CN103020290B - 电网信息校验方法及系统 - Google Patents
电网信息校验方法及系统 Download PDFInfo
- Publication number
- CN103020290B CN103020290B CN201210583261.1A CN201210583261A CN103020290B CN 103020290 B CN103020290 B CN 103020290B CN 201210583261 A CN201210583261 A CN 201210583261A CN 103020290 B CN103020290 B CN 103020290B
- Authority
- CN
- China
- Prior art keywords
- equipment
- network
- topology
- topological
- isolated island
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
连接点名称 | 标识 | 电压等级(kV) |
节点A | P01 | 10 |
节点B | P02 | 10 |
节点D | P03 | 10 |
节点E | P04 | 10 |
节点F | P05 | 10 |
节点G | P06 | 10 |
节点H | P07 | 10 |
节点I | P08 | 10 |
节点J | P09 | 10 |
节点K | P10 | 10 |
节点L | P11 | 10 |
节点M | P12 | 10 |
节点N | P13 | 10 |
节点O | P14 | 10 |
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210583261.1A CN103020290B (zh) | 2012-05-07 | 2012-08-07 | 电网信息校验方法及系统 |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210144191X | 2012-05-07 | ||
CN201210144191 | 2012-05-07 | ||
CN201210583261.1A CN103020290B (zh) | 2012-05-07 | 2012-08-07 | 电网信息校验方法及系统 |
CN2012102785110A CN102799746B (zh) | 2012-05-07 | 2012-08-07 | 电网信息校验方法及系统、电网规划辅助系统 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102785110A Division CN102799746B (zh) | 2012-05-07 | 2012-08-07 | 电网信息校验方法及系统、电网规划辅助系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103020290A CN103020290A (zh) | 2013-04-03 |
CN103020290B true CN103020290B (zh) | 2015-09-16 |
Family
ID=47968893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210583261.1A Active CN103020290B (zh) | 2012-05-07 | 2012-08-07 | 电网信息校验方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103020290B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106548290A (zh) * | 2016-11-08 | 2017-03-29 | 北京信余科技有限公司 | 一种城市区域开发决策支持系统及方法 |
CN107241740B (zh) * | 2017-04-25 | 2020-03-17 | 集美大学 | 一种孤岛移动式电力系统健康状态监测传感器部署方法 |
CN111079242B (zh) * | 2019-12-05 | 2024-01-09 | 北京四方继保自动化股份有限公司 | 配网物理模型连通错误检查方法及装置 |
CN112766741B (zh) * | 2021-01-22 | 2023-06-13 | 南方电网数字平台科技(广东)有限公司 | 查询方法、系统、终端及存储介质 |
CN113067727A (zh) * | 2021-03-16 | 2021-07-02 | 牛智军 | 基于国产系统下跨区全兼容装置及其网络拓扑采集方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101682552A (zh) * | 2007-04-18 | 2010-03-24 | 北方电讯网络有限公司 | 具有串连节点的网络中的故障通知 |
CN201629574U (zh) * | 2010-01-13 | 2010-11-10 | 山东电力集团公司 | 开放式电网损耗实时分析系统 |
CN102215123A (zh) * | 2011-06-07 | 2011-10-12 | 南京邮电大学 | 基于多环网络拓扑结构的大规模集群系统 |
CN102280875A (zh) * | 2010-06-13 | 2011-12-14 | 阿海珐T&D英国有限公司 | 电力网的孤岛划分 |
-
2012
- 2012-08-07 CN CN201210583261.1A patent/CN103020290B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101682552A (zh) * | 2007-04-18 | 2010-03-24 | 北方电讯网络有限公司 | 具有串连节点的网络中的故障通知 |
CN201629574U (zh) * | 2010-01-13 | 2010-11-10 | 山东电力集团公司 | 开放式电网损耗实时分析系统 |
CN102280875A (zh) * | 2010-06-13 | 2011-12-14 | 阿海珐T&D英国有限公司 | 电力网的孤岛划分 |
CN102215123A (zh) * | 2011-06-07 | 2011-10-12 | 南京邮电大学 | 基于多环网络拓扑结构的大规模集群系统 |
Also Published As
Publication number | Publication date |
---|---|
CN103020290A (zh) | 2013-04-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Müller et al. | Modeling framework for planning and operation of multi-modal energy systems in the case of Germany | |
Maghouli et al. | A scenario-based multi-objective model for multi-stage transmission expansion planning | |
CN101179195B (zh) | 配电网规划方案辅助决策系统 | |
CN103150605B (zh) | 电网规划辅助系统 | |
Liu et al. | Resilient distribution system leveraging distributed generation and microgrids: A review | |
CN103020290B (zh) | 电网信息校验方法及系统 | |
Chanda et al. | Quantifying resiliency of smart power distribution systems with distributed energy resources | |
Borghei et al. | A multi-objective optimization scheme for resilient, cost-effective planning of microgrids | |
Alvarez et al. | Novel methodology for selecting representative operating points for the TNEP | |
Allard et al. | Considering distribution grids and local flexibilities in the prospective development of the European power system by 2050 | |
Ferrario et al. | Predictive capacity of topological measures in evaluating seismic risk and resilience of electric power networks | |
Boardman | The role of integrated distribution management systems in smart grid implementations | |
Karmaker et al. | Electric vehicle hosting capacity analysis: Challenges and solutions | |
Li et al. | An MILP model for urban distribution network planning considering street layout and block loads | |
CN105225162A (zh) | 一种配电系统运行效率的协调性评价方法 | |
CN109245109B (zh) | 一种供电低电压预警系统及方法 | |
CN106251244A (zh) | 一种考虑设备综合利用率的配电网改造方法 | |
Humayun et al. | Quantifying distribution system state estimation accuracies achieved by adding telemetry and operational forecasting | |
Gianluigi et al. | The innovative FlexPlan methodology to reap the benefits of including storage and load flexibility in grid planning: methodology and regional study cases | |
Bataev et al. | Public-private partnership as a mechanism for the development of heat supply | |
KR20010106939A (ko) | 변전소 신,증설계획 방법 | |
Wang et al. | Research on Simulation of Distribution Network Engineering Scene Based on 3D GIS Technology | |
Al-Shaalan | Problems associated with power system planning in developing countries | |
Volianyk | Smart Grid energy conservation management based on the university's energy innovation HUB of knowledge | |
CN113269435B (zh) | 一种新能源场站运行状态耦合监测评估系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CI01 | Correction of invention patent gazette |
Correction item: Priority Correct: 201210144191X 2012.05.07 CN Number: 14 Volume: 29 |
|
CI02 | Correction of invention patent application |
Correction item: Priority Correct: 201210144191X 2012.05.07 CN Number: 14 Page: The title page Volume: 29 |
|
ERR | Gazette correction |
Free format text: CORRECT: PRIORITY; FROM: NONE TO: 201210144191X 2012.05.07 CN |
|
RECT | Rectification | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Xu Qun Inventor after: Jin Shiqiang Inventor after: Wang Zezhong Inventor after: Pan Bin Inventor after: Zhao Shirui Inventor before: Xu Qun Inventor before: Jin Shiqiang Inventor before: Wang Zezhong |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: XU QUN JIN SHIQIANG WANG ZEZHONG TO: XU QUN JIN SHIQIANG WANG ZEZHONG PAN BIN ZHAO SHIRUI |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |