CN103018532A - 高速电压跌落检测方法及系统 - Google Patents
高速电压跌落检测方法及系统 Download PDFInfo
- Publication number
- CN103018532A CN103018532A CN2012105403673A CN201210540367A CN103018532A CN 103018532 A CN103018532 A CN 103018532A CN 2012105403673 A CN2012105403673 A CN 2012105403673A CN 201210540367 A CN201210540367 A CN 201210540367A CN 103018532 A CN103018532 A CN 103018532A
- Authority
- CN
- China
- Prior art keywords
- voltage
- fall
- anticipation
- judged
- falls
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Measurement Of Current Or Voltage (AREA)
Abstract
本发明提供了一种高速电压跌落检测方法及系统,所述方法包括:S1、采样三相电压瞬时值;S2、同时预判和检测电压是否跌落;S3、根据检测结果判断预判结果是否准确。本发明采用的高速电压跌落检测方法及系统是在传统电压跌落检测法的基础上增加瞬时预判功能。通过快速预判,可给予装置预动作时间,提升了系统速度;当预判发生错误时,可通过合理的控制流程使系统快速恢复正常工作状态,不对负载正常工作带来损害性影响。
Description
技术领域
本发明涉及电力电子控制技术领域,尤其涉及一种高速电压跌落检测方法及系统。
背景技术
电压跌落以及电压短时中断的出现占所有电能质量问题的90%左右。Siemens公司研究了电压跌落(sag)对现代社会应用较广泛的电子类设备的影响,研究结表明电压跌落超过一个工频周期,即会对某些敏感负载带来重大影响。为解决电压跌落问题,研究人员设计了各种相关电能质量设备,如UPS、固态开关、动态电压补偿装置等。电压跌落检测算法的快速性对相关电能质量的设备的性能至关重要。
IEEE相关标准对电压跌落的定义为幅值标幺值在0.1~0.9之间,持续时间为半个周期至1分钟。电压跌落的幅值是针对工频分量的。常规的电压跌落检测算法由于检测工频分量的需要,必须使用滤波器,且截至频率较低(工频一般为50HZ),从而导致检测输出延迟,检测速度受到影响。例如在工程中常用的三相改进派克变换电压跌落检测法对某些单相小幅跌落检测时间可达7ms。这对电能质量设备实现快速电压补偿是不利的。为了保证能在一个工频周波内识别并补偿电压跌落,要求系统的检测速度必须尽可能快。有鉴于此,有必要提出一种高速电压跌落检测方法及系统以解决上述问题。
发明内容
本发明的目的在于提供一种高速电压跌落检测方法及系统。
本发明的一种高速电压跌落检测方法,所述方法包括:
S1、在T1时刻采样三相电压瞬时值Ux;
S2、同时预判和检测电压是否跌落,预判的时间小于检测的时间,其中预判电压是否跌落具体为:
S3、根据检测结果判断预判结果是否准确,若预判为电压跌落,检测为电压跌落,则判定为预判准确;若预判为电压跌落,检测为电压未跌落,则判定为预判错误;若预判为电压未跌落,检测为电压跌落,则判定为预判错误;若预判为电压未跌落,检测为电压未跌落,则判定为预判准确。
作为本发明的进一步改进,所述步骤S2中检测电压是否跌落采用的检测算法为基于单相电压检测法的三相电压跌落检测算法、或三相改进dq电压跌落检测算法、或小波变换电压跌落检测算法、或有效值检测法。
作为本发明的进一步改进,所述步骤S2中设有电压跌落检测阈值,所述跌落预警阈值Pk小于电压跌落检测阈值。
作为本发明的进一步改进,所述步骤S1还包括:
对电压瞬时值Ux进行平滑处理,记录系统连续采样到的电压瞬时值为Ux1、Ux2…Uxi,i为平滑窗长度,从Ux1、Ux2…Uxi去掉最大值和最小值,并将其余瞬时值求和取平均得到Ux。
作为本发明的进一步改进,所述步骤S22中电压正向过零时刻T0计算方法为:
设定负过零比较阈值-U0,以及正过零比较阈值+U0,负过零交点P的判断原则为:设当前采样值xi与-U0差为正,而上一个采样值xi-1与-U0差为负,记录负过零交点P的下标i,并开始寻找正过零交点Q;
寻找正过零交点Q的方法为以i为起点,向后考察N个瞬时采样值xi+1、xi+2…xi+N,从中寻找正过零交点Qj,设xj∈[xi+1,xi+N],若xj与+U0差为正,而上一个采样值xj-1与+U0差为负,则xj为正过零交点Qj;
若在[xi+1,xi+N]中寻找到多个Qj,则记录最大的j,若没有找到Qj,则j=i+N,Qj为所求的正向过零交点Q,之后计算P、Q时刻的中点下标k=round((i+j)/2),则k为最新的电压正向过零点T0的下标。
相应地,一种高速电压跌落检测系统,所述系统包括:
电压跌落预判模块,用于预判电压是否跌落;
电压跌落检测模块,用于检测电压是否跌落;
其中,电压跌落预判模块包括
本发明的有益效果是:本发明采用的高速电压跌落检测方法及系统是在传统电压跌落检测法的基础上增加瞬时预判功能。通过快速预判,可给予装置预动作时间,提升了系统速度;当预判发生错误时,可通过合理的控制流程使系统快速恢复正常工作状态,不对负载正常工作带来损害性影响。
附图说明
图1是本发明高速电压跌落检测方法的流程示意图;
图2是本发明高速电压跌落检测系统的模块示意图;
图3是本发明高速电压跌落检测方法中电压跌落预判原理的示意图;
图4是本发明高速电压跌落检测方法中电压过零检测方法示意图;
图5是本发明一实施方式中UPS控制器的示意图;
图6是本发明高速电压跌落检测方法中单相电压基波幅值算法示意图。
具体实施方式
以下将结合附图所示的各实施方式对本发明进行详细描述。但这些实施方式并不限制本发明,本领域的普通技术人员根据这些实施方式所做出的结构、方法、或功能上的变换均包含在本发明的保护范围内。
参图1所示,本发明的一种高速电压跌落检测方法,具体包括:
S1、在T1时刻采样三相电压瞬时值Ux,参图2所示x为A、B或C相;
S2、同时预判和检测电压是否跌落,预判的时间小于检测的时间。检测电压是否跌落采用的检测算法为基于单相电压检测法的三相电压跌落检测算法、或三相改进dq电压跌落检测算法、或小波变换电压跌落检测算法、或有效值检测法。
其中预判电压是否跌落具体为:
S23、判断是否满足Pk为跌落预警阈值,若是,则预判为电压跌落,发出预警信号,若否,则预判为电压未跌落;系统设有电压跌落检测阈值,其中跌落预警阈值Pk小于电压跌落检测阈值,这是因为系统电压跌落阈值是针对基波分量的,而瞬时跌落值里面还包含有其他频率分量。优选的,若电压跌落检测阈值设为0.9,跌落预警阈值Pk设为0.8。
S3、根据检测结果判断预判结果是否准确,若预判为电压跌落,检测为电压跌落,则判定为预判准确;若预判为电压跌落,检测为电压未跌落,则判定为预判错误;若预判为电压未跌落,检测为电压跌落,则判定为预判错误;若预判为电压未跌落,检测为电压未跌落,则判定为预判准确。
进一步地,为提高系统抗干扰能力,步骤S1还包括:
对电压瞬时值Ux进行平滑处理,记录系统连续采样到的电压瞬时值为Ux1、Ux2…Uxi,i为平滑窗长度,一般可取为5~9,从Ux1、Ux2…Uxi去掉最大值和最小值,并将其余瞬时值求和取平均得到Ux,并带入计算得到
为避免瞬时值在过零阈值附近震荡导致输出抖动。除对瞬时采样值做平滑以外,还要采用时间平均法。参图4所示,在步骤S21中电压正向过零时刻T0计算方法为:
设定负过零比较阈值-U0,以及正过零比较阈值+U0,负过零交点P的判断原则为:设当前采样值xi与-U0差为正,而上一个采样值xi-1与-U0差为负,记录负过零交点P的下标i,并开始寻找正过零交点Q;
寻找正过零交点Q的方法为以i为起点,向后考察N个瞬时采样值xi+1、xi+2…xi+N,从中寻找正过零交点Qj,设xj∈[xi+1,xi+N],若xj与+U0差为正,而上一个采样值xj-1与+U0差为负,则xj为正过零交点Qj;
若在[xi+1,xi+N]中寻找到多个Qj,则记录最大的j,若没有找到Qj,则j=i+N,Qj为所求的正向过零交点Q,之后计算P、Q时刻的中点下标k=round((i+j)/2),则k为最新的电压正向过零点T0的下标。
相应地,参图2所示,本发明的一种高速电压跌落检测系统,包括:
电压跌落预判模块10,用于预判电压是否跌落;
电压跌落检测模块20,用于检测电压是否跌落;
该检测系统适用于对电压跌落现象需进行预操作的控制系统。
其中,电压跌落预判模块包括
本发明的高速电压跌落检测方法及系统可用于各种对电压跌落检测敏感的设备。以使用晶闸管为电子开关的UPS为例,如图5所示,常规系统动作为首先检测电压跌落(耗时T1),切断晶闸管并等待电流过零(耗时T2),投入UPS储能模块(耗时T3)。因此系统最长耗时为T1+T2+T3。当使用带预判的高速电压跌落检测算法时,电压跌落预判模块10将快速给出电压跌落预警信号(微秒级速度),之后系统切除晶闸管(耗时T2),若给定电压跌落检测时间内(T1内),电压跌落检测模块20输出电压跌落信号,则投入UPS储能电源(耗时T3)。此时系统最长动作时间为MAX(T1,T2)+T3,“MAX(T1,T2)”表示T1,T2中的较大值。由此可见使用本发明的高速电压跌落检测方法及系统可以提升系统速度。若预警之后,在T1时间内,电压跌落检测模块20没有给出电压跌落信号,则说明发生误判,立刻接回原来的系统电源。系统将在半个工频周期内恢复到主侧电源,基本不影响敏感负载正常工作。
首先分别对三相电压进行采样并做平滑处理。处理方法为:设连续采样到的电压瞬时值为Ux1、Ux2…Uxi。其中i为平滑窗长度,一般可取为5~9。从Ux1、Ux2…Uxi去掉最大值和最小值,并将其余瞬时值求和取平均得到Ux。将平滑后的电压值Ux存入数组,数组长度为256,并送入电压跌落预判模块10和电压跌落检测模块20。
电压跌落预判模块10首先判断当前数值是否为电压正向过零点,若为过零点,则记录当前数据下标T0,否则记录当前数据下标为T1,计算当前相角为设系统额定电压峰值为Um,计算当前电压瞬时值应为计算并与系统电压跌落预警阈值Pk相比较。若系统电压跌落检测阈值为0.9,则Pk可设为0.8。为防止比较抖动,采用滞环比较的方法。即Pk小于0.8则输出报警信号,大于0.85才取消报警。
电压正向过零点处理方法如附图4所示,首先设定负过零比较阈值-U0(与传感器精度有关),以及正过零比较阈值+U0。设当前采样值xi与-U0差为正,而上一个采样值xi-1与-U0差为负,则xi为负过零交点P,记录其下标i,并开始寻找正过零交点Q。以i为起点,向后考察10(每周期为256个的情况)个瞬时采样值xi+1、xi+2…xi+10,从中寻找正过零交点Q。方法为设xj∈[xi+1,xi+10],若xj与+U0差为正,而上一个采样值xj-1与+U0差为负,则xj为正过零交点Q,若在[xi+1,xi+10]中寻找到多个Q,则记录下标最大的j。若没有找到Q,则j=i+10。计算P、Q时刻的中点下标k=round((i+j)/2)(取平均),则k为最新的电压正向过零点T0的下标。
电压跌落检测模块20采用单相电压基波幅值检测法。其原理如下所述:
设所转换A相电压为:
ua=Umsin(ωt+α)
则A相电压的平方值为:
ua 2=Um 2sin2(ωt+α)
换算后得:
由此可见,瞬时值的平方包括了基波幅值的直流量以及2倍基波频率的分量。通过低通滤波滤除2倍基波频率分量即可得到基波幅值。算法流程如图6所示。之后如图2所示从三相的基波幅值求最小值并与跌落检测阈值比较,输出跌落比较信号。仍然采用滞环比较方法。小于0.9则输出跌落信号,大于0.93才取消。
UPS的控制流程如下,若系统得到跌落预警信号,则撤销主电源晶闸管触发信号。若之后收到电压跌落信号,说明预判正确,等待主电源电流过零,晶闸管完全断开,闭合UPS备用电源端的晶闸管。若7ms(单相电压跌落检测法一般7ms内能完成检测)内,电压跌落检测模块20仍未给出电压跌落信号,说明发生错误报警,此时无论主电源电流是否过零,均开通主电源侧晶闸管。由上述分析可知,采用带预判的电压跌落检测法,可以最多节省7ms跌落检测时间。当发生误判时,只需7ms即可重新接回原来电源。由于时间小于半个周波,对负载无损坏性影响。且由于系统电压分量以基波分量为主,因此误判可能较小。
由上述技术方案可以看出,本发明采用的高速电压跌落检测方法及系统是在传统电压跌落检测法的基础上增加瞬时预判功能。由于电网电压相对比较稳定,高频扰动较少,因此可通过瞬时值预判电压基波幅值跌落情况。通过瞬时值预判无需经过滤波器,在足够的信号采样率下,速度极快。通常可在0.1ms内完成。通过快速预判,可给予装置预动作时间,例如对于UPS,往往采用晶闸管作为切换开关。晶闸管断开需要等待电流过零,一般情况下最长需要半个周波。若系统预判到电压跌落就断开晶闸管。则系统切换过程从单线变成了多线,可以提升系统速度;当预判发生错误时,可通过合理的控制流程使系统快速恢复正常工作状态,不对负载正常工作带来损害性影响。
应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施方式中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。
上文所列出的一系列的详细说明仅仅是针对本发明的可行性实施方式的具体说明,它们并非用以限制本发明的保护范围,凡未脱离本发明技艺精神所作的等效实施方式或变更均应包含在本发明的保护范围之内。
Claims (7)
1.一种高速电压跌落检测方法,其特征在于,所述方法包括:
S1、在T1时刻采样三相电压瞬时值Ux;
S2、同时预判和检测电压是否跌落,预判的时间小于检测的时间,其中预判电压是否跌落具体为:
S23、判断是否满足Pk为跌落预警阈值,若是,则预判为电压跌落,发出预警信号,若否,则预判为电压未跌落;
S3、根据检测结果判断预判结果是否准确,若预判为电压跌落,且检测也为电压跌落,则判定为预判准确;若预判为电压跌落,检测为电压未跌落,则判定为预判错误;若预判为电压未跌落,检测为电压跌落,则判定为预判错误;若预判为电压未跌落,检测为电压未跌落,则判定为预判准确。
2.根据权利要求1所述的方法,其特征在于,所述步骤S2中检测电压是否跌落采用的检测算法为基于单相电压检测法的三相电压跌落检测算法、或三相改进dq电压跌落检测算法、或小波变换电压跌落检测算法、或有效值检测法。
3.根据权利要求1所述的方法,其特征在于,所述步骤S2中设有电压跌落检测阈值,所述跌落预警阈值Pk小于电压跌落检测阈值。
4.根据权利要求1所述的方法,其特征在于,所述步骤1还包括:
对电压瞬时值Ux进行平滑处理,记录系统连续采样到的电压瞬时值为Ux1、Ux2…Uxi,i为平滑窗长度,从Ux1、Ux2…Uxi去掉最大值和最小值,并将其余瞬时值求和取平均得到Ux。
