CN102982360A CN2012102419665A CN201210241966A CN102982360A CN 102982360 A CN102982360 A CN 102982360A CN 2012102419665 A CN2012102419665 A CN 2012102419665A CN 201210241966 A CN201210241966 A CN 201210241966A CN 102982360 A CN102982360 A CN 102982360A
Authority
CN
China
Prior art keywords
product
eco
environmental impact
relevant
quantized value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102419665A
Other languages
Chinese (zh)
Inventor
克里斯蒂安·贝拉迪
罗布·伯纳德
安格尔·卡尔沃
拉里·科克拉内
贾森·盖姆斯
罗德里克·A·海德
罗伊斯·A·莱文
理查德·T·洛德
罗伯特·W·洛德
马克·A·马拉默德
詹妮弗·波拉德
约翰·D·小里纳尔多
克拉伦斯·T·特格雷尼
勒内·韦加
洛厄尔·L·小伍德
赵峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Elwha LLC
Original Assignee
Elwha LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US13/135,674 external-priority patent/US20120150550A1/en
Priority claimed from US13/199,475 external-priority patent/US20120150551A1/en
Priority claimed from US13/199,995 external-priority patent/US20120150552A1/en
Priority claimed from US13/200,807 external-priority patent/US20120185304A1/en
Priority claimed from US13/200,809 external-priority patent/US20130085802A1/en
Priority claimed from US13/317,726 external-priority patent/US20120150758A1/en
Priority claimed from US13/317,728 external-priority patent/US20120150733A1/en
Application filed by Elwha LLC filed Critical Elwha LLC
Publication of CN102982360A publication Critical patent/CN102982360A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/84Greenhouse gas [GHG] management systems

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Information Transfer Between Computers (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

Systems and methods for providing ecological impact quantification identifiers may implement operations including, but not limited to computing at least one ecological impact quantification associated with at least one life-cycle phase of a product; and means for assigning at least one of a positive ecological impact status, a negative ecological impact status and a neutral ecological impact status with a user account according to the at least one ecological impact quantification.

Description

Eco-environmental impact quantized value identifier
The cross reference of related application
The application relate to following application (" related application ") and require the earliest rights and interests of available live application day of following application (" related application ") (as, requirement except temporary patent application the earliest available priority date or require the rights and interests of temporary patent application according to 35USC § 119 (e), require any and whole female application of related application, grandmother's application, the rights and interests of great grandmother's application etc.).Related application and any female application, grandmother's application, great grandmother apply for waiting application all the full content of conflicting theme is not incorporated herein.
Related application
Requirement for the additional decree of USPTO, the application consists of the part continuation application of 12/928, No. 638 U.S. Patent application, and the name of this U.S. Patent application is called LIFECYCLE IMPACT INDICATORS, with Christian Belady, Rob Bernard, Angel Calvo, Larry Cochrane, Jason Garms, Roderick A.Hyde, Royce A.Levien, Richard T.Lord, Robert W.Lord, Mark A.Malamud, Jennifer Pollard, John D.Rinaldo, Jr., Clarence T.Tegreene, Rene Vega, Lowell L.Wood, Jr., and Feng Zhao is as the inventor, and the applying date is on Dec 14th, 2010, and it is at present common undetermined or enjoy the application of this application day rights and interests at present common application undetermined.
Requirement for the additional decree of USPTO, the application consists of the part continuation application that attorney docket is the U.S. Patent application of 0109-003-014-000000, the name of this U.S. Patent application is called EFFICIENCY-OF-USE TECHNIQUES, with Christian Belady, Rob Bernard, Angel Calvo, Larry Cochrane, Jason Garms, Roderick A.Hyde, Royce A.Levien, Richard T.Lord, Robert W.Lord, Mark A.Malamud, Jennifer Pollard, John D.Rinaldo, Jr., Clarence T.Tegreene, Rene Vega, Lowell L.Wood, Jr., and Feng Zhao is as the inventor, enclose simultaneously Express Mail number and be the application of No.EM483001149US, it is at present common undetermined or enjoy the application of this application day rights and interests at present common application undetermined.
Requirement for the additional decree of USPTO, the application consists of the part continuation application of 13/135, No. 683 U.S. Patent application, and the name of this U.S. Patent application is called USER AS PART OF A SUPPLY CHAI N, with Belady, Rob Bernard, Angel Calvo, Larry Cochrane, Jason Garms, Roderick A.Hyde, Royce A.Levien, Richard T.Lord, Robert W.Lord, Mark A.Malamud, Jennifer Pollard, John D.Rinaldo, Jr., Clarence T.Tegreene, Rene Vega, Lowell L Wood, Jr., with Feng Zhao as the inventor, the applying date is on 07 12nd, 2011, it is at present common undetermined or enjoy the application of this application day rights and interests at present common application undetermined.
Requirement for the additional decree of USPTO, the application consists of the part continuation application of the file number 11-1-4 of office U.S. Patent application, the name of this U.S. Patent application is called EFFICIENCY OF USE OF A SHARED PRODUCT, with Christian Belady, and Rob Bernard, Angel Calvo, Larry Cochrane, Jason Garms, Roderick A.Hyde, Royce A.Levien, Richard T.Lord, Robert W.Lord, Mark A.Malamud, Jennifer Pollard, John D.Rinaldo, Jr., Clarence T.Tegreene, Rene Vega, Lowell L.Wood, Jr., and Feng Zhao is as the inventor, the applying date is on 08 31st, 2011, and it is at present common undetermined or enjoy the application of this application day rights and interests at present common application undetermined.
United States Patent (USP) trademark office (USPTO) has promulgated notice, means that the computer program of USPTO requires the dated sequence number of patent applicant also to indicate to apply for it being continuation application or part continuation application.Stephen G.Kunin, Benefit of Prior-Filed Application(is the rights and interests of submit applications formerly), USPTO official Gazette, on 03 18th, 2003.The applicant's entity (hereinafter referred to as " applicant ") provides in front for the detailed of those applications that therefrom required right of priority to be quoted, such as by statute statement.The applicant understands, and it is clear and definite that rules call the turn at its detailed quotations, and does not require sequence number or any feature be used to the right of priority that requires U.S. Patent application, such as " continuation application " or " part continuation application ".Although aforementioned content is arranged, the applicant thinks, the computer program of USPTO has the established data input requirements, therefore the applicant points out the application as part continuation application of its female application of stating previously at this, but explicitly points out note and/or approval that this appointment can not be interpreted as whether the application is comprised any type of any fresh content except its content of mother's application by any way.
Summary of the invention
[01] a kind of system comprises:
Be used for calculating according to the product specification data relevant with product the device of the eco-environmental impact quantized value relevant with making this product of at least a portion; And
Being used for will be corresponding to the device-readable identifier and at least part of device that is associated according to the product of this product specification data manufacturing of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[02], such as above-mentioned [01] described system, wherein be used for calculating with the device of making the eco-environmental impact quantized value that this product of at least a portion is correlated with according to the product specification data relevant with product and comprise:
Be used for calculating according to product configurations material mark data the device of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[03], such as above-mentioned [02] described system, the device that wherein is used for calculating according to product configurations material mark data the eco-environmental impact quantized value relevant with this product of manufacturing at least a portion comprises:
Be used for calculating according to the quantity of product middle rare earth material the device of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[04], such as above-mentioned [02] described system, the device that wherein is used for calculating according to product configurations material mark data the eco-environmental impact quantized value relevant with this product of manufacturing at least a portion comprises:
Be used for calculating according to the quantity of product deleterious material the device of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[05] such as above-mentioned [02] described system, wherein be used for comprising according to the device of the product configurations material mark data calculating eco-environmental impact quantized value relevant with making this product of at least a portion:
Be used for calculating according to the quantity of product ground pollution material the device of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[06] such as above-mentioned [01] described system, wherein be used for comprising according to the device of the product specification data calculating relevant with the product eco-environmental impact quantized value relevant with making this product of at least a portion:
Be used for calculating according to the CO2e value relevant with making this product of at least a portion the device of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[07] such as above-mentioned [06] described system, wherein be used for comprising according to the device of the CO2e value calculating relevant with making this product of at least a portion eco-environmental impact quantized value relevant with making this product of at least a portion:
Be used for calculating according to product configurations transport of materials data the device of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[08], such as above-mentioned [06] described system, the device that wherein is used for calculating according to the CO2e value relevant with making this product of at least a portion the eco-environmental impact quantized value of being correlated with this product of manufacturing at least a portion comprises:
Be used for making the device that the energy usage data calculates the eco-environmental impact quantized value relevant with making this product of at least a portion according to product.
[09], such as above-mentioned [06] described system, the device that wherein is used for calculating according to the CO2e value relevant with making this product of at least a portion the eco-environmental impact quantized value of being correlated with this product of manufacturing at least a portion comprises:
Be used for calculating according to product configurations material junk data the device of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[10], such as above-mentioned [01] described system, wherein for comprising with at least part of device that is associated according to the product of product specification data manufacturing corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with making this product of at least a portion:
Be used for comprising corresponding to the equipment operating of the device-readable identifier of the eco-environmental impact quantized value relevant with making this product of at least a portion be coupled to the device of this product.
[11], such as above-mentioned [01] described system, wherein for comprising with at least part of device that is associated according to the product of product specification data manufacturing corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with making this product of at least a portion:
Be used for to store the device of the storer relevant with this product into corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[12], such as above-mentioned [01] described system, wherein for comprising with at least part of device that is associated according to the product of product specification data manufacturing corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with making this product of at least a portion:
Be used for to print to the device of this product surface corresponding to the readable identifier of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[13], such as above-mentioned [01] described system, further comprise:
Be used for the device that the eco-environmental impact quantized value relevant with making this product of at least a portion and device-readable identifier is related.
[14], such as above-mentioned [13] described system, wherein be used for the device that the eco-environmental impact quantized value relevant with making this product of at least a portion and device-readable identifier is related and comprise:
Be used for the device that the eco-environmental impact quantized value relevant with making this product of at least a portion and two-dimension code is related.
[15], such as above-mentioned [13] described system, wherein be used for the device that the eco-environmental impact quantized value relevant with making this product of at least a portion and device-readable identifier is related and comprise:
Be used for the device that the eco-environmental impact quantized value relevant with making this product of at least a portion and RFID chip is related.
[16], such as above-mentioned [13] described system, wherein be used for the device that the eco-environmental impact quantized value relevant with making this product of at least a portion and device-readable identifier is related and comprise:
Be used for the device that the eco-environmental impact quantized value relevant with making this product of at least a portion and printed label is related.
[17], such as above-mentioned [01] described system, further comprise:
The device that is used for the transmission product specification data relevant with making this product.
[18], such as above-mentioned [01] described system, further comprise:
Be used for receiving the device corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[19], such as above-mentioned [18] described system, further comprise:
The device-readable identifier corresponding to the eco-environmental impact quantized value relevant with making this product of at least a portion that is used for receiving stores the device on this product into.
[20], such as above-mentioned [01] described system, further comprise:
Be used for calculating according to the product treatment mode device of the eco-environmental impact quantized value relevant with processing this product of at least a portion;
Being used for will be corresponding to the device that is associated with this product with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to this product treatment mode.
[21], such as above-mentioned [20] described system, the device that wherein is used for calculating according to the product treatment mode eco-environmental impact quantized value relevant with processing this product of at least a portion comprises:
Be used for calculating according to the processing mode of reselling the device of the eco-environmental impact quantized value relevant with processing this product of at least a portion.
[22], such as above-mentioned [20] described system, the device that wherein is used for calculating according to the product treatment mode eco-environmental impact quantized value relevant with processing this product of at least a portion comprises:
Be used for calculating according to the recycling processing mode device of the eco-environmental impact quantized value relevant with processing this product of at least a portion.
[23], such as above-mentioned [20] described system, the device that wherein is used for calculating according to the product treatment mode eco-environmental impact quantized value relevant with processing this product of at least a portion comprises:
Be used for calculating according to the compost treatment mode device of the eco-environmental impact quantized value relevant with processing this product of at least a portion.
[24], such as above-mentioned [20] described system, the device that wherein is used for calculating according to the product treatment mode eco-environmental impact quantized value relevant with processing this product of at least a portion comprises:
Be used for calculating according to the burning disposal mode device of the eco-environmental impact quantized value relevant with processing this product of at least a portion.
[25], such as above-mentioned [20] described system, the device that wherein is used for calculating according to the product treatment mode eco-environmental impact quantized value relevant with processing this product of at least a portion comprises:
Be used for calculating according to the landfill disposal mode device of the eco-environmental impact quantized value relevant with processing this product of at least a portion.
[26], such as above-mentioned [20] described system, the device that wherein is used for calculating according to the product treatment mode eco-environmental impact quantized value relevant with processing this product of at least a portion comprises:
Be used for calculating according to the seabed processing mode device of the eco-environmental impact quantized value relevant with processing this product of at least a portion.
[27], such as above-mentioned [01] described system, wherein being used for will be corresponding to comprising with the device that this product is associated with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode:
Being used for will be corresponding to being coupled to the device of this product with the device-readable identifier operability of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
[28], such as above-mentioned [01] described system, wherein being used for will be corresponding to comprising with the device that this product is associated with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode:
Being used for will be corresponding to storing the device of the storer of being correlated with this product into the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
[29], such as above-mentioned [01] described system, wherein being used for will be corresponding to comprising with the device that this product is associated with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode:
Being used for will be corresponding to printing to the device of this product surface with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
[30], such as above-mentioned [20] described system, further comprise:
Be used for and process the relevant eco-environmental impact quantized value device related with the device-readable identifier of this product of at least a portion according to the product treatment mode.
[31], such as above-mentioned [30] described system, wherein be used for processing the relevant eco-environmental impact quantized value device related with the device-readable identifier of this product of at least a portion according to the product treatment mode and comprise:
Be used for and process the relevant eco-environmental impact quantized value device related with two-dimension code of this product of at least a portion according to the product treatment mode.
[32], such as above-mentioned [30] described system, wherein be used for processing the relevant eco-environmental impact quantized value device related with the device-readable identifier of this product of at least a portion according to the product treatment mode and comprise:
Be used for and process the relevant eco-environmental impact quantized value device related with the RFID chip of this product of at least a portion according to the product treatment mode.
[33], such as above-mentioned [30] described system, wherein be used for processing the relevant eco-environmental impact quantized value device related with the device-readable identifier of this product of at least a portion according to the product treatment mode and comprise:
Be used for and process the relevant eco-environmental impact quantized value device related with printed label of this product of at least a portion according to the product treatment mode.
[34], such as above-mentioned [20] described system, further comprise:
Be used for to receive corresponding to the device of the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
[35], such as above-mentioned [34] described system, further comprise:
Be used for receiving corresponding to storing device on the product into the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
[36], a kind of computer implemented method, comprising:
Calculate the eco-environmental impact quantized value relevant with making this product of at least a portion according to the product specification data relevant with product; And
To be associated with at least part of product according to this product specification data manufacturing corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[37], a kind of system, comprising:
Be used for calculating according to the product specification data relevant with product the circuit of the eco-environmental impact quantized value relevant with making this product of at least a portion; And
Being used for will be corresponding to the device-readable identifier and at least part of circuit that is associated according to the product of this product specification data manufacturing of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[38], a kind of computer-readable recording medium product of storing instruction, be used for:
Calculate the eco-environmental impact quantized value relevant with making this product of at least a portion according to the product specification data relevant with product; And
To be associated with at least part of product according to this product specification data manufacturing corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with making this product of at least a portion.
[39], a kind of system, comprising:
Be used for calculating according to the product treatment mode device of the eco-environmental impact quantized value relevant with processing this product of at least a portion;
Being used for will be corresponding to the device that is associated with this product with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
[40], such as above-mentioned [39] described system, wherein calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the product treatment mode and comprise:
Be used for calculating according to the processing mode of reselling the device of the eco-environmental impact quantized value relevant with processing this product of at least a portion.
[41], such as above-mentioned [39] described system, wherein calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the product treatment mode and comprise:
Be used for calculating according to the recycling processing mode device of the eco-environmental impact quantized value relevant with processing this product of at least a portion.
[42], such as above-mentioned [39] described system, wherein calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the product treatment mode and comprise:
Be used for calculating according to the compost treatment mode device of the eco-environmental impact quantized value relevant with processing this product of at least a portion.
[43], such as above-mentioned [39] described system, wherein calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the product treatment mode and comprise:
Be used for calculating according to the burning mode device of the eco-environmental impact quantized value relevant with processing this product of at least a portion.
[44], such as above-mentioned [39] described system, wherein calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the product treatment mode and comprise:
Be used for calculating according to the landfill disposal mode device of the eco-environmental impact quantized value relevant with processing this product of at least a portion.
[45], such as above-mentioned [39] described system, wherein calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the product treatment mode and comprise:
Be used for calculating according to the seabed processing mode device of the eco-environmental impact quantized value relevant with processing this product of at least a portion.
[46], such as above-mentioned [39] described system, wherein being used for will be corresponding to comprising with the device that this product is associated with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode:
Be used for will corresponding to the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode and the device of this product operation coupling.
[47], such as above-mentioned [39] described system, wherein being used for will be corresponding to comprising with the device that this product is associated with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode:
Being used for will be corresponding to storing the device of the storer of being correlated with this product into the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
[48], such as above-mentioned [39] described system, wherein being used for will be corresponding to comprising with the device that this product is associated with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode:
Being used for will be corresponding to printing to the device of product surface with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
[49], such as above-mentioned [39] described system, further comprise:
Be used for and process the device that the relevant eco-environmental impact quantized value of this product of at least a portion is associated with the device-readable identifier according to the product treatment mode.
[50], such as above-mentioned [49] described system, wherein be used for processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode and comprise with the device that the device-readable identifier is associated:
Be used for and process the device that the relevant eco-environmental impact quantized value of this product of at least a portion is associated with two-dimension code according to the product treatment mode.
[51], such as above-mentioned [49] described system, wherein be used for processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode and comprise with the device that the device-readable identifier is associated:
Be used for and process the device that the relevant eco-environmental impact quantized value of this product of at least a portion is associated with the RFID chip according to the product treatment mode.
[52], such as above-mentioned [49] described system, wherein be used for processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode and comprise with the device that the device-readable identifier is associated:
Be used for and process the device that the relevant eco-environmental impact quantized value of this product of at least a portion is associated with printed label according to the product treatment mode.
[53], such as above-mentioned [39] described system, further comprise:
Be used for to receive corresponding to the device of the device-readable designator of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
[54], such as above-mentioned [53] described system, further comprise:
Be used for receiving corresponding to storing device on this product into the device-readable designator of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
[55], a kind of computer implemented method, comprising:
Calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the product treatment mode;
Will be corresponding to being associated with this product with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
[56], a kind of system, comprising:
Be used for calculating according to the product treatment mode circuit of the eco-environmental impact quantized value relevant with processing this product of at least a portion;
Being used for will be corresponding to the circuit that is associated with this product with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
[57], a kind of computer-readable recording medium product of storing instruction, be used for:
Calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the product treatment mode;
The device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode is associated with this product.
In aspect one or more, different systems includes but not limited to realize circuit and/or the program of the aspect that relates to herein, the design alternative that in fact circuit and/or program can be based on system designer is used for the method aspect hardware that realization relates to herein, software, and/or the combination in any of firmware.
The general introduction of front only is a kind of exemplary and be not the restriction of attempting to carry out any mode.Except the exemplary aspect of top description, outside embodiment and the feature, with reference to following accompanying drawing and describe in detail subsequently, further aspect, embodiment and feature will become apparent.
Description of drawings
Fig. 1 has shown the high level schematic diagram of operating environment.
Fig. 2 has shown the high level schematic diagram of example system.
Fig. 3 has shown the high level schematic diagram of example system.
Fig. 4 has shown the high level schematic diagram of example system.。
Fig. 5 has shown operating process.
Fig. 6-17 has shown the alternate embodiment of the operating process of Fig. 5.
Figure 18 has shown operating process.
Figure 19-23 has shown the alternate embodiment of the operating process of Figure 18.
Embodiment
In the following detailed description, with reference to forming the accompanying drawing of a part at this.In the accompanying drawings, the assembly that identical label sign is identical, unless the context indicating other implications.At instructions, the specific embodiment of describing in accompanying drawing and the claim does not also mean that and is limited to this.Under the prerequisite that does not break away from subject area of the present invention and spirit, also can utilize other embodiment, also can carry out other change.
Concerning the earth, the caused eco-environmental impact of the consumption of rare material and mankind's activity is becoming a serious problem.For example, some scholarly forecasts we in order to obtain food, timber, energy and the use of the ecosystem has been exceeded the ability that the earth can provide.If lacking of resource is not sufficient to become a problem, human behavior has also caused being discharged into the increase of the greenhouse gases quantity in the atmospheric envelope.Some greenhouse gases, such as carbon dioxide, sulphuric dioxide, Chlorofluorocarbons (CFCs:chlorofluorocarbons) and nitrogen monoxide are because the manufacturing of product is used and decompose to produce to a certain extent.General public opinion thinks that greenhouse gases are to work the mischief to environment.For example, point out according to Intergovernmental Panel on Climate Change (IPCC:Intergovernmental Panel on Climate Change) the 4th assessment report in 2007, during 20th century, greenhouse effect are so that the temperature rises whole world surface 0.74+0.18C(1.33+0.32F).Climate model prediction temperature during 21 century will continue to rise 1.1 to 6.4C(2.0 to 11.5F).Probably this growth of temperature is a serious problem to biology.For example, the earth ecology index that identifies the designator of global bio-diversity shows that the species number reduced 30% from 1970 to 2003.
Demand for article causes huge harm to environment, yet majority are complacent.People may think that they are concerned about environment; Yet, seem that at present some (if not most people's words) not friendly to the environments is although they know how in fact their behavior will affect environment.Too abstract people are difficult to recognize to such an extent as to one of reason that produces above-mentioned situation may be this impact.For example, a people may know that the driving meeting works the mischief to environment; Yet this people may and not know to cause great harm, because this people is not because driving pays for or this people does not recognize that the behavior that he drives has any related with the harm that the behavior causes environment.
Correspondingly, except other aspects, provide robust method, thereby system and computer program form a kind of operability system, the user can recognize the acquisition of product and consumption behavior are how to affect environment therein.Similarly, in an exemplary embodiment, the potential eco-environmental impact relevant with product can be quantized, for example, be mapped to the discrete set (99 to 99) of numeral, perhaps be mapped to abstract scope, for example " bad ", " bad ", " neutral ", " good " and " outstanding " impact to have represented these products and/or will produce environment.Potential eco-environmental impact quantized value can divide one or more stages of product life cycle and/or one or more processing modes of product to calculate.In at least one exemplary embodiment, the user can find the potential eco-environmental impact quantized value information of at least part of quantized value (or based on) of product and understand that this product causes great harm (material fact that for example, is generated according to this product) to environment and/or it will cause how many potential harm to environment when this product is processed.Whether the potential environmental impact quantized value allows the user to make one to want environment is had the product of harm and/or how to process the decision of the product that he or she has about him or she.
With reference now to Fig. 1,, it has shown the high-level block diagram of the exemplary operation environment that is used for describing embodiments of the invention.Dotted arrow represents how mobile between diverse location product 102 is in its whole life cycle.The square frame element that is represented by dotted lines represents that these elements are optional
In addition, each position among Fig. 1 can be by networking 100 interconnection, and this network can be Inernet.Each element can be connected to network 100 with a kind of access method, for example, LAN (Local Area Network) (LAN:local area network), World Interoperability for Microwave Access, WiMax (WiMAX:World Interoperability for Microwave Access), public switch telephone network (PSTN:Public Switched Telephone Network), GPRS (GPRS:General Packet Radio Service), cellular network, and/or the wireless or cable network of other types.
Fig. 1 at product 102(has for example shown, household electrical appliances, the vehicles, electronic equipment, the food and beverage sevice project, etc.) life cycle in difference.On some point, product 102 can be made by goods producer 104.For example, a company can buy starting material and/or manufactured materials and generation product 102.After product 102 manufacturings were finished, this product was transported to producer retailer 106 alternatively this product sold user's (perhaps directly selling the user) and Product transport can be arrived products customers position 108, for example user's family.The user can use this product, again sells producer retailer 106(or other producer retailers with this product 102), donations product 102(does not show), maybe sell other user's (not shown)s with this product 102.Finally, product 102 falls full consumption, namely uses up, and damages etc. and can be processed.Product 102 can be transported to treatment facility 110, for example, the garbage loading embeading district, salvage station burns station etc., can be processed at these local products.
In one exemplary embodiment, ecosystem environment service provider 112 can be used to generate potential eco-environmental impact quantized value and the difference place in product 102 life cycles these values information of these values (or based on) is sent to the user.For example, ecosystem environment service provider 112 can comprise system 106, and it can comprise or a plurality of computer system with processor, storer, operating system software, network adapter etc.As shown in the figure, system 106 can comprise database 104, Fig. 2 and below paragraph in will describe this database in detail.Still be market module 122 as shown in the figure, its can be in the swap date storage vault storage market data.In brief, market module 122 can be used for affecting the position, online marketplace of product exchange.For example, market module 122 can generate one or more webpages that send to such as the computing equipment of computer system, mobile phone etc., and webpage can be used to searching products, lists product and/or the Registering product notice of exchange.Product tabulation on sale, product bid etc. can be stored in the swap date storage vault 130, and it can be realized by one or more databases.
