CN102979257B - Splicing method for metal roof profiled flat plate - Google Patents

Splicing method for metal roof profiled flat plate Download PDF

Info

Publication number
CN102979257B
CN102979257B CN201210569695.6A CN201210569695A CN102979257B CN 102979257 B CN102979257 B CN 102979257B CN 201210569695 A CN201210569695 A CN 201210569695A CN 102979257 B CN102979257 B CN 102979257B
Authority
CN
China
Prior art keywords
gripper shoe
die mould
inner groovy
top board
metal roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210569695.6A
Other languages
Chinese (zh)
Other versions
CN102979257A (en
Inventor
胡全成
钟俊浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ALL-ZIP METAL ROOFING SYSTEM Co Ltd
Original Assignee
SHANGHAI ALL-ZIP METAL ROOFING SYSTEM Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ALL-ZIP METAL ROOFING SYSTEM Co Ltd filed Critical SHANGHAI ALL-ZIP METAL ROOFING SYSTEM Co Ltd
Priority to CN201210569695.6A priority Critical patent/CN102979257B/en
Publication of CN102979257A publication Critical patent/CN102979257A/en
Application granted granted Critical
Publication of CN102979257B publication Critical patent/CN102979257B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention relates to the field of roof buildings, in particular to a splicing method for a metal roof profiled flat plate. The splicing method is characterized by at least comprising the following steps: setting of the profiled flat plate, splicing of the profiled flat plate and fixing of the profiled flat plate. The splicing method has the advantages of simple process and structure, convenience for mounting, low manufacturing cost, convenient promotion, reasonable limiting, strong wind pressure resistance and free heat expansion and cold contraction; fan-shaped plates with various sizes are easily machined and molded to realize surface modeling requirements; and as the plate performance is stable, the metal roof profiled flat plate can be permanently used. The splicing method can be widely applied to roof decoration of various large-sized buildings; and requirements on various roof performances are met through characteristics of the metal roof plate.

