CN102982673A - 沿线杆布置的电力数据传输系统 - Google Patents
沿线杆布置的电力数据传输系统 Download PDFInfo
- Publication number
- CN102982673A CN102982673A CN2012104601427A CN201210460142A CN102982673A CN 102982673 A CN102982673 A CN 102982673A CN 2012104601427 A CN2012104601427 A CN 2012104601427A CN 201210460142 A CN201210460142 A CN 201210460142A CN 102982673 A CN102982673 A CN 102982673A
- Authority
- CN
- China
- Prior art keywords
- electric power
- data
- power data
- line
- communication terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Cable Transmission Systems, Equalization Of Radio And Reduction Of Echo (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
本发明属于电力设施技术领域,尤其涉及一种沿线杆布置的电力数据传输系统。包括沿输配电干路设置的数据接收器,所述数据接收器与安装于输配电支路上的检测仪器设备采用无线通信方式连接并对各检测仪器设备进行信号覆盖;还包括电力数据通信终端,所述电力数据通信终端采用串行数据接口与所述数据接收器连接;还包括电力数据通信平台,所述电力数据通信平台与所述电力数据通信终端之间采用光纤连接。本发明通过在原有输配电拓扑网络上设置电力数据传输系统,摆脱了对基础无线网络的依赖,方便各种检测仪器设备的安装和数据传输,可应用于郊区等较偏远地区的输配电线路上。
Description
技术领域
本发明属于电力设施技术领域,尤其涉及一种沿线杆布置的电力数据传输系统。
背景技术
在输配电技术领域,为了对输配电线路的各项指标进行监控以配合智能电网的发展,在输配电网络中通常布置电力数据传输系统对传感器检测到的数据信号进行上行传输处理。现有技术中,电力数据一般通过分布式传感器测得并通过光纤和联通、电信的无线网络进行传输。由于我国电网规模远远大于这些通信运营商的网络,建设在郊区等较偏远地区的输配电线路就无法有效融入智能电网的整个网络中。随着智能电网的深入发展,对这些线路的检测变得愈发重要,这样如何在没有基础无线网络和光纤条件下对电力数据进行有效传输的问题就凸显了出来。
发明内容
本发明为解决公知技术中存在的技术问题而提供一种沿线杆布置的电力数据传输系统,摆脱对基础无线网络的依赖,方便各种检测仪器设备的安装和数据传输。
本发明为解决公知技术中存在的技术问题所采取的技术方案是:沿线杆布置的电力数据传输系统包括沿输配电干路设置的数据接收器,所述数据接收器与安装于输配电支路上的检测仪器设备采用无线通信方式连接并对各检测仪器设备进行信号覆盖;还包括电力数据通信终端,所述电力数据通信终端采用串行数据接口与所述数据接收器连接;还包括电力数据通信平台,所述电力数据通信平台与所述电力数据通信终端之间采用光纤连接。
本发明的优点和积极效果是:本发明在输配电拓扑网络的基础上设置电力数据传输系统,将检测仪器设备与数据接收器之间的通信方式设定为无线连接方式,数据接收器之间以及数据接收器与电力数据通信终端之间采用串行数据接口进行通信,电力数据通信终端与电力数据通信平台之间采用光纤连接通信,此数据传输系统摆脱了对基础无线网络的依赖,提升了数据传输的可靠性,使检测仪器设备的安装更加灵活。
优选地:所述数据接收器安装于所述输配电干路的线杆上,所述数据接收器之间的连接线以及所述数据接收器与所述电力数据通信终端之间的连接线沿电力线缆设置。
优选地:所述数据接收器为无线集中器。
优选地:所述电力数据通信终端位于变电站内。
优选地:所述电力数据通信平台位于电力公司局域网的节点上。
附图说明
图1是本发明的系统结构示意图。
图中:1、线杆; 2、输配电支路; 3、电力数据通信终端; 4、电力数据通信平台; 5、输配电干路; 6、数据接收器。
具体实施方式
为能进一步了解本发明的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:
请参见图1,本发明的电力数据传输网络包括沿输配电干路5设置的数据接收器6,该数据接收器6与安装于输配电支路2上的检测仪器设备采用无线通信方式连接并对各检测仪器设备进行信号覆盖。各检测仪器设备通常包括电压检测仪、电流检测仪、温湿度检测仪以及零序电流检测仪等,通常安装于输配电支路2和输配电干路5的线杆1上,数据接收器6之间通过光纤或无线中继进行通信,相邻两个数据接收器6之间应具有合适的距离,对其覆盖区域内的检测仪器设备发出的信号能够进行无障碍接收。本实施例中,数据接收器6采用无线集中器。
数据接收器6安装于输配电干路5的线杆1上,当采用有线连接的方式时,数据接收器6之间的连接线以及数据接收器6与电力数据通信终端3之间的连接线沿电力线缆设置。
还包括电力数据通信终端3,该电力数据通信终端3采用串行数据接口与数据接收器6连接。为了便于对整个系统进行安装和维护,电力数据通信终端3设置于变电站内。上述串行数据接口可以是RS323数据串口或者RS485数据串口。
还包括电力数据通信平台4,该电力数据通信平台4与电力数据通信终端3之间采用光纤连接,进行数据的收集与处理。电力数据通信平台4应位于电力公司局域网的节点上,方便将得到的数据上传至电力公司的数据系统。
Claims (5)
1.一种沿线杆布置的电力数据传输系统,其特征在于:包括沿输配电干路(5)设置的数据接收器(6),所述数据接收器(6)与安装于输配电支路(2)上的检测仪器设备采用无线通信方式连接并对各检测仪器设备进行信号覆盖;还包括电力数据通信终端(3),所述电力数据通信终端(3)采用串行数据接口与所述数据接收器(6)连接;还包括电力数据通信平台(4),所述电力数据通信平台(4)与所述电力数据通信终端(3)之间采用光纤连接。
2.按照权利要求1所述的沿线杆布置的电力数据传输系统,其特征在于:所述数据接收器(6)安装于所述输配电干路(5)的线杆(1)上,所述数据接收器(6)之间的连接线以及所述数据接收器(6)与所述电力数据通信终端(3)之间的连接线沿电力线缆设置。
3.按照权利要求1或2所述的沿线杆布置的电力数据传输系统,其特征在于:所述数据接收器(6)为无线集中器。
4.按照权利要求1所述的沿线杆布置的电力数据传输系统,其特征在于:所述电力数据通信终端(3)位于变电站内。
