CN103031832A - Hydropower station weak rock zone shear rheological test method - Google Patents

Hydropower station weak rock zone shear rheological test method Download PDF

Info

Publication number
CN103031832A
CN103031832A CN2013100041685A CN201310004168A CN103031832A CN 103031832 A CN103031832 A CN 103031832A CN 2013100041685 A CN2013100041685 A CN 2013100041685A CN 201310004168 A CN201310004168 A CN 201310004168A CN 103031832 A CN103031832 A CN 103031832A
Authority
CN
China
Prior art keywords
test
test specimen
shear rheology
shear
specimen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100041685A
Other languages
Chinese (zh)
Inventor
贺如平
曾纪全
费大军
王建洪
戴祺云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Original Assignee
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group filed Critical Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority to CN2013100041685A priority Critical patent/CN103031832A/en
Publication of CN103031832A publication Critical patent/CN103031832A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a hydropower station weak rock zone shear rheological test method capable of comprehensively and truly reflecting rock shear rheological property. The test method comprises the following steps: excavating weak rock zone fault disclosed by an adit to form a test hole; performing original state sample preparation in the test hole on the premise of not disturbing the mechanical property of the on-site rock to obtain a test piece; and arranging equipment of the shear rheological test in the test hole and performing shear rheological test on the test piece. By the mode of selecting the test piece on site, the geological unit of the representative and typical weak rock zone can be selected as a test object, and the problem about storage during transportation is not taken into consideration, so that the size of the test piece can be determined randomly according to the test requirement, the truth of the effect size of the test piece and the test condition can be reflected comprehensively and truly, and the shear rheological property of the rock can be reflected comprehensively and truly. The test method is suitable for being popularized and applied in the field of hydraulic and hydroelectric engineering.

