CN102994112B - Preheated coal leading-in device of coal pyrolyzing furnace - Google Patents
Preheated coal leading-in device of coal pyrolyzing furnace Download PDFInfo
- Publication number
- CN102994112B CN102994112B CN201110453445.1A CN201110453445A CN102994112B CN 102994112 B CN102994112 B CN 102994112B CN 201110453445 A CN201110453445 A CN 201110453445A CN 102994112 B CN102994112 B CN 102994112B
- Authority
- CN
- China
- Prior art keywords
- coal
- material level
- level control
- hole
- leading
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Abstract
The invention relates to a preheated coal leading-in device of a coal pyrolyzing furnace. Refractory material masonry (2) is arranged in a furnace mantle (1), eight blanking ports (9) are arranged on the refractory material masonry (2), the blanking ports (9) are connected with a material level control bin (10), a high material level gauge measuring hole (3), a low material level gauge measuring hole (4) and an observation hole (5) are arranged on the material level control bin (10), a raw coal gas pressure-measuring and temperature-measuring hole (6) is arranged on the furnace mantle (1), a heat insulation housing (7), a cement block (11) and a raw coal gas leading-out channel (12) are arranged below the material level control bin (10), and a heat insulation material (8) is arranged in the heat insulation housing (7). The interior is divided into two parts by the heat insulation housing filled with the heat insulation material, namely ceramic fiber, the external temperature is 600 DEG C, the internal temperature is 250 DEG C, the specific temperature required for leading preheated coal into the furnace can be met, and the preheated coal leading-in device can further save energy, improve efficiency and reduce cost.
Description
Technical field
The invention belongs to a kind of pit kiln, be specifically related to a kind of pre-hot coal gatherer of coal heat decomposition stove.
Background technology
The most of employing of pit kiln intermittent type coking in the market, coal in batches add coke oven, coal seam is arranged on the two ends of body of heater, and use coal not carry out preheating, but using independent equipment, coal is dry, and the scale of the equipment using is like this large, wasted the energy, service efficiency reduces greatly.
Summary of the invention
The pre-hot coal gatherer that is to provide a kind of coal heat decomposition stove of technical problem to be solved by this invention.Can be continuous, fast, pre-hot coal sent into pit kiln the carrying out coking of concentrated.
Technical scheme of the present invention: a kind of pre-hot coal gatherer of coal heat decomposition stove, it comprises: furnace shell 1, refractory materials masonry 2, high charge level instrumentation hole 3, low level gage gaging hole 4, vision slit 5, raw gas pressure measurement thermometer hole 6, insulation shell 7, lagging material 8, feed opening 9, material level control storehouse 10, cement block 11 and raw gas are derived passage 12.The inside of furnace shell 1 is provided with refractory materials masonry 2, on refractory materials masonry 2, be provided with 8 feed openings 9, feed opening 9 is connected with material level control storehouse 10, on material level control storehouse 10, be provided with high charge level instrumentation hole 3, low level gage gaging hole 4, vision slit 5, on furnace shell 1, be provided with raw gas pressure measurement thermometer hole 6,10 belows, material level control storehouse are provided with insulation shell 7, cement block 11 and raw gas and derive passage 12, and lagging material 8 is equipped with in the inside of insulation shell 7.
The present invention compared with prior art, there is following beneficial effect: material level control storehouse can be by the height of the material level of vision slit control coal, inside is divided into two portions by the insulation shell that lagging material ceramic fiber is housed, outside is 600 ℃, inside is 250 ℃, meets pre-hot coal and enters the required specified temp of stove, has saved the energy, improve efficiency, reduced cost.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention
Fig. 2 is the sectional view along A-A section line
Concrete embodiment
A pre-hot coal gatherer for coal heat decomposition stove, it comprises: furnace shell 1, refractory materials masonry 2, high charge level instrumentation hole 3, low level gage gaging hole 4, vision slit 5, raw gas pressure measurement thermometer hole 6, insulation shell 7, lagging material 8, feed opening 9, material level control storehouse 10, cement block 11 and raw gas are derived passage 12.The inside of furnace shell 1 is provided with refractory materials masonry 2, on refractory materials masonry 2, be provided with 8 feed openings 9, feed opening 9 is connected with material level control storehouse 10, on material level control storehouse 10, be provided with high charge level instrumentation hole 3, low level gage gaging hole 4, vision slit 5, on furnace shell 1, be provided with raw gas pressure measurement thermometer hole 6,10 belows, material level control storehouse are provided with insulation shell 7, cement block 11 and raw gas and derive passage 12, and lagging material 8 is equipped with in the inside of insulation shell 7.
Claims (1)
1. a pre-hot coal gatherer for coal heat decomposition stove, it comprises: furnace shell (1), refractory materials masonry (2), high charge level instrumentation hole (3), low level gage gaging hole (4), vision slit (5), raw gas pressure measurement thermometer hole (6), insulation shell (7), lagging material (8), feed opening (9), material level control storehouse (10), cement block (11) and raw gas are derived passage (12), it is characterized in that: the inside of furnace shell (1) is provided with refractory materials masonry (2), on refractory materials masonry (2), be provided with 8 feed openings (9), feed opening (9) is connected with material level control storehouse (10), is provided with high charge level instrumentation hole (3) on material level control storehouse (10), low level gage gaging hole (4), vision slit (5), is provided with raw gas pressure measurement thermometer hole (6) on furnace shell (1), below, material level control storehouse (10) is provided with insulation shell (7), cement block (11) and raw gas are derived passage (12), and lagging material (8) is equipped with in the inside of insulation shell (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110453445.1A CN102994112B (en) | 2011-12-21 | 2011-12-21 | Preheated coal leading-in device of coal pyrolyzing furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110453445.1A CN102994112B (en) | 2011-12-21 | 2011-12-21 | Preheated coal leading-in device of coal pyrolyzing furnace |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102994112A CN102994112A (en) | 2013-03-27 |
CN102994112B true CN102994112B (en) | 2014-06-11 |
Family
ID=47923230
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110453445.1A Expired - Fee Related CN102994112B (en) | 2011-12-21 | 2011-12-21 | Preheated coal leading-in device of coal pyrolyzing furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102994112B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB982829A (en) * | 1963-01-31 | 1965-02-10 | Gelsenkirchener Bergwerks Ag | Improvements in or relating to coke ovens |
CN101824328A (en) * | 2009-12-21 | 2010-09-08 | 西安理研工控科技有限公司 | System for controlling oxygen content of crude gas of internal thermal upright carbonization furnace |
CN101995837A (en) * | 2010-11-01 | 2011-03-30 | 广州迪森热能技术股份有限公司 | Automatic biomass gas feeding and diffusing control method and biomass gasification reaction system |
CN202482256U (en) * | 2011-12-21 | 2012-10-10 | 山西鑫立能源科技有限公司 | Preheated-coal introduction device for coal pyrolyzing furnace |
-
2011
- 2011-12-21 CN CN201110453445.1A patent/CN102994112B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB982829A (en) * | 1963-01-31 | 1965-02-10 | Gelsenkirchener Bergwerks Ag | Improvements in or relating to coke ovens |
CN101824328A (en) * | 2009-12-21 | 2010-09-08 | 西安理研工控科技有限公司 | System for controlling oxygen content of crude gas of internal thermal upright carbonization furnace |
CN101995837A (en) * | 2010-11-01 | 2011-03-30 | 广州迪森热能技术股份有限公司 | Automatic biomass gas feeding and diffusing control method and biomass gasification reaction system |
CN202482256U (en) * | 2011-12-21 | 2012-10-10 | 山西鑫立能源科技有限公司 | Preheated-coal introduction device for coal pyrolyzing furnace |
Also Published As
Publication number | Publication date |
---|---|
CN102994112A (en) | 2013-03-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202101540U (en) | Enclosed screw rod sintering furnace device | |
CN104004958A (en) | Method and device for continuously preparing vanadium-nitrogen alloy | |
CN204508817U (en) | A kind of graphite furnace temperature measuring apparatus | |
CN111362262B (en) | High-purity graphitization furnace | |
CN101749942A (en) | Temperature measuring device of rotary kiln | |
CN102994112B (en) | Preheated coal leading-in device of coal pyrolyzing furnace | |
CN104567357A (en) | Equipment for continuously producing scheelite ore concentrate with microwave method | |
CN102994111B (en) | Preheated coal leading-in device of coal pyrolyzing furnace | |
CN202482256U (en) | Preheated-coal introduction device for coal pyrolyzing furnace | |
CN202369540U (en) | Pre-heated coal feeding device of coal pyrolysis furnace | |
CN204555649U (en) | A kind of equipment of microwave method continuous seepage white tungsten fine ore | |
CN202993885U (en) | Temperature measuring device of silicon carbide pressureless sintering kiln | |
CN205120264U (en) | Dismountable thermocouple based on two temperature measurement cores | |
CN102994109B (en) | Raw coal gas guide device of coal pyrolysis furnace | |
CN203551131U (en) | Graphitization furnace temperature measuring device | |
CN208700580U (en) | Heat graphitizing furnace in continuous production interval | |
CN202482251U (en) | Raw coke oven gas guiding device of coal pyrolyzing furnace | |
CN102994119B (en) | Control method for instruments of coal pyrolysis furnace | |
CN103031134B (en) | Instrument of coal pyrolysis furnace and control device thereof | |
CN106645280B (en) | Coking coal heat transfer process simulation device | |
CN203683094U (en) | Shaft kiln for yellow phosphorus ore pretreatment | |
CN205980755U (en) | Drying device of solar wafer fritting furnace | |
CN212450648U (en) | High-purity graphitization furnace | |
CN104724702A (en) | Double-section graphitization furnace equipment and production process | |
CN202482253U (en) | Instruments of coal pyrolysis furnace and control device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: Wang Xiaoqun Document name: payment instructions |
|
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: Wang Xiaoqun Document name: Patent termination notice |
|
DD01 | Delivery of document by public notice | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140611 Termination date: 20211221 |
|
CF01 | Termination of patent right due to non-payment of annual fee |