5.按照权利要求1所述的沿线杆布置的电力数据传输系统,其特征在于:所述电力数据通信平台(4)位于电力公司局域网的节点上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104601427A CN102982673A (zh) | 2012-11-14 | 2012-11-14 | 沿线杆布置的电力数据传输系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104601427A CN102982673A (zh) | 2012-11-14 | 2012-11-14 | 沿线杆布置的电力数据传输系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102982673A true CN102982673A (zh) | 2013-03-20 |
Family
ID=47856597
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012104601427A Pending CN102982673A (zh) | 2012-11-14 | 2012-11-14 | 沿线杆布置的电力数据传输系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102982673A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103606258A (zh) * | 2013-09-05 | 2014-02-26 | 山西省电力公司大同供电分公司 | 一种配电设备监控系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201314942Y (zh) * | 2008-12-05 | 2009-09-23 | 上海市电力公司 | 检测配网架空线故障的监测系统 |
US8027282B2 (en) * | 2003-12-19 | 2011-09-27 | Sony Deutschland Gmbh | Heterogeneous wireless data transmission network |
CN202178771U (zh) * | 2011-06-10 | 2012-03-28 | 辽宁省电力有限公司大连供电公司 | 配电网无线宽带通信管理系统 |
CN102593827A (zh) * | 2012-02-27 | 2012-07-18 | 苏州金纳信息技术有限公司 | 电力线动态增容实现装置 |
CN202929829U (zh) * | 2012-11-14 | 2013-05-08 | 天津市翔晟远电力设备实业有限公司 | 沿线杆布置的电力数据传输系统 |
-
2012
- 2012-11-14 CN CN2012104601427A patent/CN102982673A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8027282B2 (en) * | 2003-12-19 | 2011-09-27 | Sony Deutschland Gmbh | Heterogeneous wireless data transmission network |
CN201314942Y (zh) * | 2008-12-05 | 2009-09-23 | 上海市电力公司 | 检测配网架空线故障的监测系统 |
CN202178771U (zh) * | 2011-06-10 | 2012-03-28 | 辽宁省电力有限公司大连供电公司 | 配电网无线宽带通信管理系统 |
CN102593827A (zh) * | 2012-02-27 | 2012-07-18 | 苏州金纳信息技术有限公司 | 电力线动态增容实现装置 |
CN202929829U (zh) * | 2012-11-14 | 2013-05-08 | 天津市翔晟远电力设备实业有限公司 | 沿线杆布置的电力数据传输系统 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103606258A (zh) * | 2013-09-05 | 2014-02-26 | 山西省电力公司大同供电分公司 | 一种配电设备监控系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102818590A (zh) | 基于无线传感器网络的输电线路覆冰在线监测系统 | |
CN109599940A (zh) | 一种基于lpwan的配变状态远程监测系统及其方法 | |
CN205263186U (zh) | 一种电缆环流在线监测装置 | |
CN105023416A (zh) | 基于电力线载波和微功率无线的智能集抄系统 | |
CN206412838U (zh) | 基于双模通信的配电网自动化系统 | |
KR100963793B1 (ko) | Fdd 리피팅 방식을 이용한 전력선통신 기반 지중용 원격검침 시스템 | |
CN105551223A (zh) | 一种基于中压载波和无线通信的集抄终端上行通信系统 | |
US8933816B2 (en) | Systems and methods for communication with a smart power meter over optical fiber | |
CN202600961U (zh) | 基于光纤和无线自组网的输电线路监测系统 | |
CN202178771U (zh) | 配电网无线宽带通信管理系统 | |
CN104749477A (zh) | 一种基于无线的配电线路导线松动监测系统及监测方法 | |
CN102629882A (zh) | 电缆屏蔽层电力载波通信系统 | |
CN103296752B (zh) | 电网安全稳定运行的小水电安全监控系统及其监控方法 | |
CN202929829U (zh) | 沿线杆布置的电力数据传输系统 | |
CN102982673A (zh) | 沿线杆布置的电力数据传输系统 | |
CN204881877U (zh) | 无线测温系统 | |
CN108387814B (zh) | 大小双边切换供电的城市轨道交通接触网故障定位装置及方法 | |
CN106972631A (zh) | 一体化柱上真空断路器 | |
CN105491589A (zh) | 一种基于lte无线宽带的电缆隧道监控系统的通信方法 | |
Wang et al. | The typical designs of PLC network in MV distribution network | |
CN203275579U (zh) | 电力电缆局部放电在线监测系统 | |
CN105490710A (zh) | 一种基于lte无线宽带的电缆隧道通信系统 | |
CN203632802U (zh) | 基于Mesh网络的实时视频传输系统 | |
CN202696599U (zh) | 架空线路电力载波通信系统 | |
CN106304158B (zh) | 一种基于故障指示器的无线微网自组网方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130320 |