Description

A kind of power station weak rock zone shear rheology test method
Technical field
The present invention relates to the Hydraulic and Hydro-Power Engineering field, especially a kind of power station weak rock zone shear rheology test method.
Background technology
The dam foundation of large-scale hydroelectric project, high slope, underground power house cavity group will run into a large amount of geology structural planes in work progress, rock mass is under sustained shear stress effect, its distortion slowly increases in time, when distortion runs up to a certain degree, the original standing balance of rock mass is destroyed, will produce slippage along some disadvantageous structural planes, distortion increase and the stress changes process in, the shear strength of structural plane produces loss, thereby rock mass can be because of the rheodestruction unstability.The remarkable temporal correlation that rock mass shows is great on the engineering safety impact.It is the basic test data of the long-term estimation of stability of dam foundation weak rocks band that weak rock zone destroys the time effect of lasting at different stress down cuts, at present, research to the shear rheology characteristic of weak rock zone, mainly test to study by indoor shear rheology, be about to needing the rock mass of test to make test specimen is transported to the laboratory and carries out the shear rheology test, because the rock mass of weak rock zone is comparatively soft, large-sized test specimen can't be preserved when transporting, therefore, the size of the test specimen that transports is very limited, because the impact of sample dimensions effect and test conditions, indoor shear rheology experimental study achievement can't reflect the shear rheology characteristic of Test in Situ comprehensively truly.
Summary of the invention
Technical problem to be solved by this invention provides a kind of power station weak rock zone shear rheology test method that can comprehensively reflect truly rock mass shear rheology characteristic.
The technical solution adopted for the present invention to solve the technical problems is: this power station weak rock zone shear rheology test method may further comprise the steps:
A, in the weak rock zone tomography that adit discloses, excavate the formation Test Tunnel;
B, under the prerequisite of not disturbance Test in Situ Mechanical Characters of Composite Ground, in Test Tunnel, carry out the original state sample preparation and obtain test specimen;
C, with the apparatus arrangement of shear rheology test in Test Tunnel, and test specimen carried out the shear rheology test.
Further be; in step B; described original state sampling obtains test specimen to carry out in the following way: at first; the loosening rock mass on surface, clearance test hole; dig out the test specimen initial plane; select the position at test specimen place, then dig the rock mass all around of test specimen, build at last steel concrete formation protective cover and carry out maintenance.
Further be that in step C, the range of temperature in the Test Tunnel is ± 10 ℃.
Further be the bottom shear face area 〉=2500cm of described test specimen, the minimum length of side 〉=50cm of test specimen, 1/2 of height of specimen>thrust direction test specimen length of side.
Further be in step C, to adopt flat stacking that test specimen is carried out the shear rheology test.
Further be, in step C, utilize flat stacking test specimen to be carried out in the process of shear rheology test, a plurality of test specimens are carried out the shear rheology test simultaneously, each test specimen adopts the normal stress of different sizes to test, and adopt the step by step method of increment loading, adopt multistage shear stress to test under each normal stress.
The invention has the beneficial effects as follows: this power station weak rock zone shear rheology test method is that the weak rocks band in the weak rock zone tomography that adit discloses carries out the scene and chooses test specimen and test, because the scene is chosen test specimen and can be chosen representative, the geologic element of typical weak rock zone is subjects, and on-the-spot problem of preserving when choosing test specimen and need not consider to transport, can determine arbitrarily according to test requirements document the size of test specimen, the authenticity that can comprehensively truly reflect test specimen effect size and test conditions, and then can reflect truly rock mass shear rheology characteristic comprehensively, and operability and practicality are stronger, have significant economic benefit and social benefit.
The specific embodiment
The present invention is further described below in conjunction with embodiment.
This power station weak rock zone shear rheology test method may further comprise the steps:
A, in the weak rock zone tomography that adit discloses, excavate the formation Test Tunnel;
B, under the prerequisite of not disturbance Test in Situ Mechanical Characters of Composite Ground, in Test Tunnel, carry out the original state sample preparation and obtain test specimen;
C, with the apparatus arrangement of shear rheology test in Test Tunnel, and test specimen carried out the shear rheology test.
This power station weak rock zone shear rheology test method is that the weak rocks band in the weak rock zone tomography that adit discloses carries out the scene and chooses test specimen and test, because the scene is chosen test specimen and can be chosen representative, the geologic element of typical weak rock zone is subjects, and on-the-spot problem of preserving when choosing test specimen and need not consider to transport, can determine arbitrarily according to test requirements document the size of test specimen, the authenticity that can comprehensively truly reflect test specimen effect size and test conditions, and then can reflect truly rock mass shear rheology characteristic comprehensively, and operability and practicality are stronger, have significant economic benefit and social benefit.
In above-mentioned embodiment process; in step B; the method that described original state sampling obtains test specimen can be diversified; as long as can access at last the test specimen that regulation requires, as preferred mode be: described original state sample preparation obtains test specimen and carries out in the following way: at first, and the loosening rock mass on surface, clearance test hole; dig out the test specimen initial plane; select the position at test specimen place, then dig the rock mass all around of test specimen, build at last steel concrete formation protective cover and carry out maintenance.This mode preferably geologic element representative, typical weak rock zone is subjects, and utilizes protective cover to carry out maintenance, can obtain complete test specimen, guarantees that the shear rheology characteristic that obtains at last is more accurate.
In order to obtain more accurately rock mass shear rheology characteristic, in step C, the range of temperature in the Test Tunnel remains on ± 10 ℃ in, simultaneously, in process of the test, also to carry out moisturizing to test specimen and process, guarantee to reflect truly rock mass shear rheology characteristic comprehensively.
Further be, in order to reflect truly rock mass shear rheology characteristic comprehensively, the size of General Requirements test specimen is the bigger the better, but, sample dimensions is larger, difficulty of construction is just larger, therefore, in order to reduce to greatest extent difficulty of construction under the prerequisite of rock mass shear rheology characteristic, the bottom shear face area 〉=2500cm of described test specimen in comprehensive the reflection truly, the minimum length of side 〉=the 50cm of test specimen, 1/2 of height of specimen>thrust direction test specimen length of side, preferred, described test specimen is preferably dimensioned to be 500mm * 500mm.
In addition, in step C, adopt flat stacking that test specimen is carried out the shear rheology test, this test method required time is very long, can react more really the rheological behavior of weak rock zone tomography, can collect all relevant test datas simultaneously.
Moreover, in step C, utilize flat stacking test specimen to be carried out in the process of shear rheology test, a plurality of test specimens are carried out the shear rheology test simultaneously, each test specimen adopts the normal stress of different sizes to test, and adopt the step by step method of increment loading, adopt multistage shear stress to test under each normal stress.According to the shear rheology deflection that test measures, draw shear rheology displacement under every one-level normal stress and the shear stress and the relation of time, stress~strain curve when obtaining waiting.The rock mass longterm strength is rock mass under long-term constant external load function, and the critical stress value of rheological phenomena occurs, and when external applied load during more than or equal to certain certain value, the Rheological Deformation of rock mass can continue to become large and final failure; When load during less than certain certain value, the Rheological Deformation speed of rock mass can diminish gradually in passing in time, and Rheological Deformation also can slowly be tending towards convergence, and rock mass can not break, and the threshold of this stress level just can be called the longterm strength of rock mass.Generally, generally choosing five test specimen Pyatyi normal stress tests, every grade of corresponding test specimen of normal stress, adopt at least 8 grades of shear stresses to carry out under each normal stress, each shear stress is at least 7 days before the shear failure, finishes one group and generally will last 280 days, utilize stress~strain curve when waiting, can draw accurately long-term shear rheology intensity, can react more really the rheological behavior of weak rock zone tomography, can collect all relevant test datas simultaneously.

