CN103051466A - Method and device for automatically recovering IMA device failure - Google Patents

Method and device for automatically recovering IMA device failure Download PDF

Info

Publication number
CN103051466A
CN103051466A CN2011103082917A CN201110308291A CN103051466A CN 103051466 A CN103051466 A CN 103051466A CN 2011103082917 A CN2011103082917 A CN 2011103082917A CN 201110308291 A CN201110308291 A CN 201110308291A CN 103051466 A CN103051466 A CN 103051466A
Authority
CN
China
Prior art keywords
ima
active link
state
link number
group state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103082917A
Other languages
Chinese (zh)
Other versions
CN103051466B (en
Inventor
关鲁君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201110308291.7A priority Critical patent/CN103051466B/en
Priority to PCT/CN2012/079769 priority patent/WO2013053260A1/en
Publication of CN103051466A publication Critical patent/CN103051466A/en
Application granted granted Critical
Publication of CN103051466B publication Critical patent/CN103051466B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses a method for automatically recovering an IMA device failure. The method comprises the following steps of monitoring the state of an IMA group; restarting an IMA group state machine when the link-insufficient state duration of the IMA group exceeds a preset threshold; and resetting the minimum active link number as a value which is no more than the current active link number. According to the technical scheme of the invention, the problem that the group state machine can be restarted by only manual operation when the group state machine based on the standard IMA protocol is blocked in the link-insufficient state is solved, thereby implementing the automatic recovery of the IMA device failure, and making full use of the network resources. The invention further discloses a device for automatically recovering the IMA device failure, comprising a group state monitor module, a group state machine restarting module, and a minimum active link number resetting module.

Description

Automatic recovery method and device after a kind of IMA equipment fault
Technical field
The present invention relates to PTN (Packet Transport Network, Packet Transport Network) technical field, relate in particular to the method and the device that automatically recover after the equipment fault of a kind of support IMA (Inverse Multiplexing for ATM, oppositely ATM is multiplexing) agreement.
Background technology
Ima protocol is a kind of agreement that runs between the terminal device, and two ends need the interaction protocol content to guarantee that two ends transmitting-receiving bag is normal.When only having near-end and far-end group all to be in Operational (can operate) state, the near-end group could send ATM (Asynchronous Transfer Mode, asynchronous transfer mode) cell, group flow status machine are exactly that state by near-end group and far-end group represents whether the near-end group can send ATM cell.
Fig. 1 is the status change schematic diagram of IMA group flow status machine, and as shown in Figure 1, if an end is because link failure can't enter the Operational state, then the two ends of IMA group can not send ATM cell.In the group state machine of ima protocol, enter stable state after, the group state circulates between Operational, Blocked (obstruction) and Insufficent-Links (insufficient-links).If because the number of links that link failure causes activating is less than the minimal chain way that disposes, organize so state and will remain on the Insufficent-Links state always, even also have some links to use, the IMA group can not send ATM cell yet, and Internet resources can not get effective utilization.
Summary of the invention
The invention provides automatic recovery method and device after a kind of IMA equipment fault, with solve in the prior art when since link failure enter the Insufficent-Links state after Internet resources can not get the effectively problem of utilization.
The invention provides automatic recovery method after a kind of IMA equipment fault, comprising:
Monitoring IMA group state;
When IMA organizes state at the Insufficent-Links state, restart the IMA group state machine;
Minimum active link number is re-set as the value that is not more than current active link number.
Further, describedly restart the IMA group state machine when IMA group state during at the Insufficent-Links state, the concrete grammar of employing is:
When IMA organizes state when the duration of Insufficent-Links state surpasses default thresholding, restart the IMA group state machine.
Further, the span of described default thresholding is 0 to 1 hour.
Again further, the span of described default thresholding is 0 to 5 second.
Further, described minimum active link number is re-set as the value that is not more than current active link number, refers to minimum active link number is re-set as the value that equals current active link number.
The present invention also provides automatic recovery device after a kind of IMA equipment fault, comprising:
The group state monitoring module is used for monitoring IMA group state;
Group state machine is restarted module, is used for restarting the IMA group state machine when IMA organizes state at the Insufficent-Links state;
Minimum active link is counted the replacement module, is used for minimum active link number is re-set as the value that is not more than current active link number.
Further, describedly restart the IMA group state machine when IMA group state during at the Insufficent-Links state, be specially:
When IMA organizes state when the duration of Insufficent-Links state surpasses default thresholding, restart the IMA group state machine.
Further, the span of described default thresholding is 0 to 1 hour.
Again further, the span of described default thresholding is 0 to 5 second.
Further, described minimum active link number is re-set as the value that is not more than current active link number, refers to minimum active link number is re-set as the value that equals current active link number.
Beneficial effect of the present invention is as follows:
The present invention is by autoboot IMA group state machine, and reduce minimum active link number, solved in the prior art measured ima protocol when the IMA group state machine is stuck in the Insufficent-Links state, can only manually intervene, and manually the problem that just can enter IMA group state machine rebooting status is disposed in change.The present invention need not manual intervention, autoboot IMA group state machine, and adjust configuration parameter, and make the IMA group can transmit ATM cell, take full advantage of Internet resources.Treat after the network disaster recovery, can the manual amendment dispose, do not affect original network configuration
Description of drawings
Fig. 1 is the status change schematic diagram of IMA group flow status machine;
Fig. 2 is automatic recovery method schematic flow sheet after the IMA equipment fault of the embodiment of the invention;
Fig. 3 is the normal condition IMA group schematic diagram of the embodiment of the invention;
Fig. 4 is the link failure IMA group schematic diagram of the embodiment of the invention;
Fig. 5 is automatic recovery device structural representation after the IMA equipment fault of the embodiment of the invention.
Embodiment
Below in conjunction with accompanying drawing and embodiment, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, does not limit the present invention.
Embodiment of the method
According to embodiments of the invention, automatic recovery method after a kind of IMA equipment fault is provided, the main thought of the method is: the group state of IMA group state machine Real-Time Monitoring oneself, if the IMA group state machine is at the Insufficent-Links state, IMA group state machine autoboot so, and restart as new argument (minimum active link number) with link (link) number of the current active of being in (activation).And report this IMA group of webmaster to restart with new parameter, so that follow-up manual reversion fault or configuration before.
Fig. 2 is the flow chart of automatic recovery method after the IMA equipment fault of the embodiment of the invention, as shown in Figure 2, according to automatic recovery method after the IMA equipment fault of the embodiment of the invention, specifically comprises following processing:
Step 201, IMA group state machine monitoring group state, if IMA group state is at the Insufficent-Links state, then record the minimum active link number that IMA organizes current configuration, comprise that the minimum active link of transmission is counted TXn1 and the minimum active link of reception is counted RXn1, and record the current number of links that is in state of activation, and comprise that the transmission active link is counted TXn2 and the reception active link is counted RXn2, then carry out 202.Otherwise, then do not proceed ima state if do not satisfy above-mentioned condition.
In the embodiment of the invention, the time threshold that the IMA group state machine is restarted can be set, only when IMA group state when the time of Insufficent-Links state continuance surpasses default time threshold T1, the IMA group state machine is restarted in the side.In the embodiment of the invention, default thresholding T1 can get the value in 0 to 1 hour, to get value in 0 to 5 second as good.Certainly, the present invention also can not arrange the reboot time thresholding of IMA group state machine, as long as confirm that IMA group state is the Insufficent-Links state, can implement at any time the inventive method, with autoboot IMA equipment.
Step 202, IMA group state machine autoboot enters startup (startup) state.Certainly, current active link number is not 0 among the present invention, otherwise has lost meaning.
Step 203 is re-set as the value that is not more than current active link number with minimum active link number.
In the embodiment of the invention, can be directly with the value of the current active link number new value as minimum active link number, the value that is about to TXn2 is assigned to TXn1, and the value of RXn2 is assigned to RXn1, and the reporting events user that minimum active link number is adjusted.
Step 204, the group state machine of ima protocol enters the Operational state.
The below organizes as example take the IMA of a link number N=4, and the automatic recovery of how adopting after the inventive method realizes the IMA equipment fault is described.
As shown in Figure 3, at NodeB (base station) and RNC (Radio Network Controller, radio network controller) created an IMA group between the website, the IMA ID of NodeB is 0, the IMAID of RNC is 4, number of links between two websites is 4, suppose it is the pattern of balanced configuration symmetry operation, frame length is fixing all to be M byte, M is natural number, IMA OAM Label (label of ima protocol) is consistent, and the time-out time thresholding T1 of Insufficient-Links state is made as 5 seconds.The minimum active link number of NodeB configuration is TXn1=RXn1=4, the minimum active link number of RNC is TXn1=RXn1=2, and two websites are carved T1 at a time through consulting, the IMA group state machine at two ends all is the Operational state, normal sending and receiving cell between two websites.As shown in Figure 4, carve at a time T2, the link ID between two websites is 3 disconnecting, causes the IMA group state machine of NodeB website to enter the Insufficient-Links state.
The following describes and adopt the inventive method to realize that automatically IMA organizes the Operational state that recovers.
The IMA group state machine monitoring IMA group state of the first step: NodeB end, detecting current active link number is 3, and the minimum active link number of configuration is 4, then IMA group state enters the Insufficent-Links state.After the time that Insufficent-Links continues surpasses 5 seconds, record the current number of links TXn2=RXn2=3 that is in state of activation, and carry out second step.
Second step: IMA group state machine autoboot enters the startup state.
The 3rd step: count TXn1 and reset sending minimum active link, in the embodiment of the invention, give TXn1 with the value of TXn2, the TXn1 after then resetting is 3, and minimum active link number is adjusted into 3 reporting events webmaster.Owing to be symmetric pattern, so with same rule RXn1 and RXn2 are processed simultaneously, RXn1 is reset to 3.
The 4th step: the group state machine of ima protocol carries out original flow process and RNC end in opposite end is held consultation, final IMA group state machine enters the Operational state, IMA group flow status machine is normal, can carry out the ATM cell transmission between two websites, has finished professional automatic recovery.
Device embodiment
According to embodiments of the invention, after being provided, a kind of IMA equipment fault automatically recovers, Fig. 5 is the structural representation of automatic recovery device after the IMA equipment fault of the embodiment of the invention, as shown in Figure 5, automatic recovery device after the IMA equipment fault of the embodiment of the invention, comprise the group state monitoring module 501, group state machine restarts module 502 and minimum active link is counted replacement module 503.Below the modules of the embodiment of the invention is described in detail.
Particularly, group state monitoring module 501 is used for monitoring IMA group state.
Group state machine is restarted module 502, is used for restarting the IMA group state machine when IMA organizes state at the Insufficent-Links state.
In the embodiment of the invention, when IMA organizes state at the Insufficent-Links state, restart the IMA group state machine, be specially: when IMA organizes state when the duration of Insufficent-Links state surpasses default thresholding, restart the IMA group state machine.In the embodiment of the invention, the span of default thresholding can be 0 to 1 hour, and take 0 to 5 second as good especially.
Minimum active link is counted replacement module 503, is used for minimum active link number is re-set as the value that is not more than current active link number.In the embodiment of the invention, can be that minimum active link number is reset the value that equals current active link number.
Although be the example purpose, the preferred embodiments of the present invention are disclosed, it also is possible those skilled in the art will recognize various improvement, increase and replacement, therefore, scope of the present invention should be not limited to above-described embodiment.

Claims (10)

1. automatic recovery method after the multiplexing IMA equipment fault of reverse asynchronous transfer mode is characterized in that, comprising:
Monitoring IMA group state;
When IMA organizes state at the insufficient-links state, restart the IMA group state machine;
Minimum active link number is re-set as the value that is not more than current active link number.
2. automatic recovery method after the IMA equipment fault as claimed in claim 1 is characterized in that, describedly restarts the IMA group state machine when IMA group state during at the insufficient-links state, and the concrete grammar of employing is:
When IMA organizes state when the duration of insufficient-links state surpasses default thresholding, restart the IMA group state machine.
3. automatic recovery method after the IMA equipment fault as claimed in claim 2 is characterized in that, the span of described default thresholding is 0 to 1 hour.
4. automatic recovery method after the IMA equipment fault as claimed in claim 3 is characterized in that, the span of described default thresholding is 0 to 5 second.
5. such as automatic recovery method after each described IMA equipment fault in the claim 1 to 4, it is characterized in that, minimum active link number is re-set as the value that is not more than current active link number, refers to minimum active link number is re-set as the value that equals current active link number.
6. automatic recovery device after the multiplexing IMA equipment fault of reverse asynchronous transfer mode is characterized in that, comprising:
The group state monitoring module is used for monitoring IMA group state;
Group state machine is restarted module, is used for restarting the IMA group state machine when IMA organizes state at the insufficient-links state;
Minimum active link is counted the replacement module, is used for minimum active link number is re-set as the value that is not more than current active link number.
7. automatic recovery device after the IMA equipment fault as claimed in claim 6 is characterized in that, describedly restarts the IMA group state machine when IMA group state during at the insufficient-links state, is specially:
When IMA organizes state when the duration of insufficient-links state surpasses default thresholding, restart the IMA group state machine.
8. automatic recovery device after the IMA equipment fault as claimed in claim 7 is characterized in that, the span of described default thresholding is 0 to 1 hour.
9. automatic recovery device after the IMA equipment fault as claimed in claim 8 is characterized in that, the span of described default thresholding is 0 to 5 second.
10. such as automatic recovery device after each described IMA equipment fault in the claim 6 to 9, it is characterized in that, minimum active link number is re-set as the value that is not more than current active link number, refers to minimum active link number is re-set as the value that equals current active link number.
CN201110308291.7A 2011-10-12 2011-10-12 Automatic recovery method and device after a kind of IMA equipment faults Active CN103051466B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110308291.7A CN103051466B (en) 2011-10-12 2011-10-12 Automatic recovery method and device after a kind of IMA equipment faults
PCT/CN2012/079769 WO2013053260A1 (en) 2011-10-12 2012-08-07 Method and device for automatically recovering the inverse multiplexing for asynchronous transfer mode device after failure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110308291.7A CN103051466B (en) 2011-10-12 2011-10-12 Automatic recovery method and device after a kind of IMA equipment faults

Publications (2)

Publication Number Publication Date
CN103051466A true CN103051466A (en) 2013-04-17
CN103051466B CN103051466B (en) 2018-06-08

Family

ID=48063973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110308291.7A Active CN103051466B (en) 2011-10-12 2011-10-12 Automatic recovery method and device after a kind of IMA equipment faults

Country Status (2)

Country Link
CN (1) CN103051466B (en)
WO (1) WO2013053260A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106301858A (en) * 2015-06-09 2017-01-04 中兴通讯股份有限公司 Packet Transport Network equipment and resource recovery method, device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060072579A1 (en) * 2004-09-24 2006-04-06 Ward Robert G Method and apparatus to monitor and analyze network information of an inverse multiplexed asynchronous transfer mode network
CN101035075A (en) * 2007-01-31 2007-09-12 华为技术有限公司 Reactivation method, system and device for reverse multiplexing set of the asynchronous transfer mode
CN101340381A (en) * 2008-08-04 2009-01-07 中兴通讯股份有限公司 Aggregation link management method and apparatus
CN101448274A (en) * 2007-11-26 2009-06-03 大唐移动通信设备有限公司 Method for opening base station and radio network system
CN101834758A (en) * 2010-04-09 2010-09-15 华为技术有限公司 Logical port energy-saving realization method and device and system thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7065104B1 (en) * 2000-12-28 2006-06-20 Cisco Technology, Inc. Method and system for managing inverse multiplexing over ATM
CN100512507C (en) * 2004-04-22 2009-07-08 华为技术有限公司 A method of selective switch to reference link in inverse multiplexing over ATM (IMA)
CN1870575B (en) * 2005-07-15 2010-04-21 华为技术有限公司 Method for raising transmission reliability in virtual exchange system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060072579A1 (en) * 2004-09-24 2006-04-06 Ward Robert G Method and apparatus to monitor and analyze network information of an inverse multiplexed asynchronous transfer mode network
CN101035075A (en) * 2007-01-31 2007-09-12 华为技术有限公司 Reactivation method, system and device for reverse multiplexing set of the asynchronous transfer mode
CN101448274A (en) * 2007-11-26 2009-06-03 大唐移动通信设备有限公司 Method for opening base station and radio network system
CN101340381A (en) * 2008-08-04 2009-01-07 中兴通讯股份有限公司 Aggregation link management method and apparatus
CN101834758A (en) * 2010-04-09 2010-09-15 华为技术有限公司 Logical port energy-saving realization method and device and system thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106301858A (en) * 2015-06-09 2017-01-04 中兴通讯股份有限公司 Packet Transport Network equipment and resource recovery method, device

Also Published As

Publication number Publication date
CN103051466B (en) 2018-06-08
WO2013053260A1 (en) 2013-04-18

Similar Documents

Publication Publication Date Title
CN101459549B (en) Link failure processing method and data forwarding device
US20230362051A1 (en) Control Plane Device Switching Method and Apparatus, and Forwarding-Control Separation System
CN102780593B (en) Based on the method for BFD protocol detection link, device and network processing unit
CN105306288A (en) WebSocket server monitoring method and device
CN102415056A (en) Pon system, station-end apparatus and subscriber-end apparatus
CN101051957B (en) Dynamically regulating method and device for link state and bundled link state
CN101296135A (en) Fault information processing method and device
US9013977B2 (en) Method and system for reducing traffic disturbance in a communication network caused by intermittent failure
CN100438447C (en) Recovery method and apparatus for optical network LSP occuring abnormal delete
CN111654435B (en) Link protection fault processing system and method based on LACP
CN101094114A (en) Method and device for processing bound link
WO2011003292A1 (en) Method, apparatus and system for processing configuration update failure
CN103227725A (en) Method and device for dual-server backup of firewall
CN105790965A (en) Method and device for link switching and line card
CN101951622A (en) Radio remote unit power-off alarm processing method and system
CN102035695A (en) Bidirectional forwarding detection method and device
CN103036724B (en) State information transmission method, the network equipment and unit equipment
CN101980478B (en) Method and device for detecting and processing equipment failures and network equipment
CN102868945B (en) The upgrade method of ONU in a kind of EPON
CN103051466A (en) Method and device for automatically recovering IMA device failure
CN105634774A (en) Method, service line card and system for recovering link communication
CN101494801A (en) Method, system and network appliance for fault recovery
CN105592485A (en) Method for collecting and processing messages in real time based on SNMP
CN102014054A (en) Sending method and equipment for keep-alive messages
CN111224803B (en) Multi-master detection method in stacking system and stacking system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180507

Address after: 210000 No. 68, Bauhinia Road, Ningnan street, Yuhuatai District, Nanjing, Jiangsu

Applicant after: Nanjing Zhongxing Software Co., Ltd.

Address before: 518257 Nanshan District high tech Industrial Park, Shenzhen, Guangdong, Ministry of justice, Zhongxing Road, South China road.

Applicant before: ZTE Corporation

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191025

Address after: 518057 Nanshan District Guangdong high tech Industrial Park, South Road, science and technology, ZTE building, Ministry of Justice

Patentee after: ZTE Communications Co., Ltd.

Address before: 210000 Zijing flower road, Ningnan street, Yuhuatai District, Nanjing City, Jiangsu Province, No. 68

Patentee before: Nanjing Zhongxing Software Co., Ltd.

TR01 Transfer of patent right