Multi-position half-impending LED integrated ceiling Download PDFInfo
- Publication number
- CN102953492A CN102953492A CN2012104468365A CN201210446836A CN102953492A CN 102953492 A CN102953492 A CN 102953492A CN 2012104468365 A CN2012104468365 A CN 2012104468365A CN 201210446836 A CN201210446836 A CN 201210446836A CN 102953492 A CN102953492 A CN 102953492A
- Authority
- CN
- China
- Prior art keywords
- steel frame
- led lamp
- led
- lamp holder
- impending
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Non-Portable Lighting Devices Or Systems Thereof (AREA)
- Fastening Of Light Sources Or Lamp Holders (AREA)
Abstract
The invention discloses a multi-position half-impending LED integrated ceiling which comprises a steel skeleton (1), a rod (2), a screw rod (3) and an LED lamp holder (4), wherein the steel skeleton (1) is fixed to the top of a building through the screw rod (3), the rod (2) is hung under the steel skeleton (1), and the LED lamp holder (4) is arranged on the lower tip of the rod (2). The multi-position half-impending LED integrated ceiling has the advantages that the level up degree of densely distributed half-impending LED lamp positions is effectively controlled, the installation process is simplified, the construction period is shortened, a large amount of on-site LED aerial work is reduced, the construction efficiency is improved, and a developed steel skeleton base structure unit module can realize industrial batch production of products and on-site finished product installation in units.
Description
Technical field
The present invention relates to a kind of multi-point half unsettled LED Integral ceiling, especially be applied in modern medium-to-high grade hotel and the club's engineering in hall or the dining room.
Background technology
Multi-point half hanging type LED lamp because of its environmental protection and energy saving and moulding uniqueness, is subject to owner and designer's welcome, and more and more large tracts of land are used for high-grade hotel, artistic club.But many, densely distributed because of its LED lamp point position, the scale of construction large, unsettled, the unmanageable reason of integral smoothness partly, caused very large difficulty to practice of construction.At present unit in charge of construction when installation still according to the conventional lamp mounting method in construction, new breakthrough is not arranged, also produced a series of common quality defect as: the each point position is uneven, and the work high above the ground efficiency of construction is low, not easy-maintaining etc.The present invention starts with from multi-point half vertical empty formula LED lamp base layer structure, production technology and Installation Technology and researchs and solves above-mentioned construction technology difficult point.
Summary of the invention
The objective of the invention is: provide a kind of multi-point half unsettled LED Integral ceiling, half unsettled LED lamp point position level levelling degree of dense distribution is effectively controlled, simplifies mounting process, the reduction construction period, reduce on-the-spot a large amount of LED work high above the ground, improve efficiency of construction.
Technical scheme of the present invention is: a kind of multi-point half unsettled LED Integral ceiling, it includes steel frame, rod member, screw mandrel, LED lamp holder, described steel frame is fixed to construction ceiling by screw mandrel, peg spare under the steel frame, and the rod member lower end arranges the LED lamp holder on the termination.
The below is further expalined technique scheme:
Described screw mandrel is connected with steel frame by angle steel.
Described screw mandrel is connected by securing member with angle steel, angle steel and steel frame welding.
Described LED lamp holder detachable assembled is to termination, rod member lower end.
Described rod member is stainless pipe.
It is terminal that described LED lamp holder embeds stainless pipe.
Described steel frame is made of some steel frame unit modules.
Described steel frame unit module is of a size of 1200mm*1200mm.
Advantage of the present invention is: multi-point of the present invention half unsettled LED Integral ceiling, half unsettled LED lamp point position level levelling degree of dense distribution is effectively controlled, the technological difficulties of this technique in construction have been solved, simplified mounting process, reduced construction period, reduce on-the-spot a large amount of LED work high above the ground, improved efficiency of construction; The steel frame base layer structure unit module of developing simultaneously can realize that the batch production batch production of product and field unit change into the product installation.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples:
Fig. 1 is structural representation of the present invention (looking up);
Fig. 2 is structural representation of the present invention (side);
Fig. 3 is screw mandrel of the present invention and steel frame connecting joint point diagram;
Fig. 4 is the schematic diagram that LED lamp holder of the present invention embeds lower peg spare end;
Fig. 5 is perspective view of the present invention;
Wherein: 1 steel frame; 2 rod members; 3 screw mandrels; 4 LED lamp holders.
The specific embodiment
Embodiment: such as Fig. 1, Fig. 2, shown in Figure 5, a kind of multi-point half unsettled LED Integral ceiling, it includes steel frame 1, rod member 2, screw mandrel 3, LED lamp holder 4.Steel frame 1 is fixed to construction ceiling by screw mandrel 3,1 time peg spare 2 of steel frame, and rod member 2 lower end arranges LED lamp holder 4 on the termination.
As shown in Figure 3, screw mandrel 3 is connected with steel frame 1 by angle steel.Screw mandrel 3 is connected by securing member with angle steel, angle steel and steel frame 1 welding.As shown in Figure 4, rod member 2 is stainless pipe.LED lamp holder 4 detachable embedding stainless pipes are terminal.Steel frame 1 is made of some steel frame unit modules, and the steel frame unit module is of a size of 1200mm*1200mm.
The present embodiment comprises following main points when implementing:
1, custom-sized steel frame 1 should be according to on-the-spot each the accurate unwrapping wire of in-depth composing location, LED lamp point position, steel frame 1 basic unit is carried out the 1200mm*1200mm unit to be cut apart, guarantee to hang stainless pipe (rod member 2) firm welding under the U-shaped steel of 40mm*20mm*2mm on each steel frame unit module and the 20mm, steel frame basic unit then is connected on the 8# furred ceiling screw mandrel (screw mandrel 3) by the 30mm*15mm*2mm angle steel.By the simulation of factory computer software, guarantee to hang under the steel frame unit module 4 positions of each LED lamp holder and the scene data of layouting and conform to.
2, rod member 2 is not done rigid connection with LED lamp holder 4, for reducing on-the-spot LED lamp holder 4 installation workload, avoids work high above the ground to install, and is easy to maintenance, makes LED lamp holder 4 embed rod member 2 ends, forms detachable assembled.
3, screw mandrel 3 is connected by the 30mm*15mm*2mm angle steel with steel frame 1, at the scene during assembly unit steel frame 1 unit module, for the screw mandrel 3 stressed possibility torsional deformations that prevent from hanging affect planeness, carry out the experiment of bearing a heavy burden of force analysis and load for concrete steel frame 1 cell block, according to the position of hanging of the best of measured data positioning screw rod 3.The segmentation load holding capacity of measuring and calculating screw mandrel 3 is established the screw mandrel adaptor in limiting value with interior position, avoids the screw mandrel distortion to cause that steel frame tilts or out-of-flatness, and then affects terminal each LED lamp holder 4 integral smoothness of steel frame 1 time extension stainless pipe (rod member 2).
Should be pointed out that for the present invention through proving absolutely also to have the embodiment of multiple conversion and remodeling, be not limited to the specific embodiment of above-mentioned embodiment.Above-described embodiment is as just explanation of the present invention, rather than limitation of the present invention.In a word, protection scope of the present invention should comprise those to those skilled in the art apparent conversion or alternative and remodeling.
Claims (8)
1. a multi-point half unsettled LED Integral ceiling, it is characterized in that: it includes steel frame (1), rod member (2), screw mandrel (3), LED lamp holder (4), described steel frame (1) is fixed to construction ceiling by screw mandrel (3), the lower peg spare (2) of steel frame (1), rod member (2) arranges LED lamp holder (4) on the termination, lower end.
2. multi-point according to claim 1 half unsettled LED Integral ceiling, it is characterized in that: described screw mandrel (3) is connected with steel frame (1) by angle steel.
3. multi-point according to claim 2 half unsettled LED Integral ceiling, it is characterized in that: described screw mandrel (3) is connected by securing member with angle steel, and angle steel and steel frame (1) weld.
4. multi-point according to claim 1 half unsettled LED Integral ceiling, it is characterized in that: described LED lamp holder (4) detachable assembled is to rod member (2) termination, lower end.
5. multi-point according to claim 1 half unsettled LED Integral ceiling, it is characterized in that: described rod member (2) is stainless pipe.
6. multi-point according to claim 5 half unsettled LED Integral ceiling is characterized in that: described LED lamp holder (4) embedding stainless pipe end.
7. multi-point according to claim 1 half unsettled LED Integral ceiling, it is characterized in that: described steel frame (1) is made of some steel frame unit modules.
8. multi-point according to claim 7 half unsettled LED Integral ceiling, it is characterized in that: described steel frame unit module is of a size of 1200mm*1200mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210446836.5A CN102953492B (en) | 2012-11-11 | 2012-11-11 | The unsettled LED Integral ceiling of multi-point half |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210446836.5A CN102953492B (en) | 2012-11-11 | 2012-11-11 | The unsettled LED Integral ceiling of multi-point half |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102953492A true CN102953492A (en) | 2013-03-06 |
CN102953492B CN102953492B (en) | 2015-07-29 |
Family
ID=47762829
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210446836.5A Active CN102953492B (en) | 2012-11-11 | 2012-11-11 | The unsettled LED Integral ceiling of multi-point half |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102953492B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110067976A (en) * | 2019-05-06 | 2019-07-30 | 中建八局装饰工程有限公司 | A kind of installation system and installation method of matrix form system art pendent lamp |
CN110067334A (en) * | 2019-05-06 | 2019-07-30 | 中建八局装饰工程有限公司 | A kind of folded grade installation of ceiling system and its installation method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201649404U (en) * | 2010-03-19 | 2010-11-24 | 陈晓锋 | Hanging piece type ceiling with decorative and luminous effects |
KR20110092422A (en) * | 2010-02-09 | 2011-08-18 | 주식회사 거광유브이씨 | Ceiling panel |
CN202430879U (en) * | 2011-12-06 | 2012-09-12 | 华鼎建筑装饰工程有限公司 | Perforated panel connecting mechanism |
CN202899388U (en) * | 2012-11-11 | 2013-04-24 | 苏州金螳螂建筑装饰股份有限公司 | Multi-point semi-suspended light emitting diode (LED) integrated ceiling |
-
2012
- 2012-11-11 CN CN201210446836.5A patent/CN102953492B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110092422A (en) * | 2010-02-09 | 2011-08-18 | 주식회사 거광유브이씨 | Ceiling panel |
CN201649404U (en) * | 2010-03-19 | 2010-11-24 | 陈晓锋 | Hanging piece type ceiling with decorative and luminous effects |
CN202430879U (en) * | 2011-12-06 | 2012-09-12 | 华鼎建筑装饰工程有限公司 | Perforated panel connecting mechanism |
CN202899388U (en) * | 2012-11-11 | 2013-04-24 | 苏州金螳螂建筑装饰股份有限公司 | Multi-point semi-suspended light emitting diode (LED) integrated ceiling |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110067976A (en) * | 2019-05-06 | 2019-07-30 | 中建八局装饰工程有限公司 | A kind of installation system and installation method of matrix form system art pendent lamp |
CN110067334A (en) * | 2019-05-06 | 2019-07-30 | 中建八局装饰工程有限公司 | A kind of folded grade installation of ceiling system and its installation method |
Also Published As
Publication number | Publication date |
---|---|
CN102953492B (en) | 2015-07-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204152217U (en) | The assembled moulding bed of the assembling that a kind of Construction of Steel Structure is general | |
CN104060746B (en) | The anti-engineering method that supports of a kind of furred ceiling angle bar frame | |
CN107103170B (en) | Pipeline bracket design method based on BIM technology | |
CN107990052A (en) | A kind of pipeline assembled hanger installation method | |
CN205421311U (en) | Rag bolt fixes a position mounting tool | |
CN202899361U (en) | Drilling avoiding device with hook type connection piece for stone or porcelain plate curtain wall plate blocks and cross rod | |
CN107654074B (en) | Multi-pipe multi-angle bent pipe assembling space positioning method | |
CN204284665U (en) | A kind of diagonal-bracing type suspension and support of rationally arranging for line classification | |
CN102953492A (en) | Multi-position half-impending LED integrated ceiling | |
CN105648923A (en) | Stay cable saddle positioning device and positioning method thereof | |
CN202899388U (en) | Multi-point semi-suspended light emitting diode (LED) integrated ceiling | |
CN202645020U (en) | Adjustable column rebar positioning hoop | |
CN203961091U (en) | The anti-bracing or strutting arrangement of a kind of furred ceiling angle bar frame and ceiling structure thereof | |
CN201738305U (en) | Butt-joint precision control device for steel reinforcement joint of steel reinforcement cage | |
CN201543996U (en) | Cable trench bracket manufacturing mould | |
CN105201208A (en) | System for dismantling Y-type pier column oblique rod steel mold | |
CN102294747B (en) | Pipe making machine die | |
CN203111475U (en) | Anchor platform structure manufactured through integral manufacturing process of drilling-ship anchor platform | |
CN205474865U (en) | Positioner of suspension cable saddle | |
CN203034818U (en) | Special fixture for installation of adjustable embedded part | |
CN203049462U (en) | Pre-embedded sleeve locating mould of continuous beam | |
CN204187217U (en) | A kind of annular bolt collar group integral built-in and positioning tool | |
CN203654784U (en) | Assembly and location mould for main beam and end plate of boiler steel frame structure | |
CN210316228U (en) | Stirrup installation location and inspection tool | |
CN203679558U (en) | Assembling and welding frame of vertical bent pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |