CN102968666A - Storage definition method for electric power system data holographic complete time domain management - Google Patents

Storage definition method for electric power system data holographic complete time domain management Download PDF

Info

Publication number
CN102968666A
CN102968666A CN2012104331381A CN201210433138A CN102968666A CN 102968666 A CN102968666 A CN 102968666A CN 2012104331381 A CN2012104331381 A CN 2012104331381A CN 201210433138 A CN201210433138 A CN 201210433138A CN 102968666 A CN102968666 A CN 102968666A
Authority
CN
China
Prior art keywords
management
data
electric network
network data
storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104331381A
Other languages
Chinese (zh)
Other versions
CN102968666B (en
Inventor
郭中华
李勤新
郭剑波
张松树
裘微江
陈勇
孙永锋
臧主峰
何春江
周智强
李星
秦长峰
康建东
陈继林
刘娜娜
张亮
宫春明
贾军茹
刘欣
邹卫美
白俊杰
刘骥
罗春青
刘洋
佟德江
尚康良
李亚楼
田芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201210433138.1A priority Critical patent/CN102968666B/en
Publication of CN102968666A publication Critical patent/CN102968666A/en
Application granted granted Critical
Publication of CN102968666B publication Critical patent/CN102968666B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a storage definition method for electric power system data holographic complete time domain management. The method includes the following steps: planning and establishing a holographic complete time domain model of a power grid data object according to data sources and data use; determining a storage method and a storage mechanism according to the holographic complete time domain model of the power grid data object; determining a management method of the power grid data object according to the storage method; and determining a quality attribute guarantee mechanism, wherein the quality attribute comprises capacity and performance. The storage definition method can support effective achieving of a whole-process and comprehensive information management system of electric power data of any type and management purpose. Complete self-configuration management of management type, objects and attributes is achieved. Management time and processes can be selected optionally. Large-scale data management performance requirements can be matched to a large extent such as system management capacity and service time performance.

Description

The storage define method of the holographic complete time domain management of a kind of electric power system data
Technical field
The invention belongs to technical field of power systems, be specifically related to the storage define method of the holographic complete time domain management of a kind of electric power system data.
Background technology
The formation of the large electrical network in the whole nation, very huge and the extensive so that scale of electric network data and scope also become; The operation characteristic of electrical network and the application management of scheduling controlling be complex also, especially obtains for the requirement of data and the experience of data knowledge, and holography, Whole Course Management from time, region, type need to be provided the management of data.So huge, complicated and with the time extremely relevant data message management and service request, satisfy administration of power networks and operation, be the core missions of the management and service of electric power system data.
How effectively defining, store, serve the comprehensive management and service of the space-time with complicated dimension data like this, is difficult point and the emphasis of electric network data management.The full-time breath data management of electric system utilizes memory technology, data management technique to realize the management that minimizes of the effective definition in its electric power system data ground and varying information, utilize software engineering, realize effective and rapid ground management and service method, and be easy to set up the deployment services in different pieces of information source.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, the invention provides the storage define method of the holographic complete time domain management of a kind of electric power system data, can support the overall process of electric power data of any type and administrative purposes and the system of full spectrum information management effectively to realize.The complete autonomous configuration management of management type, object, attribute; Administrative time and process can be selected arbitrarily.The also upper data management performance requirement that cooperates huge size to greatest extent is such as system management capacity, service time performance etc.
In order to realize the foregoing invention purpose, the present invention takes following technical scheme:
The storage define method of the holographic complete time domain management of a kind of electric power system data is provided, said method comprising the steps of:
Step 1: according to Data Source and purposes, planning is also established the holographic complete Model in Time Domain of electric network data object;
Step 2: according to the holographic complete Model in Time Domain of electric network data object, determine storage means and memory mechanism;
Step 3: the management method of determining the electric network data object according to storage means;
Step 4: determine that qualitative attribute guarantees mechanism, described qualitative attribute comprises capacity and performance.
Described step 1 may further comprise the steps:
Step 1-1: definition electric network data object information represents; According to administration of power networks application demand and Data Source, determine the representation model of the computer data information of electric network data object;
Step 1-2: determine electric network data Object Management group requirement representation; According to data characteristics, determine data and control and display model that this data management needs;
Step 1-3: definition electric network data objects services represents; Application service type and application that data characteristics is determined, definition method of service and method of servicing.
Described step 2 may further comprise the steps:
Step 2-1: the computer representation of planning electric network data object;
Step 2-2: database storage and the expression of electric network data object; Memory utilization comprises the requirement of data security and data performance attribute;
Step 2-3: memory management method and the requirement of definition electric network data object; The electric network data objects intact represents and stores, and determines its access requirement.
Described step 3 may further comprise the steps:
Step 3-1: the electric network data object is set up management; For specifying the electric network data object, in storage system, set up management based on the storage method of electric network data object;
Step 3-2: electric network data Object Management group operation; Based on the storage method of electric network data object, implement complete operation and Service Management to the electric network data object of setting up;
Step 3-3: electric network data object retrieval.
Described step 4 may further comprise the steps:
Step 4-1: multilayer index mechanism is set; Provide quick indexing mechanism for Classification Management, a minute performance management electric network data object;
Step 4-2: static store index information, dynamic memory change information; Provide flexibly memory mechanism for big data quantity, different demand frequency and a minute performance management electric network data object;
Step 4-3: the data storage of automatically setting up the interior external memory combination of appropriate size standard; General index information keeps memory management, and recorded information, the memory management method of taking interior external memory capable of regulating ratio at regular time and quantity;
Step 4-4: specified data detection method for quality and checking mechanism.
Compared with prior art, beneficial effect of the present invention is: the invention provides the storage define method of the holographic complete time domain management of a kind of electric power system data, can support the overall process of electric power data of any type and administrative purposes and the system of full spectrum information management effectively to realize.The complete autonomous configuration management of management type, object, attribute; Administrative time and process can be selected arbitrarily.The also upper data management performance requirement that cooperates huge size to greatest extent is such as system management capacity, service time performance etc.
Description of drawings
Fig. 1 is the storage define method synoptic diagram of the holographic complete time domain management of electric power system data.
Embodiment
Below in conjunction with accompanying drawing the present invention is described in further detail.
Such as Fig. 1, the invention provides the storage define method of the holographic complete time domain management of electric power system data, to implementing information and the data of management in the electric system, definition and storage administration mechanism with the full change procedure storage of a kind of suitable information realize full-time and the management of change procedure of the information of electric system holography or defined range and scope.The Data View of discontinuity surface when the different application that can be electric system provides.
Holographic time domain management: in the electric system Life cycle of complicated and huge management and operation information interior for the data procedures record management of administrative purposes in the activity time.
Electric power object: the unit objects such as the equipment that firm power system management and operation produce, information.It is low that the general management object data changes frequency, and the frequency of the data variation of operation object does not wait, from low and very high, according to the type of data message not.
Holographic complete time domain data management method: the basis that is power system management and operation control.By defining rational power system objects and support management method holographic, complete time domain, the using the software that the master data demands such as foundation, inquiry, analysis, preservation are provided for Operation of Electric Systems and management and realize of realization.
Namely define a basic management type object, both the data of static state managed, also the information that changes is carried out process tracking, and time-based Data View Administration service is provided.
The primary demand of holographic complete time domain data management comprises the data management service that can be deployed in by providing convenience the different pieces of information source point, realizes that the full-time territory procedural information of all data of electric system develops and manages.By data service method, for power system management and operation provide related definition to satisfy the Data View of the time correlation of definable demand.
Holographic complete time domain data management system is the storage system by appropriate design, sets up and realize the software service method in the main data management server of electric system; And can dispose a plurality of supervisor servicess according to the situation of data scale and application demand, Data Source.
Holographic complete time domain data management is the store and management by definition electric power data object, supports the support of and time overall process holographic to data and management method to realize.
Definable object type and the rule with the unique name of electric power object, object properties information that can arbitrary disposition realizes data definition and management to different management in the electric system.
Data producing source is implemented the holographic data construction by the remote method of data management service; The application system of administration of power networks and operation control also can be passed through data service method, and the definition that obtains the fixed time section has the Data View information of specifying purpose and scope.
Take real-time version, the management of data event sequence and the management method of increments of change version for huge data, change and follow the tracks of and Whole Course Management.
Expression and the memory mechanism of holographic complete time domain data management definition active data.
The electric power object of definition datum is used for being illustrated in the information description that electric system has unique number and the object of type distribution and the relevant physical attribute of determining; Comprise simultaneously the relevant physical behavio(u)r of physical attribute, objects association behavior etc.
Definition is based on the time change management of the electric power object of attribute data dictionary change management, with the variation of minimal information record electricity object.
The storage organization model that definition is high with electric power object matching degree, and utilize storage system and data management system, efficiently realize data management and the service of the holographic overall process of electric system.
Determine in the qualitative attribute assurance mechanism multilayer index mechanism to be set, by the analysis management features of the object, the type of design object, object, object properties three layer indexs mechanism.
The electric power data object is managed.Object type can be according to the definition of regulatory requirement purpose, and the data object relevant such as the operation in the operational management can be according to classification such as zone, electric pressures; Also can classify according to the physical attribute of equipment and element; Object then is the management object that is under the jurisdiction of unique name of certain type, such as the object of the CB2000 of switchtype; Attribute is defined as static state or the dynamic attribute of a concrete management object participative management.
Static index, dynamically recording: by to the static information of object identity as index, variable and variable attribute information etc. is carried out the record of dynamic change.
Memory mechanism: the memory mechanism that defines completely hierarchical index, static index and dynamically recording information.
Data capsule: the storage concept that defines Basic Design by the data management container that utilizes each software translating system to realize.
Database: by utilizing database table to store and set up management relevant design concept.
The system performance of design Storage, memory mechanism guarantees, comprising:
Capacity scale: mainly to type, object, attribute capacity setting, can be according to application demand, define arbitrarily and expand.
Service time: to the storage of basic management object, retrieval, modification, deletion etc., by the flexible operation of design Storage, memory mechanism, guarantee the time performance requirement of max cap..
This patent is simplified and the efficiently software systems realization of its regulatory requirement mainly for Whole Course Management definition information and the storage organization of the extensive and high frequency delta data of Whole Course Management.The data area that can manage comprises the data that any needs such as grid equipment information, operation information, grid simulation and applied analysis data carry out the time domain process management.
Embodiment
Take Based on Power System Analysis Software Package PSASP (Power System Analysis Software Package) trend computing application as example, the storage of its holographic complete time domain data management is supported in definition.
[1] the complete time domain memory model definition of trend calculation holographic
Object type: parameter, element, computational data, work data; Generator, transformer etc.; Calculate configuration data, calculation result data etc.;
Object: each information recording/(unique ID);
Object properties: identical with the recording domain that defines in the real system;
Object type is: default
[2] memory mechanism
[2-1] internal memory (C++) expression design:
typedef?std::map<std::string,long,std::less<std::string>>NAME2ID;
∥ defines the corresponding types of a kind of NAME-ID, quick indexing when being used for the storage inside realization
typedef?std::map<Date,std::string,std::less<Date>>TIMESTRVALUE;
∥ defines the character numerical value in a kind of moment
The object class management:
The definition of class EDType{} ∥ electric power object type
NAME2ID g_EDTypes; The object type of having managed in the ∥ system; The INT-ID of one type of name of definition is corresponding
Int g_maxEDType; The type of the object of having managed in the ∥ define system
Object Management group:
The object definition of class EDObject{} ∥ electric power
NAME2ID g_EDObjects; The object of having managed in the ∥ system; The INT-ID of one type of name of definition is corresponding
Int g_maxEDObjects; The object of having managed in the ∥ define system
The object property definition:
[can define separately class or as the language object attribute of EDObject]
NAME2ID m_AttrMap; The corresponding table of ∥ attribute
Int m_maxAttrs; ∥ has set up the attribute of management
Std::vector<std::string〉m_AttrValues; The last look that the character type that the ∥ attribute sorts according to ID represents
TIMESTRVALUE*m_AttrVerValues; The version value of ∥ attribute; ID corresponding relation and m_AttrMap system
[2-2] database table represents design:
The storage system concordance list
The electric power object type index of EDType_Index system management
EDObject_EDTypeXXXX_Index type electric power object indexing
EDObjectAttrs_EDTypeXXXX_Index type electric power object properties index
List object
Certain type electric power list object of EDObject_EDTypeXXXX management
Certain type electric power object properties [time value] of EDOIDXXXX_AttrIDXX management
[2-3] management method:
The function that can need by defining the realization of administrative class and design management method also can be by standard A PI definition realization.
bool?AddEDObect(Date,EDObject);
bool?AddEDAccount(EDObject&P_DBObject,Date&P_Date);
bool?RemoveEDAccount(EDObject&P_DBObject);
EDOAccount&SearchEDAccount(EDObject&P_DBObject);
EDObject*SearchEDObject(EDObject&P_DBObject,Date&P_Date);
bool?PurgeEDOState(Date&P_Date);
[3] rudimentary algorithm comprises the single of newly-built, deletion, Query Information and the in batches management of object.
[3-1] newly-built/add Object Management group (substantially) algorithm:
1, checks the type information EDType of electric power object EDObject
2, the types index managing listings of setting up in the index management system.
If a) set up this object, then from the types index management, obtain the inner EDTypeID that uses of its management system;
B) if this object not, then the type is joined the types index management not Biao in, corresponding management information is set; Obtain simultaneously its newly assigned type EDTypeID.
3, utilize EDTypeID, directly in the tabulation of its Object Management group class, add operation.
A) the name information EDOName(of inspection electric power object is unique, and is unique in the classification at least) and in the object indexing tabulation of the type Object Management group tabulation, check the management of whether having set up this object;
B) if set up the management of this object, from its object indexing tabulation, obtain its EDOID;
C) if do not set up the management of this object, then in the object indexing tabulation, set up management, and return the EDOID of its distribution
4, utilize the EDOID that obtains, directly anchored object position in the Object Management group tabulation of the type is implemented the time new edition of newly-built adding and existing object and is set up.
A) newly add management object, in the anchored object position, the record electricity object information; And generate the property index tabulation etc. of relevant first creative management;
B) existing object from the anchored object position, utilizes the electric power object information that writes, record current time and attribute change information last time; Revise property index list information etc.
Algorithm is deleted/removed to [3-2] Object Management group
For supporting that version data can be managed any time, for the deletion of the object type of management participation, object, object properties information, take that the deletion beacon information represents in its index, and do not do the entity information deletion.
1, electric power object deletion can specify single object or batch object to carry out; Position according to this object indexing tabulation of operation of the electric power object of appointment arranges deletion and indicates, and the supervisor status of the object in its management object tabulation of juxtaposition is " deletion ";
2, type object deletion arranges " deletion " state in the types index tabulation, and in this Object Management group tabulation its " deletion " supervisor status is set;
3, object properties are equally to its index and managing listings setting " deletion " information;
4, deletion information is for inquiry, index, adding/upgating object management provide logical process information;
5, the entity deletion is carried out in clear operation, can not inquire about the object information that is eliminated.
[3-3] retrieval/query object management algorithm:
1, checks the type information EDType of electric power object EDObject;
The types index tabulation of 2, setting up in the index management system.
Be " normally " if a) set up this Object Management group and its supervisor status, then from the types index management, obtain the inner EDTypeID that uses of its management system;
B) otherwise, directly arrange the inquiry empty object information
3, utilize EDTypeID, on the index and managing listings of its Object Management group class, retrieve
A) the name information EDOName(of inspection electric power object is unique, and is unique in the classification at least) and in the object indexing tabulation of the type Object Management group tabulation, check the management of whether having set up this object;
B) if set up management and state for " normally ", from tabulating, its object indexing obtains its EDOID; Determine " normally " time and query time matching, as meet and then carry out Object Query; Otherwise, do not carry out follow-up inquiry work, the empty object information of inquiry directly is set;
C) if built standpipe reason but state be " deletion " directly arranges to inquire about empty object information.
4, utilize the EDOID that obtains, anchored object position during direct Object Management group in the type is tabulated is according to the object information of temporal information structure time version.
A) current information, directly return attribute value;
B) fixed time, need to from each attribute time sequential value, obtain the attribute value with time match; Structure has the constantly electric power object information of numerical value of complete attribute, returns.
[4] qualitative attribute (capacity and performance) guarantees mechanism
1, multi-level Indexing Mechanism: can be according to type, object, attribute, even the Index Design of dividing for more multi-layered time, guarantee the direct location of management object; And support the modification of regime type, attribute, support the mutable object attribute management.
2, be association of activity and inertia: the static store index information; Index information is take change information not as first-selected;
The dynamic memory change information, and define with minimum information unit (object).
3, internal memory/disk combination: according to internal memory and the disk storage resource situation of computer system, and according to generation and the handling characteristics of data object of management, automatically set up the data storage of the interior external memory combination of appropriate size standard; General index information keeps memory management, and recorded information, and the frequency that especially changes is low, the perhaps low type object of frequency of utilization, the storage management technique of taking interior external memory capable of regulating ratio at regular time and quantity.
4, quality of data inspection: the electric power object has also designed the behavior operational administrative that meets its basic physical features except basic attribute management, comprises the property value quality management in the type object, object relationship bookkeeping etc.
Should be noted that at last: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit, although with reference to above-described embodiment the present invention is had been described in detail, those of ordinary skill in the field are to be understood that: still can make amendment or be equal to replacement the specific embodiment of the present invention, and do not break away from any modification of spirit and scope of the invention or be equal to replacement, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (6)

1. the storage define method of the holographic complete time domain management of an electric power system data is characterized in that: said method comprising the steps of:
Step 1: according to Data Source and purposes, planning is also established the holographic complete Model in Time Domain of electric network data object;
Step 2: according to the holographic complete Model in Time Domain of electric network data object, determine storage means and memory mechanism;
Step 3: the management method of determining the electric network data object according to storage means;
Step 4: determine that qualitative attribute guarantees mechanism.
2. the storage define method of the holographic complete time domain management of electric power system data according to claim 1, it is characterized in that: described step 1 may further comprise the steps:
Step 1-1: definition electric network data object information represents; According to administration of power networks application demand and Data Source, determine the representation model of the computer data information of electric network data object;
Step 1-2: determine electric network data Object Management group requirement representation; According to data characteristics, determine data and control and display model that this data management needs;
Step 1-3: definition electric network data objects services represents; Application service type and application that data characteristics is determined, definition method of service and method of servicing.
3. the storage define method of the holographic complete time domain management of electric power system data according to claim 1, it is characterized in that: described step 2 may further comprise the steps:
Step 2-1: the computer representation of planning electric network data object;
Step 2-2: database storage and the expression of electric network data object; Memory utilization comprises the requirement of data security and data performance attribute;
Step 2-3: memory management method and the requirement of definition electric network data object; The electric network data objects intact represents and stores, and determines its access requirement.
4. the storage define method of the holographic complete time domain management of electric power system data according to claim 1, it is characterized in that: described step 3 may further comprise the steps:
Step 3-1: the electric network data object is set up management; For specifying the electric network data object, in storage system, set up management based on the storage method of electric network data object;
Step 3-2: electric network data Object Management group operation; Based on the storage method of electric network data object, implement complete operation and Service Management to the electric network data object of setting up;
Step 3-3: electric network data object retrieval.
5. the storage define method of the holographic complete time domain management of electric power system data according to claim 1, it is characterized in that: described qualitative attribute comprises capacity and performance.
6. the storage define method of the holographic complete time domain management of electric power system data according to claim 1, it is characterized in that: described step 4 may further comprise the steps:
Step 4-1: multilayer index mechanism is set; Provide quick indexing mechanism for Classification Management, a minute performance management electric network data object;
Step 4-2: static store index information, dynamic memory change information; Provide flexibly memory mechanism for big data quantity, different demand frequency and a minute performance management electric network data object;
Step 4-3: the data storage of automatically setting up the interior external memory combination of appropriate size standard; General index information keeps memory management, and recorded information, the memory management method of taking interior external memory capable of regulating ratio at regular time and quantity;
Step 4-4: specified data detection method for quality and checking mechanism.
CN201210433138.1A 2012-11-02 2012-11-02 Storage definition method for electric power system data holographic complete time domain management Active CN102968666B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210433138.1A CN102968666B (en) 2012-11-02 2012-11-02 Storage definition method for electric power system data holographic complete time domain management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210433138.1A CN102968666B (en) 2012-11-02 2012-11-02 Storage definition method for electric power system data holographic complete time domain management

Publications (2)

Publication Number Publication Date
CN102968666A true CN102968666A (en) 2013-03-13
CN102968666B CN102968666B (en) 2014-03-12

Family

ID=47798797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210433138.1A Active CN102968666B (en) 2012-11-02 2012-11-02 Storage definition method for electric power system data holographic complete time domain management

Country Status (1)

Country Link
CN (1) CN102968666B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955520A (en) * 2014-05-09 2014-07-30 苏州鸣伦电子科技有限公司 Expressive method for feedback information of electricity demanding side
CN105321006A (en) * 2014-06-16 2016-02-10 深圳市雅都软件股份有限公司 Multi-scene service information automatic sharing platform with time tag and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101815003A (en) * 2010-02-23 2010-08-25 浪潮通信信息系统有限公司 Uniform resource model of full service converged network
CN102063509A (en) * 2011-01-12 2011-05-18 南京南瑞继保电气有限公司 Model and modeling method of multi-dimensional data integration of heterogeneous databases of electric power information system
CN102646222A (en) * 2012-02-17 2012-08-22 中国电力科学研究院 All-data management method of power grid

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101815003A (en) * 2010-02-23 2010-08-25 浪潮通信信息系统有限公司 Uniform resource model of full service converged network
CN102063509A (en) * 2011-01-12 2011-05-18 南京南瑞继保电气有限公司 Model and modeling method of multi-dimensional data integration of heterogeneous databases of electric power information system
CN102646222A (en) * 2012-02-17 2012-08-22 中国电力科学研究院 All-data management method of power grid

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103955520A (en) * 2014-05-09 2014-07-30 苏州鸣伦电子科技有限公司 Expressive method for feedback information of electricity demanding side
CN105321006A (en) * 2014-06-16 2016-02-10 深圳市雅都软件股份有限公司 Multi-scene service information automatic sharing platform with time tag and method

Also Published As

Publication number Publication date
CN102968666B (en) 2014-03-12

Similar Documents

Publication Publication Date Title
CN101789045B (en) Realization method of MDA modeling tool orienting to manufacturing field
CN104462244A (en) Smart city heterogeneous data sharing method based on meta model
CN103646348B (en) Method for saving factory station wiring diagram panoramic inversion context
CN108874988A (en) A kind of search method of pair of data object
CN106055590A (en) Power grid data processing method and system based on big data and graph database
CN104778551A (en) Designing and analyzing method of visualization grid
CN111082521A (en) Operation and maintenance data monitoring method and operation and maintenance system of power grid regulation and control system
CN106407468B (en) A method of description things space attribute is simultaneously searched based on the description
CN102968666B (en) Storage definition method for electric power system data holographic complete time domain management
CN107451222A (en) Model data management system
CN114741853A (en) Simulation operation platform and method based on universal blackboard system
Qian et al. Research on key construction technology of building engineering under the background of big data
CN104391949B (en) A kind of wide-area data method for managing resource based on data dictionary
CN103164760A (en) Power grid increment planning method and system
CN103345485B (en) A kind of mainframe platform dynamic statement automatic generation method and system
CN115884235A (en) 5G network digital twin modeling method and device, computer equipment and storage medium
CN105488229A (en) Data exchange and integration method applied to heterogeneous data environment
Pan et al. An open sharing pattern design of massive power big data
CN113783304A (en) Transformer substation monitoring cloud-side cooperative system
Xin Urban planning and management information systems analysis and design based on GIS
CN112381500B (en) BPA model parameter maintenance method and system based on Web service
CN115766447B (en) Equipment function updating method and device
CN101409889A (en) Method for storing discharging-directly station network management monitoring configuration information
Shao et al. Simulation Research of Intelligent Operation and Maintenance Information System of Rail Transit Based on Digital Twin
CN103309934B (en) Medium-low voltage distribution network data integration platform and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant