CN103015415B - Post-tensioned circular foundation pit support pile - Google Patents

Post-tensioned circular foundation pit support pile Download PDF

Info

Publication number
CN103015415B
CN103015415B CN201210590568.4A CN201210590568A CN103015415B CN 103015415 B CN103015415 B CN 103015415B CN 201210590568 A CN201210590568 A CN 201210590568A CN 103015415 B CN103015415 B CN 103015415B
Authority
CN
China
Prior art keywords
reinforcement
steel strand
pile
stake
high tensile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210590568.4A
Other languages
Chinese (zh)
Other versions
CN103015415A (en
Inventor
余元辉
白翔
黎鸿
李可一
莫振林
杨致远
康景文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southwest Architectural Design and Research Institute Co Ltd
Original Assignee
China Southwest Architectural Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southwest Architectural Design and Research Institute Co Ltd filed Critical China Southwest Architectural Design and Research Institute Co Ltd
Priority to CN201210590568.4A priority Critical patent/CN103015415B/en
Publication of CN103015415A publication Critical patent/CN103015415A/en
Application granted granted Critical
Publication of CN103015415B publication Critical patent/CN103015415B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A post-tensioned circular foundation pit support pile comprises concretes and a reinforcement cage, wherein the reinforcement cage comprises steel reinforcements, isolation tubes, a steel strand or high-strength steel reinforcement and a hoop reinforcement; the steel reinforcements and the isolation tubes form a circular framework by the hoop reinforcement, the steel reinforcements are positioned on one side close to a foundation pit, and the isolation tubes are positioned on one side close to a soil body; a pressure bearing fixing plate is arranged at the bottom end of a pile of the isolation tubes; the steel strand or high-strength steel reinforcement penetrates through the isolation tubes; one end of the steel strand or high-strength steel reinforcement is fixedly connected with the pressure bearing fixing plate at the bottom of the pile, and the other end is fixed on a pressure bearing anchorage at the top of the pile; a grouting hole and a vent port are formed in the pressure bearing anchorage at the top of the pile; and when the strength of the pile body reaches 75 percent of the design strength after the pile body is subjected to concrete pouring, the steel strand or the high-strength steel reinforcement is subjected to prestress and locked, and finally cement mortar is poured into the isolation tubes. According to the invention, the support effect of the foundation pit is increased, lateral deformation of a support structure and adverse infection on the surrounding environment are both reduced, while the usage amount of both the steel reinforcements and the concretes is reduced, and accordingly, the construction cost is saved.

Description

Post-tensioned prestressing Circular Pit soldier pile
Art
The present invention relates to a kind of building foundation pit reinforcing foundation pit supporting pile, specifically a kind of post-tensioned prestressing Circular Pit soldier pile.
Background technology
Along with the day of urban land is becoming tight, the construction of basement is also trend of the times, and deep foundation pit support just becomes an important step of excavation of foundation pit.Circle or the stake of rectangle ordinary reinforced concrete is widely used as foundation pit supporting construction in the realm of building construction.In foundation ditch during the excavation of the cubic metre of earth and stone, outside foundation ditch, the soil body is to direction slippage inside foundation ditch, pile body can form larger moment of flexure after stressed outside foundation ditch, produce deformed in tension, can cause because soldier pile distortion is excessive time serious, foundation pit supporting construction lost efficacy even unstability, brought potential safety hazard to building operations.In order to improve the intensity of foundation pit supporting system and strengthen non-deformability, now adopt increases amount of reinforcement, increases stake footpath, reduces the measures such as pile spacing more, and these measures without exception all add reinforcing bar and concrete consumption, be unfavorable for reducing costs.
Summary of the invention
In order to solve existing building foundation ditch strengthening foundation pit supporting pile Problems existing, the invention provides a kind of post-tensioned prestressing Circular Pit soldier pile, this post-tensioned prestressing Circular Pit soldier pile not only has good supporting role, and effectively can reduce lateral deformation, guarantee building foundation pit safety, reduce building costs.
The technical solution adopted for the present invention to solve the technical problems is: it is configured to by concrete and circular steel muscles and bones, wherein cage of reinforcement includes reinforcing bar and stirrup, reinforcing bar is fixed by stirrup, stirrup is fixed with isolated tube, steel strand or high tensile reinforcement is provided with in isolated tube, the top of steel strand or high tensile reinforcement is provided with stake and bears responsibility pressure ground tackle, and at the bottom of the bottom of cage of reinforcement is provided with bearing plate, wherein reinforcing bar and isolated tube are distinguished on two semicircles of the soil body outside nearly foundation ditch side, position and nearly foundation ditch, and be fixed as circular framework structure by stirrup, the bottom of steel strand or high tensile reinforcement is fixedly connected with bearing plate at the bottom of stake, born responsibility by stake and press ground tackle to lock in the top of steel strand or high tensile reinforcement, grout hole and steam vent is provided with on pressure ground tackle is born responsibility in stake.Construction sequence is carried out in the following order: 1., by the cage of reinforcement be made up of reinforcing bar, isolated tube, steel strand or high tensile reinforcement and stirrup insert the Circular Pit supporting stake holes middle position preset, and pressure-bearing fixed head at the bottom of stake is placed on below isolated tube, be fixed with the steel strand passed from isolated tube or high tensile reinforcement and be connected, when placing by being preset with the side of reinforcing bar inside foundation ditch, the side being preset with isolated tube is placed outside foundation ditch; 2., carry out pile concrete by construction reference to build; 3., after pile concrete reaches 75% of design strength, bear responsibility to steel strand or high tensile reinforcement Shi Hanzhang and with stake and press ground tackle to lock, cut off unnecessary steel strand or high tensile reinforcement; 4., from stake bear responsibility pressure ground tackle grout hole cement injection mortar, until fill up cement mortar in isolated tube.To steel strand or high tensile reinforcement Shi Hanzhang, foundation pit supporting pile can be made first compressive deformation to occur, with the active force of outside soil layer in Excavation Process of resisting, effectively reduce the distortion of support system, under same diameter under prerequisite, improve intensity and the non-deformability of foundation pit supporting pile, decrease reinforcing bar, concrete use amount.
The invention has the beneficial effects as follows: good supporting role can not only be played to foundation ditch, and the lateral deformation can effectively avoiding in use foundation pit supporting pile to produce, reduce the distortion of conventional soldier pile foundation ditch surrounding ground and the unfavorable deformation effect to environment, guarantee building foundation pit safety, and reinforcing bar and concrete consumption can be reduced under identical anti-bending bearing capacity design condition, be conducive to reducing building costs, product structure is simple, cost is low, easy construction, easily promotes the use of.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the invention will be further described.
Fig. 1 is the cross-sectional structure schematic diagram of pile body in the present invention.
Fig. 2 is the cross-sectional view of pile body in the present invention.
Fig. 3 is the cross-sectional view of the invention process state.
Fig. 4 king-pile of the present invention is born responsibility and is pressed the perspective view of ground tackle.
Code description in figure: 1-concrete; 2-reinforcing bar; 3-stirrup; 4-isolated tube; 5-steel strand or high tensile reinforcement; Pressure-bearing ground tackle at the bottom of 6-stake; 7-stake is born responsibility pressure ground tackle; 8-conical bore; 9-grout hole; 10-steam vent; At the bottom of 11-foundation ditch; Soil layer district outside 12-foundation ditch; f-active force.
Detailed description of the invention
As shown in Figure 1, when adopting post-tensioned prestressing Circular Pit soldier pile of the present invention, the side in cage of reinforcement is set to reinforcing bar (2), opposite side is set to isolated tube (4), and with stirrup (3), reinforcing bar and isolated tube are fixed as circular framework structure.As shown in Figure 2 and Figure 3, be hollow in the middle of isolated tube (4), can pass for steel strand or high tensile reinforcement (5), steel strand or high tensile reinforcement bottom are fixedly connected with pressure-bearing ground tackle (6) at the bottom of stake, and the other end of steel strand or high tensile reinforcement is provided with stake bears responsibility pressure ground tackle (7), as shown in Figure 4, on pressure ground tackle (7) is born responsibility in stake, grout hole (9), steam vent (10) is provided with and the conical bore (8) that can pass for steel strand or high tensile reinforcement.Cast in situs mode can be adopted in practice, first cage of reinforcement of the present invention is placed on the middle position of default pattern foundation pit supporting structure stake holes, to the side of reinforcing bar be preset with inside foundation ditch during placement, there is the side of isolated tube and steel strand or high tensile reinforcement outside foundation ditch, a bearing plate at the bottom of fixing and steel strand or high tensile reinforcement, then build carrying out pile concrete by construction reference.When concrete compressive strength meets design requirement; and can Shi Hanzhang after being not less than 75% of design strength grade; prestressed stretch-draw terminate rear stake bear responsibility pressure ground tackle (7) steel strand or high tensile reinforcement (5) are locked; cut off unnecessary steel strand or high tensile reinforcement; protruded length after the anchoring of guiding principle twisted wire should not be less than 30mm, ground tackle end-blocking application concrete protective.Finally by stake bear responsibility pressure ground tackle on grout hole (9) cement injection mortar, should guarantee before grouting that grouting duct is moistening, clean, slowly should carry out equably during grouting, must not interrupt, make the exhaust of steam vent (10) clear and coherent, until fill up cement mortar in isolated tube (4) simultaneously.Adopt the present invention, a large amount of reinforcing bar, concrete can be saved under identical bending resistance carrying design condition, save building costs.