Claims (6)

1. the weak rock zone shear rheology in power station test method is characterized in that may further comprise the steps:
A, in the weak rock zone tomography that adit discloses, excavate the formation Test Tunnel;
B, under the prerequisite of not disturbance Test in Situ Mechanical Characters of Composite Ground, in Test Tunnel, carry out the original state sample preparation and obtain test specimen;
C, with the apparatus arrangement of shear rheology test in Test Tunnel, and test specimen carried out the shear rheology test.
2. the weak rock zone shear rheology in power station as claimed in claim 1 test method; it is characterized in that: in step B; described original state sampling obtains test specimen to carry out in the following way: at first; the loosening rock mass on surface, clearance test hole; dig out the test specimen initial plane; select the position at test specimen place, then dig the rock mass all around of test specimen, build at last steel concrete formation protective cover and carry out maintenance.
3. the weak rock zone shear rheology in power station as claimed in claim 2 test method, it is characterized in that: in step C, the range of temperature in the Test Tunnel is ± 10 ℃.
4. the described power station of any one claim weak rock zone shear rheology test method in 3 according to claim 1, it is characterized in that: the bottom shear face area 〉=2500cm of described test specimen, the minimum length of side 〉=the 50cm of test specimen, 1/2 of height of specimen>thrust direction examination body length of side.
5. the weak rock zone shear rheology in power station as claimed in claim 4 test method is characterized in that: in step C, adopt flat stacking that test specimen is carried out the shear rheology test.
6. the weak rock zone shear rheology in power station as claimed in claim 5 test method, it is characterized in that: in step C, utilize flat stacking test specimen to be carried out in the process of shear rheology test, a plurality of test specimens are carried out the shear rheology test simultaneously, each test specimen adopts the normal stress of different sizes to test, and adopt the step by step method of increment loading, adopt multistage shear stress to test under each normal stress.
CN2013100041685A 2013-01-07 2013-01-07 Hydropower station weak rock zone shear rheological test method Pending CN103031832A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100041685A CN103031832A (en) 2013-01-07 2013-01-07 Hydropower station weak rock zone shear rheological test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100041685A CN103031832A (en) 2013-01-07 2013-01-07 Hydropower station weak rock zone shear rheological test method

Publications (1)

Publication Number Publication Date
CN103031832A true CN103031832A (en) 2013-04-10

Family

ID=48019192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100041685A Pending CN103031832A (en) 2013-01-07 2013-01-07 Hydropower station weak rock zone shear rheological test method

Country Status (1)

Country Link
CN (1) CN103031832A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106339545A (en) * 2016-08-26 2017-01-18 中国水利水电科学研究院 Rock mass rheological simulation method based on discontinuous deformation analysis

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4854175A (en) * 1988-02-29 1989-08-08 The Research Foundation Of State University Of New York Simple shear device for testing earthen materials and powders
CN201145658Y (en) * 2007-07-26 2008-11-05 河海大学 Portable on site and indoor dual-purpose direct shear test instrument
CN103758113A (en) * 2014-01-03 2014-04-30 中化二建集团有限公司 Liquefaction resistance foundation stabilization method by grate hooping

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4854175A (en) * 1988-02-29 1989-08-08 The Research Foundation Of State University Of New York Simple shear device for testing earthen materials and powders
CN201145658Y (en) * 2007-07-26 2008-11-05 河海大学 Portable on site and indoor dual-purpose direct shear test instrument
CN103758113A (en) * 2014-01-03 2014-04-30 中化二建集团有限公司 Liquefaction resistance foundation stabilization method by grate hooping

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张强勇等: "大岗山坝区岩体现场剪切蠕变试验及参数反演", 《岩土力学》 *
王宇等: "坝基软弱夹层剪切流变及其长期强度试验研究", 《第8次全国岩石力学与工程试验及测试技术学术交流会论文集》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106339545A (en) * 2016-08-26 2017-01-18 中国水利水电科学研究院 Rock mass rheological simulation method based on discontinuous deformation analysis
CN106339545B (en) * 2016-08-26 2019-05-10 中国水利水电科学研究院 A kind of rock mass rheology analogy method based on discontinuous deformation analysis

Similar Documents

Publication Publication Date Title
Yin et al. Study on the influence of joint spacing on rock fragmentation under TBM cutter by linear cutting test
Jiang et al. Rockburst characteristics and numerical simulation based on a new energy index: a case study of a tunnel at 2,500 m depth
Li et al. In situ monitoring of rockburst nucleation and evolution in the deeply buried tunnels of Jinping II hydropower station
Gao et al. Analytical elasto-plastic solution for stress and plastic zone of surrounding rock in cold region tunnels
Yazdani et al. Displacement-based numerical back analysis for estimation of rock mass parameters in Siah Bisheh powerhouse cavern using continuum and discontinuum approach
Chen et al. A new method of predicting the prestress variations in anchored cables with excavation unloading destruction
CN107036917B (en) The Experimental Method in Laboratory of deep wall rock rock burst Burst Tendency
Song et al. Measures for controlling large deformations of underground caverns under high in-situ stress condition–a case study of Jinping I hydropower station
Wu et al. Unloading deformation during layered excavation for the underground powerhouse of Jinping I Hydropower Station, southwest China
Tian et al. Relaxation behavior of argillaceous sandstone under high confining pressure
Han et al. Bearing failure mechanism of rock-socketed monopile foundation for offshore wind turbine in weathered-granite seabed
Xie et al. Research of roof anchorage rock beam bearing structure model of extra-large width open-off cut and its engineering application in a coal mine, China
Zhang et al. Numerical simulation analysis of NPR anchorage monitoring of bedding rock landslide in open-pit mine
Shengjun et al. Top coal flows in an excavation disturbed zone of high section top coal caving of an extremely steep and thick seam
CN103031832A (en) Hydropower station weak rock zone shear rheological test method
Ren et al. Performance of the reinforced right abutment slope of Zipingpu Dam during magnitude 8.0 earthquake, Wenchuan, China
Zhang et al. Numerical and experimental investigation on hydraulic fracturing for offshore wind turbine rock-socketed pile foundation construction
Cao et al. Mechanical response analysis and safety assessment of shallow-buried pipeline under the influence of mining
Li et al. Stability Analysis of Slope Based on Limit Equilibrium Method and Strength Reduction Method.
SUN et al. Elasto-plastic analysis of circular tunnels in jointed rock masses satisfy the Hoek-Brown failure criterion
Zhang Study on stress disturbed mechanism and supporting method of weakly cemented roadway near chambers
Wu et al. Research on the Extraction Technology of Gas‐Integrated Working‐Face in Close Coal Seam Mining in Permafrost Area
Dongdong et al. Study on Energy Dissipation Characteristic of Ice‐Rich Frozen Soil in SHPB Compression Tests
Sun et al. Research on the Stability of Dam Foundation of a Sluice Dam Project in the Pearl River
Cui et al. Field test on deformation control of weathered carbonaceous slate tunnel in high geostress

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Chengdu Hydroelectric Investigation & Design Institute of SPC

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of China Hydropower Consu

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER CONSU TO: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC

C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Co., Ltd of Chengdu survey and design academy of electricity Jian group of China

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of SPC

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC TO: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130410