5.根据权利要求1所述的方法,其特征在于,所述步骤S22中电压正向过零时刻T0计算方法为:
设定负过零比较阈值-U0,以及正过零比较阈值+U0,负过零交点P的判断原则为:设当前采样值xi与-U0差为正,而上一个采样值xi-1与-U0差为负,记录负过零交点P的下标i,并开始寻找正过零交点Q;
寻找正过零交点Q的方法为以i为起点,向后考察N个瞬时采样值xi+1、xi+2…xi+N,从中寻找正过零交点Qj,设xj∈[xi+1,xi+N],若xj与+U0差为正,而上一个采样值xj-1与+U0差为负,则xj为正过零交点Qj;
若在[xi+1,xi+N]中寻找到多个Qj,则记录最大的j,若没有找到Qj,则j=i+N,Qj为所求的正向过零交点Q,之后计算P、Q时刻的中点下标k=round((i+j)/2),则k为最新的电压正向过零点T0的下标。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210540367.3A CN103018532B (zh) | 2012-12-13 | 2012-12-13 | 高速电压跌落检测方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210540367.3A CN103018532B (zh) | 2012-12-13 | 2012-12-13 | 高速电压跌落检测方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103018532A true CN103018532A (zh) | 2013-04-03 |
CN103018532B CN103018532B (zh) | 2014-12-31 |
Family
ID=47967366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210540367.3A Expired - Fee Related CN103018532B (zh) | 2012-12-13 | 2012-12-13 | 高速电压跌落检测方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103018532B (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103560509A (zh) * | 2013-10-29 | 2014-02-05 | 国家电网公司 | 一种基于小波分析的电压下陷检测装置及该装置的控制方法 |
CN104237711A (zh) * | 2014-10-15 | 2014-12-24 | 四川东方电气自动控制工程有限公司 | 一种快速可靠的低电压穿越判定方法 |
CN105137164A (zh) * | 2015-08-06 | 2015-12-09 | 江苏省电力公司苏州供电公司 | 应用于电力系统中的电压暂降在线监测装置 |
CN106970260A (zh) * | 2017-05-23 | 2017-07-21 | 核工业理化工程研究院 | 一种变频器输出的相电压采集电路及幅值的测算方法 |
CN108802493A (zh) * | 2018-05-28 | 2018-11-13 | 上海大学 | 一种电压跌落智能检测方法 |
CN108872746A (zh) * | 2018-06-27 | 2018-11-23 | 郑州云海信息技术有限公司 | 一种电压跌落测试的误判预防方法及装置 |
CN110672974A (zh) * | 2019-09-27 | 2020-01-10 | 长沙理工大学 | 一种新型配电网电压跌落检测方法 |
CN111257627A (zh) * | 2020-03-04 | 2020-06-09 | 南京保合太和电力科技有限公司 | 一种基于三相电压实现的软件测频方法 |
CN112840522A (zh) * | 2019-06-17 | 2021-05-25 | 东芝三菱电机产业系统株式会社 | 电源装置以及交流电源的异常检测方法 |
CN113176437A (zh) * | 2021-03-26 | 2021-07-27 | 东南大学溧阳研究院 | 一种电压异常快速检测方法及其装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05297030A (ja) * | 1992-04-17 | 1993-11-12 | Nissin Electric Co Ltd | 電圧低下検出方法 |
CN101452016A (zh) * | 2007-11-30 | 2009-06-10 | 北京市电力公司 | 电压暂降检测方法和装置 |
CN101793918A (zh) * | 2009-11-18 | 2010-08-04 | 中电普瑞科技有限公司 | 一种电压暂降检测方法 |
