CN102944348A CN2012105217167A CN201210521716A CN102944348A CN 102944348 A CN102944348 A CN 102944348A CN 2012105217167 A CN2012105217167 A CN 2012105217167A CN 201210521716 A CN201210521716 A CN 201210521716A CN 102944348 A CN102944348 A CN 102944348A
Authority
CN
China
Prior art keywords
pipeline
model
buoyancy
pipeline model
proving installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105217167A
Other languages
English (en)
Other versions
CN102944348B (zh
Inventor
李江
李强
秦政先
陈诚
廖雍
卿太钢
康凯
陈杰
代卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
China Petroleum Engineering and Construction Corp
Original Assignee
China National Petroleum Corp Engineering Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp Engineering Design Co Ltd filed Critical China National Petroleum Corp Engineering Design Co Ltd
Priority to CN201210521716.7A priority Critical patent/CN102944348B/zh
Publication of CN102944348A publication Critical patent/CN102944348A/zh
Application granted granted Critical
Publication of CN102944348B publication Critical patent/CN102944348B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明公开了一种埋地管道上浮力测试装置及测试方法,能准确测试土中管道所受的上浮力;通过在管道模型封口钢板表面设置圆环状柔性填充材料,不但可有效减小管道模型与测试槽之间的摩擦力,减小测试误差,还能有效防止岩土体模型进入管道模型封口钢板与测试槽壁之间的缝隙中,减小边界效应的影响,保证测试在平面应变条件下进行;通过在测试槽上设置的玻璃侧面,使得管道模型以及岩土体的位移变形情况能被有效观测到,利用粒子图像测速法即可对管道、土体位移变形进行定量分析。

Description

埋地管道上浮力测试装置及测试方法
技术领域
本发明涉及一种埋地管道上浮力测试装置及测试方法。
背景技术
随着经济的快速发展,能源的开发利用越来越受到人们的重视。在能源运送中,管道运输由于其运输量大、迅速、连续、经济、平稳、安全、可靠以及占地少、投资少、费用低等特点,成为石油、天然气输送的重要方式。我国由于经济社会快速发展的需要,对能源需求量不断增加,油气管道工程建设正在不断进行。一些特殊的地质条件,尤其是深厚软土地质给管道工程建设带来了极大的困难。在高水位地区,管道经常出现上浮现象,给工程安全带来了巨大隐患,软土地区尤为严重。
在分析解决油气管道上浮问题时,两个重要的参数必须进行确定,即管道上浮力以及其上拔承载力。土体饱和后,强度会下降,特别是软土,由于其具有结构性,在施工扰动后,其强度会大大降低,甚至呈流塑状。而流塑状软土回填后,会对管道产生比水浮力更大的上浮作用力。
目前,国内外关于油气管道上浮力以及上拔承载力的理论计算方法已有很多,但少有共识,而且由于各地土体性质不同,工程情况也不尽相同,很难找到适用于各种复杂条件的理论方法。而试验测试的方法由于能够针对不同土体性质、不同工程情况进行模拟分析,则相对具体可靠。因此,发明一种能测试管道上浮力的测试装置具有现实意义。
发明内容
为了克服现有技术的上述缺点,本发明提供了一种埋地管道上浮力测试装置及测试方法。
本发明解决其技术问题所采用的技术方案是:一种埋地管道上浮力测试装置,包括测试槽和设置在测试槽内的填充岩土体模型和两端密封的管道模型,所述管道模型与连接杆相连,所述连接杆穿过固定在预先开孔的槽口反力梁上的定向轴承与加载横梁相连;在加载横梁与槽口反力梁之间设置有轴力计。
本发明还提供了一种利用埋地管道上浮力测试装置进行测试的方法,包括如下步骤:
步骤一、在测试槽内填筑岩土体模型至设计管道模型的底标高位置,再放置管道模型;
步骤二、将轴力计安装在加载横梁与槽口反力梁之间;
步骤三、读取轴力计读数;
步骤四、继续填筑岩土体模型至管道模型的顶标高位置,并提升水位至管道模型的顶标高位置;
步骤五、再次读取轴力计读数;
步骤六、计算前后两次轴力计读数之差,即可求出管道模型的上浮力。
与现有技术相比,本发明的积极效果是:
(1)能准确测试土中管道所受的上浮力。
(2)通过在管道模型封口钢板表面设置圆环状柔性填充材料,不但可有效减小管道模型与测试槽之间的摩擦力,减小测试误差,还能有效防止岩土体模型进入管道模型封口钢板与测试槽壁之间的缝隙中,减小边界效应的影响,保证测试在平面应变条件下进行。
(3)通过在测试槽上设置的玻璃侧面,使得管道模型以及岩土体的位移变形情况能被有效观测到,利用粒子图像测速法(PIV)即可对管道、土体位移变形进行定量分析。
附图说明
本发明将通过例子并参照附图的方式说明,其中:
图1是本发明上浮力测试装置的侧视图。
图2是本发明上浮力测试装置的前视图。
具体实施方式
一种埋地管道上浮力测试装置,如图1至图2所示,包括:测试槽1、管道模型2、柔性填充材料3、连接法兰4、连接杆5、加载横梁6、定向轴承7、槽口反力梁8、轴力计9、第一类连接螺杆10、第一类连接螺帽11、第二类连接螺杆12、第二类连接螺帽13、岩土体模型18、管道封口钢板20、玻璃侧面21,其中:
测试槽1设置有玻璃侧面21,在测试槽1内填充岩土体模型18,埋设管道模型2,在管道模型2两端用管道模型封口钢板20密封,管道模型封口钢板20表面设置柔性填充材料3;管道模型2通过连接法兰4与连接杆5相连,连接杆5穿过固定在预先开孔的槽口反力梁8上的定向轴承7与加载横梁6相连;
所述的柔性填充材料3呈圆环状分布,外边缘与管道封口钢板20边缘一致,固定在管道模型封口钢板20上;柔性填充材料3的厚度取约0.5cm,柔性填充材料3圆环宽度取约1cm。
所述的管道模型2可配重使其自重与相同长度实际管段一致,或不配重; 
管道模型2的外径小于等于测试槽1长度的1/3,管道模型2的长度比测试槽1的宽度小约1cm。
轴力计9通过第一类连接螺杆10以及第二类连接螺杆12,利用第一类连接螺帽11以及第二类连接螺帽13安装在加载横梁6与槽口反力梁8之间;
本发明还提供了一种埋地管道上浮力的测试方法,包括如下步骤:
步骤一、在测试槽1内填筑岩土体模型18至设计管道模型2的底标高位置,再放置管道模型2;
步骤二、将轴力计9安装在加载横梁6与槽口反力梁8之间;
步骤三、读取轴力计9读数,即为管道模型2自重;
步骤四、继续填筑岩土体模型18至管道模型2的顶标高位置,并提升水位至管道模型2的顶标高位置;
步骤五、再次读取轴力计9读数,即为管道模型2上浮力及其自重叠加后的作用力大小;
步骤六、计算前后两次轴力计9读数之差,即可求出管道模型2的上浮力。

Claims (10)

1.一种埋地管道上浮力测试装置,其特征在于:包括测试槽和设置在测试槽内的填充岩土体模型和两端密封的管道模型,所述管道模型与连接杆相连,所述连接杆穿过固定在预先开孔的槽口反力梁上的定向轴承与加载横梁相连;在加载横梁与槽口反力梁之间设置有轴力计。
2.根据权利要求1所述的埋地管道上浮力测试装置,其特征在于:所述管道模型两端用管道模型封口钢板进行密封。
3.根据权利要求2所述的埋地管道上浮力测试装置,其特征在于:在所述管道模型封口钢板表面固定有呈圆环状分布的柔性填充材料。
4.根据权利要求1所述的埋地管道上浮力测试装置,其特征在于:所述测试槽设置有玻璃侧面。
5.根据权利要求1所述的埋地管道上浮力测试装置,其特征在于:所述管道模型的外径小于等于测试槽长度的1/3;所述管道模型的长度比测试槽的宽度小约1cm。
6.根据权利要求1所述的埋地管道上浮力测试装置,其特征在于:所述管道模型通过连接法兰与连接杆相连。
7.根据权利要求1所述的埋地管道上浮力测试装置,其特征在于:所述轴力计分别通过第一类连接螺杆、第一类连接螺帽和第二类连接螺杆、第二类连接螺帽安装在加载横梁与槽口反力梁上。
8.一种利用权利要求1所述的埋地管道上浮力测试装置进行测试的方法,其特征在于:包括如下步骤:
步骤一、在测试槽内填筑岩土体模型至设计管道模型的底标高位置,再放置管道模型;
步骤二、将轴力计安装在加载横梁与槽口反力梁之间;
步骤三、读取轴力计读数;
步骤四、继续填筑岩土体模型至管道模型的顶标高位置,并提升水位至管道模型的顶标高位置;
步骤五、再次读取轴力计读数;
步骤六、计算前后两次轴力计读数之差,即可求出管道模型的上浮力。
9.根据权利要求8所述的利用埋地管道上浮力测试装置进行测试的方法,其特征在于:所述管道模型两端用管道模型封口钢板进行密封。
10.根据权利要求9所述的利用埋地管道上浮力测试装置进行测试的方法,其特征在于:在所述管道模型封口钢板表面固定有呈圆环状分布的柔性填充材料。
CN201210521716.7A 2012-12-07 2012-12-07 埋地管道上浮力测试装置及测试方法 Active CN102944348B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210521716.7A CN102944348B (zh) 2012-12-07 2012-12-07 埋地管道上浮力测试装置及测试方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210521716.7A CN102944348B (zh) 2012-12-07 2012-12-07 埋地管道上浮力测试装置及测试方法

Publications (2)

Publication Number Publication Date
CN102944348A true CN102944348A (zh) 2013-02-27
CN102944348B CN102944348B (zh) 2015-04-29

Family

ID=47727310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210521716.7A Active CN102944348B (zh) 2012-12-07 2012-12-07 埋地管道上浮力测试装置及测试方法

Country Status (1)

Country Link
CN (1) CN102944348B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104677664A (zh) * 2015-02-12 2015-06-03 上海交通大学 盾构隧道上浮机理的模型试验装置
CN106768570A (zh) * 2017-03-28 2017-05-31 西南石油大学 埋地输气管道地震液化区上浮反应模拟试验装置及方法
CN108534943A (zh) * 2018-03-29 2018-09-14 中国华电科工集团有限公司 水槽内玻璃钢管浮托力测量装置
CN109974924A (zh) * 2019-03-15 2019-07-05 上海隧道工程有限公司 盾构盾尾同步注浆浆液浮力测量装置及其测量方法
CN110646164A (zh) * 2019-10-18 2020-01-03 浙江科技学院 一种模拟盾构隧道管片上浮过程的实验装置
CN110657943A (zh) * 2019-10-18 2020-01-07 浙江科技学院 用于模拟盾构隧道管片上浮的实验装置
CN110702298A (zh) * 2019-10-18 2020-01-17 浙江科技学院 盾构隧道管片浮力测量模型实验装置
CN110702372A (zh) * 2019-10-18 2020-01-17 浙江科技学院 盾构隧道管片所受浆液浮力测量模型实验装置
CN112268647A (zh) * 2020-10-15 2021-01-26 黑龙江工程学院 一种超声悬浮器悬浮力的测量装置
CN114235250A (zh) * 2021-12-01 2022-03-25 山东大学 一种管片在浆液中受到纵向合力的测试装置及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2177231Y (zh) * 1993-08-23 1994-09-14 蓝焕奎 浮力测力计
US20040025607A1 (en) * 2000-12-22 2004-02-12 Rantala Paul A Device for in-line measurement of properties of fluid flows in pipeline systems
CN201352179Y (zh) * 2008-12-15 2009-11-25 西南交通大学 一种盾构隧道结构模型综合试验装置
CN202256087U (zh) * 2011-09-22 2012-05-30 铁道第三勘察设计院集团有限公司 土工试验压力测试标定机械装置
CN102507086A (zh) * 2011-09-22 2012-06-20 铁道第三勘察设计院集团有限公司 土工试验压力测试标定机械加荷装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2177231Y (zh) * 1993-08-23 1994-09-14 蓝焕奎 浮力测力计
US20040025607A1 (en) * 2000-12-22 2004-02-12 Rantala Paul A Device for in-line measurement of properties of fluid flows in pipeline systems
CN201352179Y (zh) * 2008-12-15 2009-11-25 西南交通大学 一种盾构隧道结构模型综合试验装置
CN202256087U (zh) * 2011-09-22 2012-05-30 铁道第三勘察设计院集团有限公司 土工试验压力测试标定机械装置
CN102507086A (zh) * 2011-09-22 2012-06-20 铁道第三勘察设计院集团有限公司 土工试验压力测试标定机械加荷装置

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104677664A (zh) * 2015-02-12 2015-06-03 上海交通大学 盾构隧道上浮机理的模型试验装置
CN104677664B (zh) * 2015-02-12 2017-06-13 上海交通大学 盾构隧道上浮机理的模型试验装置
CN106768570A (zh) * 2017-03-28 2017-05-31 西南石油大学 埋地输气管道地震液化区上浮反应模拟试验装置及方法
CN106768570B (zh) * 2017-03-28 2022-11-04 西南石油大学 埋地输气管道地震液化区上浮反应模拟试验装置及方法
CN108534943A (zh) * 2018-03-29 2018-09-14 中国华电科工集团有限公司 水槽内玻璃钢管浮托力测量装置
CN109974924A (zh) * 2019-03-15 2019-07-05 上海隧道工程有限公司 盾构盾尾同步注浆浆液浮力测量装置及其测量方法
CN109974924B (zh) * 2019-03-15 2021-08-06 上海隧道工程有限公司 盾构盾尾同步注浆浆液浮力测量装置及其测量方法
CN110702372A (zh) * 2019-10-18 2020-01-17 浙江科技学院 盾构隧道管片所受浆液浮力测量模型实验装置
CN110702298A (zh) * 2019-10-18 2020-01-17 浙江科技学院 盾构隧道管片浮力测量模型实验装置
CN110657943A (zh) * 2019-10-18 2020-01-07 浙江科技学院 用于模拟盾构隧道管片上浮的实验装置
CN110657943B (zh) * 2019-10-18 2021-09-28 浙江科技学院 用于模拟盾构隧道管片上浮的实验装置
CN110702372B (zh) * 2019-10-18 2021-10-22 浙江科技学院 盾构隧道管片所受浆液浮力测量模型实验装置
CN113670500A (zh) * 2019-10-18 2021-11-19 浙江科技学院 盾构隧道管片浮力测量模型实验装置
CN110702298B (zh) * 2019-10-18 2021-11-30 浙江科技学院 盾构隧道管片浮力测量模型实验装置
CN110646164A (zh) * 2019-10-18 2020-01-03 浙江科技学院 一种模拟盾构隧道管片上浮过程的实验装置
CN112268647A (zh) * 2020-10-15 2021-01-26 黑龙江工程学院 一种超声悬浮器悬浮力的测量装置
CN112268647B (zh) * 2020-10-15 2022-03-08 黑龙江工程学院 一种超声悬浮器悬浮力的测量装置
CN114235250A (zh) * 2021-12-01 2022-03-25 山东大学 一种管片在浆液中受到纵向合力的测试装置及方法

Also Published As

Publication number Publication date
CN102944348B (zh) 2015-04-29

Similar Documents

Publication Publication Date Title
CN102944348B (zh) 埋地管道上浮力测试装置及测试方法
CN102944480A (zh) 埋地管道上拔承载力测试装置及测试方法
CN102278117B (zh) 平行顶管顶进施工模拟装置
CN201352179Y (zh) 一种盾构隧道结构模型综合试验装置
CN102359861B (zh) 一种建筑结构表面风压测试装置及测试方法
CN104634646A (zh) 一种模拟盾构隧道施工周围地下管线力学行为的试验方法
CN102288157A (zh) 一种地基深层沉降监测方法
CN109883599B (zh) 一种水面爆炸对海底隧道抗暴能影响的试验方法
CN201897544U (zh) 一种高压力土工直剪试验的直剪盒
CN104075936A (zh) 无约束管段横向运动全过程监控测试系统
Gao et al. Feasibility study on sinkhole monitoring with fiber optic strain sensing nerves
CN104181002A (zh) 一种用于隧道结构模型试验的均匀水压模拟加载装置和方法
CN102401749B (zh) 一种地下压力管线试验装置
CN202170505U (zh) 一种大吨位可远距离施压和检测位移的载荷箱
CN102797267B (zh) 密闭式沉井侧壁摩阻力计
CN103422487B (zh) 利用测斜仪通过角度可调转化器测量沉降变形的方法
CN203965228U (zh) 无约束管段横向运动全过程监控测试系统
CN203429596U (zh) 一种使用顶管技术建造测井的水位站
CN206974325U (zh) 一种新型的只读式巷道顶板离层仪
Wei et al. Monitoring and environmental impact analysis of deep excavation of subway stations in river islands
CN204479420U (zh) 一种大型冻土直剪仪
CN210293156U (zh) 测量土与地下结构接触界面动态相对滑移的传感器
XU et al. Site monitoring analysis on construction deformation of long large deep foundation pit in coastal complex stratum
CN201672956U (zh) 称重式水位计
CN206132048U (zh) 沉降杯监测系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180110

Address after: 610041 Chengdu high tech Zone, Sichuan province sublimation Road No. 6

Patentee after: China Petroleum Engineering Construction Co Ltd

Address before: 610041 Chengdu high tech Zone, Sichuan province sublimation Road No. 6

Patentee before: Engineering Design Co., Ltd., China Petroleum Group

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210209

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CHINA PETROLEUM ENGINEERING & CONSTRUCTION Corp.

Address before: No. 6, Sichuan hi tech Zone, sublime Road, Chengdu, Sichuan

Patentee before: CHINA PETROLEUM ENGINEERING & CONSTRUCTION Corp.

TR01 Transfer of patent right