Claims (2)

1. a post-tensioned prestressing Circular Pit soldier pile, it is configured to by concrete and circular steel muscles and bones, wherein cage of reinforcement comprises reinforcing bar and stirrup, reinforcing bar is fixed by stirrup, it is characterized in that: on stirrup, be fixed with isolated tube, be provided with steel strand or high tensile reinforcement in isolated tube, the top of steel strand or high tensile reinforcement is provided with stake and bears responsibility pressure ground tackle, and at the bottom of the bottom of cage of reinforcement is provided with bearing plate, on pressure ground tackle is born responsibility in stake, be provided with grout hole and steam vent; Its construction sequence is carried out in the following order: 1., by the cage of reinforcement be made up of reinforcing bar, isolated tube, steel strand or high tensile reinforcement and stirrup insert the Circular Pit supporting stake holes middle position preset, and bearing plate at the bottom of stake is placed on below isolated tube, be fixed with the steel strand passed from isolated tube or high tensile reinforcement and be connected, when placing by being preset with the side of reinforcing bar inside foundation ditch, the side being preset with isolated tube is placed outside foundation ditch; 2., carry out pile concrete by construction reference to build; 3., after pile concrete reaches 75% of design strength, bear responsibility to steel strand or high tensile reinforcement Shi Hanzhang and with stake and press ground tackle to lock, cut short unnecessary steel strand or high tensile reinforcement; 4., from stake bear responsibility pressure ground tackle grout hole cement injection mortar, until fill up cement mortar in isolated tube; Reinforcing bar and isolated tube to lay respectively at inside nearly foundation ditch and outside nearly foundation ditch the soil body two semicircles on, and be fixed as circular framework structure by stirrup.
2. a kind of post-tensioned prestressing Circular Pit soldier pile according to claim 1, is characterized in that: the bottom of steel strand or high tensile reinforcement is fixedly connected with bearing plate at the bottom of stake, is born responsibility by stake and press ground tackle to lock in the top of steel strand or high tensile reinforcement.
CN201210590568.4A 2012-12-31 2012-12-31 Post-tensioned circular foundation pit support pile Active CN103015415B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210590568.4A CN103015415B (en) 2012-12-31 2012-12-31 Post-tensioned circular foundation pit support pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210590568.4A CN103015415B (en) 2012-12-31 2012-12-31 Post-tensioned circular foundation pit support pile

Publications (2)

Publication Number Publication Date
CN103015415A CN103015415A (en) 2013-04-03
CN103015415B true CN103015415B (en) 2015-07-08

Family

ID=47964477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210590568.4A Active CN103015415B (en) 2012-12-31 2012-12-31 Post-tensioned circular foundation pit support pile

Country Status (1)

Country Link
CN (1) CN103015415B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019449B (en) * 2014-04-30 2018-05-08 德翰智慧科技有限公司 Prestressed concrete pipe pile and its construction method with degassing function
CN107012880A (en) * 2017-02-24 2017-08-04 中铁二十五局集团第五工程有限公司 A kind of pile pier structure of the empty rail of suspension type

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101570969A (en) * 2009-06-04 2009-11-04 河南建华管桩有限公司 Horizontal force supporting pile and production process thereof
CN101629418A (en) * 2009-08-03 2010-01-20 天津市建筑科学研究院 Post-tensioned prestressing cast pile and construction method thereof
CN202416307U (en) * 2012-01-05 2012-09-05 湖北中南勘察基础工程有限公司 Cast-in-place pile post-tensioning prestressed construction device
CN102808414A (en) * 2012-08-24 2012-12-05 天津市建筑科学研究院有限公司 Bonded post-tensioned prestressed anchoring construction method for cast-in-place concrete structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2618850B2 (en) * 1995-05-18 1997-06-11 建設基礎エンジニアリング株式会社 Construction method of high strength pile

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101570969A (en) * 2009-06-04 2009-11-04 河南建华管桩有限公司 Horizontal force supporting pile and production process thereof
CN101629418A (en) * 2009-08-03 2010-01-20 天津市建筑科学研究院 Post-tensioned prestressing cast pile and construction method thereof
CN202416307U (en) * 2012-01-05 2012-09-05 湖北中南勘察基础工程有限公司 Cast-in-place pile post-tensioning prestressed construction device
CN102808414A (en) * 2012-08-24 2012-12-05 天津市建筑科学研究院有限公司 Bonded post-tensioned prestressed anchoring construction method for cast-in-place concrete structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
新型基坑支护体系施工工艺研究;解新路;《建筑技术开发》;19971231;第24卷(第6期);第16-19页 *

Also Published As

Publication number Publication date
CN103015415A (en) 2013-04-03

Similar Documents

Publication Publication Date Title
KR102055436B1 (en) Prefabricated pier column member with steel-concrete composite structure
CN104790424B (en) The hardened system on generation power foundation of wind power ring basis and reinforcement means thereof
CN203639942U (en) Arched retaining wall
CN101634144A (en) Anti-slide pile with vertical prestressed anchor cables adopting secondary grouting
CN102345291A (en) Partially prestressed supporting cantilever pile
CN203821400U (en) Prestressing force supporting structure of foundation pit
CN102345292B (en) A kind of composite prestressed uplift pile with enlarged footing
CN106930436B (en) Reinforced concrete shear wall with built-in prestressed steel diagonal bracing
CN202194129U (en) Composite prestress soil-blocking pile
CN102363957B (en) A kind of post-tensioned prestressing composite uplift pile
CN103015415B (en) Post-tensioned circular foundation pit support pile
CN111197312A (en) L-shaped prestress pulling-anchoring engaged double-row pile foundation pit supporting structure and construction method thereof
CN103147438A (en) Cast-in-place post-tensioning method-based I-shaped support pile and manufacturing method of support pile
CN103410144A (en) Prestressed reinforcement rock-socketed cast-in-place pile and construction method thereof
CN103031841A (en) Post-tensioned prestressing rectangular hollow foundation pit support pile
CN202194131U (en) Partially prestressed cantilever soldier pile
CN202194130U (en) Compound pre-stressed anti-pulling pile with enlarged head
CN217299047U (en) Basement adds anti structure of floating of type
CN207998838U (en) A kind of compound pile pile of resistance to plucking
CN200985510Y (en) Anchored exterior-protected construction
CN201512786U (en) Secondary grouting type anti-slide pile with vertical prestressed anchor cable
CN205259173U (en) Be applied to novel resistance to compression foundation pile of excavation supporting engineering
CN201284461Y (en) Apparatus with convenient pre-stress anchor cable anchorage
CN107642095B (en) Construction method for reinforcing rigidity of side wall of foundation pit by composite soil nailing wall support
CN209384243U (en) A kind of prestressing force support pile and piling wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant