CN1029793C - Post-tensioned prestressed reinforcement field cold drawing and anchoring - Google Patents

Post-tensioned prestressed reinforcement field cold drawing and anchoring Download PDF

Info

Publication number
CN1029793C
CN1029793C CN 91103478 CN91103478A CN1029793C CN 1029793 C CN1029793 C CN 1029793C CN 91103478 CN91103478 CN 91103478 CN 91103478 A CN91103478 A CN 91103478A CN 1029793 C CN1029793 C CN 1029793C
Authority
CN
China
Prior art keywords
jack
reinforcing bar
ground tackle
anchoring
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 91103478
Other languages
Chinese (zh)
Other versions
CN1058820A (en
Inventor
钟莉
刘滨晨
申邦乔
申邦武
王学群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 91103478 priority Critical patent/CN1029793C/en
Publication of CN1058820A publication Critical patent/CN1058820A/en
Application granted granted Critical
Publication of CN1029793C publication Critical patent/CN1029793C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The present invention relates to a process of butt welding, cold drawing and anchoring at engineering site of a post-tensioning prestressed reinforcement. The present invention utilizes the characteristic that a reinforced concrete prefabricated member itself can bear very large pressure stress to design a heavy frame system of a cold-drawn reinforcement, and a prestressed tensioning jack is used as a stretcher. A manufactured prestressed reinforcement is used for the anchorage of the member, and the anchorage adopts an annular gasket-type anchor device. The butt welding, the cold drawing and the anchoring of a post-tensioning prestressed reinforcement can be completed at an engineering site. The present invention largely simplifies the manufacture and anchorage procedures of the post-tensioning prestressed reinforcement, and is convenient for the construction, the popularization and the application of a post-tensioning prestressed structure.

Description

Post-tensioned prestressed reinforcement field cold drawing and anchoring
The invention belongs to the making and the anchoring process of the employed post-tensioned prestressed reinforcement of prefabricated units in the construction work.
The making of the prestressed reinforcement of post-tensioned prestressed reinforcement concrete prefabricated element and anchoring technology are the technology of a more complicated always, the making of traditional prestressed thick reinforcement generally all will be carried out in factory or reinforcement yard, with powerful steel bar butt welding machine bar dowel is welded together earlier, on large-scale cold-drawn machine, carry out cold drawn then, make elongation per unit length reach the length of designing requirement, and by the intensity of cold drawn raising reinforcing bar and the intensity of check butt joint, after all qualified, transport engineering site to large-scale exclusive trail car again and use.The equipment of its process is huge, complex process, and cost is very high.In addition, the anchoring of these post-tensioned prestressing bar reinforcements is also very difficult, and conventional general anchor clamp " prestressed concrete is used the anchor clamp shaping figure set always " (Chinese architecture publishing house published in 1980) all has a lot of different shortcomings separately.As: the simplest screw Duan Rod ground tackle, end must make the 45# steel do, and should could use through special modifier treatment, and nut also must be processed in forging and pressing, and price is very expensive.If with cone anchorage or strand tapered anchorage, then in the anchoring process, be easy to crush parent material of reinforcement rebar, the stress that forms the wound is concentrated, and the danger that causes the unexpected brittle failure of reinforcing bar is arranged, and the slippage of reinforcing bar is bigger in the anchoring process simultaneously, and loss of prestress is very big.In addition, the processing of ground tackle is also very difficult.Therefore, the processing of this cover prestressed reinforcement and anchoring technology.Bring very big difficulty for applying of post-tensioned prestressed reinforcement concrete component.
Along with on-the-spot lamination is produced the generation of post-tensioned prestressed reinforcement concrete large slab member and development and (is seen China Patent No.: 85102720.2; 85200851.1; 89204818.2; 89219426.X; 90205535.6) pressing for a kind of new technology that can at engineering site on the spot make post-tensioned prestressing bar reinforcement supporting with it, it comprises the butt welding of reinforcing bar, cold drawn and anchoring.The present invention with this end in view studies.
The objective of the invention is to utilize the precast member for reinforcing bar concrete of having produced after concrete reaches design strength, self can bear the characteristics of very big external load, design the heavy frame system that a cover can carry out steel bar cold-drawn at building-site, so that draw the position that utilizes existing prestress tensioning equipment to carry out reinforcing bar, do not increase other large-scale cold drawn equipment and load in addition, pedestal; And the Stew of welding of the joint of reinforcing bar and anchoring major part is thick, then adopts existing gas pressure welding technology, also no longer needs powerful power equipment; Adopt a kind of novel gasket type ground tackle to carry out the anchoring of the thick head of Stew simultaneously, make that reinforcing bar does not have slippage in the anchoring process, do not crush parent material of reinforcement rebar again.This ground tackle still is a kind of important anchor, pull tool in the cold drawn heavy frame of the present invention system, can make the length of the prestressed reinforcement of making, and just in time reaches the length of designing requirement.
Adopt above-mentioned technology, can finally reach the making and the stretch-draw anchor technology that make whole prestressed reinforcement.Also can both use the on-the-spot purpose of finishing in engineering, the development of formation and on-the-spot lamination production post-tensioned prestressed reinforcement concrete large slab member is supporting complete set technology fully.
One of particular content of the present invention, be to bear the condition of the characteristics of very big pressure to utilize prefabricated at the scene precast member for reinforcing bar concrete itself, design the heavy frame system of a hard drawn wire reinforcement, it comprises: the gooseneck 1.2 of two band notches alive; Two fixing reinforcing bars 3 of using of gooseneck; A hollow reverse lengthening 4; A steel ring 5; A hookup 6; Punching that tension reinforcing steel bar is used or jack 7(do herein cold-drawn machine with); The ground tackle 8 of an outer endless belt screw thread; Three general ground tackles 9,10,11; Reached the concrete prefabricated element 12 of design strength; With treat cold drawn prestressed reinforcement 13 and form.As shown in Figure 1.
Below in conjunction with accompanying drawing and enforcement operating principle of the present invention and method are described as follows:
Fig. 1 is the vertical view of hard drawn wire reinforcement heavy frame system, wherein:
The 1st, at the gooseneck of the band movable chuck of anchored end;
The 2nd, at the gooseneck of the band movable chuck of stretch-draw end;
The 3rd, after the movable chuck notch of gooseneck 1,2 tightly is stuck on the prefabricated units 12, with gooseneck 1,2 and prefabricated units 12 at vertical also hoop fastening reinforcing bar (have screw thread at two ends, tighten) together tightly with bolt.
4 is a thick-walled tube or the Chang Rod of reverse Jia that makes with the box section of two channel-section steel buttons formation welded together.
(end has screw thread to 5 steel Zhu Jie Rod.Being screwed in one with hookup 6 reinstates).
6 one hookups (hard drawn wire reinforcement 13 and power transmission Zhu Jie Rod 5 usefulness are treated in connection).
7 one vertically-displacable jack (making cold-drawn machine herein uses) that tension reinforcing steel bar is used.
8 one gasket type ground tackles that have screw thread outside anchor ring (are screwed on the hookup 6.Being used for anchoring treats hard drawn wire reinforcement 13 usefulness).
The 9th, be placed on the general gasket type ground tackle of the outside anchoring Zhu Jie Rod 5 of stretch-draw jack 7.
The 10th, be placed on the general gasket type ground tackle (when jack 7 backhauls, preventing Zhu Jie Rod 5 retraction usefulness) of the inboard anchoring Zhu Jie Rod 5 of jack 7.
The 11st, be placed on the Chang Rod of reverse Jia 4 outer ends, the general gasket type ground tackle of hard drawn wire reinforcement 13 usefulness is treated in anchoring.
The 12nd, prefabricated, reached the precast member for reinforcing bar concrete of design strength.
The 13rd, treat cold drawn prestressed reinforcement, in the anchored end of reinforcing bar a Stew head is arranged, live by ground tackle 11 anchors, at the stretch-draw end of reinforcing bar two Stew heads are arranged, the Stew head of end is lived by ground tackle 8 anchors that are screwed on the hookup 6.
Fig. 2 is the a-a sectional drawing of gooseneck among Fig. 1, and gooseneck itself is with two welded together making of channel-section steel button.Wherein:
14 is fixed chuck.
15 is movable chuck.
16 for can adjust the movable chuck position, fixedly bolt hole and the bolt used of movable chuck.
Fig. 3 is the vertical section of hookup 6, wherein:
17 is annular gaskets of two semicircles.
Fig. 4 is the lateral view of the Zhu Jie Rod 5 that forms with a round steel turning.
Fig. 5 is with an equidistant head of reinforcing bar, welds then that the preceding paragraph screw thread makes, the lateral view of bamboo joint Rod 5.
Fig. 6 is the sectional drawing of air ring chip ground tackle.
Fig. 7 is the a-a lateral view of Fig. 6.
Fig. 8 is the anchor ring vertical view of air ring chip ground tackle.
Fig. 9 is the b-b section of Fig. 8.
Figure 10 is the vertical view of two semi-round ring shape pads 17.
Figure 11 is the c-c section of Figure 10.
Steel bar cold-drawn embodiment:
1, the gooseneck 1,2 of one Gent system respectively is installed at the two ends of prefabricated units 12, and is adjusted movable chuck 15, make it tightly clamp prefabricated units 12.
2, answer the reinforcing bar 3 that penetrates two butt headband Luo Si Rod on the reinforcing bar position in advance in the former design and installation in prefabricated units 12 both sides, and make it pass gooseneck 1,2, tighten with bolt then, make gooseneck 1,2 cuff tightly on prefabricated units 12, form one and can bear reinforcing bar, the heavy frame framework of cold drawn stress.When bearing steel bar cold-drawn stress, it is stressed that gooseneck and dop are the gusseted shape.
3, treat that in order to guarantee hard drawn wire reinforcement 13 has enough steel bar cold-drawn extension areas in the length range of prefabricated units 12, the Chang Rod 4 of reverse Jia is housed on anchored end gooseneck 1, make by " fixed length " blanking, and have the hard drawn wire reinforcement 13 for the treatment of of anchoring major part and stretch-draw major part to stretch out one section oppositely length of lengthening 4 earlier to the whole heavy frame outside in advance at two Duan Dou Rod.
Rod 4, will treat that with ground tackle 11 Rod anchor of anchoring Duan of hard drawn wire reinforcement 13 live.
5, will treat that with the ground tackle on the hookup 68 the stretch-draw major part anchor of hard drawn wire reinforcement 13 stretch-draw ends lives.
6, in the outside of stretch-draw end girder steel 2 the vertically-displacable jack 7 that tension reinforcing steel bar is used is installed, is made stretching-machine and use.
7, in the center hole of vertically-displacable jack 7, penetrate Zhu Jie Rod 5, and respectively put on a ground tackle 9 and 10 at the two ends of Zhu Jie Rod 5.
8, Zhu Jie Rod 5 De Si Rod are screwed in the screw thread of hookup 6.
9, with ground tackle 9 near jack 7, with two semicircle pads 17 Zhu Jie Rod 5 De Xi Rod that fill the span of a man's arms, again anchor ring is pushed to then, entangle pad 17, Zhu Jie Rod anchor is lived.
10, start jack 7, make the piston pushing tow ground tackle 9 of jack, outwards pull out bamboo joint Rod 5, make by hookup 6 and treat that hard drawn wire reinforcement 13 outwards stretches.
11, after the piston stroke of jack puts in place,, living in Zhu Jie Rod 5 near the position anchor of reinforcing bar beam 2 the ground tackle 10 of jack front end sleeve on Zhu Jie Rod 5.
12, loosen jack 7, make Zhu Jie Rod 5 be bearing on the gooseneck 2 and can not bounce back by ground tackle 10.
13, when jack 7 continued oil return, ground tackle 9 can unclamp Zhu Jie Rod 5 automatically.Behind the piston reset of jack 7, the anchor ring of ground tackle 9 is pushed to once more near position of piston.And anchor lives in Zhu Jie Rod 5 once more.
14, start jack 7 once more, make piston promote ground tackle 9, bamboo joint Rod 5 can outwards pull out again, and the ground tackle 10 of front end also unclamps bamboo joint Rod 5 thereupon automatically, makes and treats that cold drawn reinforcing bar 13 is stretched once more.
15, because the piston stroke of stretch-draw jack 7 is limited, can not once just be cold drawn to the development length of requirement, repeatedly backhaul, stretch piecemeal, just can meet the requirements of length, therefore need repeat above-mentioned operation and carry out the segmentation stretching, till treating that cold drawn reinforcing bar 13 meets the requirements of cold drawn elongation per unit length or cold drawn stress value, cold drawn work can finish.
16, unload the cold reinforcing bar that is over 13, carry out timeliness.
Two of particular content of the present invention: be the anchoring after the prestressed reinforcement stretch-draw.
