CN103023022B - Take into account the transmission section power limit emulated computation method of circuit Real-time Monitoring Data - Google Patents

Take into account the transmission section power limit emulated computation method of circuit Real-time Monitoring Data Download PDF

Info

Publication number
CN103023022B
CN103023022B CN201210492510.6A CN201210492510A CN103023022B CN 103023022 B CN103023022 B CN 103023022B CN 201210492510 A CN201210492510 A CN 201210492510A CN 103023022 B CN103023022 B CN 103023022B
Authority
CN
China
Prior art keywords
calculation
real
data
power
stabilization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210492510.6A
Other languages
Chinese (zh)
Other versions
CN103023022A (en
Inventor
苏永春
李升健
周宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210492510.6A priority Critical patent/CN103023022B/en
Publication of CN103023022A publication Critical patent/CN103023022A/en
Application granted granted Critical
Publication of CN103023022B publication Critical patent/CN103023022B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of transmission section power limit emulated computation method taking into account circuit Real-time Monitoring Data, according to stabilization of power grids result of calculation, critical circuits in electrical network is installed the on-line monitoring equipment such as microclimate, wire and gold utensil temperature survey, Real-time Collection line operational data, unification is sent to power system monitor center.By determining the environmental aspect residing for transmission line in real time, compared with completed stabilization of power grids result of calculation, checking and assessing the correctness of stability Calculation result.With reference to transmission line real-time running data, can reasonable arrangement current electric grid operational mode, and guide next year stabilization of power grids calculation and check.The transmission section power limit that the inventive method is applicable in Power System Stability Analysis calculates.