Continue the high-level overview of Fig. 1, system 106 can comprise social networks module 116 and/or e-mail server 120.In brief, social networks module 116 can be used for generating one or more webpages that send to such as the computing equipment of the equipment 302 among Fig. 3, and this equipment will be described in detail in the paragraph of back.In one exemplary embodiment, this webpage allow user to generate and the leading subscriber configuration file and/or with other the user of generating configuration file carry out alternately.In identical or another exemplary embodiment, webpage can be used to carry out alternately with the life cycle module, and this module will be described in detail in the paragraph of back.Also shown e-mail server among Fig. 1, it can be realized to the e-mail system that sends Email such as the equipment 302 such electronic equipments among Fig. 3.In one exemplary embodiment, Email can comprise different information, for example buys the bid of product, reward, and potential eco-environmental impact quantized value (in the paragraph of back, describing in detail), etc.
Media distribution center 150 is also shown among Fig. 1.Media distribution center 150 can be safeguarded by homologue or the corpus separatum of maintenance server 106.As a rule, media distribution center 150 can be used for receiving, storage, and/or propagate the information of being collected by system 106.For example, media distribution center can be configured to comprise the webserver, e-mail server, Short Message Service (SMS:short messageemail) server, TV station, etc.In a particular embodiment, media distribution center 150 can receive, storage, and/or be transmitted to the information based on user's eco-environmental impact scoring (in other paragraphs, describing in detail) of small part.For example, media distribution center 150 may be a tissue that allows the user to create internet diary (for example blog).In this embodiment, blog can receive the eco-environmental impact scoring from for example equipment 302 or system 106.Then this eco-environmental impact scoring can be stored in by in the addressable webpage of this daily record or the text.
System 106 also comprises life cycle module 118(LCM:lifestyle module) and database 114.As shown in Figure 2, database 114 can comprise product information CC/PP Repository 202, and it can comprise the information of one or more products; And user account CC/PP Repository 222, but each user's of its storage system user account.For example, be device-readable identifier of each product dispensation, it is a unique alphanumeric values that can be used to product in the recognition system 106.Also distribute an alphanumeric values that can be used to user account in the recognition system 106 for each user account.But the product information of the product 102 in product information CC/PP Repository 202 storage maps 1 and the information of other products, the information that while user account CC/PP Repository 222 can be stored user account 224, this user account is the user account of user 300 among Fig. 3.It will be understood by a person skilled in the art that the information that is described as " in database 114 " can be stored in one or more entity data baks and the application of being arranged in one or more geographical location is not defined as illustrated configuration.
Product information CC/PP Repository 202 can comprise information that one or more agencies by ecosystem environment service provider collect and/or that collected by goods producer's agency.In embodiment disclosed by the invention, the above-mentioned data of collecting can be used to generate potential eco-environmental impact quantized value, for example, be 5 impact point or such as " good " such as value, the arbitrary value of " on average " or " bad ", at least one stage that is used for the product life cycle, for example, its production phase, operational phase, and/or the processing stage, the suitable part that this quantized value can be stored in product information CC/PP Repository 202 (that is to say production phase quantization value table 216, operational phase quantization value table 218, and/or the processing stage quantization value table 220, a plurality of quantized values that comprise product that the latter is potential a: quantized value of each processing mode of product).
The detailed bill that forms the material of this product in the time of can collecting and be stored in one type data in the exotic material table 210 and be the material of having used up and/or produce a product.In at least one exemplary embodiment, be identified at other products of product 102() in exotic material and/or the data of the exotic material that in the process that manufactures a product, consumes can be used to generate one or more potential eco-environmental impact quantized values.The quantity that for example, can obtain the decomposition of component in the product 102 and can derive to produce rare earth material and/or the exotic material of product 102 from ecosystem environment service provider 112 and/or goods producer's 104 agency.
Exotic material can comprise rare earth material and/or only be rare material.For example, IUPAC has set up a dvielement and has been called " rare earth metal " in the periodic table of chemical element.To a great extent, these elements are quantitatively not rare, but it is very difficult to extract these elements from compound.That important component and demand increase day by day at hyundai electronics industry rare earth elements.For example, ceria, the most cheap rare earth element, it has increased by 930 percentage point per kilogram and has surpassed 35 dollars during from 2007 to 2010.Rare earth element is lanthanum (it can be used to generate glass of high refractive index, camera lens, battery electrode), cerium, praseodymium, neodymium (it can be used to the produced nucleus battery), samarium, europium, gadolinium (it can be used to generate calculator memory), terbium, ytterbium, lutetium, actinium, thorium, protactinium, uranium, neptunium, plutonium, americium, curium, berkelium, californium, einsteinium, fermium, mendelevium, nobelium and lawrencium.
The deleterious material information of each product can be collected and be stored in the database 114, for example, in the deleterious material table 204, and can be used to generate such as the potential eco-environmental impact quantized value of the product of product 102.Harmful Waste can comprise those cause essence or potential threat to public health and/or environment rubbish.The objectionable impurities tabulation that the objectionable impurities of following the tracks of tabulation and being used for generates the eco-environmental impact quantized value can change to some extent and can comprise at country variant, but be not limited to the material that those can explode when being exposed to fire maybe when bump, and those have high flammable material, etc., and/or those are poisonous, and are corrosive, infection, carcinogenic, etc. material.
Ground pollution thing data can be stored in the ground pollution thing table 208 and can be used to generate one or more potential eco-environmental impact quantized values.The estimator of the ground pollution that produces when as a rule, ground pollution thing data can comprise the estimator of the pollutant (rather than Harmful Waste) that discharges such as goods producer 104 and/or carry out product treatment according to different processing modes.In one exemplary embodiment, the ground pollution thing of following the tracks of includes, but not limited to heavy metal, chlorinated hydrocarbons, and lead, zinc, benzene, etc.These typical pollutants enter into environment by landfill.
Carbon dioxide equivalent table 206 can comprise that information about greenhouse gases is (that is: with carbon dioxide equivalent or CO 2The normalized greenhouse gases that e is represented).Can emission greenhouse gas and in an exemplary embodiment in almost each stage of product life cycle, owing to the production of product, the quantity of the common greenhouse gases of use and/or processing can be collected and be used for generating one or more potential eco-environmental impact quantized values.For example, but agency's measurement products manufacturer 104 employed electric weight of ecosystem environment service provider 112 or goods producer 104 and determine to make a kind of product needed and use how much energy.Can from power plant determine energy source and by power plant's generation for the production of CO 2The discharge capacity of e can determine the to manufacture a product quantity of 102 electric current.The energy can be to determine from the generating plant, and the generating plant can be to obtain in order producing be used to the CO that obtains starting material and the required energy that manufactures a product discharges 2E also is stored in CO 2In the e information 206.
CO by the generating plant generation 2The quantity of e can be estimated according to the information that is obtained by the energy grid.For example, the energy company of managing gridding can provide the expression energy source (for example, hydropower, rock gas, coal, etc.) information, and can calculate the CO2e of each energy source discharging and the number percent of the energy that generates from each energy source.In this embodiment, the CO that is associated of the production of the energy required with producing product 102 2The quantity of e discharging can obtain and can be stored in CO 2In the e table 206.
The tabulation of gas can comprise following gas and the scalar value that shows in the quantity of each gas and the parenthesis can be multiplied each other and converts gas (with metric ton) to CO 2E: carbon dioxide (1), methane (21), nitrous oxide (310), perfluocarbon (2300), HFC compound (12,000) and sulfur hexafluoride (23,900).This shows that 1,000,000 tons methane and nitrous oxide are equal to respectively the discharging of the carbon dioxide of 2,100 hundred ten thousand tons and 300,000,000 1 thousand ten thousand tons.In an exemplary embodiment, estimate the CO relevant with product by the Information Availability that the Environmental Protection Committee (EPA:Enironment Protection Agency) provides 2The quantity of e.This information can be that report and the title of " catalogue of U.S.'s greenhouse gas emission and decline; 1990-2005 " is " solid refuse management and greenhouse gases: discharging and the life cycle that descends are estimated " (the 3rd edition at title, in September, 2006) obtain in the report of EPA, above-mentioned two are reported in herein and are all introduced in full.
In one exemplary embodiment, some or all data above-mentioned can be used to generate the one or more potential eco-environmental impact quantized value of one or more products.For example, potential eco-environmental impact quantized value can at least part of quantity based on the rare element relevant with product, the quantity of the Harmful Waste relevant with product, the quantity of the ground pollution thing relevant with product, and/or the CO relevant with product 2The quantity of e.For example, the general CO that discharges 60 kilograms in the process of making mobile phone 2E.In an exemplary embodiment, CO 2E quantity can with the quantity of rare element in the mobile phone, and make that the quantity of Harmful Waste and ground pollution thing together quantizes in the mobile phone process.Then this quantized value can combine (for example, addition is multiplied each other, etc.) to generate potential eco-environmental impact quantized value.
Each potential eco-environmental impact quantized value can be categorized in the group of different phase of product life cycle and go.For example, the eco-environmental impact relevant with the fabrication phase can be stored in the production phase quantization value table 216.Other tables be operational phase quantization value table 218 and the processing stage quantization value table 220.In one exemplary embodiment, single product can with the potential eco-environmental impact quantized value of the potential hazard that environment is caused when making this product, the potential environmental impact harm quantized value of the potential hazard that causes when using this product, the potential eco-environmental impact quantized value of the potential hazard that is caused by the Different treatments of product is relevant.In another exemplary embodiment, can generate a single demonstration by the potential eco-environmental impact quantized value of the eco-environmental impact of the caused accumulation of product, for example, the summation of all aforesaid eco-environmental impact quantized values of this potential eco-environmental impact quantized value different phase that can be the product life cycle.
In a particular embodiment, but the quantity of exotic material or the quantity of making the exotic material that this product consumes are determined in the potential eco-environmental impact quantized value product-based of production run.In this embodiment, quantizing process can utilize the price of exotic material when generating potential eco-environmental impact quantized value and/or the quantity of product 102 middle rare earth materials.For example, 1,000 kilograms can then be complementary with eco-environmental impact quantized value 9 with material 1 praseodymium (a kind of relatively more expensive rare earth) that is complementary 1,000 kilograms of marking such as the rare earth material of the lesser value of ceria.The potential eco-environmental impact quantized value of material combines to generate the potential eco-environmental impact quantized value of production run alternatively with other potential eco-environmental impact quantized values.
Except exotic material, produce quantity and the type of the Harmful Waste that the eco-environmental impact quantized value also can produce when producing product and determine.For example, the Harmful Waste of high quantity high-risk degree type then are complementary with high eco-environmental impact quantized value.This eco-environmental impact quantized value can preferably combine to generate production eco-environmental impact quantized value with other eco-environmental impact quantized values.
In another embodiment, the eco-environmental impact quantized value of production run can be based on producing the CO that produces in the product 2The quantity of e is determined.For example, usually can discharge CO in this stage 2E is to generate transmission starting material/finished material to the energy at goods producer place and to be used for material is integrated into the required energy of product.In this embodiment, can estimate for making up the CO that product generates 2The quantity of e and it can being mapped to based on CO 2The eco-environmental impact quantized value of e.For example, a small amount of CO 2E can be mapped to low based on CO 2The eco-environmental impact quantized value of e, simultaneously a large amount of CO 2E quantity can be mapped to high based on CO 2The eco-environmental impact quantized value of e.Based on CO 2The eco-environmental impact quantized value of e can with other based on CO 2The eco-environmental impact quantized value of e combines to obtain the eco-environmental impact quantized value of production phase.
With obtain exotic material and the 102 relevant CO that manufacture a product 2The discharging of e can comprise obtain exotic material, manufacture a product, energy that management company and disposal of refuse consume.As a rule, the most of energy that is used for above-mentioned activity is to obtain from being used for operating the mineral fuel that mining equiment and blast furnace blowing etc. burn, and is generated as the electric current that machine provides energy during the fabrication phase.
Operational phase eco-environmental impact quantized value can reflect because transportation, storage and in fact use a kind of product and potential hazard that environment is caused.Major part at this stage eco-environmental impact is attributable to the CO relevant with the energy of product use 2The discharging of e, and/or product (for example, motor vehicle) moves the CO that discharges 2E.The food service product can need freezing, and it needs and CO 2The relevant electric current of e discharging.Most cold storage establishments are operated in the wide in range temperature range.In an exemplary embodiment, can estimate together the average-size of medial temperature, storage facility and be used for the mean value of frozen product institute energy requirement that this product can be six tinned beers.The Information Availability relevant with small product size estimated by the caused CO of storage products in the refrigeration 2The discharging of e and this CO 2The e discharging can be used to generate operational phase eco-environmental impact quantized value, and it can be stored in the operational phase quantization value table 218.
With above-mentioned and transportation and/or the relevant eco-environmental impact quantized value of storage similar be that the eco-environmental impact quantized value relevant with operated products can most of CO by discharging for the required energy of generation product 2E and/or the CO that when product moves, discharges 2E calculates.These data of product 102 can be collected, and are stored in CO 2In the e table 206, and be used for generating based on CO 2The potential eco-environmental impact quantized value of e.For example, any consumer products is because the energy of its consumption may come self-generating CO 2The energy source of e is probably to environment work the mischief (even indirectly harm).
When the user uses a product (for example when this product is positioned at the end of its life), this product can be processed.In one exemplary embodiment, one or more exotic materials that the potential eco-environmental impact quantized value the processing stage can cause based on the processing to product lose the CO that discharges during treatment product 2The quantity of e (perhaps from product or from the equipment for the treatment of this product), the quantity of the Harmful Waste that this product discharges during processing, the quantity of the ground pollution thing that this product produces during processing, etc.In one exemplary embodiment, each the processing stage potential eco-environmental impact quantized value can be stored in processing mode identifier list 214 in the processing mode identifier relevant.The processing mode identifier with how to describe that to carry out the information of product treatment according to processing mode relevant.For example, recycling mode identifier can with the text of the address that recvery facility is provided or relevant to the map of recvery facility.In another particular embodiment, a burning disposal mode identifier can comprise the audio frequency of describing the container handling (for example, dustbin, garbage tank etc.) that uses which kind of type, and this product can be placed on wherein to burn.
Because a kind of product can multiple different mode be processed, so each product can be relevant with a plurality of processing eco-environmental impact quantized values.Example but not the processing mode tabulation of exhaustive can comprise and reselling reclaims (and/or donations, manage etc.), and compost burns landfill etc.Similarly, in one exemplary embodiment, a product can be relevant to one or more eco-environmental impact quantized values of the effective processing mode of product with each.For example, resell to comprising such as the effective mode of the product of Mp 3 player class, reclaim and land-fill method.
In one exemplary embodiment, product can be relevant with the processing mode of reselling.In this exemplary embodiment, the potential eco-environmental impact quantized value relevant with this product of reselling can be according to the CO that is used for this product is estimated when a user is sent to another user 2The quantity of e is determined.In certain embodiments, this CO 2The quantity of e can be ignored.
In one exemplary embodiment, the potential eco-environmental impact quantized value that product can be relevant with the recycling pattern is relevant.In one exemplary embodiment, the potential ecologic environment quantized value that be used for to reclaim can based on, for example, the CO of the energy correlation that produces with analytical product 2The quantity of e, quantity of the exotic material that in removal process, loses etc.Product relates to analytical product and the part of its decomposition of use in other products owing to reclaim, and therefore the product by the product manufacturing of reclaiming has potential eco-environmental impact quantized value of lower production phase than the like products by the original material manufacturing.
Compost is another kind of processing mode, can generate the eco-environmental impact quantized value of composting production.Compost is a process processing organic material by aerobic is olation.For example, compost can cause from aerobic decomposition discharging CH 4And N after fertilizer application arrives ground 2O can be discharged by soil, but these dischargings are substantially zero.An extra benefit of composting process is obtained exactly carbon and can be come fertile soil with carbon.That another kind is used for reducing the technology that is discharged into the carbon content in the environment by the processing of burying realization.EPA estimates that compost/burying fertilizer per ton reduces by 0.5 tonne of CO 2The e discharging.In one exemplary embodiment, this Information Availability generates the CO based on compost of the product of compost 2The eco-environmental impact quantized value of e.In certain embodiments, this eco-environmental impact quantized value can reduce the harm to celestial body.
Another kind of processing mode is to burn.Burning relates to the burning at organic matter in garbage, thus garbage conversion is become ash content, heat and flue gas, these flue gases can comprise a large amount of specific particle materials, heavy metal, bioxin, furans, sulphuric dioxide and hydrochloric acid and/or carbon dioxide.Domestic waste (MSW:Municipal solid waste) comprises the carbon component of the massfraction that is roughly the same with carbon dioxide itself (27%), so 1 ton of domestic waste of burnup generates general 1 ton carbon dioxide.In one exemplary embodiment, the CO that is discharged by burning 2The quantity of e, the CO that is used to combustion plant to provide energy to produce 2Quantity of the quantity of e and the Harmful Waste of generation etc. can be integrated into together and be used for generating according to the combustion system of processing the eco-environmental impact quantized value of product treatment.With burning similarly be, by liquid storage can be reflected rubbish evaporation and eco-environmental impact quantized value by the caused harm to environment of evaporating liquid product in evapotranspire bed or mechanical vapor unit.
The processing mode of product comprises product is transported to the landfill district.In the consumer waste filling and embedding operation, refuse collector is transported to dump plaftorm or Working front desk with garbage substance, load of their discharge car at this.After load is removed, packer or dozer can be used to spread out and these rubbish of compacting on construction surface and the rubbish of compacting can be covered with soil every day.
Landfill has caused a lot of problems to environment: such as pollution and the rotten caused pollution of gas that discharges of organism by underground water and soil.The CO in landfill district 2E discharging major part is because discharge of methane, the discharging of the carbon dioxide that transportation is relevant and because the caused carbon storage of landfill organic waste and house refuse.Metal is carbon containing and do not produce CO not 2The e discharging, however they can cause ground pollution.For example, salt, nitrate, lead, copper, nickel, cadmium etc. are the different materials that causes ground pollution.Plastics are not degraded so emission greenhouse gas not.This Information Availability generates landfill eco-environmental impact quantized value.
Process in the seabed is another kind of disposal route.This technology relates to precipitate rubbish in bottom sediment, for example, and radioactive waste.The exemplary techniques of precipitation rubbish relates to the bottom that rubbish is mixed in the concrete vanning or enters into the sea with auger spindle.The eco-environmental impact quantized value can consider that thereby rubbish is deposited in large marine caused potential eco-environmental impact to be generated.
Except storing potential eco-environmental impact quantized value, in one exemplary embodiment, database 114 is maintenance customer's account also.User account can be put down in writing blog therein with the user, and upload pictures and the social networks of sending out mutually message etc. associate.Social networks module 116 can be used for generating the one or more webpages can download to computer equipment (for example, desktop individual notebook, smart mobile phone etc.), but this equipment comprises and allows each other mutual operation logic of user.For example, social networks module 116 can send webpage to computing equipment, and this equipment allows the user to put down in writing blog, upload pictures etc.Shown user account 224 can with user 300 relevant (although only shown a user account, system 106 can safeguard a plurality of users).
Except front described, each user account, for example user account 224 can comprise a product tabulation, can comprise the catalogue of the product relevant with user account 224 in this product tabulation.For example, product tabulation 226 can be the operation tabulation of the product that is associated with user account.Related how long each product that the user has bought can be with the selected processing mode of its state (for example, movable or process), treatment product, this product and user account, unique sequence number (this sequence number can be used for the specific production phase of product is associated with the specific user) of product etc. is associated.
Continue the description of Fig. 2, award/punishment information 228 can comprise that indication is according to he or she purchase and/or processing behavior, the data of the award that this user has obtained/punishment.For example, the award that is stored in award/punishment information 228 can comprise an icon, and this icon indication is by the prize of being devoted to generate with the tissue that the friendly mode of environmental protection is taken action.In another embodiment, reward/punishment information table 228 comprises an expression reward voucher, Gift Voucher, indication is free or reduce the information that offers user's 300 services, etc. figure.Similarly, reward/punishment information table 228 also comprises based on processing and/or the punishment relevant with user account 224 of product purchase behavior.For example, punishment can be to collect the charges to the user, has the prize of negative association, etc.
Each user account also can be relevant with the eco-environmental impact scoring, the impact on ecologic environment that this scoring can partly be estimated based on the user.In a particular embodiment, eco-environmental impact scoring can be that the operation of the potential eco-environmental impact quantized value relevant with user account is marked.For example, suppose that the user has the estimation impact scoring at zero point and buys the mobile phone with potential eco-environmental impact quantized value, this quantized value is because 4 when producing mobile phone affect a little.The user used this mobile phone 3 years and according to the past these years in the expense of mobile phone with payment function added up 5 and affected a little.After 3 years, the user may be discarded into this mobile phone in the landfill district and cause 3 to affect a little.The whole potential eco-environmental impact of this mobile phone then is 12 to be affected a little.In this specific embodiment, the scoring of user's eco-environmental impact can be 12 to be affected a little.
In another embodiment, potential eco-environmental impact quantized value can be a factor calculating the eco-environmental impact scoring.In this particular example, the quantity of the environmental protection close friend's that eco-environmental impact scoring can be adopted by the user behavior is adjusted, and for example, buys the carbon credit volume or carries out other behaviors that environment had positive influences.In other exemplary embodiments, how the eco-environmental impact scoring can be adjusted with product based on the user.For example, buy automobile and drive per month once user effectively do not use one of this automobile and user better to select to be select public transport or add such as The Car sharing tissue.In this specific embodiment, but the information negative sense/forward how the description product is used consumingly affects the scoring of user's eco-environmental impact.In another exemplary embodiment, ecological sublimity impact scoring can according to the user as members tissue adjust.For example, the user can be a member in " green " tissue, and this tissue is set product should use requirement how long before processing.In this embodiment, abide by/being not to scale of user can affect his or her eco-environmental impact scoring.
Rotate back into user account 224, user account can have list of friends 232, and this tabulation associates user account and other user accounts.As directed ecologic environment statistical form 236, it can comprise, and the number of times of processing such as user selection burning mode circulates to selection or the quantity of the number of times that the mode of reselling is processed; How other users on user 300 and his or she list of friends compare performance, etc.
System 106 also shows and comprises life cycle module 118.For example, describe in detail in conjunction with following paragraph, life cycle module 118 can be used for generating the eco-environmental impact scoring of user account, determines whether Graphics Processing mode designator (will describe in detail in the paragraph below), and/or search for different information etc. in database 114.
As shown in the figure, in one exemplary embodiment, life cycle module 118 can be relevant with information table, and this information table can be used to dispose life cycle module 118 in exemplary embodiment of the present invention.In brief, this table can include, but not limited to threshold value table 234, quantized value adjustment form 242, and image table 246, and/or reward/punishment table 248.Briefly, image table 246 can comprise the product image relevant with the device-readable identifier.In one exemplary embodiment, product may not comprise that device-readable identifier and LCM118 can determine the designator from image.Quantized value adjustment form 242 can comprise the quantized value that can adjust based on some condition that will describe in detail in the paragraph below the eco-environmental impact scoring.Award/punishment table 248 can comprise rewards tabulation, for example positive award and punishment, and it can be associated with user account based on some condition that following paragraph will be described in detail.
Group configuration file stores 240 can be used to store the information of for example organizing 250 group about one or more, and user 300 belongs to a member of this group 250 in an exemplary embodiment.Group can be stored the information such as the group policy, and it comprises and can be used to adjust the eco-environmental impact scoring, rewards the user, etc. different condition.For example, the group policy can comprise the treatment schedule of the product of a kind of product or a type.This timetable can be used to determine according to user before the processing mode treatment product that environment is worked the mischief whether this product to be had an acceptable time span.In a particular embodiment, suppose that product 102 is Mp 3 players, and assembly puts file 250 and comprise that Mp 3 player can accept the tabulation of processing mode, each processing mode is related with time value.Suppose that also the user wishes to process by Mp 3 player being delivered to the landfill district.In this embodiment, the time value with the Mp 3 player landfill disposal is 5 years.In this embodiment, suppose that the landfill disposal mode is selected in the 3rd days that Mp 3 player exists.In this embodiment, LCM118 can calculate time quantum that Mp 3 player existed and compare with above-mentioned time value.In this embodiment, LCM 118 time that can determine to occupy Mp 3 player is less than above-mentioned time value and generate the quantized value of an adjustment.For example, the quantized value of adjustment can be 2, and it shows that the processing of Mp 3 player has shifted to an earlier date the time in 2 years.LCM 118 can combine the quantized value of the adjustment by the landfill disposal Mp 3 player and potential eco-environmental impact quantized value and this result be joined in the eco-environmental impact scoring.
Get back to now Fig. 3, it has shown exemplary environment usually, and it can be producer retailer position 106, product consumption position 108 or treatment facility 110.The dotted arrow of black represents that product 102 can process by being placed in the container handling 324, and described container is collection box or dustbin for example, perhaps this product is given to another user such as user 318.Certainly, in this exemplary embodiment, product is packed with packing 350, and packing 350 also will be given to other users 308 or be placed in the container handling 324.
