CN103046566A - 开放式冻结窗口的简易判断及治理方法 - Google Patents

开放式冻结窗口的简易判断及治理方法 Download PDF

Info

Publication number
CN103046566A
CN103046566A CN2012105864275A CN201210586427A CN103046566A CN 103046566 A CN103046566 A CN 103046566A CN 2012105864275 A CN2012105864275 A CN 2012105864275A CN 201210586427 A CN201210586427 A CN 201210586427A CN 103046566 A CN103046566 A CN 103046566A
Authority
CN
China
Prior art keywords
window
freezing
frozen
freeze
open type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105864275A
Other languages
English (en)
Other versions
CN103046566B (zh
Inventor
嵇彭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA COAL TUNNEL ENGINEERING Co.,Ltd.
Original Assignee
China Coal No 5 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 5 Construction Co Ltd filed Critical China Coal No 5 Construction Co Ltd
Priority to CN201210586427.5A priority Critical patent/CN103046566B/zh
Publication of CN103046566A publication Critical patent/CN103046566A/zh
Application granted granted Critical
Publication of CN103046566B publication Critical patent/CN103046566B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Investigating Or Analyzing Materials Using Thermal Means (AREA)
  • Building Environments (AREA)

Abstract

本发明公开了一种开放式冻结“窗口”的简易判断及治理方法,属于冻结壁透水“窗口”的治理方法。具体为:初步判断冻结是否存在异常情况,如冻结异常,在测温孔中加密布设测温点,通过测得的温度初步判断冻结“窗口”的具体位置;将就近冻结管停止冻结约3小时,在冻结管内设测温点,根据测温情况进一步判断冻结“窗口”的准确位置并分析产生冻结“窗口”的原因;采用注浆堵塞或减缓流水通道的方法消除水流对冻结的影响,然后继续冻结;当效果不理想时采用液氮快速突破冻结,达到冻结效果后,维护冻结。积极效果是:方法简单易行,判断透水“窗口”位置准确,治理方法针对性强。改变了以往开放式冻结“窗口”无从判断、盲目处治的难题。

Description

开放式冻结窗口的简易判断及治理方法
技术领域
本发明涉及一种开放式冻结“窗口”的简易判断及治理方法,属于冻结壁透水“窗口”的判断和治理方法。主要适用于城市市政开放式冻结时出现透水“窗口”时判断准确位置并有针对性地进行治理。 
背景技术
在地下水流速较大的地层中进行冻结施工,可能会使冻结壁存在透水“窗口”的现象,而以前常用的检测冻结效果的方法主要是利用水文观测孔中水位的变化或泄压孔压力的变化来判断交圈情况;利用测温孔中测点温度分布情况获取冻土扩展速度和冻结壁厚度。地连墙接缝冻结为开放式冻结,无法设置水文观测孔或泄压孔;测温孔中测点的布设是根据地层情况在冻结前设计的,不能准确判断透水“窗口”位置、范围及原因,不能针对性地对透水“窗口”进行治理,无法达到冻结应有的效果,甚至使冻结施工归于失败。 
发明内容
为了解决上述问题,本发明提供一种开放式冻结“窗口”的简易判断及治理方法,可简单判断冻结施工中透水“窗口”的准确位置并据此分析产生的原因,采取有针对性的措施对透水“窗口”进行治理。 
本发明是以如下技术方案实现的:一种开放式冻结“窗口”的简易判断及治理方法,具体步骤是: 
1)根据开放式冻结时测温孔的测温数据判断冻结存在透水“窗口”; 
2)在测温孔中以0.5~1.0米设一个测温点的方式加密布设测温点,通过测得的温度初步判断冻结“窗口”的具体位置; 
3)将就近冻结管停止冻结约3小时,在冻结管内每0.5~1.0米设一个测温点,根据测温情况进一步判断冻结“窗口”的准确位置;并据此分析冻结“窗口”产生的原因; 
4)采用注浆堵塞或减缓流水通道的方法消除水流对冻结的影响,然后继续 冻结; 
5)当效果不理想时采用液氮快速突破冻结; 
6)液氮快速突破冻结达到冻结效果后,维护冻结。 
所述的维护冻结采用盐水冻结,以节约施工成本。 
本发明的积极效果是:本发明采用简单方法进行透水“窗口”的判断和原因分析,为采取针对性地治理措施提供了依据,使开放式冻结“窗口”的判断变的有据可依。避免了原方法无法对开放式冻结“窗口”进行判断的弱点。本发明判断方法简单,治理针对性强,易于推广使用。 
具体实施方式
一种开放式冻结“窗口”的简易判断及治理方法,根据开放式冻结时测温孔的测温情况,初步判断冻结是否存在异常情况。如冻结异常,首先在测温孔中以0.5~1.0米设一个测点的方式加密布设测温点,通过测得的温度初步判断冻结“窗口”的具体位置。其次,将就近冻结管停止冻结约3小时,在冻结管内每0.5~1.0米设一个测温点,根据测温情况进一步判断冻结“窗口”的准确位置并据此分析产生冻结“窗口”的原因。当判断出冻结“窗口”的准确位置并分析产生的原因后,可采用注浆堵塞或减缓流水通道的方法消除水流对冻结的影响,然后继续冻结。当效果不理想时可采用液氮快速突破冻结,达到冻结效果后,维护冻结仍采用盐水冻结以节约施工成本。 

Claims (2)

1.一种开放式冻结“窗口”的简易判断及治理方法,其特征在于:具体步骤是:
1)根据开放式冻结时测温孔的测温数据判断冻结存在透水“窗口”;
2)在测温孔中以0.5~1.0米设一个测温点的方式加密布设测温点,通过测得的温度初步判断冻结“窗口”的具体位置;
3)将就近冻结管停止冻结约3小时,在冻结管内每0.5~1.0米设一个测温点,根据测温情况进一步判断冻结“窗口”的准确位置;并据此分析冻结“窗口”产生的原因;
4)采用注浆堵塞或减缓流水通道的方法消除水流对冻结的影响,然后继续冻结;
5)当效果不理想时采用液氮快速突破冻结;
6)液氮快速突破冻结达到冻结效果后,维护冻结。
2.根据权利要求1所述的一种开放式冻结“窗口”的简易判断及治理方法,其特征在于:所述的维护冻结采用盐水冻结。
CN201210586427.5A 2012-12-28 2012-12-28 开放式冻结窗口的简易判断及治理方法 Active CN103046566B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210586427.5A CN103046566B (zh) 2012-12-28 2012-12-28 开放式冻结窗口的简易判断及治理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210586427.5A CN103046566B (zh) 2012-12-28 2012-12-28 开放式冻结窗口的简易判断及治理方法

Publications (2)

Publication Number Publication Date
CN103046566A true CN103046566A (zh) 2013-04-17
CN103046566B CN103046566B (zh) 2014-12-31

Family

ID=48059404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210586427.5A Active CN103046566B (zh) 2012-12-28 2012-12-28 开放式冻结窗口的简易判断及治理方法

Country Status (1)

Country Link
CN (1) CN103046566B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421334A (zh) * 2015-11-10 2016-03-23 上海市机械施工集团有限公司 一种土体冻结的施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2727081A1 (de) * 1977-06-15 1978-12-21 Linde Ag Verfahren und vorrichtung zum abdichten von spundwaenden
CN102287190A (zh) * 2011-09-08 2011-12-21 同济大学 一种高梯度非均质冻结壁的冻结方法
CN102409691A (zh) * 2011-09-08 2012-04-11 同济大学 地下连续墙墙体开口处预埋冻结管的冻结法止水装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2727081A1 (de) * 1977-06-15 1978-12-21 Linde Ag Verfahren und vorrichtung zum abdichten von spundwaenden
CN102287190A (zh) * 2011-09-08 2011-12-21 同济大学 一种高梯度非均质冻结壁的冻结方法
CN102409691A (zh) * 2011-09-08 2012-04-11 同济大学 地下连续墙墙体开口处预埋冻结管的冻结法止水装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
齐敦典: "混合冻结法治理地连墙接缝渗漏施工技术", 《建筑机械化》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421334A (zh) * 2015-11-10 2016-03-23 上海市机械施工集团有限公司 一种土体冻结的施工方法

Also Published As

Publication number Publication date
CN103046566B (zh) 2014-12-31

Similar Documents

Publication Publication Date Title
CN103559775B (zh) 城市洪涝灾害预警系统及方法
CN105257297A (zh) 一种管间精准控制冻土帷幕的施工方法
CN104790961B (zh) 一种盾构隧道端头垂直杯型冻结加固结构及方法
CN104806253B (zh) 一种矩形顶管通道之间开洞的施工方法
US11808152B2 (en) Method for real-time strength estimation, grading, and early warning of rock mass in tunnel boring machine (TBM) tunneling
CN204609889U (zh) 一种盾构隧道端头垂直杯型冻结加固结构
CN106706697A (zh) 模拟地下水流动作用下预降温冻结法施工的模型试验装置
CN206052685U (zh) 螺纹冻结管
CN205532600U (zh) 一种用于立井冻结法施工时的冻结圈控制系统
CN109403312A (zh) 一种含水软弱地层高温固化支护方法
CN103046566B (zh) 开放式冻结窗口的简易判断及治理方法
CN205262629U (zh) 一种用于测量冻结土层内部温度的测温装置
CN103290827B (zh) 一种多点位移计安装埋设注浆方法
CN111680403B (zh) 一种基于热-声耦合算法的冻结壁发育状况判断预警方法
CN104458506A (zh) 岩土体中注浆浆液扩散范围测控方法
CN110132347A (zh) 基于冻结施工的隧道的施工监控方法
CN103195072B (zh) 一种推测冻结帷幕发展情况的算法
CN202693189U (zh) 一种测量超高压大流量岩溶裂隙水压力的封堵结构
CN103453843A (zh) 隧道无尺量测可拆卸反光片的安装方法
CN103114823B (zh) 一种利用冰封栓塞分段封堵钻孔的装置及方法
CN103556989A (zh) 一种冻结法施工井筒围岩水压测量及限量排水装置及其施工方法
CN113722805B (zh) 基于隧道排水量的衬砌水压力计算及结构安全预警方法
CN105628612B (zh) 一种定降深诱发粘土承压含水层释水的装置的释水方法
CN110593263B (zh) 严寒地区基坑混凝土越冬防护施工方法
CN104863596B (zh) X形冻结管及其在冻结施工中的应用方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200319

Address after: 221000 150 meters east of Airport dormitory, Hancheng East Road, Jiuli street, Gulou District, Xuzhou City, Jiangsu Province

Patentee after: CHINA COAL TUNNEL ENGINEERING Co.,Ltd.

Address before: 221016 No. 241 Huaihai West Road, Jiangsu, Xuzhou

Patentee before: CHINA COAL NO.5 CONSTRUCTION Co.

TR01 Transfer of patent right