Description

Take into account the transmission section power limit emulated computation method of circuit Real-time Monitoring Data
Technical field
The present invention relates to a kind of section power limit emulated computation method taking into account circuit Real-time Monitoring Data, belong to Power System Stability Analysis technical field.
Background technology
In electric power system, all need the stabilization of power grids calculation and check work carrying out following 2-3 every year.Before carrying out stability Calculation task, first to carry out the establishment of boundary condition.The boundary condition of stability Calculation comprises network load prediction level, annual rack change project (comprising the situation of change of power supply and electrical network) etc. in following 2 to three years.After boundary condition is determined, the preparation of simulation calculation data can be carried out, mainly carry out emulated data modeling according to boundary condition and analogue system calculation requirement, Computed-torque control is mainly used in searching and finds the hidden danger that may exist in electrical network, these hidden danger comprise, and the transmitted power that the little wire diameter wire in electrical network bears exceedes that it allows operate power for a long time, area power grid voltage levvl does not meet the demands.According to calculating conclusion, the suggestion solving following electrical network problem is proposed.The whole stabilization of power grids analyzes the flow chart of simulation calculation as shown in Figure 1.
Calculate in check in the current stabilization of power grids and there is following problem: (1) ambient temperature and conductor overheating amount adopt fixed numbers, such as, the ambient temperature in the harshest situation is by the outdoor maximum temperature 40 degrees Celsius consideration of the hottest moon; (2) wire maximum safety temperature adopts fixed numbers, and overhead line conductor heating maximum permissible value is generally by 70 degrees Celsius of calculating.Such calculation and check result cannot reflect the ambient temperature of transmission line under practical operation situation and conductor overheating situation, and the confidence level of result is affected.
Current, in global range, the pressure of resources and environment aspect constantly increases, and the requirement of society to environmental protection, energy-saving and emission-reduction and sustainable development improves day by day; Meanwhile, the continuous propelling of electricity marketization process and user are to the continuous lifting of the quality of power supply and reliability requirement, and this requires that following electrical network must can provide supply of electric power that is safer, reliable, clean, high-quality.For this reason, the requirement of power grid construction should meet electric network reliability and fail safe needs on the one hand, as far as possible rationally should reduce power network construction project again on the other hand, alleviates passway for transmitting electricity and builds nervous pressure, with Economization on land and all kinds of resource.Thus, how to consider the actual conditions of electrical network when carrying out power grid security check analysis and calculating, become a problem demanding prompt solution.
Summary of the invention
The object of the invention is, for realizing taking into account circuit practical operation situation when power system stability calculation and check, proposing a kind of transmission section power limit Simulation Analysis method.
Technical scheme of the present invention is, the inventive method has taken into account the Real-time Monitoring Data of transmission line in electrical network; By microclimate, wire and gold utensil temperature survey on-line monitoring equipment that the key transmission circuit in electrical network is installed, Real-time Collection line operational data, unification is sent to power system monitor center; Apply the transmission line Real-time Monitoring Data collected, improve the accuracy of stabilization of power grids calculation and check result.
The step that the present invention takes into account the transmission section power limit emulated computation method of circuit Real-Time Monitoring is:
1, stabilization of power grids calculation and check.
Primary Calculation is carried out to the stabilization of power grids, finds out the critical circuits and generating set that may affect power grid security.
2, circuit runs Real time data acquisition.
Critical circuits in electrical network is installed microclimate, wire and gold utensil temperature survey on-line monitoring equipment, Real-time Collection line operational data, unification is sent to power system monitor center.
3, transmission line real-time running data is considered, rational power system operating mode.
Dispatching of power netwoks runs department after the real-time running data obtaining critical circuits in electrical network, specifies the environmental aspect residing for transmission line, compared with completed stabilization of power grids result of calculation, checks and assesses the correctness of stability Calculation result; With reference to transmission line real-time running data, reasonable arrangement current electric grid operational mode, and guides next year stabilization of power grids calculation and check.In the stability Calculation of next year, with reference to the most adverse circumstances of wire in the current year and the highest heat condition, in stability Calculation work from now on, adopt practicable transmission of electricity limit data.
The present invention's beneficial effect is compared with the prior art, (1) the inventive method considers the actual conditions of operation of power networks, makes calculation and check result more accurate; (2) the present invention can excavate passway for transmitting electricity potentiality as far as possible when ensureing safety, saves power grid construction investment, promotes energy-saving and emission-reduction.
The inventive method is applicable to transmission section power limit simulation calculation when carrying out stability analysis in electric power system.
Accompanying drawing explanation
Fig. 1 is the flow chart that existing stability simulation calculates;
Fig. 2 is the flow chart considering that the stability simulation of circuit Real-Time Monitoring calculates.
Embodiment
The embodiment that the present invention takes into account the transmission section power limit emulated computation method of circuit Real-Time Monitoring comprises the following steps:
1, stabilization of power grids calculation and check
The flow process of stabilization of power grids calculation and check comprises the following steps:
(1) boundary condition is formulated.The basis of compilation of boundary condition is the major network Rolling Planning of electrical network, the development electric grid investment plan of planning department and the construction project plan etc. of bouw/infra, is used for determining network load prediction level, annual power supply and power network construction project etc.
(2) grid simulation data modeling.According to the requirement of analogue system calculated data modeling, the power network construction project data in second and third year in fixed boundary condition are input in analogue system, set up the model of annual grid condition after can reflecting.Emulated data modeling contents comprises determines transmission line length, model, single double back data, by calculating the parameter such as resistance, reactance obtaining circuit, similar mode is adopted to calculate main transformer parameter, generator parameter, capacity reactance device parameter, again according to each element connected mode, finally erect electrical network computer sim-ulation system model.
(3) electricity net safety stable calculates.According to the requirement of " guiding rules of power system safety and stability ", based on the electric network model put up, carry out the Simulation Analysis such as trend, transient stability, minor interference under first, second level security stability criterion, find the safety and stability hidden danger existed in electrical network.Whether alternative route transmission power and the line power limit, search the little wire diameter wire that operate power in electrical network is out-of-limit, check area power grid voltage levvl simultaneously and meet the demands, find out voltage stabilization weakness zone in system.
2, on the critical circuits of passway for transmitting electricity, online monitoring equipment is installed, gathers real-time running data.
By being arranged on microclimate, wire and the gold utensil on-line temperature monitoring equipment on transmission line, the first-hand meteorologic parameter data that the temperature on monitored overhead line structures, humidity, wind direction, wind speed, rainfall, atmospheric pressure etc. are detailed can be obtained; By installing sensor for measuring temperature on wire and gold utensil, pass field wires and node intensification situation back rear Surveillance center in real time, then in conjunction with the parameter such as temperature, humidity, wind speed, wind direction, sunshine of site environment, reference line conveying capacity, realize analyzing wire overtemperature, sag trend, effectively solve the electric power accident that conductor temperature raises, sag reduces and causes.
3, according to real-time running data, formulate current electric grid operational mode and and guide stability Calculation work in the coming year.
After acquisition transmission line real-time measuring data, carry out following work:
(1) stability Calculation result is adjusted.After obtaining transmission line real-time running data, can determine that environmental aspect residing for transmission line and circuit generate heat situation in real time, thus determine the actual fed power limit of transmission line.This limit and the stabilization of power grids are calculated compared with the transmission line stability limit data considered, can check and assess the accuracy of stability Calculation result.
(2) reasonable arrangement power system operating mode.According to stabilization of power grids calculation and check result, and with reference to transmission line real-time running data, the real-time transmission power limit of each transmission line section can be calculated, calmodulin binding domain CaM network load level, can the service work of the grid equipment such as reasonable arrangement circuit, generator, such as, when transmission cross-section power margin is larger, suitably can arrange overhaul of the equipments more, when power margin is less, then should reduces or not arrange grid maintenance work.Adjustment current electric grid operational mode can be reached like this, adapt to the demand of operation of power networks real-time change.
(3) next year stabilization of power grids calculation and check is instructed.In the stability Calculation of next year, with reference to the current year and the most adverse circumstances of wire of forcasted years and the highest heat condition in the past, in stability Calculation work, adopt practicable transmission of electricity limit data, result of calculation Feasible degree is significantly improved.

Claims (2)

1. take into account a section power limit emulated computation method for circuit Real-time Monitoring Data, comprise stabilization of power grids calculation and check, it is characterized in that, described method has taken into account the Real-time Monitoring Data of transmission line in electrical network; By microclimate, wire and gold utensil temperature survey on-line monitoring equipment that critical circuits in electrical network is installed, Real-time Collection critical circuits service data, is sent to power system monitor center by Real-time Monitoring Data and the unification of critical circuits service data; And in conjunction with the temperature of critical circuits site environment, humidity, wind speed, wind direction, sunshine parameter, with reference to critical circuits conveying capacity, realize analyzing critical circuits wire overtemperature, sag trend, effectively solve the electric power accident that critical circuits conductor temperature raises, sag reduces and causes; Apply the transmission line Real-time Monitoring Data collected, improve the accuracy of stabilization of power grids calculation and check result;
Described method, after the real-time running data obtaining critical circuits in electrical network, specifies the environmental aspect residing for transmission line, compared with completed stabilization of power grids calculation and check result, checks and assesses the correctness of stabilization of power grids calculation and check result; With reference to critical circuits real-time running data, reasonable arrangement current electric grid operational mode, and guides next year stabilization of power grids calculation and check; In the stabilization of power grids calculation and check of next year, with reference to the most adverse circumstances of critical circuits wire in the current year and the highest heat condition, in stabilization of power grids calculation and check work from now on, adopt practicable transmission of electricity limit data.
2. take into account the section power limit emulated computation method of circuit Real-time Monitoring Data according to claim 1, it is characterized in that, described stabilization of power grids calculation and check comprises grid simulation data modeling, the power network construction project data in second and third year in fixed boundary condition are input in analogue system, set up the model of annual grid condition after can reflecting; Emulated data modeling contents comprises determines transmission line length, model, single double back data, by calculating the resistance, the reactance parameter that obtain transmission line; Calculate main transformer parameter, generator parameter, capacity reactance device parameter according to main transformer, generator and capacity reactance data, then according to main transformer, generator and capacity reactance connected mode, finally erect electrical network computer sim-ulation system model.
CN201210492510.6A 2012-11-28 2012-11-28 Take into account the transmission section power limit emulated computation method of circuit Real-time Monitoring Data Active CN103023022B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210492510.6A CN103023022B (en) 2012-11-28 2012-11-28 Take into account the transmission section power limit emulated computation method of circuit Real-time Monitoring Data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210492510.6A CN103023022B (en) 2012-11-28 2012-11-28 Take into account the transmission section power limit emulated computation method of circuit Real-time Monitoring Data

Publications (2)

Publication Number Publication Date
CN103023022A CN103023022A (en) 2013-04-03
CN103023022B true CN103023022B (en) 2015-09-30

Family

ID=47971288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210492510.6A Active CN103023022B (en) 2012-11-28 2012-11-28 Take into account the transmission section power limit emulated computation method of circuit Real-time Monitoring Data

Country Status (1)

Country Link
CN (1) CN103023022B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105281330B (en) * 2015-11-09 2017-12-19 山东大学 One kind sends the hot valued methods of wind-powered electricity generation transmission line of electricity outside
CN109165820A (en) * 2018-08-06 2019-01-08 南京理工大学 A kind of methods of risk assessment of aerial condutor and its splicing fitting excess temperature
CN110458405A (en) * 2019-07-10 2019-11-15 清华大学 It is a kind of based on electric power-Characteristics of micrometeorology data power system security method for early warning

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101957891A (en) * 2010-09-14 2011-01-26 天津理工大学 Static safety analysis system of modularization power grid on basis of communication system
CN102055243A (en) * 2010-12-15 2011-05-11 北京交通大学 High-voltage transmission line/ tower long-distance video on-line monitoring system
CN102215253A (en) * 2011-05-18 2011-10-12 中国电力科学研究院 Layered exchange and control method for real-time monitoring system data by power dispatching
JP2012010567A (en) * 2010-06-28 2012-01-12 Toshiba Corp Power system monitoring control apparatus
CN102593829A (en) * 2012-03-12 2012-07-18 广东省电力调度中心 Method and device for determining transmission section in consideration of key branch circuit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012010567A (en) * 2010-06-28 2012-01-12 Toshiba Corp Power system monitoring control apparatus
CN101957891A (en) * 2010-09-14 2011-01-26 天津理工大学 Static safety analysis system of modularization power grid on basis of communication system
CN102055243A (en) * 2010-12-15 2011-05-11 北京交通大学 High-voltage transmission line/ tower long-distance video on-line monitoring system
CN102215253A (en) * 2011-05-18 2011-10-12 中国电力科学研究院 Layered exchange and control method for real-time monitoring system data by power dispatching
CN102593829A (en) * 2012-03-12 2012-07-18 广东省电力调度中心 Method and device for determining transmission section in consideration of key branch circuit

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
南方电网综合防御框架的构思;赵建国等;《南方电网技术》;20080229;第2卷(第1期);第9页-15页 *
电网安全稳定运行全过程协调防御方法;郑 亮等;《江苏电机工程》;20110531;第30卷(第3期);第11页-18页 *

Also Published As

Publication number Publication date
CN103023022A (en) 2013-04-03

Similar Documents

Publication Publication Date Title
CN103235221B (en) Fault detecting system and fault detecting method for photovoltaic power station remote monitoring
CN102290800B (en) Method for checking relay protection setting
CN103138397B (en) Method of dynamic capacity increasing of distribution network lines based on technology of internet of things
CN102195354B (en) Large-grid wide-area asynchronous coordination control method
CN101364109B (en) Machine-net dynamic safety system and method based on actual measurement
CN103336217B (en) A kind of power cable is met an urgent need the computational methods of duration of load application
CN101425681A (en) Relay protection on-line check method for electric grid system
CN109582004B (en) Intelligent detection platform
CN104240045A (en) Method for analyzing coordination and safety of protective relaying of regional power grid
CN110380412B (en) Main and auxiliary integrated online real-time loop closing analysis method based on CIM/SVG
CN103023022B (en) Take into account the transmission section power limit emulated computation method of circuit Real-time Monitoring Data
CN112491034B (en) Electric power information physical system modeling method based on alternating current power flow model
CN106528968B (en) A kind of automatic dynamic model test method of intelligent substation based on SSD file
CN103744386B (en) Offshore oil platform energy managing and control system
CN103592531B (en) A kind of parameter detection method of wind energy turbine set static reacance generator and system
CN107492890B (en) A kind of cyclization turns the calculation method of power supply control parameter
CN105305428A (en) Method and system for improving reliability of wind prediction system by use of double-redundancy mode
CN103560497B (en) A kind of short circuit current method for limiting based on power network topology adjustment
CN102749593B (en) Distributive power supply synchronization detection system and method
CN203929933U (en) Power grid integrated on-line testing device
CN107292759A (en) Distribution network planning based on power supply reliability calculates analysis system
CN105844542B (en) WAMS-based online detection method for single large disturbance of power grid
CN203932958U (en) Power grid integrated intelligence is adjusted and online nucleus correcting system
CN202720323U (en) Distributive power supply synchronization detection system
CN102508052A (en) Test method for field band channel operation of automatic bus transfer system of area network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180709

Address after: 330096 No. 88, min Qiang Road, private science and Technology Park, Nanchang, Jiangxi

Co-patentee after: State Grid Corporation of China

Patentee after: Power Science Research Institute of Jiangxi Electric Power Co., Ltd.

Address before: 330088 No. 88, min Qiang Road, private science and Technology Park, Nanchang, Jiangxi

Co-patentee before: State Grid Corporation of China

Patentee before: Jiangxi Electric Power Science Academy