CN102953549B - Novel quick tensioning construction method for front-blocked jack - Google Patents

Novel quick tensioning construction method for front-blocked jack Download PDF

Info

Publication number
CN102953549B
CN102953549B CN201110253279.0A CN201110253279A CN102953549B CN 102953549 B CN102953549 B CN 102953549B CN 201110253279 A CN201110253279 A CN 201110253279A CN 102953549 B CN102953549 B CN 102953549B
Authority
CN
China
Prior art keywords
clip type
type jack
jack
oil
draw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110253279.0A
Other languages
Chinese (zh)
Other versions
CN102953549A (en
Inventor
杨基好
宋善岭
徐加增
贡蓝珊
段胜伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN201110253279.0A priority Critical patent/CN102953549B/en
Publication of CN102953549A publication Critical patent/CN102953549A/en
Application granted granted Critical
Publication of CN102953549B publication Critical patent/CN102953549B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a novel quick tensioning construction method for a front-blocked jack. The novel quick tensioning construction method is applicable to the tensioning construction of a bridge pre-stressed projects in traffic engineering (such as bridge engineering, railway engineering, highway engineering and municipal engineering) and pre-stressed structure projects in the building industry. According to the novel quick tensioning construction method for the front-blocked jack, a steel strand in a beam is tensioned by the front-blocked jack. The novel quick tensioning construction method for the front-blocked jack is characterized by comprising the following steps: sequentially mounting working clips on steel strand bundles on the beam; fastening and positioning the working clips; then mounting limiting plates which are matched in diameter on the steel strands; mounting a lengthening sleeve, the front-blocked jack and tool clips; quickly tensioning; and returning oil and releasing. The novel quick tensioning construction method for the front-blocked jack combines the advantages of various domestic construction technologies based on front-blocked jacks and rear-blocked jacks, and is simple, safe, quick, efficient, environmentally friendly and energy-saving, greatly improves the production efficiency, reduces the construction cost, and reduces the construction period.

Description

Front clip type jack quick tensioning construction method
Technical field
The present invention relates to front clip type jack quick tensioning construction method and be adapted to different types of rridges, in the stretching construction of the bridge prestress engineerings of traffic engineering such as railway, highway, municipal administration and the prestressed structure engineering of builing industry.
Background technology
The domestic prestress tensioning equipment for the Engineering such as traffic, building of China mostly is traditional rear clip type jack, and the steel strand exposed are longer, and cost is high, waste is large.Clip type jack before the minority of the domestic appearance of current China: the anchor hole center to center distance had can not adapt to existing work anchor too greatly, and application is limited to very much; The bad handling of some manufacturabilities are inconvenient, therefore widely applied.
Summary of the invention
In order to make up the deficiencies in the prior art, invention provides a kind of and saves material and the high front clip type jack quick tensioning construction method of efficiency.
Invention is achieved by the following technical solution:
Clip type jack quick tensioning construction method before a kind of, strained by the steel strand of beam inside by jack, its construction method comprises, and its processing step is as follows:
One, the fast blanking of steel strand, lashing: steel strand are adopted CSJ15-1A steel strand strand pulling machine pair
Bridge carries out lashing and blanking;
Two, clip type jack accessory before Fast Installation
1. installation work intermediate plate: work clip sheet is arranged on steel strand, steel strand are fastening;
2. mounting limit plate: by the limiting plate matched with steel strand diameter, accurate contraposition is installed;
Three, clip type jack before installing: first the stretch-draw oil circuit of oil pump is connect front clip type jack stretch-draw chamber oil nozzle, stretch-draw oil circuit also received by calibrated pressure meter simultaneously, oil pump backhaul oil circuit connects the backhaul oil nozzle of front clip type jack, and the safety valve of stretch-draw oil circuit is adjusted to 10MPa, then before utilizing the hoisting frame be fixed on prefabricated case beam to promote, clip type jack is to stretching notch, and rapid-aligning is installed;
Four, fast fixing tool anchor: bearing pin and draw-in groove are turned an angle, bearing pin and draw-in groove are in can connection status, can complete the installation of moveable anchor;
Five, erecting tools intermediate plate: ready tool clamping piece will be shifted to an earlier date and install fastened in place;
Six, quick tensioning: open switch, stretch-draw oil circuit fuel feeding hydraulic oil is filled with stretch-draw oil pocket, promotion cylinder body advance and cylinder body outwards move, and the hydraulic oil of the oil circuit of backhaul is simultaneously flowed in the fuel tank of oil pump by backhaul oil circuit, and backhaul oil circuit now must be open mode;
Seven, oil return pine: open oil return switch backhaul oil circuit fuel feeding, the oil return of stretch-draw oil circuit, hydraulic oil is filled with backhaul oil pocket, promotes cylinder body and retreats retraction, the hydraulic oil of the oil circuit of backhaul is simultaneously flowed in the fuel tank of oil pump by stretch-draw oil circuit, and stretch-draw oil circuit now must be open mode;
Eight, moveable anchor move back anchor, dismounting fast: tool clamping piece, moveable anchor, front clip type jack, limiting plate are dismantled successively;
Nine, enter the circulation of next operation: the tool clamping piece under dismounting, moveable anchor, front clip type jack, limiting plate are put well successively, prepare to enter the circulation of next operation.
Clip type jack quick tensioning construction method before the present invention; Accessory installation work intermediate plate on front clip type jack and mounting limit plate are first arranged on steel strand respectively, and then front clip type jack, moveable anchor, tool clamping piece are installed successively, after all installing, quick tensioning is stretching by steel strand, then oil return pine, the moving back anchor fast and device therefor and workpiece disassembled, for next bridge is with preparing of moveable anchor.
This processing step also includes the installation that transition lengthens cover, and transition lengthens cover and is mainly used in the cave anchor of railway beam, and non-cave anchor can omit this part, and transition lengthens cover and can install in advance, namely installs before clip type jack before Installation of New Type.
The moveable anchor of this front clip type jack is that the 45# Steel material of being heat-treated by ionic nitriding Technology for Heating Processing is made, its compliance is extensive, all working anchor can be adapted to and easily move back anchor, when do not use any move back anchor agent just easily can move back anchor fast; Positioning sleeve and the gland of jack adopt bearing pin card slot type to be connected, and because positioning sleeve and gland adopt bearing pin card slot type to be connected, positioning sleeve easy accessibility, can quick despatch moveable anchor.Change moveable anchor specification convenient and swift, when moveable anchor changed by needs, only need by bearing pin and draw-in groove slightly gyration (being in detachable state) can positioning sleeve be taken out, then directly take out moveable anchor, change very quick.After changing moveable anchor, then bearing pin and draw-in groove are in clamped condition, the installation of moveable anchor can be completed, not only convenient but also quick, effectively improve operating efficiency.
The advantage of this construction method is mainly reflected in following several respects
1, front clip type jack quick tensioning construction: the placement of front clip type jack is contrary with rear cassette, and piston is near work anchor, and moveable anchor is contained in jack inside, when stretch-draw, piston is motionless, and cylinder part drives punching cover mobile, thus drives moveable anchor to move to carry out stretch-draw.Because the moveable anchor of novel front clip type jack is inner at jack, shorten its distance with work anchor, so the activity duration both having accelerated stretch-draw in turn saves steel strand (often end saving about 0.4 ~ 0.5m).
2, moveable anchor move back anchor technology fast: the moveable anchor of this front clip type jack is that the 45# Steel material of being heat-treated by ionic nitriding Technology for Heating Processing is made, its compliance is extensive, all working anchor can be adapted to and easily move back anchor, when do not use any move back anchor agent just easily can move back anchor fast.
3, the rapid-aligning lashing technology of moveable anchor: moveable anchor is inner by step power transmission at punching cover, and can arbitrarily rotate, and can not change its front and back position as being threaded, therefore very convenient with work anchor contraposition, be convenient to lashing.
4, moveable anchor quick loading, unloading, change technology: because positioning sleeve and gland adopt bearing pin card slot type to be connected, positioning sleeve easy accessibility, energy quick despatch moveable anchor.Change moveable anchor specification convenient and swift, when moveable anchor changed by needs, only need by bearing pin and draw-in groove slightly gyration (being in detachable state) can positioning sleeve be taken out, then directly take out moveable anchor, change very quick.After changing moveable anchor, then bearing pin and draw-in groove are in clamped condition, the installation of moveable anchor can be completed, not only convenient but also quick, effectively improve operating efficiency.
5, a difficult problem for stretch-draw insufficient space is overcome: during tensioning construction between the cast-in-situ box girder and prefabricated case beam of railway or bridges in highway engineering, between cast-in-situ box girder and cast-in-situ box girder (containing continuous girders by suspension grouting), because of stretch-draw insufficient space, traditional rear cassette generally only has 0.6 ~ 0.8m, and front cassette space is up to 1.8m, novel front clip type jack can overcome the shortcoming of stretch-draw insufficient space.
Front clip type jack quick tensioning construction method, combine the advantage of domestic various forward and backward clip type jack construction technology, construction method be simple and easy, safe, fast, efficient, environmental protection, energy-conservation, substantially increase production efficiency, save engineering cost, shorten the construction period.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, invention is further described:
Fig. 1 is the structural representation of the technological process of invention;
Fig. 2 is structure and the accessory figure of front clip type jack used in the technological process of invention.
In figure, 1. bonnet; 2. gland; 3. punching cover; 4. positioning sleeve; 5. piston; 6. cylinder body; 7. tool clamping piece; 8. work anchor ring; 9. moveable anchor; 10. protecgulum; 11. transition lengthen cover; 12 limiting plates; 13. work clip sheets.
Detailed description of the invention
It is below a kind of specific embodiment of invention.In this processing step, novel kilocalorie jack used is made up of bonnet 1, gland 2, punching cover 3, positioning sleeve 4, piston 5, cylinder body 6, tool clamping piece 7, moveable anchor 9 and protecgulum 10, accessory used comprises transition and lengthens cover 11, limiting plate 12, work clip sheet 13 and work anchor ring 8, wherein lengthens cover for apolegamy part.
It is as follows that this embodiment comprises processing step:
One, the fast blanking of steel strand, lashing
CSJ15-1A steel strand strand pulling machine is adopted by steel strand to carry out lashing and blanking to bridge.
Two, clip type jack accessory before Fast Installation
1. installation work intermediate plate 13: work clip sheet 13 is arranged on steel strand, steel strand are fastening;
2. mounting limit plate 12: by the limiting plate 12 matched with steel strand diameter, accurate contraposition is installed;
3. transition is installed and lengthens cover 11:
Three, clip type jack before installing
The stretch-draw oil circuit of oil pump connects front clip type jack stretch-draw chamber oil nozzle, stretch-draw oil circuit also received by calibrated pressure meter simultaneously, oil pump backhaul oil circuit connects the backhaul oil nozzle of front clip type jack, and the safety valve of stretch-draw oil circuit is adjusted to 10MPa, then before utilizing the hoisting frame be fixed on prefabricated case beam to promote, clip type jack is to stretching notch, and rapid-aligning is installed;
Four, fast fixing tool anchor 9
By bearing pin and draw-in groove slightly gyration make it be in can connection status, the installation of moveable anchor 9 can be completed;
Five, erecting tools intermediate plate 7
Ready tool clamping piece 7 will be shifted to an earlier date fastened in place will be installed.
Six, quick tensioning: open switch, stretch-draw oil circuit fuel feeding hydraulic oil is filled with stretch-draw oil pocket, promotion cylinder body advance and cylinder body outwards move, and the hydraulic oil of the oil circuit of backhaul is simultaneously flowed in the fuel tank of oil pump by backhaul oil circuit, and backhaul oil circuit now must be open mode;
Seven, oil return pine: open oil return switch backhaul oil circuit fuel feeding, the oil return of stretch-draw oil circuit, hydraulic oil is filled with backhaul oil pocket, promotes cylinder body and retreats retraction, the hydraulic oil of the oil circuit of backhaul is simultaneously flowed in the fuel tank of oil pump by stretch-draw oil circuit, and stretch-draw oil circuit now must be open mode;
Eight, moveable anchor move back anchor, dismounting fast: tool clamping piece 7, moveable anchor 9, front clip type jack, limiting plate 12 are dismantled successively;
Nine, enter the circulation of next operation: the tool clamping piece 7 under dismounting, moveable anchor 9, front clip type jack, limiting plate 12 are dismantled successively and put well successively, prepare to enter the circulation of next operation.
Mark deep and clear river grand bridge for large western special line for passenger trains III and lead to bridge (2008) 2322A series 31.5m and 23.5m case beam 582 Pin, now 450 Pin are produced, every Pin prefabricated case beam has 27 prestressed stretch-draw ducts, the often end in each duct is saved steel strand length and is considered according to 0.4m, cost-saved 63.375 ten thousand yuan altogether.
Save the quantity of steel strand: G=(+1 hole × 12 piece, 26 hole × 9) × 0.8m × 1.101/1000 × 450 Pin=97.5t (steel strand)
The cost of saving: 97.5t × 6500 yuan/t=63.375 ten thousand yuan.

Claims (5)

1. a clip type jack quick tensioning construction method before, strained by the steel strand of beam inside by jack, its processing step is as follows:
One, the fast blanking of steel strand, lashing: adopted by steel strand CSJ15-1A steel strand strand pulling machine to carry out lashing and blanking to bridge;
Two, clip type jack accessory before Fast Installation
1. installation work intermediate plate (13): work clip sheet (13) is arranged on steel strand, steel strand are fastening;
2. mounting limit plate (12): limiting plate (12) accurate contraposition matched with steel strand diameter is installed;
Three, clip type jack before installing: the stretch-draw oil circuit of oil pump connects front clip type jack stretch-draw chamber oil nozzle, the stretch-draw oil circuit of front clip type jack also received by calibrated pressure meter simultaneously, oil pump backhaul oil circuit connects the backhaul oil nozzle of front clip type jack, and the safety valve of the stretch-draw oil circuit of front clip type jack is adjusted to 10MPa, then before utilizing the hoisting frame be fixed on prefabricated case beam to promote, clip type jack is to stretching notch, and rapid-aligning is installed;
Four, fast fixing tool anchor (9): bearing pin and draw-in groove are turned an angle, bearing pin and draw-in groove are in can connection status, can complete the installation of moveable anchor (9);
Five, erecting tools intermediate plate: ready tool clamping piece will be shifted to an earlier date and install fastened in place;
Six, quick tensioning: open switch, stretch-draw oil circuit fuel feeding hydraulic oil is filled with stretch-draw oil pocket, promotion cylinder body advance and cylinder body outwards move, and the hydraulic oil of the oil circuit of backhaul is simultaneously flowed in the fuel tank of oil pump by backhaul oil circuit, and backhaul oil circuit now must be open mode;
Seven, oil return pine: open oil return switch, backhaul oil circuit fuel feeding, the oil return of stretch-draw oil circuit, hydraulic oil is filled with backhaul oil pocket, promote cylinder body and retreat retraction, the hydraulic oil of the oil circuit of backhaul is simultaneously flowed in the fuel tank of oil pump by stretch-draw oil circuit, and stretch-draw oil circuit now must be open mode;
Eight, moveable anchor move back anchor, dismounting fast: tool clamping piece (7), moveable anchor (9), front clip type jack, limiting plate (12) are dismantled successively;
Nine, enter the circulation of next operation: the tool clamping piece (7) under dismounting, moveable anchor (9), front clip type jack, limiting plate (12) are put well successively, prepare to enter the circulation of next operation.
2. front clip type jack quick tensioning construction method according to claim 1, when its processing step is also included in clip type jack accessory before Fast Installation, installs transition and lengthens cover (11) after mounting limit plate.
3. front clip type jack quick tensioning construction method according to claim 1, in its processing step, used tool anchor is that the 45# Steel material of being heat-treated by ionic nitriding Technology for Heating Processing is made.
4. front clip type jack quick tensioning construction method according to claim 1, in its processing step, the positioning sleeve (4) of jack used adopts bearing pin card slot type to be connected with gland (2).
5. front clip type jack quick tensioning construction method according to claim 1, in its processing step, kilocalorie jack used is made up of bonnet (1), gland (2), punching cover (3), positioning sleeve (4), piston (5), cylinder body (6), tool clamping piece (7), moveable anchor (9) and protecgulum (10), and accessory used comprises transition and lengthens cover (11), limiting plate (12), work clip sheet (13), work anchor ring (8).
CN201110253279.0A 2011-08-30 2011-08-30 Novel quick tensioning construction method for front-blocked jack Expired - Fee Related CN102953549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110253279.0A CN102953549B (en) 2011-08-30 2011-08-30 Novel quick tensioning construction method for front-blocked jack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110253279.0A CN102953549B (en) 2011-08-30 2011-08-30 Novel quick tensioning construction method for front-blocked jack

Publications (2)

Publication Number Publication Date
CN102953549A CN102953549A (en) 2013-03-06
CN102953549B true CN102953549B (en) 2015-03-18

Family

ID=47762885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110253279.0A Expired - Fee Related CN102953549B (en) 2011-08-30 2011-08-30 Novel quick tensioning construction method for front-blocked jack

Country Status (1)

Country Link
CN (1) CN102953549B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108103946A (en) * 2017-12-21 2018-06-01 中国十九冶集团有限公司 Tensioning device applied to small space construction

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225403B (en) * 2013-05-10 2015-07-15 史东生 Method for installing elastic supporting and lifting devices by adopting prestressing technique
CN105422131B (en) * 2015-12-28 2018-07-06 上海市机械施工集团有限公司 The device and its application method longitudinally tensed for shield duct piece
CN106809759A (en) * 2017-03-02 2017-06-09 湖南联智智能科技有限公司 A kind of preceding clip type jack from dynamometry value
CN117486114B (en) * 2024-01-03 2024-03-05 河南丽卡数控设备有限公司 Multi-hole front clamping jack

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09217493A (en) * 1996-02-14 1997-08-19 Abe Kogyosho:Kk Device for automatic tension system for pc structure
CN2460241Y (en) * 2000-11-13 2001-11-21 柳州欧维姆建筑机械有限公司 Jack for single prestressed reinforcing steel stretch-draw
CN101397851A (en) * 2008-10-24 2009-04-01 上海建科建设发展有限公司 Construction regulation means of prestressing force steel construction stretching end cable force
CN201635028U (en) * 2009-09-11 2010-11-17 李树颜 Retrogradation restricting device for one-way road
CN102003072A (en) * 2010-10-08 2011-04-06 天津滨海盈信投资有限公司 Steel strand bundle-weaving and crossing construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09217493A (en) * 1996-02-14 1997-08-19 Abe Kogyosho:Kk Device for automatic tension system for pc structure
CN2460241Y (en) * 2000-11-13 2001-11-21 柳州欧维姆建筑机械有限公司 Jack for single prestressed reinforcing steel stretch-draw
CN101397851A (en) * 2008-10-24 2009-04-01 上海建科建设发展有限公司 Construction regulation means of prestressing force steel construction stretching end cable force
CN201635028U (en) * 2009-09-11 2010-11-17 李树颜 Retrogradation restricting device for one-way road
CN102003072A (en) * 2010-10-08 2011-04-06 天津滨海盈信投资有限公司 Steel strand bundle-weaving and crossing construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108103946A (en) * 2017-12-21 2018-06-01 中国十九冶集团有限公司 Tensioning device applied to small space construction
CN108103946B (en) * 2017-12-21 2019-04-16 中国十九冶集团有限公司 Tensioning device applied to small space construction

Also Published As

Publication number Publication date
CN102953549A (en) 2013-03-06

Similar Documents

Publication Publication Date Title
CN102953549B (en) Novel quick tensioning construction method for front-blocked jack
CN106395674A (en) Intelligent front-clamping type jack
CN202200257U (en) Jig for pressing in pins
CN202284348U (en) Structure for fixing transverse beam and vertical column of curtain wall by using spring pressing plate
CN211173175U (en) Guide device for rapid positioning of assembled wallboard
CN205064431U (en) Inside callipers formula pneumatic cylinder for anchor is buried deeply in stretch -draw
CN104047398A (en) Automatic clamping piece of tool anchor
CN203199934U (en) Front-clamping type tensioning jack
CN203307931U (en) Embedded part positioning screw connecting structure
CN204019725U (en) A kind of concrete box girder prestressing force drawing steel stranded wire move back anchor device
CN103882840B (en) A kind of surge shaft Cast-in-place concrete assembling falsework and mounting method thereof
CN201367756Y (en) Armored concrete chimney with steel plate outer cylinder
CN202491213U (en) Portable clamp withdrawal tool of belt pulley
CN202337669U (en) Prestress internal clamping jack
CN204685943U (en) A kind of for forging automatic bending device
CN212803228U (en) Shield translation device
CN210530882U (en) Large-diameter longitudinal duct piece mistake proofing platform temporary fixing clamp
CN211444850U (en) Front clamping type hydraulic jack for post-tensioning method railway precast beam
CN210172859U (en) Gasket feeding device for welding machine
CN201225006Y (en) Clamp special for beam formwork
CN204001430U (en) Automated tool anchoring clamping piece
CN201907949U (en) Prestressed tensioning jack for highway and railway bridges
CN102218628B (en) Prestressed pile tip anchor bar welding mould
CN211889622U (en) Rivet welding platform of general coincide wallboard
CN201416603Y (en) Coupler capable of aligning fast

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161017

Address after: 210023, A6 building, Purple East International Creative garden, No. 2 Purple East Road, Qixia District, Jiangsu, Nanjing

Patentee after: China Railway Tenth Bureau Group Fourth Engineering Co.,Ltd.

Address before: 250101 Shandong city in Ji'nan Province, Lixia District (the New District) Shun Tai Plaza No. 7

Patentee before: China Railway Tenth Group Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150318