The anchoring of prestressed reinforcement is important procedure and the means that guarantee the structural element trouble free service.Traditional way all is to adopt (seeing " anchor clamp shaping figure set commonly used ") such as screw Duan Rod ground tackle, strand tapered anchorage, cone anchorages, and the shortcoming of these ground tackles is a lot, needs to improve.
The objective of the invention is the full mother metal that will make being made as of prestressed reinforcement single, do not crush mother metal, the hidden danger that stress is concentrated do not occur, will guarantee also that simultaneously anchoring reliably, does not produce slippage and in the anchoring process, do not produce again, simple to operation.
The present invention adopts Stew anchor, with annular gasket or ground tackle anchoring Stew head.For this reason, prestressed reinforcement will be taked fixed length blanking, fixed length Stew head, that is: at anchoring major part of the anchored end Stew of reinforcing bar, at the stretch-draw end of reinforcing bar anchoring major part of position Stew by the design length requirement, again at stretch-draw major part of end Stew.Then reinforcing bar is put in the cold drawn heavy frame that anchor is lived the anchoring major part of anchored end and the stretch-draw major part of stretch-draw end carries out cold drawn.Its elongation per unit length is reached till the length of designing requirement.The cold drawn prestressed reinforcement that is over is unloaded down after overaging, refilled and go on the post-tensioned structure to use.At this moment, earlier the anchoring major part of anchored end is lived with air ring chip ground tackle anchor, on the stretch-draw end, put on the anchor ring of an air ring chip ground tackle more earlier, and then live the stretch-draw major part of reinforcing bar with the Chuan Li Rod anchor of vertically-displacable jack, carry out prestressed stretch-draw, because this prestressed reinforcement is made by fixed length blanking Stew head and is cold drawn, so when reaching the stretch-draw control stress of designing requirement, the anchoring major part on the stretch-draw end also just in time reaches the position that need carry out anchoring.At this moment, shift the front and the member of anchoring major part onto and be close to being through anchor ring on the reinforcing bar in advance, then the annular gasket of two semicircles the is filled the span of a man's arms parent material of reinforcement rebar of anchoring major part front then entangles pad with anchor ring immediately, forms a complete air ring chip ground tackle.Because anchor ring will be shifted to pad from the surface of being close to member originally, pad is entangled, so one section space will occur between final ground tackle and the component surface.The jail is tightly filled up with shape of a hoof open washer in this section space, just prestressed reinforcement has been lived at stretch-draw end also anchor.At last, cut off one section unnecessary reinforcing bar of stretch-draw major part, just finish whole anchoring work.
Advantage of the present invention is:
1, prestressed reinforcement is full mother metal, does not need other material fit, as long as need the anchoring major part of each Stew of place of anchoring and the stretch-draw major part of a special use at the two ends of reinforcing bar, does not just have other special processing request.
2, ground tackle does not crush the prestressed reinforcement mother metal, does not produce the hidden danger that stress is concentrated, reinforcing bar safe and reliable.Reinforcing bar does not have slippage in the anchoring process, and loss of prestress is little.
3, the own reliable operation of ground tackle, two semi-round ring shape pads mainly bear shear stress, and the anchor ring force-bearing table mainly bears compressive stress, and not having slip extremely may.And ground tackle processing is simple, and material is without any need for specially treated, and cost is very low.
The whole activities of 4, stretch-draw, anchoring is simple, easy to operate, is convenient to promote the use of.
Below in conjunction with drawings and Examples the present invention is further described.
Figure 12 is the operation drawing of prestressed reinforcement, wherein:
13-is the prestressed reinforcement mother metal.
The anchoring major part of 20-anchored end.
The anchoring major part of 21-stretch-draw end, the position is determined by the length that the fixed length blanking requires.
The stretch-draw major part of 22-stretch-draw end.
The anchored end of Figure 13 prestressed reinforcement on prefabricated units is lived the schematic diagram of anchoring major part with air ring chip ground tackle anchor.
The stretch-draw end of Figure 14 prestressed reinforcement on prefabricated units is earlier put on an anchor ring 24 on reinforcing bar, then with the Chuan Li Rod 5 on the jack, live the stretch-draw major part 22 of reinforcing bar by hookup 6 and ground tackle 8 anchors, prepares to carry out prestressed stretch-draw.
Figure 15 carries out prestressed stretch-draw, reach control stress for prestressing after, anchoring major part 21 should slightly grow the thickness of anchor ring 24 about pads.
Figure 16 clamps prestressed reinforcement mother metal 13 with two semi-round ring shape pads 17 in the inboard of anchor head 21.
Figure 17 pushes to anchor ring 24, entangles annular gasket 17, is assembled into a complete ground tackle.But one section space has appearred between ground tackle and the member.
Figure 18 fills in shape of a hoof open washer 25 in the space between ground tackle and member, can loosen jack.This moment, the anchoring major part 21 of prestressed reinforcement was blocked by the annular gasket in the ground tackle 17, and prestressed reinforcement can not bounce back, and has realized the anchoring to reinforcing bar.
Figure 19 downcuts stretch-draw major part 22 unnecessary on the reinforcing bar, and anchoring work is all over.
The phantom drawing signal of Figure 20 shape of a hoof open washer 25.

Claims (3)

1, a kind of cold drawn method of prestressed reinforcement, be two goosenecks (1), (2) that are installed in the precast reinforced concrete structure two ends by two, carry out on the load-bearing frame that two are constituted its fastening reinforcing bar (3) of vertically straining, it is characterized in that:
A. gooseneck (1) (2) is that movable chuck (15) with fixed chuck (14) and adjustable-width is clipped on the precast unit (12).
B., a reverse extension bar (4) is housed on anchored end gooseneck (1), and making in these prefabricated units (12) length range can be had enough cold drawn expanded ranges by hard drawn wire reinforcement (13).
C. be to carry out the two ends anchoring by hard drawn wire reinforcement (13) with the gasket type ground tackle (8) that is arranged in the gasket type ground tackle (11) of reverse extension bar (4) end and is contained in connector (6).
D. the cold drawn of reinforcing bar is to have screw thread and connector (6) to join with a ring bar (5) front end, vertically-displacable jack (7) is passed in the rear end, being close to jack piston with a gasket type ground tackle (9) is in fixing, after starting jack (7), the elongation by jack piston drives ring bar (5) and carries out cold drawn to reinforcing bar (13);
E. the piston stroke of working as jack (7) is all stretched out, and do not reached as yet when needing length by hard drawn wire reinforcement (13), be positioned at the gasket type ground tackle (10) that gooseneck (2) locates in the ring bar (5) ring bar (5) is fixed by being enclosed within advance, the oil return valve that loosens jack makes the piston of jack (7) get back to zero-bit.
F. shift ground tackle (9) onto jack (7) piston end face once more along ring bar (5) and fix, startup jack (7) is proceeded cold drawn, makes by cold drawn reinforcing bar to reach the cold drawn length that needs.
2, gasket type ground tackle as claimed in claim 1, it is by a step anchor ring (24), two semicircle pads (17) are formed, and it is characterized in that:
The hole diameter of anchor ring step center equals the diameter of reinforcing bar pier nose, and the external diameter of the circular gasket of two semicircle pad formation equals the diameter of anchor ring step, and internal diameter equals the diameter of pier nose parent material of reinforcement rebar.
3, the method for claim 1 is characterized in that: wherein c is described by cold drawn reinforcing bar, and the anchored end of its reinforcing bar is a pier nose (20), and the stretch-draw end of reinforcing bar is two pier noses (21), (22).
CN 91103478 1991-05-24 1991-05-24 Post-tensioned prestressed reinforcement field cold drawing and anchoring Expired - Fee Related CN1029793C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 91103478 CN1029793C (en) 1991-05-24 1991-05-24 Post-tensioned prestressed reinforcement field cold drawing and anchoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 91103478 CN1029793C (en) 1991-05-24 1991-05-24 Post-tensioned prestressed reinforcement field cold drawing and anchoring

Publications (2)

Publication Number Publication Date
CN1058820A CN1058820A (en) 1992-02-19
CN1029793C true CN1029793C (en) 1995-09-20

Family

ID=4906113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 91103478 Expired - Fee Related CN1029793C (en) 1991-05-24 1991-05-24 Post-tensioned prestressed reinforcement field cold drawing and anchoring

Country Status (1)

Country Link
CN (1) CN1029793C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2840935B1 (en) * 2002-06-12 2005-08-19 Andre Loew CONSTRUCTION ELEMENT IN BEAM TYPE MASONRY, SUCH AS LINTEAU OR SIMILAR
CN110814651B (en) * 2019-11-14 2021-09-21 鞍钢建设集团有限公司 Manufacturing method of anchoring piece for steel structure building beam column decoration module component

Also Published As

Publication number Publication date
CN1058820A (en) 1992-02-19

Similar Documents

Publication Publication Date Title
CN1046205A (en) The mechanical connection method of round concrete bar muscle
CN1030410C (en) Reinforcing bar connector
CN201241479Y (en) Stretching device of prestress FRP rib anchorage
CN202925767U (en) Low-retraction pre-stressed anchorage device
CN1029793C (en) Post-tensioned prestressed reinforcement field cold drawing and anchoring
CN209760863U (en) External prestress steel strand connector and matched tensioning device
CN102912987B (en) Stress applying method and tool thereof for low retraction pre-stress concrete member
CN103147412B (en) A kind of carbon fibre bar external prestressing stretching and anchoring device and anchoring process
CN110883937A (en) Movable non-pretensioning bidirectional prestress production line
CN207537885U (en) The anchoring mechanism in inclined guy cable stretching stage
CN2447319Y (en) Repeat stretch-draw jack
CN1699709A (en) Prestressed anchoring system by high tensile steel wire pretension and construction method thereof
CN106436587A (en) Chain link type automatic synchronous tensioning system and method for prestressed wire ropes
CN204940273U (en) A kind of Prestressed anchor rope with pressure dispersing construction equipment
CN108678408B (en) Reinforced concrete roof beam prestressing force wire rope reinforcing apparatus
CN1084818C (en) Anchorage assembly
CN210013129U (en) Prefabricated stand hoist structure
CN219298200U (en) Tensioning anchoring device for finish rolling deformed steel bar prestress anti-floating anchor rod
CN2249772Y (en) Steel wire bounder
CN218668108U (en) Hogging moment prestressing force steel pipe truss superimposed sheet
CN218204358U (en) Prefabricated square quick concatenation formula pressure dispersion type stock
CN2701981Y (en) High strength wire pre-tensioned prestressing anchor system
CN218453064U (en) Pretensioned polygonal prestressed steel beam bending and fixing device
CN1648506A (en) Super large caliber centripetal stress high pressure water transport pipe and its preparing process
CN214220647U (en) Flat friction type anchorage device applied to tensioning of prestressed FRP (fiber reinforced plastic) grids

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee