of gravity place, more meets mechanics principle, improved the Occupation coefficient of hawser; This kind ship mooring eye plate is easy to use, uses shackle to be connected with hawser during use and gets final product, and has improved installation effectiveness.
Description of drawings
Fig. 1 is the structural representation of a kind of ship mooring eye plate of the present invention.
Fig. 2 is the A-A cutaway view of Fig. 1.
Fig. 3 is the B-B cutaway view of Fig. 2.
Among the figure: 1, vertical web; 2, transversal web; 3, cladding plate; 4, transverse panel.
The specific embodiment
Such as Fig. 1, Fig. 2 and shown in Figure 3, the ship mooring eye plate, comprise vertical web 1, transversal web 2, cladding plate 3 and transverse panel 4, vertical web 1 and transversal web 2 right-angled crossing weld togethers, described cladding plate 3 is installed on vertical web 1, described transverse panel 4 is installed on the transversal web 2, vertically have through hole on the web 1, have the hole corresponding with through hole on vertical web 1 on the cladding plate 3, ship mooring eye plate of the present invention, utilize the high-strength AH36 steel plate of shipyard stock steel plate to carry out blanking prefabricated, and Welding Safety workload mark (SWL85T), hold groove successfully, the completion flaw detection, the numbering warehouse-in, the ship mooring eye plate is installed to ship plank, and notice that the Type of Welding between eye plate and the ship plank is complete penetraction and fusion in welding, welding need to finish flaw detection, the adjustment of harbour checking bollard deployment scenarios is looked in the installation site of eye plate on ship plank, when the mooring eye plate uses, use shackle to connect eye plate and get final product with hawser and with harbour is fixing, during use the harbour high altitude vehicle to cooperate or the cooperation of use shore tackle, mooring band cable is very convenient, and can be used for tugboat to the traction diversion operation of boats and ships.

Claims (3)

1. ship mooring eye plate, it is characterized in that: comprise vertical web (1), transversal web (2), cladding plate (3) and transverse panel (4), described vertical web (1) and transversal web (2) right-angled crossing weld together, described cladding plate (3) is installed on vertical web (1), and described transverse panel (4) is installed on the transversal web (2).
2. a kind of ship mooring eye plate according to claim 1 is characterized in that: have through hole on described vertical web (1).
3. a kind of ship mooring eye plate according to claim 1 is characterized in that: have the hole corresponding with the upper through hole of vertical web (1) on the described cladding plate (3).
CN2013100334205A 2013-01-29 2013-01-29 Ship mooring hole plate Pending CN103057666A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100334205A CN103057666A (en) 2013-01-29 2013-01-29 Ship mooring hole plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100334205A CN103057666A (en) 2013-01-29 2013-01-29 Ship mooring hole plate

Publications (1)

Publication Number Publication Date
CN103057666A true CN103057666A (en) 2013-04-24

Family

ID=48100632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100334205A Pending CN103057666A (en) 2013-01-29 2013-01-29 Ship mooring hole plate

Country Status (1)

Country Link
CN (1) CN103057666A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110228570A (en) * 2019-07-01 2019-09-13 上海外高桥造船有限公司 Offshore floating type produces oil storage ship
CN111846108A (en) * 2020-08-05 2020-10-30 上海外高桥造船有限公司 Mooring system and ship comprising same

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3754525A (en) * 1972-01-20 1973-08-28 A Leighty Portable anchor unit
US20050066870A1 (en) * 1996-09-04 2005-03-31 Burns Peter Robert Ground anchors using tines and compression plate
RU2370403C1 (en) * 2008-07-14 2009-10-20 Государственное образовательное учреждение высшего профессионального образования Марийский государственный технический университет Portable anchor
CN101559826A (en) * 2008-04-18 2009-10-21 王晓勇 High-efficiency taper leak stoppage tool
CN101835682A (en) * 2007-10-26 2010-09-15 霍顿深水发展系统有限公司 The method of anchor and mooring system and mooring ship
CN102050201A (en) * 2009-08-13 2011-05-11 美铝公司 Tie down assembly
CN102126540A (en) * 2010-01-20 2011-07-20 美铝公司 Tie down assembly

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3754525A (en) * 1972-01-20 1973-08-28 A Leighty Portable anchor unit
US20050066870A1 (en) * 1996-09-04 2005-03-31 Burns Peter Robert Ground anchors using tines and compression plate
CN101835682A (en) * 2007-10-26 2010-09-15 霍顿深水发展系统有限公司 The method of anchor and mooring system and mooring ship
CN101559826A (en) * 2008-04-18 2009-10-21 王晓勇 High-efficiency taper leak stoppage tool
RU2370403C1 (en) * 2008-07-14 2009-10-20 Государственное образовательное учреждение высшего профессионального образования Марийский государственный технический университет Portable anchor
CN102050201A (en) * 2009-08-13 2011-05-11 美铝公司 Tie down assembly
CN102126540A (en) * 2010-01-20 2011-07-20 美铝公司 Tie down assembly

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110228570A (en) * 2019-07-01 2019-09-13 上海外高桥造船有限公司 Offshore floating type produces oil storage ship
CN111846108A (en) * 2020-08-05 2020-10-30 上海外高桥造船有限公司 Mooring system and ship comprising same

Similar Documents

Publication Publication Date Title
CN101492140A (en) Sling apparatus for aluminum alloy catamaran and whole-boat set afloat process
CN206634166U (en) A kind of working ship
CN102312438A (en) Piling construction equipment for large steel pipe piles of seaborn intertidal zone wind power station
CN207045637U (en) A kind of floating ship terminals
CN103723247B (en) Binding-type fixing device in single-point floating drum shipment transportation
CN103057666A (en) Ship mooring hole plate
CN201816726U (en) Structure of floating type multifunctional refuge harbor
CN104354831A (en) Installation process for tail roller of three-purpose working ship
CN105539740A (en) Wharf boarding ladder of FLNG barge
CN101870435A (en) Overturned hoisting method for helicopter platform
KR20150065442A (en) Movable mooring system and the ship having it
CN204037857U (en) Floating Production oil storage emptying equipment alongside fender structure
CN201685988U (en) Height positioning device for afloat joining of main body of 1600-ton crane ship
NO20141466A1 (en) Pipe section for floating bridge
KR101313164B1 (en) Bitt for building vessel
CN107021187A (en) A kind of working ship and under water thing transportation installation method
CN104358234A (en) Over-water floating gate type anti-collision device and manufacture and installation method thereof
CN209241255U (en) Enclosed diplopore fairlead
CN105714680A (en) Floating drilling platform for underwater pile foundation of bridge
CN110696963A (en) Ship wharf mooring method
Liang Heavy lift installation study of offshore structures
RU2735475C1 (en) System for lifting of sunken objects
KR102632396B1 (en) Apparatus for reducing flow resistance in moonpool and a ship having the same
CN207987709U (en) A kind of pontoon structure convenient for bridge construction
Ghosh et al. Role of Marine Warranty Surveyors and their requirements for selected items

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20161228

C20 Patent right or utility model deemed to be abandoned or is abandoned