CN102983631A CN2012105223628A CN201210522362A CN102983631A CN 102983631 A CN102983631 A CN 102983631A CN 2012105223628 A CN2012105223628 A CN 2012105223628A CN 201210522362 A CN201210522362 A CN 201210522362A CN 102983631 A CN102983631 A CN 102983631A
Authority
CN
China
Prior art keywords
log
monitoring
dispatching
shift change
daily record
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012105223628A
Other languages
English (en)
Inventor
任冬
许文阁
丁伟
王均安
刘亚伟
林树军
李广贤
宋立新
张臻
张洋
于忠建
张彦方
刘金岭
刘建坡
武辉
尹天华
郑瑜
余长城
李治
张�浩
贺治炜
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority to CN2012105223628A priority Critical patent/CN102983631A/zh
Publication of CN102983631A publication Critical patent/CN102983631A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种变电站调控信息电子交接班方法,属于电网运行监控方法技术领域,包括以下步骤,第一步、在调控信息管理系统中的调度日志和监控日志之间增加关联模块;第二步、调度端进行交接班时,调度员通过网络查看并引用监控日志,实现完整准确交接;第三步、监控端进行交接班时,监控员通过网络查看并引用调度日志,实现完整准确交接。本发明优点在于:在调度日志和监控日志之间增设关联模块,通过服务器实现调度日志和监控日志的网络共享,调度端可以调阅监控日志,监控端可以调阅调度日志,在交接班过程中,双方交接班人员可以根据对方日志核对命令下达情况或者命令执行情况,避免因错交或者漏交而影响电网正常运行。

Description

变电站调控信息电子交接班方法
技术领域
本发明涉及电力分配及调度技术领域。
背景技术
对变电站实现微机实时监控与调度自动化,能够使调控值班人员准确地了解电网的运行状态,使电网在最佳状态下运行,以取得最优的经济效益,当电网发生故障时,变电站实时监控系统能够及时提供变电站现场的运行信息和故障线路,使调度人员能及时采取措施,缩短停电时间,防止大面积停电事故,调度自动化可以取代调度员的屏前监视,手工查表和列表计算等繁琐劳动,大大减轻调度人员的劳动强度,所以电网微机实时监控与调度自动化系统对于提高电网系统运行的经济效益,实现电网的安全运行具有重要意义。
现有的调控信息管理系统能够实现调度和监控网络实时沟通,通过网络下令和确认,节约资源,提高沟通效率,其主要包括服务器、调度端和监控端,调度端和监控端都保存有相应的日志文件,以便进行复核确认,调度端根据变电站运行状况下令,监控端与调度端确认和复述以后进行监控操作,但是,现有的调控信息管理系统不能进行调度日志和监控日志之间的数据共享。
另外,监控端和调度端均需要相关人员进行值守,而且值守人员要定期进行交接班,交接班过程中必须将现有命令下达或者命令执行情况进行详细交接,为了避免双方出现漏交或者错交的问题,双方在交接班过程中需要通过电话等方式进行详细核对和沟通,往往交接班时间较长,而且不能一目了然,仍然存在漏交或者错交的风险,如果出现漏交或者错交,将直接影响变电站正常运行或者造成故障。
发明内容
本发明要解决的技术问题是提供一种变电站调控信息电子交接班方法,通过在调度日志和监控日志之间增设关联模块,实现调度日志和监控日志的网络共享,调度人员和监控人员在交接班过程中可以查询核对下令情况或者命令执行情况,避免因错交或者漏交而影响变电站正常运行,防止造成事故,缩短了交接班时间,提高了工作效率。
为解决上述技术问题,本发明所采取的技术方案是:一种变电站调控信息电子交接班方法,所述调控信息管理系统包括服务器、调度端和监控端,包括以下步骤,
第一步、在调控信息管理系统中的调度日志和监控日志之间增加关联模块;
第二步、调度端进行交接班时,调度员通过网络查看并引用监控日志,实现完整准确交接;
第三步、监控端进行交接班时,监控员通过网络查看并引用调度日志,实现完整准确交接。
所述调度日志和监控日志通过不同颜色字体进行区分。
本发明的有益效果如下:在调度日志和监控日志之间增设关联模块,通过服务器实现调度日志和监控日志的网络共享,调度端可以调阅监控日志,监控端可以调阅调度日志,在交接班过程中,双方交接班人员可以根据对方日志核对命令下达情况或者命令执行情况,避免因错交或者漏交而影响变电站正常运行,防止造成事故。
具体实施方式
本发明方法是基于现有的调控信息管理信息系统进行的,本发明采用了在调度日志和监控日志之间增设关联模块的技术手段,具体技术方案如下:所述调控信息管理系统包括服务器、调度端和监控端,包括以下步骤,
第一步、在调控信息管理系统中的调度日志和监控日志之间增加关联模块,实现调度日志和监控日志之间的数据交互。
第二步、调度端进行交接班时,调度员可通过网络查看监控日志,实现完整准确交接,避免因漏交或者错交而造成事故或者损失。
第三步、监控端进行交接班时,监控员可以通过网络查看调度日志,实现完整准确交接。
监控端交接班方式和调度端交接班方式相同,同时可以将调度日志和监控日志通过不同颜色字体进行区分,一目了然。
具体应用实例如下:
1、出现电网事故或地调管辖设备故障:
    监控员在监控日志中详细记录故障信息,调度员根据监控员所做记录进行事故分析、判断及处理。事故处理告一段落后,调度员、监护员相互引用运行日志并进行补充、完善,从而还原整个事故处理过程,为后续维护提供实时依据。
2、电网一次运行方式改变
    监控员将调度日志中记述的电网一次接线方式的变更原因、持续时间、特殊要求引用至监控运行日志并进行交接,以便后续值守监控员对人物进行监控和回复。
3、当需要进行重要保电工作时
    调度员、监控员通过关联的运行日志系统实现保电信息共享并进行交接班工作,保证重要线路、变电站的可靠供电。
综上所述,本发明将调度日志、监控日志进行关联,通过实现调控之间的信息交换,节省了电话通知和做记录的时间,在提高工作效率的同时,密切了调度、监控间的业务联系,真正实现了调度、监控专业的集约融合。 

Claims (2)

1.一种变电站调控信息电子交接班方法,其特征在于:包括以下步骤,
第一步、在调控信息管理系统中的调度日志和监控日志之间增加关联模块;
第二步、调度端进行交接班时,调度员通过网络查看并引用监控日志,实现完整准确交接;
第三步、监控端进行交接班时,监控员通过网络查看并引用调度日志,实现完整准确交接。
2.根据权利要求1所述的变电站调控信息电子交接班方法,其特征在于:所述调度日志和监控日志通过不同颜色字体进行区分。
CN2012105223628A 2012-12-07 2012-12-07 变电站调控信息电子交接班方法 Pending CN102983631A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012105223628A CN102983631A (zh) 2012-12-07 2012-12-07 变电站调控信息电子交接班方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012105223628A CN102983631A (zh) 2012-12-07 2012-12-07 变电站调控信息电子交接班方法

Publications (1)

Publication Number Publication Date
CN102983631A true CN102983631A (zh) 2013-03-20

Family

ID=47857444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012105223628A Pending CN102983631A (zh) 2012-12-07 2012-12-07 变电站调控信息电子交接班方法

Country Status (1)

Country Link
CN (1) CN102983631A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105894216A (zh) * 2016-05-24 2016-08-24 国网江苏省电力公司无锡供电公司 电网调度运行交接班辅助装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101719690A (zh) * 2009-11-30 2010-06-02 宁波市鄞州天灵信息科技有限公司 电网调度方法
CN101917061A (zh) * 2010-07-14 2010-12-15 山东电力集团公司泰安供电公司 变电站自动化巡视方法及其装置
CN201846134U (zh) * 2010-07-14 2011-05-25 山东电力集团公司泰安供电公司 变电站自动化巡视系统
CN102142717A (zh) * 2011-02-23 2011-08-03 江西省电力科学研究院 一种基于iec61850的电能质量监测装置模型

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101719690A (zh) * 2009-11-30 2010-06-02 宁波市鄞州天灵信息科技有限公司 电网调度方法
CN101917061A (zh) * 2010-07-14 2010-12-15 山东电力集团公司泰安供电公司 变电站自动化巡视方法及其装置
CN201846134U (zh) * 2010-07-14 2011-05-25 山东电力集团公司泰安供电公司 变电站自动化巡视系统
CN102142717A (zh) * 2011-02-23 2011-08-03 江西省电力科学研究院 一种基于iec61850的电能质量监测装置模型

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
倪燕: "异构系统数据共享的研究与实现", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *
张波明: "‘基于事件’电网调控一体化信息管理智能辅助决策系统", 《第十二届中国科协年会论文集》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105894216A (zh) * 2016-05-24 2016-08-24 国网江苏省电力公司无锡供电公司 电网调度运行交接班辅助装置

Similar Documents

Publication Publication Date Title
CN104133443A (zh) 一种由电网检修申请单自动生成电网调度操作票的方法
CN105100252A (zh) 一种分布式电源监控系统的网络拓扑结构
CN104753063A (zh) 一种变电站母线负荷转移方法及系统
CN103839117B (zh) 一种配电网供电可靠性及其投资敏感度分析确定方法
CN109167437A (zh) 一种基于配电柜智能配电管理的方法及系统
CN108011699A (zh) 反应堆计算机监控系统网络构架方法
CN111564906A (zh) 一种高效处理城网配网自动化缺陷的方法
CN104269934A (zh) 基于移动式模拟调度主站的变电站监控信息调试方法
CN108183814B (zh) 用电信息采集系统的通信信道的故障排查方法和装置
CN108539856A (zh) 配电网全面感知运行监控配电抢修系统
CN107545519A (zh) 一种电网企业运检管控方法
CN104468586A (zh) 基于modbus协议的光伏电站远程智能监控通讯方法
CN114139742A (zh) 一种配电网管控系统及管控方法
CN102983631A (zh) 变电站调控信息电子交接班方法
CN104616117A (zh) 基于pas55标准的资产运营监管理平台
CN105337257A (zh) 一种基于中心服务器实现站域保护定值自适应的方法
CN201138449Y (zh) 集控中心数据监控系统
CN204256508U (zh) 一种基于scada系统的监控系统
CN106655127A (zh) 一种配网抢修指挥系统
CN103595492B (zh) Cdt通道故障报警系统
CN103701197A (zh) 一种提高一体化电源系统可靠性的监控冗余备份方法
CN105894216A (zh) 电网调度运行交接班辅助装置
CN106655176A (zh) 一种配电网在线合环决策方法及系统
CN106602714A (zh) 一种配电网的故障处理方法
CN101719634A (zh) 变电巡视记录管理系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: HEBEI ELECTRIC POWER CORPORATION CANGZHOU POWER SU

Effective date: 20130315

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: CANGZHOU POWER SUPPLY CO., LTD.

Effective date: 20130315

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 061001 CANGZHOU, HEBEI PROVINCE TO: 100761 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20130315

Address after: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Applicant after: State Grid Corporation of China

Applicant after: Hebei Electric Power Corporation

Applicant after: Cangzhou Power Supply Co.,Ltd.

Address before: 061001 No. 21 West Yongji Road, Hebei, Cangzhou

Applicant before: Cangzhou Power Supply Co.,Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Applicant after: State Grid Corporation of China

Applicant after: State Grid Hebei Electric Power Company

Applicant after: Cangzhou Power Supply Branch Company, State Grid Hebei Electric Power Company

Address before: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Applicant before: State Grid Corporation of China

Applicant before: Hebei Electric Power Corporation

Applicant before: Cangzhou Power Supply Co.,Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130320