Equipment 302 can be calculating/communication facilities, for example comprises mobile phone, PDA(Personal Digital Assistant), kneetop computer, the calculating/means of communication of desktop computer or other types.In an exemplary embodiment, equipment 302 can be handheld device, such as mobile phone, smart mobile phone, mobile internet device (MID:Mobile Internet Device), super portable personal (UMPC:Ultra Mobile Personal Computer) can be integrated equipment, for example PDA(Personal Digital Assistant), and other similar equipment.For example, equipment can comprise storer, for example, random access storage device, ROM, etc., can comprise in the storer can be by the executable instruction of processor execution.In addition, equipment 302 also can comprise different integrated circuit, GPS radio for example, and network adapter, etc., and the relevant firmware that operates such equipment.Equipment 302 can comprise user interface 310, it can include but not limited to, by software and hardware in conjunction with the input module of realizing: for example, touch user interface, keyboard, the direction pad, the input module that the combination of the software and hardware of microphone etc. realizes and such as the screen of LCDs, the output precision of loudspeaker etc.
Equipment 302 comprises customer database 342 and customer life cycle module 340 alternatively.Equipment 302 also can comprise network adapter 352, and it can be used to accesses network 100 and permission equipment 302 communicates with ecosystem environment service provider 112.In one exemplary embodiment, customer database 342 can comprise some or all data in the database 114.For example, customer database 342 can be configured to comprise the copy of user account 224, the copy of product information CC/PP Repository 202, and the part of product information CC/PP Repository 202 (part relevant with the product in being stored in product tabulation 226), etc.The life cycle module can be client component, and it can be carried out the executable function of some or all LCM118 and/or life cycle 340 and can be used as interface information is sent among the LCM118.The configurable LCM340 of implementer carries out other functions to carry out certain function while LCM118.
User 300 obtains ecologic environment information about product 102, for example potential eco-environmental impact quantized value with equipment 302 alternatively.For example, product 102 can comprise storer, for example, two-dimension code, random access storage device, ROM (read-only memory) etc., storer can be used to memory device 302 spendable information to obtain information and/or the potential eco-environmental impact quantized value itself based on potential eco-environmental impact quantized value.
As shown in the figure, product 102 optionally comprises device-readable identifier 314, and this identifier is the information that is used for representing product 102 that is extracted by equipment 302.Device-readable identifier 314 can be an alphanumeric values, and it can be stored in storer, for example among RAM or the ROM, is stored in the two-dimension code, is stored in the RFID label or is etched in the product 102.In one exemplary embodiment, device-readable identifier 314 can together be stored with unique sequence number, and this sequence number has also represented the particular instance of product 102.Equipment 302 by with product 102 communicate by letter obtain device-readable identifier 314 and/or use reader for two-dimension code 306, RFID reader 312, network adapter 352 or camera 304 come to extract this identifier from product 102.In other exemplary embodiments, product 102 may not have the device-readable identifier of stickup, the substitute is, and device identifier 314 can be from the image of product 102, the user talk about in the audio frequency of product 102 or user's input in search.
In one exemplary embodiment, potential eco-environmental impact quantized value is attached on the product 102 in the mode of the potential eco-environmental impact quantized value 316 of enclosing.In this embodiment, equipment 302 can obtain one or more potential eco-environmental impact quantized values from product 102 rather than from database 114 or customer database 112.With foregoing device-readable identifier similarly be, the potential eco-environmental impact quantized value 316 of enclosing can be stored in storer, two-dimension code, RFID label and/or be etched in the product 102.In an exemplary embodiment, wherein product 102 does not comprise the potential eco-environmental impact quantized value of enclosing, LCM118 or 340 can be used to obtain device-readable identifier 314, and it can be used to the potential eco-environmental impact quantized value of search in database 114 or 342.
Still in another embodiment, product 102 can have one or more processing mode identifiers 320 of enclosing.The processing mode identifier can comprise according to processing mode (for example, burn, recycle, landfill, etc.) come the instruction for the treatment of product, for example, text, audio frequency, image.Similarly be that the processing mode identifier also may be non-cohesive on product 102 with foregoing device-readable identifier.The substitute is, this information can be stored in database 114 and/or the customer database 342.
In one exemplary embodiment, user 300 can obtain with equipment 302 the potential eco-environmental impact quantized value of product 102, and like this, he or she can understand the potential ecologic environment quantized value relevant with product 102.For example, it is interested to suppose that 300 couples of users buy product 102, and this product may be an automobile, and the user may want to understand the potential eco-environmental impact that this automobile of production causes environment.In this specific embodiment, by for example using camera 304(, video camera and/or static images camera) take at least one photo of product 102, user 300 obtains the eco-environmental impact that this automobile causes environment.These one or more photos are by life cycle module 340 and/or LCM118 processes and device-readable identifier 314 can be obtained by life cycle module 340 and/or LCM118.For example, this image can be stored in other images in the image table 246 and compare and carry out map operation.
Alternatively, RFID(radio frequency identifiers) label can be attached on the automobile and device-readable identifier 314 can be stored in wherein.In this exemplary embodiment, equipment 302 can comprise RFID reader 312, and it can be used for obtaining the device-readable identifier 314 from automobile.Then LCM118 and/or LCM340 can use this device-readable identifier 314 with the such database of search class likelihood data storehouse 114 and/or customer database 342.
In another particular embodiment, hypothetical network adapter 354 is attached on the automobile.In this exemplary embodiment, device-readable identifier 314 can be stored in storer, for example, and RAM, ROM etc.In this specific examples, the connection of point-to-point, for example, by
Figure BDA00001882291600261
Or pass through network connection (for example, WiFi, GSM, Wi-Max etc.) and can between equipment 302 and product 102, set up.By the information of network adapter 354 these automobiles to equipment 302 transmission indication equipment readable identifier 314, this information is in one or more information packet.The network adapter 352 of equipment 302, for example, the Wi-Fi radio can receive this packet and extraction equipment readable identifier 314.Then LCM118 and/or LCM340 can use this device-readable identifier 314 with the such database of search class likelihood data storehouse 114 and/or customer database 342.
No matter how device-readable identifier 314 obtains, equipment 302 can obtain with device-readable identifier 314 the one or more potential eco-environmental impact quantized value of automobile, and this automobile does not have the potential eco-environmental impact quantized value of enclosing in such an embodiment.For example, suppose that equipment 302 comprises LCM340, it can be communicated by letter with LCM118 and do not comprise customer database in this specific embodiment.Herein, by transmitting apparatus readable identifier 314 to LCM118, LCM340 can ask at least one potential eco-environmental impact quantized value relevant with the production of automobile from database 114, LCM118 can search for production phase quantization value table 216 with device-readable identifier 314 and obtain the potential eco-environmental impact quantized value relevant with producing automobile.For example, but LCM118 receipt message, comprising the information such as the user account identifier of user account 224, the value of the request of the potential eco-environmental impact quantized value of production stage that device-readable identifier 314 and indication and device-readable identifier 314 are relevant, i.e. automobile.LCM 118 can receive this message and utilize device-readable identifier 314 to search the potential eco-environmental impact quantized value of production phase of automobile.Then LCM 118 can should send to LCM 340 by potential eco-environmental impact quantized value by network 100.In this embodiment, LCM 340 can be so that user interface 310 provides the bitmap of the potential eco-environmental impact quantized value of indication in the storer.Then user interface 310 can send to display with this bitmap.
Get back to Fig. 3, at the end of product life cycle, can be with this product treatment.In an exemplary embodiment, user 300 may want to understand how to process this product 102 and process this product 102 how to affect environment.In this embodiment, user 300 can he or she wants treatment product 102 to equipment 301 expressions by user interface 310.Life cycle module 340 can receive user's request and obtain device-readable identifier 314.Customer database 342 and/or database 114 can be searched for and the processing mode identifier can be found and/or potential eco-environmental impact quantized value.In another particular embodiment, in response to the request of the indication treatment product 102 of user input, LCM 340 can be from enclosing processing mode identifier 320 extraction process mode identifiers and/or extract potential eco-environmental impact quantized value from potential eco-environmental impact quantized value 316.
Then can by being placed on, product 102 process this product 102 in the container handling 324 by user 300.In one exemplary embodiment, container handling 324 can check product 102(by extraction equipment readable identifier from product 102 and/or infer that passively product 102 is present in the container handling 324, for example by taking the photo of product 102).Container handling 324 can utilize network adapter 356 that device-readable identifier 314 is sent to life cycle 340 or LCM 118.Customer database 342 and/or database 114 can be searched for and the processing mode identifier can be searched out and/or potential eco-environmental impact quantized value.But then user interface 310 Graphics Processing mode identifiers and/or potential eco-environmental impact quantized value.
In another embodiment, product 102 can be placed in the container handling 324 and be transported to treatment facility 110.In this embodiment, but agency's extraction equipment readable identifier 314 for the treatment of facility and arbitrarily product 102 sequence number and send to LCM118 and to comprise this sequence number, the message of device-readable identifier 314 and treatment facility 110 identity.LCM 118 can use the device-readable identifier to search the processing mode of one or more products in processing mode identifier list 214 and this message is sent back to treatment facility 110.Then this agency can select one of them processing mode.Then LCM 118 can utilize this sequence number identify the user account relevant with product 102 and upgrading products tabulation 226 reflect product 102 the selected processing mode of processed facility processed.
Come now Fig. 4, Fig. 4 has shown exemplary environments usually, its can be product 102 therein manufactured product make position 104.As mentioned above, in the construction process of product 102, need need to determine the material that uses (for example, rare earth element, objectionable impurities, etc.), and other eco-environmental impact factors relevant with the composition of product 102 (for example, energy consumes, rubbish, etc.), come the complete eco-environmental impact quantized value of product 102 manufacture processes is characterized with this, come the efficiency of relevant manufacture process is compared with this.
There is a kind of like this feelings situation, when the manufacturing standard data directly related with the manufacture process of product 102 (are for example known by the manufacturer of product 102, the quantity of the material that is used for manufacturing a product, from the dealer position to the travel distance of making the position, process parameters (for example, is made temperature, pressure, duration), etc.), but the actual eco-environmental impact of these manufacturing standard data may not known by this manufacturer.Like this, as shown in Figure 4, product specification module 401 can provide at manufacturing 104 places, position.Product specification module 401 can be software, and hardware and/or firmware module are used for receiving the product specification data relevant with the manufacturing of product 102.Particularly, product specification module 401 can be that the customer network relevant with the host server system of being safeguarded by ecosystem environment service provider 112 used.Product specification module 401 further can comprise database 414, LCM 418 and be used for providing database 114 about above-described system 106, the network adapter 424 of the function of LCM 118 and network adapter 124.Such assembly can provide in this locality of goods producer 104 function of remote system 106.
Product specification module 401 can further provide product specification interface 402.This product specification interface 402 can be associated one or more data entry field submissions with the clauses and subclauses of permission with the product specification data to the user with the manufacturing of product 102.For example, product specification interface 402 can be used for receiving the product specification data, for example product configurations material data 403(for example, rare earth material data 404, deleterious material data 405, ground pollution data 406 etc.) and/or manufacture course of products data 407(is for example, product configurations transport of materials data 408, product is made energy usage data 409, and product is made junk data 410).
Product specification module 401 receives after the product specification data, can calculate the eco-environmental impact quantized value according to these product specification data.For example, product specification module 401 can provide product specification data relevant with the manufacturing of product 102 at least one LCM 118(relevant with product specification module 401 namely, product manufacturing 104 this locality, position) and the LCM118 relevant with ecosystem environment service provider 112.The LCM 116 of product specification module 401 and/or ecosystem environment service provider 112 respectively accessing database 114 or database 414 to obtain eco-environmental impact quantized value data and the product specification data relevant with the manufacturing of product 102.
For example, the product specification data can comprise the data of the mileage between indication raw material supplier and the product manufacturing position 104.LCM 116 can obtain and transport the CO from database 114/414 that specifies the specific mileage of starting material relevant 2The CO of e table 206 2E value and with CO 2E value and eco-environmental impact quantized value in being retained in production phase quantization value table 216 associate to calculate and raw material supplier and product are made the relevant eco-environmental impact quantized value of mileage between the position 104.
In the Fig. 5 that comprises a plurality of operating processes and later accompanying drawing, with discussion and the explanation that provides about the exemplary environments among Fig. 1 above-mentioned-4.It should be understood, however, that operating process can carry out in other a plurality of environment and context and/or in a plurality of distortion of Fig. 1-3.Similarly, although different operating processes is represented according to illustrated sequence, it should be understood that different operations can according to different rather than shown in those execution sequences carry out, perhaps can carry out simultaneously.
Further, in the accompanying drawing below describing different flow processing, different operating can be described by the mode of the nested square frame of square frame (box-within-a-box).Such description can represent that the operation in the inner square frame can comprise the optional exemplary embodiment of the operation steps shown in one or more outside square frames.It should be understood, however, that the operation of inner square frame can be regarded as the independent operation that separates mutually with any related peripheral operation and it can carry out in random order with respect to operation shown in every other, perhaps can carry out concurrently.
Fig. 5 has shown the operating process 500 that comprises operation 502 and 504.
Operation 502 has shown according to the product specification data relevant with product calculates the eco-environmental impact quantized value relevant with making this product of at least a portion.For example shown in Fig. 1-4, product specification module 401 (for example can receive the product specification data, from the deviser, process engineering teacher, user's input of commercial person in charge) the one or more manufacturing characteristics relevant with product 102 of definition (for example, building material, the transport of materials data are made relevant energy with product and are used).Product specification module 401 can offer LCM118/418 with the product specification data.LCM 118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and the product information CC/PP Repository data that are retained in the product information CC/PP Repository 202 of database 114/414 are associated.LCM can calculate the eco-environmental impact quantized value relevant with the product specification data of product in the product information CC/PP Repository from be maintained in data 114/414.
For example, the product specification data can comprise the starting material that use in the manufacture process of product 102.But the deleterious material table 204 in the LCM118/418 Query Database 114/414 determines wherein whether have starting material to be classified as deleterious material.Consist of determining of deleterious material based on one or more starting material, LCM118/418 can compare the raw-material quantity that is categorized as deleterious material with the threshold quantity that is maintained in the deleterious material in the threshold value table 234.If the raw-material quantity that is categorized as deleterious material is lower than the threshold value of deleterious material, the eco-environmental impact of its expression and the 102 relevant minimizings that manufacture a product then.If the raw-material quantity that is categorized as deleterious material is higher than the threshold value of deleterious material, the eco-environmental impact of its expression and the 102 relevant growths that manufacture a product then.According to the comparison of the threshold value of the raw-material quantity that is categorized as deleterious material and deleterious material, LCM118/418 can calculate the eco-environmental impact quantized value.For example, the threshold map that the raw-material quantity that is categorized as deleterious material is lower than deleterious material is " 1 " to the eco-environmental impact quantized value, the threshold map that the raw-material quantity that is categorized as deleterious material equals deleterious material is " 2 " to the eco-environmental impact quantized value, and the threshold map that the raw-material quantity that is categorized as deleterious material is higher than deleterious material is " 3 " to the eco-environmental impact quantized value.
In an alternative embodiment, the product specification data can comprise the data relevant with the raw-material transportation of use in the manufacture process of product 102.But the CO in the LCM118/418 Query Database 114/414 2E table 206 is to determine the CO relevant with the starting material certain distance of transportation some 2The quantity of e.Based on the CO relevant with the starting material certain distance of transportation some 2Determining of the quantity of e, LCM118/418 can be with CO 2CO in e value and the threshold value table 234 2The threshold value of e value compares.If the CO relevant with the starting material certain distance of transportation some 2The e value surpasses CO 2The threshold value of e value, the then eco-environmental impact of its expression and the 102 relevant growths that manufacture a product.According to the CO relevant with the starting material certain distance of transportation some 2E value and CO 2The comparison of the threshold value of e, LCM118/418 can calculate the eco-environmental impact quantized value.For example, the CO relevant with the starting material certain distance of transportation some 2The e value is lower than CO 2The threshold map of e is " 1 " to the eco-environmental impact quantized value, the CO relevant with the starting material certain distance of transportation some 2The e value equals CO 2The threshold map of e is " 2 " to the eco-environmental impact quantized value, the CO relevant with the starting material certain distance of transportation some 2The e value is higher than CO 2The threshold map of e is " 3 " to the eco-environmental impact quantized value.
Calculating along with the eco-environmental impact quantized value relevant with different product authority data type, those independent eco-environmental impact quantized values (for example can combine, summation, average, weighted mean) the whole eco-environmental impact quantized value that provides product to make.
Operation 504 has shown and will be associated with at least part of product according to this product specification data manufacturing corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with making at least part of product.For example, according to the product specification data that receive by product specification module 401 (for example, building material, process transportation data, process the energy usage data, etc.) calculate after eco-environmental impact quantized values relevant with this product of manufacturing at least a portion 102 finish, this eco-environmental impact quantized value can (for example be associated with device-readable identifier 314, be encoded to, be stored in wherein, be mapped to).For example, the eco-environmental impact quantized value can be mapped to be stored in the RFID type equipment that adheres on the product 102 device-readable identifier 314(for example, alphanumeric values).By communicating by letter with product 102 and/or extracting from product 102, equipment 302 can obtain device-readable identifier 314.
Fig. 6 has shown exemplary embodiment, and wherein the operation 502 in the example operational flow 500 of Fig. 5 can comprise the operation that at least one is extra.Extra operation can comprise operation 602,604,606 and/or 608.
Operation 602 has shown according to product configurations material mark data calculates the eco-environmental impact quantized value relevant with making this product of at least a portion.For example, the product specification data that receive by product specification module 401 can comprise the starting material for the manufacture of product 102.But the product information CC/PP Repository 202 of LCM118/418 Query Database 114/414 is to be identified for manufacturing a product 102 raw-material different ecological environmental impact characteristic.LCM118/418 can compare the given raw-material number of thresholds in given raw-material quantity and the threshold value table 234 (quantity of for example, advising such as official).If raw-material quantitative value is lower than given raw-material permission threshold value, then represent the eco-environmental impact with the 102 relevant minimizings that manufacture a product.If raw-material quantitative value is higher than given raw-material permission threshold value, then represent the eco-environmental impact with the 102 relevant growths that manufacture a product.LCM118/418 calculates the eco-environmental impact quantized value according to the comparative result of raw-material quantity and raw-material number of thresholds.For example, given raw-material quantitative value is lower than threshold map eco-environmental impact quantized value for " 1 ", and given raw-material quantitative value equals threshold map eco-environmental impact quantized value and is " 3 " for " 2 " and given raw-material quantitative value are higher than threshold map eco-environmental impact quantized value.
Operation 604 has shown according to the quantity of product middle rare earth material calculates the eco-environmental impact quantized value relevant with making this product of at least a portion.For example, the product specification data that receive by product specification module 401 can comprise the 102 used starting material that manufacture a product.But the rare earth material table 210 of LCM 118/418 search data 114/414 has determined whether any 102 employed starting material that manufacture a product and has been classified as rare earth material.The raw-material quantity that LCM 118/418 will be categorized as rare earth material compares with the number of thresholds that is maintained in threshold value table 234 middle rare earth materials.Be lower than the number of thresholds of rare earth material such as the quantity of the rare earth material in the fruit product 102, then it is designated the eco-environmental impact with the 102 relevant minimizings that manufacture a product.Be higher than the number of thresholds of rare earth material such as the quantity of the rare earth material in the fruit product 102, then it is designated the eco-environmental impact with the 102 relevant growths that manufacture a product.LCM 118/418 can be according to the number of thresholds of the quantity of rare earth material and rare earth material relatively calculate the eco-environmental impact quantized value.For example, the quantity of rare earth material is lower than number of thresholds mapping eco-environmental impact quantized value and is " 1 ", and the quantity of rare earth material equals number of thresholds mapping eco-environmental impact quantized value and is " 3 " for the quantity of " 2 " and rare earth material is higher than number of thresholds mapping eco-environmental impact quantized value.
Operation 606 has shown according to the quantity of deleterious material in the product calculates the eco-environmental impact quantized value relevant with making this product of at least a portion.For example, the product specification data that receive by product specification module 401 can comprise the 102 employed starting material that manufacture a product.But determining to manufacture a product, the deleterious material table of LCM 118/418 Query Database 114/414 whether is classified as deleterious material in 102 employed any starting material.The raw-material quantity that LCM 118/418 will be categorized as deleterious material compares with the raw-material number of thresholds that is maintained in the threshold value table 234.Be lower than the threshold value of acceptable starting material quantity such as the quantity of the deleterious material in the fruit product 102, then it is designated the eco-environmental impact with the 102 relevant minimizings that manufacture a product.Be higher than the threshold value of acceptable starting material quantity such as the quantity of the deleterious material in the fruit product 102, then it is designated the eco-environmental impact with the 102 relevant growths that manufacture a product.LCM118/418 can calculate the eco-environmental impact quantized value according to the comparative result of the number of thresholds of the quantity of deleterious material and deleterious material.For example, the quantity of deleterious material is lower than number of thresholds mapping eco-environmental impact quantized value and is " 1 ", the quantity of deleterious material equals number of thresholds mapping eco-environmental impact quantized value and is " 2 ", and the quantity of deleterious material is higher than number of thresholds, and will shine upon the eco-environmental impact quantized value be " 3 ".
Operation 608 has shown according to the quantity of the ground pollution thing in the product calculates the eco-environmental impact quantized value relevant with making this product of at least a portion.For example, the product specification data that receive by product specification module 401 can comprise the 102 employed starting material that manufacture a product.But determining to manufacture a product, the ground pollution material list 204 of LCM 118/418 Query Database 114/414 whether is classified as the ground pollution material in 102 employed any starting material.The raw-material quantity that LCM 118/418 will be categorized as the ground pollution material compares with the raw-material number of thresholds that is maintained in the threshold value table 234.Be lower than the threshold value of acceptable starting material quantity such as the quantity of the ground pollution material in the fruit product 102, then it is designated the eco-environmental impact with the 102 relevant minimizings that manufacture a product.Be higher than the threshold value of acceptable ground pollution material quantity such as the quantity of the ground pollution material in the fruit product 102, then it is designated the eco-environmental impact with the 102 relevant growths that manufacture a product.But the comparative result of the quantity of LCM118/418 base area surface pollution material and the number of thresholds of ground pollution material calculates the eco-environmental impact quantized value.For example, the quantity of ground pollution material is lower than number of thresholds mapping eco-environmental impact quantized value and is " 1 ", the quantity of ground pollution material equals number of thresholds mapping eco-environmental impact quantized value and is " 2 ", and the quantity of ground pollution material is higher than number of thresholds mapping eco-environmental impact quantized value and is " 3 ".
Fig. 7 has shown exemplary embodiment, and wherein the operation 502 of the example operational flow 500 of Fig. 5 can comprise the operation that at least one is extra.Extra operation can comprise operation 702,704,706 and/or 708.
Operation 702 has shown according to the CO2e value relevant with making this product of at least a portion calculates the eco-environmental impact quantized value relevant with making this product of at least a portion.For example, the product specification data that receive by product specification module 401 can comprise manufacture a product 102 manufacturing technology steps and/or the parameter relevant with manufacturing technology steps.But the CO2e table 206 of LCM 118/418 Query Database 114/414 is to determine the CO relevant with the manufacturing technology steps of product 102 2The e value.According to the CO relevant with manufacturing technology steps 2Determining of e value, LCM 118/418 can be with CO 2E value and the CO that is maintained in the threshold value table 234 2The threshold value of e value compares.If the CO relevant with manufacturing technology steps 2The e value is lower than CO 2The threshold value of e value, then it is designated the eco-environmental impact with the 102 relevant minimizings that manufacture a product.If the CO relevant with manufacturing technology steps 2The e value is higher than CO 2The threshold value of e value, then it is designated the eco-environmental impact with the 102 relevant growths that manufacture a product.LCM 118/418 can be according to the CO relevant with manufacturing technology steps 2E value and CO 2The threshold value of e value relatively calculate the eco-environmental impact quantized value.For example, the CO2e value relevant with manufacturing technology steps is lower than CO 2Mapping eco-environmental impact quantized value is " 1 " during the threshold value of e value, the CO relevant with manufacturing technology steps 2The e value equals CO 2Mapping eco-environmental impact quantized value is " 2 " during the threshold value of e value, the CO relevant with manufacturing technology steps 2The e value is higher than CO 2Mapping eco-environmental impact quantized value is " 3 " during the threshold value of e value.
Operation 704 has shown according to product configurations transport of materials data calculates the eco-environmental impact quantized value relevant with making this product of at least a portion.For example, the product specification data that receive by product specification module 401 can comprise with the 102 relevant product configurations transport of materials data that manufacture a product (for example, the transport of materials mileage, the transport of materials method (for example, train, lorry, steamer, aircraft, etc.)).But the CO of LCM 118/418 Query Database 114/414 2E value table 206 is to determine the CO relevant with product configurations transport of materials data 2The e value.According to the CO relevant with product configurations transport of materials data 2Determining of e value, LCM 118/418 can be with CO 2E value and the CO that is maintained in the threshold value table 234 2The threshold value of e value compares.If the CO relevant with product configurations transport of materials data 2The e value is lower than CO 2The threshold value of e value, then it is designated the eco-environmental impact with the 102 relevant minimizings that manufacture a product.If the CO relevant with product configurations transport of materials data 2The e value is higher than CO 2The threshold value of e value, then it is designated the eco-environmental impact with the 102 relevant growths that manufacture a product.LCM 118/418 can be according to the CO relevant with product configurations transport of materials data 2E value and CO 2The comparative result of the threshold value of e value calculates the eco-environmental impact quantized value.For example, the CO relevant with product configurations transport of materials data 2The e value is lower than CO 2Mapping eco-environmental impact quantized value is " 1 " during the threshold value of e value, the CO relevant with product configurations transport of materials data 2The e value equals CO 2Mapping eco-environmental impact quantized value is " 2 " during the threshold value of e value, the CO relevant with product configurations transport of materials data 2The e value is higher than CO 2Mapping eco-environmental impact quantized value is " 3 " during the threshold value of e value.
Operation 706 has shown that making the energy usage data according to product calculates the eco-environmental impact quantized value relevant with making this product of at least a portion.For example, the product specification data that receive by product specification module 401 can comprise and (for example manufacture a product 102 relevant product manufacturing energy usage datas, process step parameters (for example, the process steps duration, temperature, pressure), the energy consumption ratio of process steps, the energy source of supplying energy, etc.).But the CO of LCM 118/418 Query Database 114/414 2E value table 206 is to determine making the relevant CO of energy usage data with product 2The e value.According to making the relevant CO of energy usage data with product 2Determining of e value, LCM 118/418 can be with CO 2E value and the CO that is maintained in the threshold value table 234 2The threshold value of e value compares.If make the relevant CO of energy usage data with product 2The e value is lower than CO 2The threshold value of e value, then it is designated the eco-environmental impact with the 102 relevant minimizings that manufacture a product.If make the relevant CO of energy usage data with product 2The e value is higher than CO 2The threshold value of e value, then it is designated the eco-environmental impact with the 102 relevant growths that manufacture a product.According to the relevant CO that manufactures a product 2E value and CO 2The comparison of the threshold value of e value, LCM 118/418 can calculate the eco-environmental impact quantized value.For example, make the relevant CO of energy usage data with product 2The e value is lower than CO 2Mapping eco-environmental impact quantized value be " 1 " during the threshold value of e value, the CO relevant with product manufacturing energy usage data 2The e value equals CO 2Mapping eco-environmental impact quantized value be " 2 " during the threshold value of e value, the CO relevant with product manufacturing energy usage data 2The e value is higher than CO 2Mapping eco-environmental impact quantized value is " 3 " during the threshold value of e value.
Operation 708 shows calculates the eco-environmental impact quantized value relevant with making this product of at least a portion according to product configurations material junk data.For example, the product specification data that received by product specification module 401 can comprise and (for example manufacture a product 102 relevant product configurations material junk datas, product starting material request quantity, the product starting material are made usage quantity, and starting material quantity of refuse, waste disposal method are (for example, recycle, landfill burns, etc.)).But the CO of LCM118/418 Query Database 114/414 2E value table 206 is to determine the CO relevant with product configurations material junk data 2The e value.According to the CO relevant with product configurations material junk data 2Determining of e value, LCM118/418 is with CO 2E value and the CO that is maintained in the threshold value table 234 2The threshold value of e value compares.If the CO relevant with product configurations material junk data 2The e value is lower than CO 2During the threshold value of e value, it is designated the eco-environmental impact with the 102 relevant minimizings that manufacture a product.If the CO relevant with product configurations material junk data 2The e value is higher than CO 2During the threshold value of e value, it is designated the eco-environmental impact with the 102 relevant growths that manufacture a product.According to the CO relevant with product configurations material junk data 2E value and CO 2Comparison between the threshold value of e value, LCM118/418 eco-environmental impact quantized value.For example, the CO relevant with product configurations material junk data 2The e value is lower than CO 2Mapping eco-environmental impact quantized value is " 1 " during the threshold value of e value, the CO relevant with product configurations material junk data 2The e value equals CO 2Mapping eco-environmental impact quantized value is " 2 " and the CO relevant with product configurations material junk data during the threshold value of e value 2The e value is higher than CO 2Mapping eco-environmental impact quantized value is " 3 " during the threshold value of e value.
Fig. 8 has shown an exemplary embodiment, and wherein the operation 504 of the example operational flow 500 of Fig. 5 can comprise the operation that at least one is extra.Extra operation can comprise operation 802,804 and/or 806.
Operation 802 has shown that the device coupled that functionally will comprise corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with making this product of at least a portion arrives this product.For example, according to the product specification data that receive by product specification module 401 (for example, building material, process transportation data, process the energy usage data, etc.) calculate after eco-environmental impact quantized values relevant with this product of manufacturing at least a portion 102 finish, this eco-environmental impact quantized value can with the equipment that comprises device-readable identifier 314 (for example, the RFID chip) (for example, being stored in wherein) is associated.Then by equipment and the product 102 that will comprise device-readable identifier 314 functionally be coupled (for example, electrical links, wireless link, adhere to, bolt is included in wherein, etc.), can be related with product 102 corresponding to the device-readable identifier 314 of eco-environmental impact quantized value.
Operation 804 has shown and will store in the storer of being correlated with this product corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with making this product of at least a portion.For example, according to the product specification data that receive by product specification module 401 (for example, building material, process transportation data, process the energy usage data, etc.) calculate after eco-environmental impact quantized values relevant with this product of manufacturing at least a portion 102 finish this eco-environmental impact quantized value can be associated with device-readable identifier 314 (for example, being encoded to the device-readable identifier).Then by storage corresponding to the device-readable identifier of eco-environmental impact quantized value to 102 relevant with product (for example, electric coupling, physical coupling, etc.) storer in, this device-readable identifier 314 can be associated with product 102.
Operate 806 Display and Prints corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with making this product of at least a portion.For example, according to the product specification data that receive by product specification module 401 (for example, building material, process transportation data, process the energy usage data, etc.) calculate after eco-environmental impact quantized values relevant with this product of manufacturing at least a portion 102 finish, this eco-environmental impact quantized value can with the device-readable identifier (for example, two-dimension code) (for example, being encoded to the device-readable identifier) is associated.Then by the surface that will print to corresponding to the device-readable identifier of eco-environmental impact quantized value product 102 device-readable identifier 314 and product 102 are associated.
Fig. 9 has shown an exemplary embodiment, and wherein the example operational flow 500 of Fig. 5 can comprise the operation that at least one is extra.This extra operation can comprise operation 902,904,906 and/or 908.
Operation 902 has shown to be carried out eco-environmental impact quantized value and the device-readable identifier relevant with making this product of at least a portion related.For example, according to the product specification data that receive by product specification module 401 (for example, building material, process transportation data, process the energy usage data, etc.) calculate after eco-environmental impact quantized values relevant with this product of manufacturing at least a portion 102 finish, this eco-environmental impact quantized value can associate with device-readable identifier 314: for example, be encoded to device-readable identifier 314, be mapped to device-readable identifier 314, be stored in the equipment that comprises device-readable identifier 314.
Operation 904 has shown to be carried out eco-environmental impact quantized value and the two-dimension code relevant with making this product of at least a portion related.For example, according to the product specification data that receive by product specification module 401 (for example, building material, process transportation data, process the energy usage data, etc.) calculate after eco-environmental impact quantized values relevant with this product of manufacturing at least a portion 102 finish, this eco-environmental impact quantized value may be encoded as the device-readable identifier 314 that can be printed on product 102 lip-deep two-dimension code types.
Operation 906 has shown to be carried out eco-environmental impact quantized value and the RFID chip relevant with making this product of at least a portion related.For example, according to the product specification data that receive by product specification module 401 (for example, building material, process transportation data, process the energy usage data, etc.) calculate after eco-environmental impact quantized values relevant with this product of manufacturing at least a portion 102 finish, this eco-environmental impact quantized value can be stored in the device-readable identifier 314 that operationally is coupling in the RFID type.
Operation 908 has shown to be carried out eco-environmental impact quantized value and the printed label relevant with making this product of at least a portion related.For example, according to the product specification data that receive by product specification module 401 (for example, building material, process transportation data, process the energy usage data, etc.) calculate after eco-environmental impact quantized values relevant with this product of manufacturing at least a portion 102 finish, this eco-environmental impact quantized value can be printed on the device-readable identifier 314 of tag types, and this identifier can be attached on the product 102.
Figure 10 has shown an exemplary embodiment, and wherein the example operational flow 500 of Fig. 5 can comprise the operation that at least one is extra.This extra operation can comprise operation 1002,1004,1006 and/or 1008.
Operation 1002 has shown transmission and the product specification data that manufacture a product relevant.Embodiment as shown in Fig. 1-4, product specification module 401 (for example can receive the product specification data, from the designer, process engineers, user's input of professional executive chairman), it has defined one or more manufacturing characteristics (for example, the building material relevant with product 102, the transport of materials data, the energy relevant with the product manufacturing uses).Then but product specification module 401 transmission product authority datas are to the long-range positioning system (Loran) 106 relevant with ecosystem environment service provider 112.For example, the network adapter 414 of product specification module 401 is sent to the product specification data by network 100 network adapter 114 of the system 106 relevant with ecosystem environment service provider 112.
Operation 1004 has shown the device-readable identifier that receives corresponding to the eco-environmental impact quantized value relevant with making this product of at least a portion.After receiving the product specification data by the system 106 relevant with ecosystem environment service provider 112, the LCM118 of system 106 can be associated the product specification data with product information data storage database data in the product information CC/PP Repository 202 that is maintained in database 114.Described such as top operation 502, LCM118 can calculate be maintained in database in the relevant eco-environmental impact quantized value of the product specification data of product of product information data storage database data.After the eco-environmental impact quantized value calculated and finishes, the eco-environmental impact quantized value can be related with the device-readable identifier: for example, be encoded to the device-readable identifier, be mapped to the device-readable identifier.Then this device-readable identifier can send to and be received by product 102 and/or product specification standard module 401.The device-readable identifier can be 102 relevant with product (for example, be stored in the storer relevant with product 102, adhere to for two-dimension code or other readable form arbitrarily, be stored among the RFID).
Operation 1004 shown storage corresponding to the device-readable identifier that receives of the eco-environmental impact quantized value relevant with making this product of at least a portion to product.After the reception corresponding to the device-readable identifier 314 that receives of the eco-environmental impact quantized value relevant with making this product of at least a portion, device-readable identifier 314 can be stored in the storer or can be read on the RFID chip that visits device-readable identifier 314 by equipment 302.
Figure 11 has shown an exemplary embodiment, and wherein the example operational flow 500 of Fig. 5 can comprise the operation that at least one is extra.This extra operation can comprise operation 1102,1104,1106 and/or 1108.
Operation 1102 has shown according to the product treatment mode calculates the eco-environmental impact quantized value relevant with the processing of this product of at least a portion.Embodiment as shown in Fig. 1-4, product specification module 401 can receive and for example define one or more and product 102(, building material) the product specification data of relevant manufacturing characteristics are (for example, from the designer, process engineers, user's input of professional executive chairman).Product specification module 401 can provide the product specification data to LCM118/418.LCM118/418 can receive and manufacture a product 102 relevant product specification data and these product specification data and product information CC/PP Repository data in the product information CC/PP Repository 202 that is maintained in database 114/414 are associated.LCM can calculate the eco-environmental impact quantized value relevant with the processing mode of this product of at least a portion according to the product treatment mode in the product information CC/PP Repository that is maintained in database 114/414.
The product specification data can comprise the employed starting material of the manufacturing of product 102.But the starting material that the processing stage quantization value table 220 of LCM118/418 Query Database 114/414 comes with the employed raw-material difference of manufacturing of determining product-based 102 to use in the option of processing mode for the treatment of product and the manufacturing according to product 102 are distributed to one or more processing modes with the eco-environmental impact quantized value.
For example, contain the recyclable material of high number percent such as fruit product 102, then LCM118/418 can be according to the relatively low eco-environmental impact quantized value of recycling mode computing product 102.Alternatively, comprise the recyclable material that hangs down number percent such as fruit product 102, then LCM118/418 can be according to the relatively high eco-environmental impact quantized value of recycling mode computing product 102.
Further among the embodiment, comprise the deleterious material of high number percent such as fruit product, then LCM118/418 is according to the relatively high eco-environmental impact quantized value of landfill disposal mode computing product 102.Alternatively, comprise the deleterious material of high number percent such as fruit product, then LCM118/418 is according to the relatively low eco-environmental impact quantized value of burning disposal mode computing product 102.
Operation 1104 has shown will be corresponding to being associated with this product with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.Behind the relevant eco-environmental impact quantized value of Different treatments calculation of parameter and the treatment product 102 of storage, this eco-environmental impact quantized value can (for example associate by the device-readable identifier 214 relevant with product 102, be encoded to the device-readable identifier, be stored in the device-readable identifier, be mapped to the device-readable identifier).For example, the eco-environmental impact quantized value can be mapped to the device-readable identifier (for example, alphanumeric values) of storing in the equipment of the RFID type that is attached on the product 102.By communicating by letter with product 102 and/or extracting from product 102, equipment 302 can obtain device-readable identifier 314.
Figure 12 has shown an exemplary embodiment, and wherein the operation 1102 of the example operational flow 500 of Figure 11 can comprise the operation that at least one is extra.This extra operation can comprise operation 1202,1204, and/or 1206.
Operation 1202 has shown according to the processing mode of reselling calculates the eco-environmental impact quantized value relevant with processing at least part of product.For example, shown in Fig. 1-4, product specification module 401 (for example can receive definition one or more characteristics relevant with product 102, the lifetime of product) product specification data (for example, from the deviser, process engineering teacher, user's input of professional executive chairman).Product specification module 401 can provide the product specification data to LCM118/418.LCM118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and product information CC/PP Repository data in the product information CC/PP Repository 202 that is maintained in database 114/414 are associated.According to the processing mode of reselling in the product information data storage database data that is maintained in the database 114/414, LCM can calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion.
For example, product 102(for example, battery) have an energy operating characteristic (for example, storage capacity) of within its lifetime, successively decreasing.In this case, LCM 118/418 can come according to the processing mode of reselling the eco-environmental impact quantized value of the time dependence of computing product 102.Especially, if LCM118/418 determine product relatively near incipient stage of its lifetime (for example, by comparative product build date and current date), LCM 118/418 can be according to the relatively low eco-environmental impact quantized value of the processing mode computing product 102 of reselling.Alternatively, if LCM 118/418 determines the ending phase of product near its lifetime, LCM 118/418 can be according to the relatively high eco-environmental impact quantized value of the processing mode computing product 102 of reselling (for example, the resell eco-environmental impact cost of transaction (for example, shipping products) of realization exceeds the useful part of the phase life of product).
Operation 1204 has shown according to the recycling processing mode calculates the eco-environmental impact quantized value relevant with processing this product of at least a portion.For example, shown in Fig. 1-4, product specification module 401 can receive the product specification data (for example, from the deviser, process engineering teacher, professional executive chairman's input) of the definition one or more manufacturing characteristics (for example, building material) relevant with product 102.Product specification module 401 can provide the product specification data to LCM 118/418.LCM 118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and product information CC/PP Repository in the product information CC/PP Repository 202 that is maintained in database 114/414 associated.LCM can calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the recycling processing mode in the product information CC/PP Repository that is maintained in the database 114/414.
For example, but comprise the recycled materials of high number percent such as fruit product 102, then LCM 118/418 can come according to the recycling processing mode the relatively low eco-environmental impact quantized value of computing product 102.Alternatively, but comprise the recycled materials that hangs down number percent such as fruit product 102, then LCM 118/418 can come according to the recycling processing mode the relatively high eco-environmental impact quantized value of computing product 102.
Operation 1206 has shown according to the compost treatment mode calculates the ecology influence quantized value relevant with processing this product of at least a portion.For example, shown in Fig. 1-4, can receive the product specification data (for example, from the deviser, process engineering teacher, professional executive chairman's input) of the definition one or more manufacturing characteristics (for example, building material) relevant with product 102.Product specification module 401 can provide the product specification data to LCM118/418.LCM 118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and product information CC/PP Repository in the product information CC/PP Repository 202 that is maintained in database 114/414 associated.LCM can calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the compost treatment mode in the product information CC/PP Repository that is maintained in the database 114/414.
For example, comprise the material of high number percent such as fruit product, this material provides one or more recycling byproduct materials after degraded, and LCM118/418 can be according to the relatively low eco-environmental impact quantized value of compost treatment mode computing product 102.Alternatively, the material that comprises low number percent such as fruit product, this material provides one or more recycling byproduct materials after degraded, LCM118/418 can be according to the relatively high eco-environmental impact quantized value of compost treatment mode computing product 102.
Figure 13 has shown an exemplary embodiment, and wherein the operation 1102 of the example operational flow 500 of Figure 11 can comprise the operation that at least one is extra.This extra operation can comprise operation 1302,1304 and/or 1306.
Operation 1302 has shown according to the burning disposal mode calculates the ecology influence quantized value relevant with processing this product of at least a portion.For example, shown in Fig. 1-4, can receive the product specification data (for example, from the deviser, process engineering teacher, professional executive chairman's input) of the definition one or more manufacturing characteristics (for example, building material) relevant with product 102.Product specification module 401 can provide the product specification data to LCM118/418.LCM 118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and product information CC/PP Repository in the product information CC/PP Repository 202 that is maintained in database 114/414 associated.LCM can calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the burning disposal mode in the product information CC/PP Repository that is maintained in the database 114/414.
For example, the material that comprises high number percent such as fruit product 102, behind the contacted many heats of this material, generate one or more harmful secondary products or have explosivity, then LCM118/418 can be according to the relatively high eco-environmental impact quantized value of burning disposal mode computing product 102.Alternatively, the material that comprises low number percent such as fruit product 102, behind the contacted many heats of this material, generate one or more harmful secondary products or have explosivity, then LCM118/418 can be according to the relatively low eco-environmental impact quantized value of compost treatment mode computing product 102.
Operation 1304 has shown according to the landfill disposal mode calculates the ecology influence quantized value relevant with processing this product of at least a portion.For example, shown in Fig. 1-4, can receive the product specification data (for example, from the deviser, process engineering teacher, professional executive chairman's input) of the definition one or more manufacturing characteristics (for example, building material) relevant with product 102.Product specification module 401 can provide the product specification data to LCM118/418.LCM 118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and product information CC/PP Repository in the product information CC/PP Repository 202 that is maintained in database 114/414 associated.LCM can calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the landfill disposal mode in the product information CC/PP Repository that is maintained in the database 114/414.
For example, comprise the biodegradable material of high number percent such as fruit product 102, then LCM118/418 can be according to the relatively low eco-environmental impact quantized value of burning disposal mode computing product 102.Alternatively, comprise the biodegradable material that hangs down number percent such as fruit product 102, then LCM118/418 can be according to the relatively high eco-environmental impact quantized value of compost treatment mode computing product 102.
Operation 1306 has shown according to the seabed processing mode calculates the ecology influence quantized value relevant with processing this product of at least a portion.For example, shown in Fig. 1-4, can receive the product specification data (for example, from the deviser, process engineering teacher, professional executive chairman's input) of the definition one or more manufacturing characteristics (for example, building material) relevant with product 102.Product specification module 401 can provide the product specification data to LCM118/418.LCM 118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and product information CC/PP Repository in the product information CC/PP Repository 202 that is maintained in database 114/414 associated.LCM can calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the seabed processing mode in the product information CC/PP Repository that is maintained in the database 114/414.
For example, comprise the water-soluble material of high number percent such as fruit product 102, then LCM118/418 can come according to the seabed processing mode the relatively low eco-environmental impact quantized value of computing product 102.Alternatively, comprise the water-soluble material that hangs down number percent such as fruit product 102, then LCM118/418 can be according to the relatively high eco-environmental impact quantized value of compost treatment mode computing product 102.
Figure 14 has shown an exemplary embodiment, and wherein the operation 1104 of the example operational flow 500 of Figure 11 can comprise the operation that at least one is extra.This extra operation can comprise operation 1402,1404 and/or 1406.
Operation 1402 has shown will be corresponding to functionally being coupled to product with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.For example, according to the product specification data that receive by product specification module 401 (for example, building material, process transportation data, process the energy usage data, etc.) and/or processing mode (for example, resell, recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with processing this product of at least a portion 102 finish, this eco-environmental impact quantized value (for example can be used as device-readable identifier 314 and equipment, the RFID chip) associates (for example, being stored in wherein).Then functionally be coupled by equipment and the product 102 that will comprise device-readable identifier 314 and (for example, be electrically connected wireless connections, adhere to, be included in wherein, etc.), can be associated with product 102 corresponding to the device-readable identifier 314 of eco-environmental impact quantized value.
Operation 1404 has shown and will store in the storer of being correlated with this product corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with processing this product of at least a portion.For example, according to the product specification data that receive by product specification module 401 (for example, building material is processed transportation data, processes the energy usage data, etc.) and/or processing mode (for example, resell recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with this product of processing at least a portion 102 finish, this eco-environmental impact quantized value can associate with device-readable identifier 314.Then in the storer of 102 relevant with product by being stored in corresponding to the device-readable identifier of eco-environmental impact quantized value (for example, be electrically connected, physical connection, etc.), device-readable identifier 314 can be associated with product 102.
Operation 1406 has shown will be corresponding to being printed on product surface with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.For example, product specification data (for example, the building material that receives by product specification module 401 in basis, process transportation data, process the energy usage data, etc.) and/or processing mode (for example, resell, recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with this product of processing at least a portion 102 finish, this eco-environmental impact quantized value can with the device-readable identifier (for example, two-dimension code) associates (for example, being encoded to the device-readable identifier).Then by on the surface that will be printed on corresponding to the device-readable identifier of eco-environmental impact quantized value product 102 this device-readable identifier 314 being associated with product 102.
Figure 15 has shown an exemplary embodiment, and wherein the example operational flow 500 of Figure 11 can comprise the operation that at least one is extra.This extra operation can comprise operation 1502.
Operation 1502 has shown that will process the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode carries out related with the device-readable identifier.For example, according to the product specification data that receive by product specification module 401 (for example, building material, process transportation data, process the energy usage data, etc.) and/or processing mode (for example, resell, recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with this product of processing at least a portion 102 finish, the eco-environmental impact quantized value can (for example associate with device-readable identifier 314, be encoded to the device-readable identifier, be mapped to the device-readable identifier, store in the equipment that comprises the device-readable identifier).
Figure 16 has shown an exemplary embodiment, and wherein the operation 1502 of the example operational flow 500 of Figure 15 can comprise the operation that at least one is extra.This extra operation can comprise operation 1602,1604 and/or 1606.
Operation 1602 has shown that will process the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode carries out related with two-dimension code.For example, according to the product specification data that receive by product specification module 401 (for example, building material is processed transportation data, processes the energy usage data, etc.) and/or processing mode (for example, resell recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with this product of processing at least a portion 102 finish, this eco-environmental impact quantized value may be encoded as the device-readable identifier 314 that can be printed on product 102 lip-deep two-dimension code types.
Operation 1604 has shown that will process the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode carries out related with the RFID chip.For example, according to the product specification data that receive by product specification module 401 (for example, building material is processed transportation data, processes the energy usage data, etc.) and/or processing mode (for example, resell recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with this product of processing at least a portion 102 finish, this eco-environmental impact quantized value can be stored in the device-readable identifier 314 of the RFID type that can functionally be coupled to product 102.
Operation 1606 has shown that will process the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode carries out related with printed label.For example, according to the product specification data that receive by product specification module 401 (for example, building material is processed transportation data, processes the energy usage data, etc.) and/or processing mode (for example, resell recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with this product of processing at least a portion 102 finish, this eco-environmental impact quantized value can be printed in the tag types that is attached on the product 102 device-readable identifier 314 on.
Figure 17 has shown an exemplary embodiment, and wherein the example operational flow 500 of Fig. 5 can comprise the operation that at least one is extra.This extra operation can comprise operation 1702 and/or 1704.
