CN103015418A - Ground anchor assembly and method thereby for fixing objective - Google Patents
Ground anchor assembly and method thereby for fixing objective Download PDFInfo
- Publication number
- CN103015418A CN103015418A CN2012105265476A CN201210526547A CN103015418A CN 103015418 A CN103015418 A CN 103015418A CN 2012105265476 A CN2012105265476 A CN 2012105265476A CN 201210526547 A CN201210526547 A CN 201210526547A CN 103015418 A CN103015418 A CN 103015418A
- Authority
- CN
- China
- Prior art keywords
- connection cord
- pull bar
- locking plate
- anchor assemblies
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention discloses a ground anchor assembly, which comprises a draw bar (1), a locking plate (2), a guide device (3) and a connecting rope (4), wherein the locking plate (2) is provided with a plate-shaped main body part (2a); one surface of the plate-shaped main body part (2a) is provided with a connecting rope fixing part (2f) and a connecting rope maintaining part (2b); the connecting rope fixing part (2f) and the connecting rope maintaining part (2b) are provided with an opening part (2c) penetrating through the plate-shaped main body part (2a); the connecting rope (4) passes through the connecting rope maintaining part (2b); one end of the connecting rope (4) is fixedly arranged on the connecting rope fixing part (2f); the first end of the draw bar (1), which can be inserted into earth, is provided with a barb part (1f); and the first end can pass through the opening part (2c). According to the ground anchor assembly disclosed by the invention, the reusability of components can be further improved so as to lower the cost.
Description
Technical field
The method that the present invention relates to a kind of ground anchor assemblies and use this ground anchor assemblies fixed object thing.
Background technology
In Figure 17~Figure 22 of following patent documentation 1, disclose a kind of ground anchor assemblies, this ground anchor assemblies has the tool of leading, main fixed bar and auxiliary fixed bar, leading tool leads respectively to main fixed bar and auxiliary fixed bar, make the two insert in the soil with intersecting, and, the upper end of main fixed bar is used for connecting rope etc., and the lower end is formed with through hole, and auxiliary fixed bar inserts in this through hole.So, make main fixed bar can bear very large pulling force, that is, obtained stronger earth-grasping force.
Yet, adopt the ground anchor assemblies, lead tool although when finishing fixed operation, can take away, namely, thereby can reuse quantity, the reduction cost of leading tool and saving part, but main fixed bar and auxiliary fixed bar are neither reusable, existing in this can improved place.
Patent documentation 1: the open communique CN102400463A of Chinese invention patent
Summary of the invention
In view of this, main purpose of the present invention is, thereby provides a kind of reusability that improves parts to reduce the ground anchor assemblies of cost and the method for using this ground anchor assemblies fixed object thing.
For achieving the above object, ground of the present invention anchor assemblies is, comprise pull bar, locking plate and lead tool, described leading has the 1st pilot hole that described pull bar is led and the 2nd pilot hole that described locking plate is led on the tool, described main tie and described locking plate can be inserted in the soil along described the 1st pilot hole and described the 2nd pilot hole respectively.
Described ground anchor assemblies also comprises connection cord.Described locking plate has plate-like body section, and a surface of this plate-like body section is provided with connection cord fixed part and connection cord maintaining part), be provided with the peristome that runs through described plate-like body section in described connection cord fixed part and described connection cord maintaining part.Described connection cord passes described connection cord maintaining part, and one end (this " end " is not " end " that is defined on the absolute mathematical meaning, comprises the mode shown in the drawings that relates in the following embodiment) is fixed on the described connection cord fixed part.The 1st end that can insert in the soil of described pull bar is provided with barb section, and the 1st end can pass described peristome.
The present invention is preferred, is provided with arrow section at described the 1st end of described pull bar), described barb section is formed in this arrow section.
The present invention is preferred, is formed with pin at the 2nd end of described pull bar.
The present invention is preferred, is fixed with retainer on the described connection cord, thereby the position that this retainer can move to described connection cord maintaining part butt stops described connection cord to move.
The present invention is preferred, and described connection cord maintaining part is formed with a plurality of along the length direction of described plate-like body section.
The present invention is preferred, and described connection cord is wire rope.
In addition, the method for ground of the present invention anchor assemblies fixed object thing may further comprise the steps:
The described tool of leading is placed on the ground; The described locking plate that is fixed wtih described connection cord is inserted in the soil via described the 2nd pilot hole; Described pull bar is inserted in the soil via described the 1st pilot hole, and make the described barb section of described the 1st end of this pull bar pass the described peristome of described locking plate, the part facing to described peristome of being hooked described connection cord by this barb section; Described pull bar is extracted, by described barb section the part of described connection cord is pulled out; Remove the described tool of leading, the part that is drawn out of described connection cord connect be used for being connected with described object fixedly use rope.
The present invention is preferred, and described object comprises tent, small aircraft, small building facility, communications service, electric power facility, small-sized mining apparatus.
Effect of the present invention
Employing has as above the ground anchor assemblies of structure and the method for using this ground anchor assemblies fixed object thing, not only can obtain stronger earth-grasping force, and can reuse and lead tool and pull bar, compare with only reusing the prior art of leading tool, further improved parts reusing, provide cost savings.
Description of drawings
(a) (b) is the partial enlarged drawing of (a) for the specific embodiment of the invention relates to the oblique view of pull bar of ground anchor assemblies among Fig. 1;
(a) is the oblique view with the locking plate of connection cord of above-mentioned ground anchor assemblies among Fig. 2, (b) is the oblique view of another angle of this locking plate;
(a) is the oblique view of leading tool of above-mentioned ground anchor assemblies among Fig. 3, (b), (c) be the partial enlarged drawing of (a);
Fig. 4~Figure 13 uses the accompanying drawing of the method for above-mentioned ground anchor assemblies fixed object thing for being used for explanation, wherein, the partial enlarged drawing that (b) sees for another angle identical with (a) state among Fig. 9 among Fig. 9, (a) is identical with the state shown in (b) among Figure 10.
The specific embodiment
With reference to the accompanying drawings the specific embodiment of the present invention is described in detail.
The ground anchor assemblies of present embodiment comprises pull bar 1, locking plate 2, leads tool 3.
As shown in Figure 1, pull bar 1 has the main part 1a of elongated plate-like, the lower end of main part 1a forms tip-angled shape, and, be provided with perpendicular to the 1b of arrow section on the plate face direction at this lower end (the 1st end), and, in the present embodiment, the head end of the 1b of this arrow section is wedge angle, and tail end is formed with the 1f of barb section.Be provided with axis perpendicular to the pin 1d of plate face direction in the upper end (lower end) of main part 1, this pin 1d not only has the effect that stops pull bar 1 further to move down, and also can be used as the handle when extracting pull bar 1.In addition, on the main part 1a of pull bar 1, also be formed with the upwardly extending aliform 1c of section perpendicular to plate face side.
As shown in Figure 2, locking plate 2 has the main part 2a of elongated plate-like, and the left and right edges of this main part 2a are bent, thereby have strengthened intensity.The lower end of main part 2a is formed with the 2d of wedge angle section.At main part 2a connection cord 4 is installed, in the present embodiment, this connection cord 4 is wire rope.On the surface of main part 2a, be provided with along its length two connection cord maintaining part 2b, in addition, also be provided with a connection cord fixed part 2f, between the connection cord maintaining part 2b of lower side and connection cord fixed part 2f, be provided with the peristome 2c that runs through main part 2a.Above-mentioned connection cord 4 passes two connection cord maintaining part 2b (on through hole) from top to bottom successively, is connected rope maintaining part 2b and keeps and can slide (movement), and the lower end of this connection cord 4 is fixed among the connection cord fixed part 2f.
In addition, be fixed with detent 4a at connection cord 4, (when connection cord 4 slides) this detent 4a can move to the connection cord maintaining part 2b of top side and contact, thereby stops the continuation of connection cord 4 to be moved.Although show detent 4a among the figure, but need to prove, for convenient, show in the drawings the structure of detent 4a, but its actual setting position on connection cord 4 is not truly as shown in the figure, that is, under shown position, the length of the connection cord 4 between the connection cord keeper 2b of detent 4a and top side is not illustrated lengths.
As shown in Figure 3, lead the main part 31 that tool 3 has elongated plate-like, when being positioned on the ground, the plate face of this main part 31 perpendicular to ground namely perpendicular to horizontal direction.Be respectively equipped with the 1st pilot hole (the 1st guide part) 3a and the 2nd pilot hole (the 2nd guide part) 3b at the two ends of main part 31, this the 1st pilot hole 3a and the 2nd pilot hole 3b correspond respectively to pull bar 1 and arrange with locking plate 2, namely, respectively pull bar 1 and locking plate 2 are led, its shape also corresponds respectively to pull bar 1 and locking plate 2.As shown in the figure, the 1st pilot hole 3a is cross.
Below with reference to Fig. 4~Figure 13 the method for the ground anchor assemblies fixed object thing of use said structure is described.Object among the present invention comprises tent, small aircraft, small building facility, communications service, electric power facility, small-sized mining apparatus etc.
At first, as shown in Figure 4, will lead tool 3 horizontal positioned on the ground.Afterwards, such as Fig. 5, shown in Figure 6, will aim at the locking plate 2 of connection cord 4 and lead the 2nd pilot hole 3b of tool 3, and insert in the soil such as (can use hammer instrument squeeze into) via the 2nd pilot hole 3b, in the soil, this state as shown in Figure 7 until locking plate 2 all submerges.Under this state, a distolateral part of connection cord 4 enters in the soil, and other end (not shown) side leaves certain length on ground.
Afterwards, such as Fig. 7, shown in Figure 8, pull bar 1 aimed at lead the 1st pilot hole 3a of tool 3, and insert in the soil such as (can use hammer instrument squeeze into) via the 1st pilot hole 3a.As shown in Figure 9, pull bar 1 inserts in the process in soil, (1b of arrow section and on the 1f of barb section) can enter among the peristome 2c of locking plate 2 in its bottom, further, shown in (a) among Figure 10, hooked the part facing to peristome 2c of connection cord 4 by the 1f of barb section, at this moment, shown in (b) among Figure 10, thereby the pin 1d of pull bar 1 upper end can not enter among the 1st pilot hole 3a and is blocked, and pull bar 1 can not continue to move down.Afterwards, as shown in figure 11, the user will hold pin 1d with it as handle, pull bar 1 is extracted, and at this moment, the part of being hooked by the 1f of barb section of connection cord 4 is spurred by the 1f of barb section, make connection cord 4 in the maintenance lower slider (movement) of connection cord maintaining part 2b, finally, as shown in figure 12, the part of connection cord 4 is drawn out on the ground.Afterwards, remove pull bar 1 and lead tool 3, this state as shown in figure 13.At last, the part that is drawn out of connection cord 4 connect be used for the connecting object thing fixedly use rope.Should be fixing with rope connecting object thing in advance, also can with connecting object thing again after connection cord 4 is connected.
In addition, can suitably set the position of detent 4a, thereby, when reality is used, connection cord 4 is pulled out to the position of the connection cord maintaining part 2a butt of detent 4a and top side, so, can either guarantee the length of pulling out of connection cord 4, also can rationally set the total length of connection cord 4.
Employing has as above the ground anchor assemblies of structure and the method for using this ground anchor assemblies fixed object thing, not only can obtain stronger earth-grasping force, and can reuse and lead tool 3 and pull bar 1, compare with only reusing the prior art of leading tool, further improved parts reusing, provide cost savings.
In addition, because pull bar 1 is removed, and locking plate 2 all submerges in the soil, thereby, only have connection cord 4 to reveal on the ground, do not expose any metal hard components on the ground, so, the people is when movable around it, and the possibility that is tripped, damages greatly reduces.
The above only is preferred embodiment of the present invention, and is in order to limit the present invention, within the spirit and principles in the present invention not all, any modification of doing, is equal to replacement, improvement etc., all should be included within protection scope of the present invention.
For example; in the above-described embodiment; illustration the 1f of barb section of shape shown in the figure; yet; the present invention is not limited to this; those skilled in the art can record according to the present invention knows all overhead structures that can hook connection cord 4 and pull it (for example, being similar to shape and the structure of fish hook, crochet hook etc.) and all goes for the present invention, thereby the employing of these structures is also contained among protection scope of the present invention.
Claims (9)
- One kind ground anchor assemblies, comprise pull bar (1), locking plate (2) and lead tool (3), described leading on tool (3) has the 1st pilot hole (3a) that described pull bar (1) is led and the 2nd pilot hole (3b) that described locking plate (2) is led, described main tie (1) can be inserted in soil along described the 1st pilot hole (3a) and described the 2nd pilot hole (3b) respectively with described locking plate (2), it is characterized in thatAlso comprise connection cord (4),Described locking plate (2) has plate-like body section (2a), a surface of this plate-like body section (2a) is provided with connection cord fixed part (2f) and connection cord maintaining part (2b), be provided with the peristome (2c) that runs through described plate-like body section (2a) in described connection cord fixed part (2f) and described connection cord maintaining part (2b)Described connection cord (4) passes described connection cord maintaining part (2b), and the one end is fixed on the described connection cord fixed part (2f),The 1st end that can insert in the soil of described pull bar (1) is provided with barb section (1f), and the 1st end can pass described peristome (2c).
- 2. anchor assemblies is characterized in that according to claim 1ly, is provided with arrow section (1b) at described the 1st end of described pull bar (1), and described barb section (1f) is formed in this arrow section (1b).
- 3. anchor assemblies is characterized in that according to claim 1ly, is formed with pin (1d) at the 2nd end of described pull bar (1).
- 4. each described ground anchor assemblies according to claim 1~3, it is characterized in that, be fixed with retainer (4a) on the described connection cord (4), this retainer (4a) can move to described connection cord maintaining part (2b) thereby the position of butt and stop described connection cord (4) mobile.
- 5. each described ground anchor assemblies is characterized in that according to claim 1~3, and described connection cord maintaining part (2b) is formed with a plurality of along the length direction of described plate-like body section (2a).
- 6. each described ground anchor assemblies is characterized in that according to claim 1~3, and described connection cord (4) is wire rope.
- 7. a right to use requires the method for each described ground anchor assemblies fixed object thing in 1~6, it is characterized in that, may further comprise the steps:The described tool (3) of leading is placed on the ground;The described locking plate (2) that will be fixed wtih described connection cord (4) inserts in the soil via described the 2nd pilot hole (3b);Described pull bar (1) is inserted in the soil via described the 1st pilot hole (3a), and the described peristome (2c) of described locking plate (2) passes in the described barb section (1f) that makes described the 1st end of this pull bar (1), is hooked the part facing to described peristome (2c) of described connection cord (4) by this barb section (1f);Described pull bar (1) is extracted, by described barb section (1f) part of described connection cord (4) is pulled out;Remove the described tool (3) of leading, the part that is drawn out of described connection cord (4) connect be used for being connected with described object fixedly use rope.
- 8. method according to claim 7 is characterized in that, the integral body of described locking plate (2) is fully inserted in the soil and is not exposed to part more than the ground.
- 9. according to claim 7 or 8 described methods, it is characterized in that described object comprises tent, small aircraft, small building facility, communications service, electric power facility, small-sized mining apparatus.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210526547.6A CN103015418B (en) | 2012-12-07 | 2012-12-07 | Ground anchor assembly and method thereby for fixing objective |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210526547.6A CN103015418B (en) | 2012-12-07 | 2012-12-07 | Ground anchor assembly and method thereby for fixing objective |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103015418A true CN103015418A (en) | 2013-04-03 |
CN103015418B CN103015418B (en) | 2015-03-11 |
Family
ID=47964480
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210526547.6A Expired - Fee Related CN103015418B (en) | 2012-12-07 | 2012-12-07 | Ground anchor assembly and method thereby for fixing objective |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103015418B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522654A (en) * | 2016-12-26 | 2017-03-22 | 王福全 | Temporary anchoring fixing device for construction and temporary protective barrier fixing supporting foot |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR851256A (en) * | 1938-03-08 | 1940-01-05 | Anchoring device for tents, masts, camouflage fabrics, etc., by means of a traction device provided on these objects and inclined with respect to the plane of the ground | |
CN2492596Y (en) * | 2001-07-11 | 2002-05-22 | 台湾地工有限公司 | A-shaped ground anchor |
JP2009102982A (en) * | 2009-01-13 | 2009-05-14 | Tokyo Seiko Co Ltd | Anchor device and anchor |
CN102400463A (en) * | 2011-08-24 | 2012-04-04 | 周卫 | Ground-grabbing device |
-
2012
- 2012-12-07 CN CN201210526547.6A patent/CN103015418B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR851256A (en) * | 1938-03-08 | 1940-01-05 | Anchoring device for tents, masts, camouflage fabrics, etc., by means of a traction device provided on these objects and inclined with respect to the plane of the ground | |
CN2492596Y (en) * | 2001-07-11 | 2002-05-22 | 台湾地工有限公司 | A-shaped ground anchor |
JP2009102982A (en) * | 2009-01-13 | 2009-05-14 | Tokyo Seiko Co Ltd | Anchor device and anchor |
CN102400463A (en) * | 2011-08-24 | 2012-04-04 | 周卫 | Ground-grabbing device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106522654A (en) * | 2016-12-26 | 2017-03-22 | 王福全 | Temporary anchoring fixing device for construction and temporary protective barrier fixing supporting foot |
Also Published As
Publication number | Publication date |
---|---|
CN103015418B (en) | 2015-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102400463B (en) | Ground-grabbing device | |
JP5572668B2 (en) | Replacement method of oblique cable and temporary hanger for replacing oblique cable | |
US20130152743A1 (en) | Fastener Attachment System and Methods of Use | |
CN210808420U (en) | Greening curtain wall | |
CN212025936U (en) | Equipment for mounting continuous steel strand stay cable at tower end of cable-stayed bridge | |
CN103015418A (en) | Ground anchor assembly and method thereby for fixing objective | |
CN202716232U (en) | Nail puller | |
CN202745402U (en) | Hard protection structure for construction of high-rise elevator shaft | |
CN101289890B (en) | Steel stranded line rapid traction joint | |
CN215631662U (en) | A assembled plug connector for civil engineering | |
CN205777090U (en) | A kind of sliding steel truss structure for long-span roofing | |
JP5276208B1 (en) | Aluminum wire retention clamp | |
CN104317011A (en) | Manufacture method of fiber ceramic insertion core tail handle capable of preventing fibers from falling off | |
CN214783904U (en) | Hammer stake machine slide integrated configuration | |
JP6395207B2 (en) | Scaffolding connector and large assembly method and large paying method using the same | |
CN201067870Y (en) | Reinforcing steel bar clamping machine | |
CN111441594B (en) | Construction method of multilayer sectional type main cable | |
CN204662284U (en) | For changing withdrawing steel wire and the hole cleaning device assembly of the old suspension rod of arched bridge pre-stressed boom | |
CN114508232A (en) | Construction process for end cantilever beam of ship type roof frame | |
CN102623927A (en) | Tool and method for charged replacement of multi-circuit double-split conductor insulators of 200kV line | |
CN210529574U (en) | Municipal administration rail guard | |
EP3118386B1 (en) | Wedge for post tensioning tendon | |
CN113047074B (en) | Portable steel wire rope connector and working method thereof | |
CN213329982U (en) | Permanent railing fixing device on concrete or steel structure platform | |
CN216973128U (en) | Cable-stay bridge king-tower rollover template fixed knot constructs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150311 Termination date: 20161207 |
|
CF01 | Termination of patent right due to non-payment of annual fee |