Description

A kind of assembling method of metal Roof die mould flat board
Technical field
The present invention relates to roof building field, be specifically related to a kind of assembling method of metal Roof die mould flat board.
Background technology
What metal current roofing template generally adopted is corrugated metal sheet, this corrugated metal sheet is to form by a kind of Profile procoess equipment compacting, the longitudinal connected mode of described template can be divided into overlapping, fastening type, biting connecions and other connected mode etc., laterally connects the general lower support that adopts and is connected with the snap close form of template.Corrugated metal sheet is applicable to roofing and the metope of all kinds of buildings, can be processed into the templates such as straight plate, arc plate and fanning strip of different sizes, but the impact due to the concavo-convex of its surperficial waveform generation and building surface modeling, the particularly requirement of public beautiful property building to outward appearance, great majority designs is taked to increase one decorative panel on the basis of described template again and is formed the whole structure that double-level-metal plate completes building, produces thus that structure species is various, the shortcoming such as complicated construction technique, long construction period and construction costs height.
Summary of the invention
The object of the invention is according to above-mentioned the deficiencies in the prior art part, a kind of assembling method of metal Roof die mould flat board is provided, this assembling method adopts the die mould flat plate splicing that top board is plane, make double-level-metal Roof system be reduced to individual layer, rely on the water-guiding hole and the guiding gutter that in die mould flat board, arrange to realize buildings waterproof function simultaneously.
Realization of the present invention is completed by following technical scheme:
A kind of assembling method of metal Roof die mould flat board, described metal Roof die mould flat board comprises that some die moulds are dull and stereotyped, it is characterized in that: described die mould flat board is by top board and be vertically connected at the first gripper shoe of described top board two ends belows, the second gripper shoe forms, in described the first gripper shoe, a projection is set, in described the second gripper shoe, an inner groovy is set, and described inner groovy is provided with a section of stretching out that is parallel to described top board, the described section of stretching out tail end is provided with the upwards folding section of a snap fit shape, in the described horizontal direction section of stretching out, be provided with a wave trough, described wave trough to described in section between the upwards inflection point of the section of stretching out tail end be guiding gutter, junction in described top board and described the first gripper shoe is provided with a flange, and the junction of described top board and described the second gripper shoe is provided with a groove,
Described assembling method at least comprises the following steps:
Projection in dull and stereotyped first gripper shoe of described die mould matches and is fixedly connected with the inner groovy in dull and stereotyped the second gripper shoe of adjacent described die mould; A dull and stereotyped first gripper shoe upper flange of described die mould matches with the groove in dull and stereotyped the second gripper shoe of adjacent described die mould, and its gap forms water-guiding hole, and described water-guiding hole is communicated with described guiding gutter; The top board of the described some die mould flat boards formation roofing that is connected.
Described projection refers to being fixedly connected with of described inner groovy: in the junction of described flange and described inner groovy, one slip support node is set, on described slip support node, contain at least two fastening positions, and described fastening position forms a fixed connection with the upwards folding section of described snap fit and the outer wall of described inner groovy respectively.
Described projection refers to being fixedly connected with of described inner groovy: on the junction of described flange and described inner groovy, be fixed with a connection piece, the intersection that described connector vertically runs through described flange and described inner groovy is joined together.
Advantage of the present invention is: technique, simple in structure, be convenient to install; Cost is low, and it is convenient to promote; Spacing reasonable, opposing blast is strong, the freedom of expanding with heat and contract with cold; Easily each big or small fanning strip of machine-shaping, realizes surface modeling requirement; Template stable performance, can forever be used.The roof decorations that can be widely used in all kinds of heavy constructions, realize the requirement of various roofing performances with the characteristic of its metal house sheet material.
Accompanying drawing explanation
Fig. 1 is structural front view of the present invention;
Fig. 2 is the structure chart of single die mould flat board in the present invention;
Fig. 3 is the structure chart of slip support node in the present invention.
The specific embodiment
Below in conjunction with accompanying drawing, by embodiment, feature of the present invention and other correlated characteristic are described in further detail, so that technician's of the same trade understanding:
As Figure 1-3, in figure, mark 1-16 is respectively: projection 1, the first gripper shoe 2, groove 3, top board 4, inner groovy 5, the second gripper shoe 6, flange 7, wave trough 8, snap fit 9, guiding gutter 10, extension 11, die mould flat board 12, slip support node 13, water-guiding hole 14, fastening position 15, fastening position 16.
Embodiment: the assembling method that the present embodiment adopts is that some die mould flat boards 12 are spliced into one, and by the structure of die mould flat board 12, the top board 4 that is plane as roofing to realize.
As shown in Figure 2, the die mould flat board 12 in the present embodiment forms by top board 4 and perpendicular to the first gripper shoe 2 and the second gripper shoe 6 below its two ends, and above-mentioned three is made of one piece by bender.Top board 4 is layed on roofing, and the first gripper shoe 2 is all bent in order to the tenon groove structure with dull and stereotyped 12 splicings of identical die mould at its afterbody with the second gripper shoe 6.The afterbody of the first gripper shoe 2 is bent into an outside projection 1, and this projection 1 takes the shape of the letter U structure in order to improve its bonding strength.The afterbody bending of the second gripper shoe 6 is an inside inner groovy 5, and inner groovy 5 is in order to the projection 1 of the adjacent roof panel of clamping.
The top board 4 of die mould flat board 12 and the junction of the first gripper shoe 2 are provided with a groove 3; The junction of top board 4 and the second gripper shoe 6 is provided with a flange 7, and groove 3 matches with flange 7 structures, and after assembled gap between the two as the water-guiding hole 14 of Roof system.
The second gripper shoe 6 is also provided with an extension 11 that is parallel to top board 4 after inner groovy 5 is set, and is provided with a wave trough 8 on extension 11, and this wave trough 8 plays overflow effect.Extension 11 rear bendings are a snap fit making progress 9, and this snap fit 9 is for the installation of connector.
When adopting the present embodiment to carry out when assembled realizing according to following steps:
1, the projection 1 of the first gripper shoe 2 of a die mould flat board 12 snaps in inner groovy 5 inside of dull and stereotyped 12 second gripper shoes 6 of adjacent die mould, forms tenon groove structure, adopts afterwards slip support node 13 fixing, to complete mating formation of roofing.Additionally need to set forth: the top board 4 that the roofing of having mated formation is plane by surface, as end face, makes in Roof system without the laying of decorating flaggy herein.On slip support node 13, contain fastening position 15 and fastening position 16, wherein fastening position 15 is fixedly connected with snap fit 9, fastening position 16 is fixedly connected with the outer wall of inner groovy 5, adopt the mode being fixedly connected with respectively with adjacent die mould flat board 12 that some die mould flat boards 12 are connected, obviously those skilled in the art can increase fastening position according to the required intensity parameter of dull and stereotyped 12 splicing of two die moulds on slip support node 13, or by the 16 and second gripper shoe 6 sidewalls of fastening position, or employing screw, the connectors such as nut vertically run through the connecting portion of projection 1 and inner groovy 5, become one, increase intensity and the stability of its splicing.
2, wave trough 8 section that 11 rears make progress between inflection point to extension is the guiding gutter 10 of the present embodiment medium-pressure type flat board, this guiding gutter 10 is connected with water-guiding hole 14, when rainwater cannot be discharged in time in top board 4 surfaces, ponding flow to guiding gutter 10 by water-guiding hole 14, then carries out water guide draining by guiding gutter 10.
The present embodiment is in the specific implementation: roofing surface adopts the top board 4 that is plane by some surfaces to be connected, both saved unnecessary double-deck room panel structure, and the groove 3 that can also arrange by its surface is realized water-proof drainage function with the guiding gutter 10 of the water-guiding hole 14 between flange 7, die mould flat board 12 inside.
Although below the design of the utility model object and embodiment are described in detail with reference to accompanying drawing, but those of ordinary skills can recognize, do not departing under the precondition of claim limited range, still can make various improvement and conversion to the present embodiment, as: the selection for projection 1 and inner groovy 5 structures of mentioning in embodiment, also can in the situation that meets its load scope, change, as chute connection etc.; The correlation values parameters such as height of the length of the bending angle of snap fit 9, guiding gutter 10, wave trough 8 all can be selected according to Specific construction situation, therefore do not repeat one by one at this.

Claims (3)

1. the assembling method of a metal Roof die mould flat board, described metal Roof die mould flat board comprises that some die moulds are dull and stereotyped, it is characterized in that: described die mould flat board is by top board and be vertically connected at the first gripper shoe of described top board two ends belows, the second gripper shoe forms, in described the first gripper shoe, a projection is set, in described the second gripper shoe, an inner groovy is set, and described inner groovy is provided with a section of stretching out that is parallel to described top board, the described section of stretching out tail end is provided with the upwards folding section of a snap fit shape, in the described horizontal direction section of stretching out, be provided with a wave trough, described wave trough to described in section between the upwards inflection point of the section of stretching out tail end be guiding gutter, junction in described top board and described the first gripper shoe is provided with a flange, and the junction of described top board and described the second gripper shoe is provided with a groove,
Described assembling method at least comprises the following steps:
Projection in dull and stereotyped first gripper shoe of described die mould matches and is fixedly connected with the inner groovy in dull and stereotyped the second gripper shoe of adjacent described die mould; A dull and stereotyped first gripper shoe upper flange of described die mould matches with the groove in dull and stereotyped the second gripper shoe of adjacent described die mould, and its gap forms water-guiding hole, and described water-guiding hole is communicated with described guiding gutter; The top board of the described some die mould flat boards formation roofing that is connected.
2. the assembling method of a kind of metal Roof die mould flat board according to claim 1, it is characterized in that: described projection refers to being fixedly connected with of described inner groovy: in the junction of described flange and described inner groovy, one slip support node is set, on described slip support node, contain at least two fastening positions, and described fastening position forms a fixed connection with the upwards folding section of described snap fit shape and the outer wall of described inner groovy respectively.
3. the assembling method of a kind of metal Roof die mould flat board according to claim 1, it is characterized in that: described projection refers to being fixedly connected with of described inner groovy: on the junction of described flange and described inner groovy, be fixed with a connection piece, the intersection that described connector vertically runs through described flange and described inner groovy is joined together.
CN201210569695.6A 2012-12-25 2012-12-25 Splicing method for metal roof profiled flat plate Expired - Fee Related CN102979257B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210569695.6A CN102979257B (en) 2012-12-25 2012-12-25 Splicing method for metal roof profiled flat plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210569695.6A CN102979257B (en) 2012-12-25 2012-12-25 Splicing method for metal roof profiled flat plate

Publications (2)

Publication Number Publication Date
CN102979257A CN102979257A (en) 2013-03-20
CN102979257B true CN102979257B (en) 2014-09-03

Family

ID=47853580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210569695.6A Expired - Fee Related CN102979257B (en) 2012-12-25 2012-12-25 Splicing method for metal roof profiled flat plate

Country Status (1)

Country Link
CN (1) CN102979257B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108838584A (en) * 2018-05-05 2018-11-20 芜湖君如保温材料有限公司 A kind of rectangular Stainless Molding Board of assembled water tank

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1706924A (en) * 1926-06-12 1929-03-26 Truscon Steel Co Metal roof-deck construction
CN1745223A (en) * 2002-12-04 2006-03-08 格兰特·查尔伍德 A cladding element
CN201679155U (en) * 2010-05-22 2010-12-22 浙江精工轻钢建筑工程有限公司 Roofing inner laminated sectional steel plate

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1706924A (en) * 1926-06-12 1929-03-26 Truscon Steel Co Metal roof-deck construction
CN1745223A (en) * 2002-12-04 2006-03-08 格兰特·查尔伍德 A cladding element
CN201679155U (en) * 2010-05-22 2010-12-22 浙江精工轻钢建筑工程有限公司 Roofing inner laminated sectional steel plate

Also Published As

Publication number Publication date
CN102979257A (en) 2013-03-20

Similar Documents

Publication Publication Date Title
CN206346432U (en) A kind of fabricated wallboard interface arrangment
CN102287024B (en) Integrated ceiling structure
CN203113633U (en) Assembling structure of profiling plate of metal roof
CN103046696A (en) Snap-in metal composite roof and assembling method thereof
CN102979257B (en) Splicing method for metal roof profiled flat plate
CN203113634U (en) Meshed type metal composite roof
CN202090488U (en) Structure of integrated suspended ceiling
CN204001283U (en) A kind of grade beam of and the supporting Fast Installation of house wall
CN210459781U (en) Plastic tile
CN203022232U (en) Profiling flat plate for metal roof
CN202627373U (en) Pinch plate for exterior wall facings
CN203420381U (en) Connecting structure of building wall frame
CN102605914A (en) Outer wall facing pinch plate
CN200958264Y (en) Connecting mound layer of solar plate
CN103276843B (en) Ceiling structure
CN203008248U (en) Eaves gutter and gutter roof drainage system with same
CN204960209U (en) Composite wall panel
CN204531262U (en) A kind of color steel buckle
CN2929030Y (en) Sun light plate connection press strip
CN204715635U (en) Easy assembled roofing slab
CN103790288A (en) Method for molding melon rind type metal roofing board
CN110273522A (en) A kind of ultra-thin cement fiber board mounting structure
CN111075091A (en) Mounting structure of prefabricated grade furred ceiling light groove of falling of assembled
CN217998579U (en) Connection structure of assembled furred ceiling panel and fossil fragments
CN211172656U (en) One-step formed light steel keel for lamp groove

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20180410

Granted publication date: 20140903

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20180604

Granted publication date: 20140903

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140903

Termination date: 20191225