Operation 1702 shown receive corresponding to the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.For example, after receiving product specification data and product treatment data by the system 106 relevant with ecosystem environment service provider 112, the LCM118 of system 106 can with the processing mode identifier list 214 of product specification data and product treatment data and database 114 and/or the processing stage quantization value table 220 associate.As above 502 described about operating, LCM118 can calculate with product from aforesaid processing mode identifier list 214 and/or the processing stage quantization value table 220 the product specification data eco-environmental impact quantized value relevant with the product treatment data.After the eco-environmental impact quantized value calculating relevant with processing this product of at least a portion 102 is finished, this eco-environmental impact quantized value can (for example associate with device-readable identifier 314, be encoded to the device-readable identifier, be mapped to the device-readable identifier).Then this device-readable identifier can be transmitted to and be received by product 102 and/or product specification module 401.Then this device-readable identifier can associate with product 102 (for example, be stored in the storer relevant with product 102, but adhere to for two-dimension code or other optional read modes, be stored among the RFID).
Operation 1704 has shown will be corresponding to being stored on the product with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.After finishing corresponding to the calculating of the eco-environmental impact quantized value relevant with the product 102 of processing at least a portion, device-readable identifier 314 can be stored in the storer or RFID chip on the product 102, and the equipment 302 that it can accessed device-readable identifier 314 reads.
Figure 18 has shown the operability process 1800 that comprises operation 1802 and operation 1804.
Operation 1802 has shown according to the product treatment mode calculates the eco-environmental impact quantized value relevant with this product of at least a portion.For example, shown in Fig. 1-4, product specification module 401 (for example can receive the relevant manufacturing characteristics of definition one or more and product 102, building material) product specification data (for example, from the deviser, process engineering teacher, user's input of professional executive chairman).Product specification module 401 can provide the product specification data to LCM118/418.LCM118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and product information CC/PP Repository data in the product information CC/PP Repository 202 that is maintained in database 114/414 are associated.LCM can be according to calculating the eco-environmental impact quantized value relevant with processing at least part of product from the product treatment mode that is maintained in the database 114/414 product information data storage database data.
The product specification data can comprise the starting material that use in product 102 manufacturings.But the processing stage quantization value table 220 of LCM118/418 data query 114/414 is determined to come the Different treatments option for the treatment of product and according to the 102 employed starting material that manufacture a product the eco-environmental impact quantized value is distributed to one or more processing modes based on the 102 employed starting material that manufacture a product.
For example, but comprise the material of high number percent recycle such as fruit product 102, then LCM118/418 is according to the relatively low eco-environmental impact quantized value of recycling processing mode computing product 102.Alternatively, but comprise the material that hangs down number percent recycle such as fruit product 102, then LCM118/418 is according to the relatively high eco-environmental impact quantized value of recycling processing mode computing product 102.
In a further embodiment, comprise high number percent deleterious material such as fruit product 102, then LCM118/418 is according to the relatively high eco-environmental impact quantized value of landfill disposal mode computing product 102.Alternatively, comprise high number percent deleterious material such as fruit product 102, then LCM118/418 is according to the relatively low eco-environmental impact quantized value of landfill burning disposal mode computing product 102.
Operation 1804 has shown will be corresponding to carrying out related with device-readable identifier and the product of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.After 102 relevant eco-environmental impact quantized value calculating are finished according to the Different treatments parameter pair of storage and treatment product, this eco-environmental impact quantized value (for example can be associated with the device-readable identifier 314 relevant with product 102, be encoded to, be stored in wherein, be mapped to).For example, the eco-environmental impact quantized value can be mapped to the readable identifier 314 that is stored in the RFID type equipment, and this RDID type equipment is attached on the product 102.Equipment 302 can by communicate by letter with product 102 and/or from product 102 information extraction obtain device-readable identifier 314.
Figure 19 has shown an exemplary embodiment, and wherein the operation 1802 of the example operational flow 1800 of Figure 18 can comprise the operation that at least one is extra.This extra operation can comprise operation 1902,1904 and/or 1906.
Operation 1902 has shown according to the processing mode of reselling calculates the eco-environmental impact quantized value relevant with processing this product of at least a portion.For example, as shown in Fig. 1-4, product specification module 401 (for example can receive the relevant manufacturing characteristics of definition one or more and product 102, building material) product specification data (for example, from the deviser, process engineering teacher, user's input of professional executive chairman).Product specification module 401 can provide the product specification data to LCM 118/418.LCM 118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and product information CC/PP Repository data in the product information CC/PP Repository 202 that is maintained in database 114/414 are associated.LCM can be according to calculating the eco-environmental impact quantized value relevant with processing this product of at least a portion from the processing side of reselling in the product information data storage database data that is maintained in the database 114/414.
For example, product 102(for example, battery) have an energy operating characteristic (for example, storage capacity) of within its lifetime, successively decreasing.In this case, LCM 118/418 can come according to the processing mode of reselling the eco-environmental impact quantized value of the time dependence of computing product 102.Especially, if LCM118/418 determine product relatively near incipient stage of its lifetime (for example, by comparative product build date and current date), LCM 118/418 can be according to the relatively low eco-environmental impact quantized value of the processing mode computing product 102 of reselling.Alternatively, if LCM 118/418 determines the ending phase of product near its lifetime, LCM 118/418 can be according to the relatively high eco-environmental impact quantized value of the processing mode computing product 102 of reselling (for example, the resell eco-environmental impact cost of transaction (for example, shipping products) of realization exceeds the useful part of the phase life of product).
Operation 1904 has shown according to the recycling processing mode calculates the eco-environmental impact quantized value relevant with processing this product of at least a portion.For example, shown in Fig. 1-4, product specification module 401 can receive the product specification data (for example, from the deviser, process engineering teacher, professional executive chairman's input) of the definition one or more manufacturing characteristics (for example, building material) relevant with product 102.Product specification module 401 can provide the product specification data to LCM 118/418.LCM 118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and product information CC/PP Repository in the product information CC/PP Repository 202 that is maintained in database 114/414 associated.LCM can calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the recycling processing mode in the product information CC/PP Repository that is maintained in the database 114/414.
For example, but comprise the recycled materials of high number percent such as fruit product 102, then LCM 118/418 can come according to the recycling processing mode the relatively low eco-environmental impact quantized value of computing product 102.Alternatively, but comprise the recycled materials that hangs down number percent such as fruit product 102, then LCM 118/418 can come according to the recycling processing mode the relatively high eco-environmental impact quantized value of computing product 102.
Operation 1906 has shown according to the compost treatment mode calculates the ecology influence quantized value relevant with processing this product of at least a portion.For example, shown in Fig. 1-4, can receive the product specification data (for example, from the deviser, process engineering teacher, professional executive chairman's input) of the definition one or more manufacturing characteristics (for example, building material) relevant with product 102.Product specification module 401 can provide the product specification data to LCM118/418.LCM 118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and product information CC/PP Repository in the product information CC/PP Repository 202 that is maintained in database 114/414 associated.LCM can calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the compost treatment mode in the product information CC/PP Repository that is maintained in the database 114/414.
For example, the material that comprises high number percent such as fruit product 102, this material provides one or more recycling byproduct materials after degraded, LCM118/418 can be according to the relatively low eco-environmental impact quantized value of compost treatment mode computing product 102.Alternatively, the material that comprises low number percent such as fruit product 102, this material provides one or more recycling byproduct materials after degraded, LCM118/418 can be according to the relatively high eco-environmental impact quantized value of compost treatment mode computing product 102.
Figure 20 has shown an exemplary embodiment, and wherein the operation 1802 of the example operational flow 1800 of Figure 18 can comprise the operation that at least one is extra.This extra operation can comprise operation 2002,2004 and/or 2006.
Operation 2002 has shown according to the burning disposal mode calculates the ecology influence quantized value relevant with processing this product of at least a portion.For example, shown in Fig. 1-4, can receive the product specification data (for example, from the deviser, process engineering teacher, professional executive chairman's input) of the definition one or more manufacturing characteristics (for example, building material) relevant with product 102.Product specification module 401 can provide the product specification data to LCM118/418.LCM 118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and product information CC/PP Repository in the product information CC/PP Repository 202 that is maintained in database 114/414 associated.LCM can calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the burning disposal mode in the product information CC/PP Repository that is maintained in the database 114/414.
For example, the material that comprises high number percent such as fruit product 102, this material generates one or more harmful secondary products or has explosivity behind contacted many heats, and then LCM118/418 can be according to the relatively high eco-environmental impact quantized value of burning disposal mode computing product 102.Alternatively, the material that comprises low number percent such as fruit product 102, this material generates one or more harmful secondary products or has explosivity behind contacted many heats, and then LCM118/418 can be according to the relatively low eco-environmental impact quantized value of compost treatment mode computing product 102.
Operation 2004 has shown according to the landfill disposal mode calculates the ecology influence quantized value relevant with processing this product of at least a portion.For example, shown in Fig. 1-4, can receive the product specification data (for example, from the deviser, process engineering teacher, professional executive chairman's input) of the definition one or more manufacturing characteristics (for example, building material) relevant with product 102.Product specification module 401 can provide the product specification data to LCM118/418.LCM 118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and product information CC/PP Repository in the product information CC/PP Repository 202 that is maintained in database 114/414 associated.LCM can calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the landfill disposal mode in the product information CC/PP Repository that is maintained in the database 114/414.
For example, comprise the biodegradable material of high number percent such as fruit product 102, then LCM118/418 can be according to the relatively low eco-environmental impact quantized value of burning disposal mode computing product 102.Alternatively, comprise the biodegradable material that hangs down number percent such as fruit product 102, then LCM118/418 can be according to the relatively high eco-environmental impact quantized value of compost treatment mode computing product 102.
Operation 2006 has shown according to the seabed processing mode calculates the ecology influence quantized value relevant with processing this product of at least a portion.For example, shown in Fig. 1-4, can receive the product specification data (for example, from the deviser, process engineering teacher, professional executive chairman's input) of the definition one or more manufacturing characteristics (for example, building material) relevant with product 102.Product specification module 401 can provide the product specification data to LCM118/418.LCM 118/418 can receive and manufacture a product 102 relevant product specification data and product specification data and product information CC/PP Repository in the product information CC/PP Repository 202 that is maintained in database 114/414 associated.LCM can calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the seabed processing mode in the product information CC/PP Repository that is maintained in the database 114/414.
For example, comprise the water-soluble material of high number percent such as fruit product 102, then LCM118/418 can come according to the seabed processing mode the relatively low eco-environmental impact quantized value of computing product 102.Alternatively, comprise the water-soluble material that hangs down number percent such as fruit product 102, then LCM118/418 can be according to the relatively high eco-environmental impact quantized value of compost treatment mode computing product 102.
Figure 21 has shown an exemplary embodiment, and wherein the operation 1804 of the example operational flow 1800 of Figure 18 can comprise the operation that at least one is extra.This extra operation can comprise operation 2102,2104 and/or 2106.
Operation 2102 has shown will be corresponding to functionally being coupled to this product with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.For example, according to the product specification data that receive by product specification module 401 (for example, building material, process transportation data, process the energy usage data, etc.) and/or processing mode (for example, resell, recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with this product of processing at least a portion 102 finish, this eco-environmental impact quantized value as device-readable identifier 314 can with equipment (for example, the RFID chip) associates (for example, being stored in wherein).Then functionally be coupled by equipment and the product 102 that will comprise device-readable identifier 314 and (for example, be electrically connected wireless connections, adhere to, be included in wherein, etc.), can be associated with product 102 corresponding to the device-readable identifier 314 of eco-environmental impact quantized value.
Operation 2104 has shown and will store in the storer of being correlated with product corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with processing this product of at least a portion.For example, according to the product specification data that receive by product specification module 401 (for example, building material is processed transportation data, processes the energy usage data, etc.) and/or processing mode (for example, resell recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with this product of processing at least a portion 102 finish, this eco-environmental impact quantized value can associate with device-readable identifier 314.Then in the storer of 102 relevant with product by being stored in corresponding to the device-readable identifier of eco-environmental impact quantized value (for example, be electrically connected, physical connection, etc.), this device-readable identifier 314 can be associated with product 102.
Operation 2106 has shown will be corresponding to being printed on product surface with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.For example, product specification data (for example, the building material that receives by product specification module 401 in basis, process transportation data, process the energy usage data, etc.) and/or processing mode (for example, resell, recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with this product of processing at least a portion 102 finish, this eco-environmental impact quantized value can with the device-readable identifier (for example, two-dimension code) associates (for example, being encoded to the device-readable identifier).Then by on the surface that will be printed on corresponding to the device-readable identifier of eco-environmental impact quantized value product 102 this device-readable identifier 314 being associated with product 102.
Figure 22 has shown an exemplary embodiment, and wherein the operation 1804 of the example operational flow 1800 of Figure 18 can comprise the operation that at least one is extra.This extra operation can comprise operation 2202,2204,2206 and/or 2208.
Operation 2202 has shown that will process the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode carries out related with the device-readable identifier.For example, according to the product specification data that receive by product specification module 401 (for example, building material, process transportation data, process the energy usage data, etc.) and/or processing mode (for example, resell, recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with this product of processing at least a portion 102 finish, the eco-environmental impact quantized value can (for example associate with device-readable identifier 314, be encoded to the device-readable identifier, be mapped to the device-readable identifier, store in the equipment that comprises the device-readable identifier)
Operation 1602 has shown that will process the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode carries out related with two-dimension code.For example, according to the product specification data that receive by product specification module 401 (for example, building material is processed transportation data, processes the energy usage data, etc.) and/or processing mode (for example, resell recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with this product of processing at least a portion 102 finish, this eco-environmental impact quantized value may be encoded as the device-readable identifier 314 that can be printed on product 102 lip-deep two-dimension code types.
Operation 2206 has shown that will process the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode carries out related with the RFID chip.For example, according to the product specification data that receive by product specification module 401 (for example, building material is processed transportation data, processes the energy usage data, etc.) and/or processing mode (for example, resell recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with this product of processing at least a portion 102 finish, this eco-environmental impact quantized value can be stored in the device-readable identifier 314 that can functionally be coupling in the RFID type on the product 102.
Operation 2208 has shown that will process the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode carries out related with printed label.For example, according to the product specification data that receive by product specification module 401 (for example, building material is processed transportation data, processes the energy usage data, etc.) and/or processing mode (for example, resell recycle, landfill, etc.) calculate after eco-environmental impact quantized values relevant with this product of processing at least a portion 102 finish, this eco-environmental impact quantized value can be printed on the device-readable identifier 314 of the tag types that is attached on the product 102.
Figure 23 has shown an exemplary embodiment, and wherein the example operational flow 1800 of Figure 18 can comprise the operation that at least one is extra.This extra operation can comprise operation 2302 and/or 2304.
Operation 2302 shown receive corresponding to the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.For example, after receiving product specification data and product treatment data by the system 106 relevant with ecosystem environment service provider 112, the LCM118 of system 106 can with the processing mode identifier list 214 of product specification data and product treatment data and database 114 and/or the processing stage quantization value table 220 associate.As above 502 described about operating, LCM118 can calculate with product from processing mode identifier list 214 and/or the processing stage quantization value table 220 the product specification data eco-environmental impact quantized value relevant with the product treatment data.After the eco-environmental impact quantized value calculating relevant with processing this product of at least a portion 102 was finished, this eco-environmental impact quantized value can associate with the device-readable identifier (for example, be encoded to, be mapped to).Then this device-readable identifier can be transmitted to and be received by product 102 and/or product specification module 401.Then this device-readable identifier can associate with product 102 (for example, be stored in the storer relevant with product 102, but adhere to for two-dimension code or other optional read modes, be stored among the RFID).
Operation 2304 has shown will be corresponding to being stored on the product with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.After the relevant eco-environmental impact quantized value of the product 102 that receives and process at least a portion, device-readable identifier 314 can be stored on the storer or RFID chip on the product 102, and this product can read by equipment 302 and visit device-readable identifier 314.
The situation that those skilled in the art will appreciate that this area has proceeded to such degree, has difference seldom between the hardware and software of system aspects is realized; The use of hardware or software is generally the design alternative of (but not always, because in some situation, it is very important that the selection of hardware and software may become) representative cost and efficiency trade-off.One skilled in the art should appreciate that, existence can be implemented the various ways of processing described here and/or system and/or other technology (for example hardware, software and/or firmware), and the preferred mode of institute will change along with employed processing and/or system and/or other technology.For example, be most important if the implementer has determined speed and accuracy, then the implementer can mainly select hardware and/or firmware mode; On the other hand, if dirigibility is topmost, then the implementer can mainly select software to realize; Otherwise, also having on the other hand, the implementer can select some combinations of hardware, software and/or firmware.Therefore, existence can be implemented several possible mode of processing described here and/or equipment and/or other technology, wherein neither one is better than another inherently, this is because employed any mode all is a kind of selection, described selective dependency in the situation of use-pattern and implementer's special concern (for example, speed, dirigibility or predictability), wherein any one all can change.The optics aspect that those skilled in the art will appreciate that realization need to be towards hardware, software and/or the firmware of optics.
By user's block diagram, process flow diagram, application drawing, flow chart and/or example, a plurality of embodiments that described equipment and/or process have been illustrated in the detailed description in front.Comprise at such block scheme, application drawing, flow chart and/or example in the situation of one or more functions and/or operation, one skilled in the art will understand that and individually and/or jointly to realize each function and/or operation in such block scheme, application drawing, flow chart or the example by various hardware, software, firmware or any combination in fact wherein.In one embodiment, can realize the some parts of theme described here by special IC (ASICs), field programmable gate array (FPGAs), digital signal processor (DSPs) or other integrated form.Yet, those skilled in the art will be appreciated that, some aspects of embodiment disclosed herein, (for example can be used as the one or more computer programs that move at one or more computing machines, as the one or more programs of moving in one or more computer systems), as the one or more programs of moving at one or more processors (for example, the one or more programs of moving at one or more microprocessors), as firmware or as in fact whole or in part equivalently realization in the standard integrated circuit of its any combination, and open according to this, design circuit and/or write code to software and/or firmware and will drop on fully in the technical scope of this area.In addition, one skilled in the art should appreciate that, theme mechanism described here can be distributed into various forms of program products, and the illustrated embodiment of theme described here is applicable equally, and irrelevant with the particular type of carrying medium for the signal of in fact realizing described distribution.Signal carries the example of medium including, but not limited to following: but the medium of record type, floppy disk for example, hard disk drive, CD (CD), DVD, numerical tape and computer memory etc.; And the medium of transport-type, for example numeral and/or analogue communication medium (for example optical fiber, waveguide, wire communication link, wireless communication link etc.).
In the universal sense, it will be appreciated by those skilled in the art that can by hardware, software, firmware or their combination in any of wide region separately and/or each scheme as herein described that realizes uniformly can be regarded as being consisted of by various types of " Circuits System ".Therefore, this paper employed " Circuits System " includes but not limited to: the Circuits System with at least one discrete circuit, Circuits System with at least one integrated circuit, Circuits System with at least one special IC, formation by the general-purpose operation device of computer program configuration (for example, multi-purpose computer by the configuration of the computer program of at least part of execution process as herein described and/or device, the microprocessor that is perhaps disposed by the computer program of carrying out at least in part process as herein described and/or device) Circuits System, (for example form storage arrangement, the form of random access memory) Circuits System, and/or formation communicator (for example, modulator-demodular unit, communication switch or optoelectronic device) Circuits System.It will be appreciated by those skilled in the art that purport as herein described can the analog or digital form or they certain make up to realize.
Person of skill in the art will appreciate that, usually describing equipment and/or process in mode as herein described in the art, utilize thereafter engineering practice that the equipment of this description and/or process are attached to and comprise in the illustrative data handling system of this paper.That is, at least a portion in equipment as herein described and/or the process can be attached to via the experiment of fair amount in the system that comprises the data processing.Person of skill in the art will appreciate that, this system generally comprises one or more system units, video display apparatus, one or more storeies such as volatibility or nonvolatile memory, processor such as microprocessor and data signal processor, calculating support such as operating system or the entity that is associated, user interface, driver, sensor, actuator, application program, one or more interactive devices such as FPDP, comprise that feedback control loop and control realize the control system (equipment that for example, is used for its position of sensing and/or speed and/or acceleration or time rate of change of actuator; The control motor that is used for mobile and/or adjusting part and/or quantity).Typical data handling system can utilize any suitable available assembly (such as the assembly of generally finding in suitable calculating/communication system and/or data storage and reading system) and the engineering practice of combined standard to realize.
It will be appreciated by those skilled in the art that in this area commonly and come tracing device and/or process in the mode of setting forth herein, after this use the engineering customary means with these described devices and/or process integration in data handling system.That is to say that at least part of of device described herein and/or process can be integrated in the data handling system via the experiment of reasonable amount.It will be appreciated by those skilled in the art that, typical data handling system generally includes system unit housing, video display devices, storeies such as volatibility and non-volatile memories, processors such as microprocessor and digital signal processor, such as one or more, the one or more interactive devices such as touch pad and touch-screen in computing entity, driver, graphical user interface and the application programs such as operating system and/or comprise feedback loop and the control motor (feedback that for example, is used for sensed position and/or speed; The control motor that is used for movement and/or adjusting parts and/or amount) control system.Typical data handling system can be utilized such as any suitable commercial obtainable parts that usually find in data operation/communication and/or network operations/communication system and realize.
Although show and described the particular aspects of this theme described here, one skilled in the art should appreciate that, based on the instruction here, can change and revise and do not break away from theme described here and wider aspect thereof, therefore, as the same in the practicalness of described theme here and the scope, claims will comprise change and the modification that all are such in its scope.In addition, should be understood that the present invention only is defined by the following claims.
Usually, here particularly in the claims (for example claims main body) employed term refer generally to " open " term (for example, term " comprise (including) " and should be construed to " including, but not limited to ", term " has " should be interpreted as " having at least ", term " comprise (includes) " and should be interpreted as " including, but not limited to ", etc.).Those skilled in the art should further be understood that, if wish to have the specific quantity of the claim of being directed narration, then will enunciate this intention in claims, and also do not have such intention in the situation that does not have this narration.For example, in order to help to understand, below the appending claims use that can comprise guided bone term " at least one " and " one or more " narrate with the guiding claim.Yet, the use of this term should not be interpreted as inferring and will comprise this any specific claim that is directed the claim narration by indefinite article " " or " one " to the guiding of claim narration and be restricted to the invention that only comprises such narration, even when identical claim comprises guided bone term " one or more " or " at least one " and the indefinite article such as " " or " " (for example, " one " and/or " one " should be interpreted as meaning " at least one " or " one or more " usually); This is equally applicable to guide the claim narration with definite article.
In addition, even certain claim has been enumerated specific quantity clearly, it will be appreciated by those skilled in the art that, this enumerating should be interpreted as (for example meaning cited at least quantity usually, be enumerated as merely " enumerating for two " and without other modifier, usually mean at least two and enumerate, or two or more are enumerated).In addition, under those situations of use and " at least one among A, B and the C etc. " similar conventional term, usually wish those skilled in the art the meaning of routine understand its implication (for example, " have at least one the system among A, B and the C " will including, but not limited to: only have A, only have B, only have C, A and B together, A and C together, B and C together and/or the system that waits together of A, B and C).
Under those situations of use and " at least one among A, B or the C etc. " similar conventional term, usually wish those skilled in the art the meaning of routine understand its implication (for example, " have at least one the system among A, B or the C " will including, but not limited to: only have A, only have B, only have C, A and B together, A and C together, B and C together and/or the system that waits together of A, B and C).What those skilled in the art will be further understood that is, in fact present any word and/or term of extracting of two or more options, no matter appear in instructions, claims or the accompanying drawing, all should be understood to consider to comprise one, each or two s' possibility.For example, term " A or B " will be understood to include the possibility of " A " or " B " or " A and B ".

Claims (10)

1. system comprises:
Be used for calculating according to the product specification data relevant with product the device of the eco-environmental impact quantized value relevant with making this product of at least a portion; And
Being used for will be corresponding to the device-readable identifier and at least part of device that is associated according to the product of this product specification data manufacturing of the eco-environmental impact quantized value relevant with making this product of at least a portion.
2. the system as claimed in claim 1 wherein is used for calculating with the device of making the eco-environmental impact quantized value that this product of at least a portion is correlated with according to the product specification data relevant with product and comprises:
Be used for calculating according to product configurations material mark data the device of the eco-environmental impact quantized value relevant with making this product of at least a portion.
3. system as claimed in claim 2, the device that wherein is used for calculating according to product configurations material mark data the eco-environmental impact quantized value relevant with this product of manufacturing at least a portion comprises:
Be used for calculating according to the quantity of product middle rare earth material the device of the eco-environmental impact quantized value relevant with making this product of at least a portion.
4. system as claimed in claim 2, the device that wherein is used for calculating according to product configurations material mark data the eco-environmental impact quantized value relevant with this product of manufacturing at least a portion comprises:
Be used for calculating according to the quantity of product deleterious material the device of the eco-environmental impact quantized value relevant with making this product of at least a portion.
5. computer implemented method comprises:
Calculate the eco-environmental impact quantized value relevant with making this product of at least a portion according to the product specification data relevant with product; And
To be associated with at least part of product according to this product specification data manufacturing corresponding to the device-readable identifier of the eco-environmental impact quantized value relevant with making this product of at least a portion.
6. system comprises:
Be used for calculating according to the product specification data relevant with product the circuit of the eco-environmental impact quantized value relevant with making this product of at least a portion; And
Being used for will be corresponding to the device-readable identifier and at least part of circuit that is associated according to the product of this product specification data manufacturing of the eco-environmental impact quantized value relevant with making this product of at least a portion.
7. system comprises:
Be used for calculating according to the product treatment mode device of the eco-environmental impact quantized value relevant with processing this product of at least a portion;
Being used for will be corresponding to the device that is associated with this product with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
8. system as claimed in claim 7, wherein calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the product treatment mode and comprise:
Be used for calculating according to the processing mode of reselling the device of the eco-environmental impact quantized value relevant with processing this product of at least a portion.
9. computer implemented method comprises:
Calculate the eco-environmental impact quantized value relevant with processing this product of at least a portion according to the product treatment mode;
Will be corresponding to being associated with this product with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
10. system comprises:
Be used for calculating according to the product treatment mode circuit of the eco-environmental impact quantized value relevant with processing this product of at least a portion;
Being used for will be corresponding to the circuit that is associated with this product with the device-readable identifier of processing the relevant eco-environmental impact quantized value of this product of at least a portion according to the product treatment mode.
CN2012102419665A 2011-07-12 2012-07-12 Ecological impact quantification identifiers Pending CN102982360A (en)

Applications Claiming Priority (18)

Application Number Priority Date Filing Date Title
US13/135,683 2011-07-12
US13/135,674 US20120150550A1 (en) 2010-12-14 2011-07-12 Efficiency-of-use techniques
US13/135,683 US20120150703A1 (en) 2010-12-14 2011-07-12 User as part of supply chain
US13/135,674 2011-07-12
US13/199,475 US20120150551A1 (en) 2010-12-14 2011-08-31 Efficiency of use of a shared product
US13/199,476 2011-08-31
US13/199,476 US20120150756A1 (en) 2010-12-14 2011-08-31 Ecological impact quantification identifiers
US13/199,475 2011-08-31
US13/199,995 2011-09-14
US13/199,995 US20120150552A1 (en) 2010-12-14 2011-09-14 Monitoring efficiency and ecological impact associated with a use of a product
US13/200,807 US20120185304A1 (en) 2010-12-14 2011-09-30 Disposal mode ecological impact monitoring
US13/200,809 US20130085802A1 (en) 2011-09-30 2011-09-30 Publication of efficiency and ecological impact data to a social media interface
US13/200,809 2011-09-30
US13/200,807 2011-09-30
US13/317,726 US20120150758A1 (en) 2010-12-14 2011-10-26 Efficiency of use of a common product
US13/317,728 US20120150733A1 (en) 2010-12-14 2011-10-26 Ecological impact compliance
US13/317,726 2011-10-26
US13/317,728 2011-10-26

Publications (1)

Publication Number Publication Date
CN102982360A true CN102982360A (en) 2013-03-20

Family

ID=47856341

Family Applications (9)

Application Number Title Priority Date Filing Date
CN2012102419665A Pending CN102982360A (en) 2011-07-12 2012-07-12 Ecological impact quantification identifiers
CN2012102419487A Pending CN103093299A (en) 2011-07-12 2012-07-12 Publication of efficiency and ecological impact data to a social media interface
CN2012102419504A Pending CN103020719A (en) 2011-07-12 2012-07-12 Efficiency-of-use techniques
CN2012102420126A Pending CN103020720A (en) 2011-07-12 2012-07-12 User as part of supply chain
CN2012102419472A Pending CN103106537A (en) 2011-07-12 2012-07-12 Monitoring efficiency and environment influence associated with product use
CN2012102416192A Pending CN103020718A (en) 2011-07-12 2012-07-12 Ecological impact compliance
CN2012102416417A Pending CN102982377A (en) 2011-07-12 2012-07-12 Efficiency-of-use of shared product
CN2012102416385A Pending CN102999836A (en) 2011-07-12 2012-07-12 Disposal mode ecological impact monitoring
CN2012102416440A Pending CN102982378A (en) 2011-07-12 2012-07-12 Efficiency of use of a shared product

Family Applications After (8)

Application Number Title Priority Date Filing Date
CN2012102419487A Pending CN103093299A (en) 2011-07-12 2012-07-12 Publication of efficiency and ecological impact data to a social media interface
CN2012102419504A Pending CN103020719A (en) 2011-07-12 2012-07-12 Efficiency-of-use techniques
CN2012102420126A Pending CN103020720A (en) 2011-07-12 2012-07-12 User as part of supply chain
CN2012102419472A Pending CN103106537A (en) 2011-07-12 2012-07-12 Monitoring efficiency and environment influence associated with product use
CN2012102416192A Pending CN103020718A (en) 2011-07-12 2012-07-12 Ecological impact compliance
CN2012102416417A Pending CN102982377A (en) 2011-07-12 2012-07-12 Efficiency-of-use of shared product
CN2012102416385A Pending CN102999836A (en) 2011-07-12 2012-07-12 Disposal mode ecological impact monitoring
CN2012102416440A Pending CN102982378A (en) 2011-07-12 2012-07-12 Efficiency of use of a shared product

Country Status (1)

Country Link
CN (9) CN102982360A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115578010A (en) * 2022-10-24 2023-01-06 中国环境科学研究院 Method and device for evaluating town garbage treatment mode and computer equipment
WO2023248001A1 (en) * 2022-06-19 2023-12-28 Fok Sin Ying Barbara Proportional control systems and methods for innovation cross-subsidies

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160048938A1 (en) * 2014-08-15 2016-02-18 Elementum Scm (Cayman) Ltd. Method for determining and analyzing impact severity of event on a network
CN107516382A (en) * 2017-09-01 2017-12-26 深圳小气科技有限公司 The leasing method and system of air quality detector
CN107525830A (en) * 2017-09-01 2017-12-29 深圳小气科技有限公司 Air quality detector
CN107516383A (en) * 2017-09-01 2017-12-26 深圳小气科技有限公司 Air quality detector gives back device and gives back method
JP6938474B2 (en) * 2017-10-16 2021-09-22 株式会社wash−plus Self-laundry system
CN114253880A (en) * 2020-09-24 2022-03-29 京东方科技集团股份有限公司 Clock frequency adjusting method and device, electronic equipment and readable storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1343945A (en) * 2000-09-21 2002-04-10 株式会社理光 System and method providing environment effect information, recording medium and data signal
WO2006036977A3 (en) * 2004-09-27 2009-04-23 Decision Commerce Group Llc Product environmental information system

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010110532A (en) * 2000-06-07 2001-12-13 김점두 Method discrimination for the production background of the products by bar code system
CA2509629A1 (en) * 2002-12-27 2004-07-22 Dow Global Technologies Inc. Heat activated epoxy adhesive and use in a structural foam insert
WO2006131789A1 (en) * 2005-06-10 2006-12-14 Mehran Sam A global pollution rating system for products and services
US20070214055A1 (en) * 2006-03-04 2007-09-13 Seth Temko System for beverage dispensing and sales tracking
US20070219862A1 (en) * 2006-03-20 2007-09-20 Casella Waste Systems, Inc. System and method for identifying and processing recyclables
US20080319810A1 (en) * 2007-06-21 2008-12-25 Robert Stewart Mostyn Methods and system for collecting, storing and distributing information relating to goods and/or services
US8738430B2 (en) * 2008-11-14 2014-05-27 International Business Machines Corporation Environmentally responsive shipping selection
US7813970B1 (en) * 2009-04-16 2010-10-12 Amazon Technologies, Inc. Environmentally conscious electronic transactions
US10013666B2 (en) * 2009-04-24 2018-07-03 Rockwell Automation Technologies, Inc. Product lifecycle sustainability score tracking and indicia
US8812352B2 (en) * 2009-10-14 2014-08-19 International Business Machines Corporation Environmental stewardship based on driving behavior
US8509987B2 (en) * 2009-11-11 2013-08-13 Benjamin Resner Methods and apparatus for automatic internet logging and social comparison of vehicular driving behavior
CN101777157A (en) * 2010-02-09 2010-07-14 北京师范大学 Ecological economy evaluation method for industrial system
CN101901467A (en) * 2010-06-02 2010-12-01 桂林电子科技大学 Average emission rate index of product life cycle

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1343945A (en) * 2000-09-21 2002-04-10 株式会社理光 System and method providing environment effect information, recording medium and data signal
WO2006036977A3 (en) * 2004-09-27 2009-04-23 Decision Commerce Group Llc Product environmental information system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023248001A1 (en) * 2022-06-19 2023-12-28 Fok Sin Ying Barbara Proportional control systems and methods for innovation cross-subsidies
CN115578010A (en) * 2022-10-24 2023-01-06 中国环境科学研究院 Method and device for evaluating town garbage treatment mode and computer equipment
CN115578010B (en) * 2022-10-24 2023-08-29 中国环境科学研究院 Village and town garbage disposal mode evaluation method and device and computer equipment

Also Published As

Publication number Publication date
CN103106537A (en) 2013-05-15
CN103020720A (en) 2013-04-03
CN103020718A (en) 2013-04-03
CN102982377A (en) 2013-03-20
CN102999836A (en) 2013-03-27
CN103093299A (en) 2013-05-08
CN102982378A (en) 2013-03-20
CN103020719A (en) 2013-04-03

Similar Documents

Publication Publication Date Title
CN102982360A (en) Ecological impact quantification identifiers
Kurniawan et al. Accelerating sustainability transition in St. Petersburg (Russia) through digitalization-based circular economy in waste recycling industry: A strategy to promote carbon neutrality in era of Industry 4.0
O'Neill Waste
Mayers et al. Implementing individual producer responsibility for waste electrical and electronic equipment through improved financing
Frischknecht et al. Overview and methodology. Data v2. 0 (2007). Ecoinvent report No. 1
US20120185304A1 (en) Disposal mode ecological impact monitoring
Hill The circular economy: from waste to resource stewardship, part I
Jha et al. A sustainable warehouse selection: an interpretive structural modelling approach
Kua Attributional and consequential life cycle inventory assessment of recycling copper slag as building material in Singapore
Eisted et al. Waste management in Greenland: current situation and challenges
US20120150733A1 (en) Ecological impact compliance
Shoaeinaeini et al. Pricing policy in green supply chain design: the impact of consumer environmental awareness and green subsidies
Tong et al. The shadow of the global network: E-waste flows to China
Ochoa Bique et al. Design of hydrogen supply chains under demand uncertainty–a case study of passenger transport in Germany
Iacovidou et al. Plastic packaging-How do we get to where we want to be?
Kogel et al. Measuring sustainable development in industrial minerals mining
US20120150756A1 (en) Ecological impact quantification identifiers
Ramakrishna et al. Handbook of Materials Circular Economy
Taye et al. E-waste management in Botswana
Mayers An investigation of the implications and effectiveness of producer responsibility for the disposal of WEEE
Mouton et al. A proposed model for South Africa to effectively recycle and dispose waste electrical and electronic equipment
Pazhani Design and analysis of closed-loop supply chain networks
Vera-Burau et al. A Comparison of the Fuel Consumption and Truck Models in Different Production Scenarios
Veerakamolmal Design and analysis of disassembly and remanufacturing systems in the electronics industry
WO2023158421A1 (en) Process for creating a tradable nonfungible token for recyclable materials

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20130320

RJ01 Rejection of invention patent application after publication