JP4515937B2 (ja) * | 2005-03-03 | 2010-08-04 | 株式会社明電舎 | 波形比較による電圧低下検出方法及び装置 |
CN102156217A (zh) * | 2011-03-31 | 2011-08-17 | 山亿新能源股份有限公司 | 一种基于平均值滤波的三相电网电压跌落检测方法 |
WO2012068586A1 (en) * | 2010-11-21 | 2012-05-24 | Qualcomm Incorporated | Circuitry for detecting a transient |
-
2012
- 2012-12-13 CN CN201210540367.3A patent/CN103018532B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05297030A (ja) * | 1992-04-17 | 1993-11-12 | Nissin Electric Co Ltd | 電圧低下検出方法 |
JP4515937B2 (ja) * | 2005-03-03 | 2010-08-04 | 株式会社明電舎 | 波形比較による電圧低下検出方法及び装置 |
CN101452016A (zh) * | 2007-11-30 | 2009-06-10 | 北京市电力公司 | 电压暂降检测方法和装置 |
CN101793918A (zh) * | 2009-11-18 | 2010-08-04 | 中电普瑞科技有限公司 | 一种电压暂降检测方法 |
WO2012068586A1 (en) * | 2010-11-21 | 2012-05-24 | Qualcomm Incorporated | Circuitry for detecting a transient |
CN102156217A (zh) * | 2011-03-31 | 2011-08-17 | 山亿新能源股份有限公司 | 一种基于平均值滤波的三相电网电压跌落检测方法 |
Non-Patent Citations (3)
Title |
---|
KAI DING等: "A Novel Detection Method for Voltage Sags", 《2006 2ND INTERNATIONAL CONFERENCE ON POWER ELECTRONICS SYSTEMS AND APPLICATIONS》, 31 December 2006 (2006-12-31), pages 250 - 255 * |
刘海春等: "基于周期相位的电压跌落检测方法", 《电工技术学报》, vol. 24, no. 9, 30 September 2009 (2009-09-30), pages 186 - 190 * |
王智勇等: "基于动态预测的DVR检测算法", 《电工技术学报》, vol. 22, no. 1, 31 January 2007 (2007-01-31), pages 125 - 131 * |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103560509B (zh) * | 2013-10-29 | 2015-06-10 | 国家电网公司 | 一种基于小波分析的电压下陷检测装置及该装置的控制方法 |
CN103560509A (zh) * | 2013-10-29 | 2014-02-05 | 国家电网公司 | 一种基于小波分析的电压下陷检测装置及该装置的控制方法 |
CN104237711A (zh) * | 2014-10-15 | 2014-12-24 | 四川东方电气自动控制工程有限公司 | 一种快速可靠的低电压穿越判定方法 |
CN104237711B (zh) * | 2014-10-15 | 2017-07-14 | 四川东方电气自动控制工程有限公司 | 一种快速可靠的低电压穿越判定方法 |
CN105137164A (zh) * | 2015-08-06 | 2015-12-09 | 江苏省电力公司苏州供电公司 | 应用于电力系统中的电压暂降在线监测装置 |
CN106970260B (zh) * | 2017-05-23 | 2023-08-18 | 核工业理化工程研究院 | 一种变频器输出的相电压采集电路及幅值的测算方法 |
CN106970260A (zh) * | 2017-05-23 | 2017-07-21 | 核工业理化工程研究院 | 一种变频器输出的相电压采集电路及幅值的测算方法 |
CN108802493A (zh) * | 2018-05-28 | 2018-11-13 | 上海大学 | 一种电压跌落智能检测方法 |
CN108872746B (zh) * | 2018-06-27 | 2021-02-02 | 苏州浪潮智能科技有限公司 | 一种电压跌落测试的误判预防方法及装置 |
CN108872746A (zh) * | 2018-06-27 | 2018-11-23 | 郑州云海信息技术有限公司 | 一种电压跌落测试的误判预防方法及装置 |
CN112840522A (zh) * | 2019-06-17 | 2021-05-25 | 东芝三菱电机产业系统株式会社 | 电源装置以及交流电源的异常检测方法 |
CN112840522B (zh) * | 2019-06-17 | 2024-09-20 | 株式会社Tmeic | 电源装置以及交流电源的异常检测方法 |
CN110672974A (zh) * | 2019-09-27 | 2020-01-10 | 长沙理工大学 | 一种新型配电网电压跌落检测方法 |
CN111257627A (zh) * | 2020-03-04 | 2020-06-09 | 南京保合太和电力科技有限公司 | 一种基于三相电压实现的软件测频方法 |
CN113176437A (zh) * | 2021-03-26 | 2021-07-27 | 东南大学溧阳研究院 | 一种电压异常快速检测方法及其装置 |
Also Published As
Publication number | Publication date |
---|---|
CN103018532B (zh) | 2014-12-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103018532B (zh) | 高速电压跌落检测方法及系统 | |
CN103163363B (zh) | 用于动态电压恢复器的电网电压跌落检测算法 | |
US11728640B2 (en) | Secured fault detection in a power substation | |
CN101706527B (zh) | 基于电流高频分量时频特征的电弧故障检测方法 | |
Teke et al. | Fast sag/swell detection method for fuzzy logic controlled dynamic voltage restorer | |
CN106569129B (zh) | 电机安全检测方法及系统和电机控制系统 | |
Yin et al. | Islanding detection using proportional power spectral density | |
CN108418459B (zh) | 一种电流滞环控制的逆变器开路故障容错控制方法和装置 | |
Kamwa et al. | Synchrophasors data analytics framework for power grid control and dynamic stability monitoring | |
CN105116195A (zh) | 适用于电网电压谐波含量大的电压跌落检测方法 | |
CN102377195B (zh) | 独立运转检测装置 | |
CN105119510A (zh) | 混合型级联多电平换流器的电容电压平衡方法与系统 | |
CN102854421A (zh) | 一种光伏逆变器低电压穿越的快速判定方法 | |
CN106291170A (zh) | 面向大容量冲击负荷的tcr型svc动态响应性能试验方法 | |
Kim et al. | A fast and robust PLL of MCFC PCS under unbalanced grid voltages | |
CN104678171A (zh) | 一种相位差测试电路 | |
CN103475303B (zh) | 变频器的旁路切换方法、系统及电源切换方法、系统 | |
CN103954870A (zh) | 一种串联谐振与相位跳变相结合的孤岛检测方法 | |
CN104201684B (zh) | 一种基于负荷控制灵敏度的低频低压减载优化控制方法 | |
CN103869200B (zh) | 一种基于广域信息的配电网孤岛检测方法 | |
CN103066616A (zh) | 一种发电机组自动并车控制方法及系统 | |
CN102983770B (zh) | 一种四桥臂并网的逆变器及用其就地补偿零序电流的方法 | |
Reza et al. | Robust estimation of real-time single-phase grid voltage frequency under distorted conditions | |
CN104062545A (zh) | 新型短路故障源快速定位方法 | |
CN110247433A (zh) | 一种基于改进滑模移频法的光伏并网孤岛检测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141231 Termination date: 20181213 |