CN102990573A - Device for assembling large calcium carbide furnace electrode shell - Google Patents

Device for assembling large calcium carbide furnace electrode shell Download PDF

Info

Publication number
CN102990573A
CN102990573A CN2013100040752A CN201310004075A CN102990573A CN 102990573 A CN102990573 A CN 102990573A CN 2013100040752 A CN2013100040752 A CN 2013100040752A CN 201310004075 A CN201310004075 A CN 201310004075A CN 102990573 A CN102990573 A CN 102990573A
Authority
CN
China
Prior art keywords
ring
semicircular ring
locating
location semi
electrode shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100040752A
Other languages
Chinese (zh)
Other versions
CN102990573B (en
Inventor
马立全
李勇
耿玉侠
孔祥武
曲建平
张梦娣
李洪深
汤明伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tianchen Engineering Corp
Tianjin Tianchen Green Energy Resources Engineering Technology and Development Co Ltd
Original Assignee
China Tianchen Engineering Corp
Tianjin Tianchen Green Energy Resources Engineering Technology and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tianchen Engineering Corp, Tianjin Tianchen Green Energy Resources Engineering Technology and Development Co Ltd filed Critical China Tianchen Engineering Corp
Priority to CN201310004075.2A priority Critical patent/CN102990573B/en
Publication of CN102990573A publication Critical patent/CN102990573A/en
Application granted granted Critical
Publication of CN102990573B publication Critical patent/CN102990573B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a device for assembling a large calcium carbide furnace electrode shell, which comprises tubular electrode shells connected in sequence, wherein a first semicircular ring and a second semicircular ring are symmetrically arranged on the outer circumference of the joints of the electrode shells by using transverse coordinates as a center; the first semicircular ring is provided with a first locating semiring and a second locating semiring along longitudinal coordinates; at least four sets of locating devices are arranged between the first locating semiring and the second locating semiring; both ends of the first semicircular ring are respectively provided with a first support plate; the second semicircular ring is provided with a third locating semiring and a fourth locating semiring along longitudinal coordinates; at least four sets of locating devices are arranged between the third locating semiring and the fourth locating semiring; both ends of the second semicircular ring are respectively provided with a second support plate; the first support plates are connected with the second support plates through bolts so as to realizes high-precision abutting joint of the electrode shells; and therefore, the electric conductivity of the electrode shells is improved, and the accidents of the electrode shells in calcium carbide production process are reduced.

Description

The equipment that is used for large-scale furnace of calcium carbide electrode shell assembling
Technical field
The present invention relates to plant equipment, relate in particular to the equipment for large-scale furnace of calcium carbide electrode shell assembling.
Background technology
Calcium carbide is widely used in the numerous areas such as chemical industry, metallurgy, medicine as important industrial chemicals.At present, along with the fast development of China's economy, the demand of calcium carbide is also constantly increasing.The furnace of calcium carbide of past conventional small has not satisfied market to the demand of calcium carbide, and large-scale furnace of calcium carbide arises at the historic moment.In order to guarantee that large-scale furnace of calcium carbide steady production adopts self-baking sintered electrode system usually, wherein the assembling of electrode shell is the important guarantee of the good self-baking electrode of formation system, and the quality of its assembling performance is the production of the large-scale furnace of calcium carbide of impact directly.
Existing large-scale furnace of calcium carbide is large, highly large with the electrode shell diameter from training electrode, and quality is heavy, does not have proprietary mounting equipment to be difficult to realize the high accuracy docking of electrode shell.Do not have the docking of high-precision electrode shell, just can't form high-precision self-baking electrode system, will cause furnace of calcium carbide normally to produce.
 
Summary of the invention
Problem for prior art exists the invention provides a kind of mounting equipment for large-scale furnace of calcium carbide electrode shell, has realized the docking of electrode shell high accuracy, has improved the electrode shell electric conductivity, reduces the generation of electrode shell accident in calcium carbide production process.
The problem that exists in order to solve prior art, design of the present invention is:
A kind of equipment for large-scale furnace of calcium carbide electrode shell assembling, comprise the tubular electrode shell that connects successively, centered by lateral coordinates, be symmetrically arranged with the first semicircular ring and the second semicircular ring on the excircle of described electrode shell junction, described the first semicircular ring longitudinally coordinate is provided with the first location semi-ring and the second location semi-ring, be provided with the above positioner of at least 4 groups between described the first location semi-ring and the second location semi-ring, described the first semicircular ring two ends are respectively arranged with the first gripper shoe; Described the second semicircular ring longitudinally coordinate is provided with the 3rd location semi-ring and the 4th location semi-ring, is provided with the above positioner of at least 4 groups between described the 3rd location semi-ring and described the 4th location semi-ring; The two ends of described the second semicircular ring are respectively arranged with the second gripper shoe; Described the first gripper shoe is connected with described the second gripper shoe by bolt.
Described positioner includes on two location semi-rings on described the first semicircular ring therein and is respectively arranged with corresponding locating hole, be provided with the steel pipe with the steel axle between described two location semi-rings, be symmetrically arranged with position block on the described steel pipe, the two ends of described steel axle are connected with described the first location semi-ring, described the second location semi-ring by securing member respectively.
Described steel pipe also is provided with handle.
Be provided with support between described steel pipe and the described handle.
Beneficial effect of the present invention: electrode shell assembling task equipment is the device for upper/lower electrode shell location, be on the excircle of electrode shell junction and centered by transverse coordinate axis, be symmetrically arranged with two semicircular ring, these two semicircular ring are made of two location semi-rings respectively, on the semi-ring of location corresponding locating hole is set, locate the steel pipe that is provided with between the semi-ring with the steel axle for two, the steel axle is connected with two location semi-rings by securing member, be symmetrically arranged with position block on the steel pipe simultaneously, be used for the up and down location of two electrode shells.Also be useful on the fast open locking device of the locking of upper/lower electrode shell, the two ends that are two semicircular ring are respectively arranged with gripper shoe, and gripper shoe is bolted.Electrode shell after the present invention can guarantee to assemble satisfies the required precision of self-baking electrode axiality, perpendicularity, electric conductivity is largely increased, guaranteed the demand of large-scale furnace of calcium carbide high power conductive, guaranteed the steady production of large-scale furnace of calcium carbide, reduced the furnace of calcium carbide accident and occur.
Description of drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is positioning device structure schematic diagram of the present invention.
Fig. 3 is locking device structure schematic diagram of the present invention.
1-electrode shell, 2-positioner, 3-locking device 1a-first semicircular ring 1b-second semicircular ring
A1-first locating ring a2-second locating ring b1-the 3rd locating ring b2-the 4th locating ring
21-position block, 22-steel pipe, 23-locating hole, 24-steel axle, 25-securing member
26-handle, 27-support the 31-the first gripper shoe the 32-the second gripper shoe, 33-bolt
The specific embodiment
The invention will be further described for content by reference to the accompanying drawings:
Such as Fig. 1, shown in Figure 3, the invention provides a kind of equipment for large-scale furnace of calcium carbide electrode shell assembling, comprise successively continuous tubular electrode shell 1, be provided with the first semicircular ring 1a and the second semicircular ring 1b symmetrical centered by lateral coordinates on the excircle of described electrode shell 1 junction, described the first semicircular ring 1a longitudinally coordinate is provided with the first location semi-ring a1 and the second location semi-ring a2, is provided with the positioner 2 that is no less than 4 groups between described the first location semi-ring a1 and the second location semi-ring a2; Described the second semicircular ring 1b longitudinally coordinate is provided with the 3rd location semi-ring b1 and the 4th location semi-ring b2; Be provided with the positioner 2 that is no less than 4 groups between described the 3rd location semi-ring b1 and described the 4th location semi-ring b2; Described the first semicircular ring 1a two ends are respectively arranged with the first gripper shoe 31, and the two ends of described the second semicircular ring 1b are respectively arranged with the second gripper shoe 32,, described the first gripper shoe 31 is connected with described the second gripper shoe 32 by bolt 33.Described positioner 2 among the present invention preferably is set to 8 groups.The semicircle stiffening ring that provides among the present invention bends by angle steel and forms, and material is ordinary carbon steel.
As shown in Figure 2, positioner among the present invention includes two the location semi-ring (a1 of 1a on described the first semicircular ring therein, a2) be respectively arranged with corresponding locating hole 23 on, locating hole is used for location and the installation of the first location semi-ring and the second location semi-ring, described two location semi-ring (a1, a2), between be provided with steel pipe 22 with steel axle 24, be symmetrically arranged with position block 21 on the described steel pipe 22, the two ends of described steel axle 24 are connected with described the first location semi-ring a1, described the second location semi-ring a2 by securing member 25 respectively.Described steel pipe 22 also is provided with handle 26.Be provided with support 27 between described steel pipe 22 and the described handle 26.Wherein securing member is nut, pad.
In actual production, described position block 21 need to be symmetrically welded on the described steel pipe 22, wherein the length of steel pipe should be between 600~800mm, and the distance between the position block is preferably 180mm, and position block is answered symmetry to be arranged at apart from steel pipe two ends 210mm~310mm and is advisable.To with handle 26 and steel pipe 22 welding, be convenient to practical operation simultaneously.In order to reinforce the fastness of described handle, welding support 27 between it.At last, for the axiality that satisfies the docking electrode shell, the high-precision requirement of perpendicularity, need to make steel axle 24 continuous with up and down location semi-ring (a1, a2) or (b1, b2) with locating hole by securing member.Two semicircular ring (1a among the present invention, 4 groups of positioners are set respectively 1b), and the up and down location semi-ring of the first semicircular ring 1a (a1 wherein, 4 positioners are set a2) altogether, comprising 4 steel pipes 22 of 8 location link stoppers 21, two the semicircle stiffening rings in location, location 4 steel axles 24, the location securing member 25 of two semicircle stiffening rings up and down of two semicircle stiffening rings up and down, i.e. 8 nuts and 8 packing rings, 4 26 and 4 supports of handle 27 consist of.All parts in the positioner is made by the ordinary carbon steel material.
As shown in Figure 3, the fast open locking device is exactly that the two ends of the wherein location semi-rings of two among the first semicircular ring 1a (a1, a2) are respectively arranged with 2 identical the first gripper shoes 31; The two ends of two the location semi-rings (b1, b2) among the second semicircular ring 1b are respectively arranged with 2 identical the second gripper shoes 32, and described the first gripper shoe 31 is connected by bolt 33 with described the second gripper shoe 32.Two semicircular ring (1a, 1b) need 4 groups of fasteners to connect altogether, can guarantee that like this two semicircular ring connect securely, realize the up and down positioning and locking of two electrode shells, have guaranteed the high-precision assembling docking of electrode shell.The assembling process of fast open locking device: finish two semicircular ring (1a, 1b) after the positioner assembling, with gripper shoe (31,32) respectively with two semicircular ring (1a, 1b) welding, by bolt 33 and securing member (nut and pad) two semicircular ring positioners (1a, 1b) are linked together, and then finish the assembling of whole device.
Production process of the present invention, at first, the staff utilizes the handle in the positioner that two semicircular ring (1a, 1b) and two electrode shells are up and down positioned, and is namely identical by the position block in the positioner and electrode shell; Then, the fast open locking device of semicircular ring carried out the bolt connection; Up and down axiality and the perpendicularity of two electrode shells have been guaranteed fully, and then so that two upper/lower electrode shell gusset bolt connecting holes centering exactly, the bolt that the staff can finish all gussets very efficiently connects, and has guaranteed the connective stability of upper/lower electrode shell.Just because of the up and down high-precision stable connection of two electrode shells can guarantee that just the housing of two electrode shells docks accurately with connecting plate up and down, the electrode axiality after the moulding, the high-precision requirement of perpendicularity have been satisfied better.After the staff has finished up and down two electrode shell link of boards, the nut in the fast open locking device is suitably loosened, the staff just can take out preparation operation next time from two electrode shells up and down with two semicircular ring (1a, 1b).
Above embodiment is described preferred embodiment of the present invention; be not that scope of the present invention is carried out limit; design under the prerequisite of spirit not breaking away from the present invention; those of ordinary skills all should fall into the protection domain that claims of the present invention are determined to various distortion and transformation that the present invention makes.

Claims (4)

1. one kind is used for the equipment that large-scale furnace of calcium carbide electrode shell is assembled, comprise the tubular electrode shell that connects successively, it is characterized in that: centered by lateral coordinates, be symmetrically arranged with the first semicircular ring and the second semicircular ring on the excircle of described electrode shell junction, described the first semicircular ring longitudinally coordinate is provided with the first location semi-ring and the second location semi-ring, be provided with the above positioner of at least 4 groups between described the first location semi-ring and the second location semi-ring, described the first semicircular ring two ends are respectively arranged with the first gripper shoe; Described the second semicircular ring longitudinally coordinate is provided with the 3rd location semi-ring and the 4th location semi-ring; Be provided with the above positioner of at least 4 groups between described the 3rd location semi-ring and described the 4th location semi-ring; The two ends of described the second semicircular ring are respectively arranged with the second gripper shoe; Described the first gripper shoe is connected with described the second gripper shoe by bolt.
2. the equipment of described large-scale furnace of calcium carbide electrode shell assembling according to claim 1, it is characterized in that: described positioner includes on two location semi-rings on described the first semicircular ring therein and is respectively arranged with corresponding locating hole, be provided with the steel pipe with the steel axle between described two location semi-rings, be symmetrically arranged with position block on the described steel pipe, the two ends of described steel axle are connected with described the first location semi-ring, described the second location semi-ring by securing member respectively.
3. the equipment of described large-scale furnace of calcium carbide electrode shell assembling according to claim 2, it is characterized in that: described steel pipe also is provided with handle.
4. the equipment of described large-scale furnace of calcium carbide electrode shell assembling according to claim 3 is characterized in that: be provided with support between described steel pipe and the described handle.
CN201310004075.2A 2013-01-07 2013-01-07 Device for assembling large calcium carbide furnace electrode shell Active CN102990573B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310004075.2A CN102990573B (en) 2013-01-07 2013-01-07 Device for assembling large calcium carbide furnace electrode shell

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310004075.2A CN102990573B (en) 2013-01-07 2013-01-07 Device for assembling large calcium carbide furnace electrode shell

Publications (2)

Publication Number Publication Date
CN102990573A true CN102990573A (en) 2013-03-27
CN102990573B CN102990573B (en) 2015-04-15

Family

ID=47919962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310004075.2A Active CN102990573B (en) 2013-01-07 2013-01-07 Device for assembling large calcium carbide furnace electrode shell

Country Status (1)

Country Link
CN (1) CN102990573B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108608351A (en) * 2018-06-11 2018-10-02 中国航发哈尔滨东安发动机有限公司 A kind of survey windup-degree holder fast-positioning device
CN109514464B (en) * 2018-11-26 2020-12-04 中国航发沈阳黎明航空发动机有限责任公司 Positioning and assembling method for ring parts

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB809986A (en) * 1956-04-13 1959-03-04 Sunrod Mfg Corp Electrode clamp
US2889387A (en) * 1957-11-04 1959-06-02 Mallory Sharon Metals Corp Electrode holder construction
US3107267A (en) * 1961-06-22 1963-10-15 Union Carbide Corp Electrode contact apparatus
CN201271845Y (en) * 2008-05-30 2009-07-15 上海宝冶建设有限公司 Rapid locating tool for changing pipeline flange
CN201604101U (en) * 2009-11-23 2010-10-13 凯迈(洛阳)测控有限公司 Rolling clamp used for machnical working platform
CN202278516U (en) * 2011-08-26 2012-06-20 凯迈(洛阳)测控有限公司 Adjustable clamp
CN203003746U (en) * 2013-01-07 2013-06-19 中国天辰工程有限公司 Equipment for assembling electrode housing of large-scale calcium carbide furnace

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB809986A (en) * 1956-04-13 1959-03-04 Sunrod Mfg Corp Electrode clamp
US2889387A (en) * 1957-11-04 1959-06-02 Mallory Sharon Metals Corp Electrode holder construction
US3107267A (en) * 1961-06-22 1963-10-15 Union Carbide Corp Electrode contact apparatus
CN201271845Y (en) * 2008-05-30 2009-07-15 上海宝冶建设有限公司 Rapid locating tool for changing pipeline flange
CN201604101U (en) * 2009-11-23 2010-10-13 凯迈(洛阳)测控有限公司 Rolling clamp used for machnical working platform
CN202278516U (en) * 2011-08-26 2012-06-20 凯迈(洛阳)测控有限公司 Adjustable clamp
CN203003746U (en) * 2013-01-07 2013-06-19 中国天辰工程有限公司 Equipment for assembling electrode housing of large-scale calcium carbide furnace

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108608351A (en) * 2018-06-11 2018-10-02 中国航发哈尔滨东安发动机有限公司 A kind of survey windup-degree holder fast-positioning device
CN109514464B (en) * 2018-11-26 2020-12-04 中国航发沈阳黎明航空发动机有限责任公司 Positioning and assembling method for ring parts

Also Published As

Publication number Publication date
CN102990573B (en) 2015-04-15

Similar Documents

Publication Publication Date Title
CN205290270U (en) Pipeline external clamp
CN104999202A (en) High-precision automatic robot welding device and working method thereof
CN204657836U (en) Pipeline axial centering tooling
CN102990573B (en) Device for assembling large calcium carbide furnace electrode shell
CN203003746U (en) Equipment for assembling electrode housing of large-scale calcium carbide furnace
CN204254114U (en) A kind of three-limb tube
CN203092055U (en) Pipeline outer aligning device capable of adjusting space between pipe sections
CN204326259U (en) A kind of steel column connector
CN201704801U (en) Steel pipe truss and H-shaped steel column connecting member
CN203418277U (en) Welding circular degree supporting tool
CN207723673U (en) Vertical horizontal position welding built-up welding fixing device
CN103143873B (en) Full-symmetrical cylindrical membrane wall assembly tooling and assembly method
CN107866652A (en) A kind of mobile portable pipeline welding platform truck
CN204248325U (en) A kind of sheet-metal duct assembling tool
CN203589665U (en) MPP (modified polypropylene) power cable protection pipe
CN106425264B (en) The welding universal fixturing of EMU tubular beams
CN206351363U (en) A kind of mechanical concentric parts with modular construction
CN205614253U (en) Monocycle awl steel cage welding auxiliary device
CN205021031U (en) T type steel structure welding device
CN201815827U (en) Pipeline assembly mould
CN202317500U (en) Special clamp for welding flange and connecting pipe
CHEN et al. An image feature extraction method for a certain kind of narrowgap weld seam
CN214291175U (en) Variable telescopic large-scale pipeline groove cutting machine cutter head arm
CN214518567U (en) Internal butt-joint device for large-diameter pipeline
CN209867827U (en) Device for quickly repairing broken shaft

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant