CN102937436A - 非定向岩心地面定向法 - Google Patents
非定向岩心地面定向法 Download PDFInfo
- Publication number
- CN102937436A CN102937436A CN2012104197753A CN201210419775A CN102937436A CN 102937436 A CN102937436 A CN 102937436A CN 2012104197753 A CN2012104197753 A CN 2012104197753A CN 201210419775 A CN201210419775 A CN 201210419775A CN 102937436 A CN102937436 A CN 102937436A
- Authority
- CN
- China
- Prior art keywords
- core
- tiltmeter
- rock core
- angle
- inclinometer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Earth Drilling (AREA)
Abstract
非定向岩心地面定向法,包括如下步骤:①采样;②获取岩心试样已有孔斜数据:③采用球面三角正、余弦公式计算全弯曲角γ、终点角特殊值π-φ1和终点角特殊值φ2;④采用JJG-1型测斜仪校验台、测斜仪壳及与岩心间同轴式夹具,小口径测斜仪或定盘测斜仪进行测试,实现岩心定向。本发明方法克服了传统方法因判定岩心是否断根时不可靠的缺点,具有操作简单,数据单解准确,实现成本低的优点。随着测斜仪的改进,其精度仍有提高的潜力。
Description
技术领域
本发明涉及一种用于岩土工程、土木建筑、采矿、石油钻采、地质勘探、地震、水利水电、交通隧道及地下工程等的非定向岩心地面定向法。
背景技术
现有传统的岩心定向方法(参考“Керно-Метрия”,ЮшковА.С.,с.33-102,Недра,1989。)都是基于未与岩体分开的岩心,采用孔内的定向工具在岩心端面或侧面进行刻痕或标记完成。其缺点是:不能判定岩心是否断根,可靠性差;需要中断生产过程,需专用工具,因此成本高。
发明内容
本发明要解决的技术问题是,克服现有技术存在的上述缺陷,提供一种操作简单,测量精度高,实现成本低的非定向岩心地面定向法。
本发明解决其技术问题所采用的技术方案是:
本发明是基于岩心轴与钻孔轴一致,通过连环测斜的逆过程恢复岩心柱(含岩心试样)的原位产状。利用已知3个测斜数据,计算另3个未知数据,然后再在测斜仪校检台上恢复岩心的原位产状。
非定向岩心地面定向法是连环测斜的逆过程。连环测斜就是由已知测斜数据天顶角θi、天顶角θi+1、终点角一般值π-φi和终点角一般值φi+1(△φ=φi+1-φi)使钻孔恢复原位(定向)。其逆过程就是已知天顶角θ1、天顶角θ2和方位角改变值△α,求出全弯曲角γ、终点角特殊值π-φ1和终点角特殊值φ2,终点角特殊值π-φ1和终点角特殊值φ2与其它4个元素(θ1、θ2、γ和△α)构成唯一球面三角形的值。再利用测斜仪校验台恢复岩心的原位产状。
凡断面吻合的相邻岩心,具有共同母线其原位产状可类推为一致。而对钻孔缺失岩心的孔段,可用数学内插入法算得到其原位产状。
非定向岩心地面定向法,包括如下步骤:
①采样:由钻探现场或岩心库采取圆柱状岩心,要求有上下顺序未颠倒、长径比大于5~10的完整岩心;有所在孔段(即钻孔的相邻上、下二测程)的孔深、钻孔(含垂直孔)方位角和天顶角;有结构面特性和标志;在运输和检测中保持岩心原有完整状态。
另外对所取岩心上面和下面断口吻合的岩心,再多取一或多段岩心。有助于测量精度的提高;
②获取岩心试样已有孔斜数据:目前地质钻探钻孔孔斜测量测程为50m,石油钻井测程小于50m,用数学内插入法或赤平投影一球面三角法取得所采取各个岩心试样的天顶角θ和方位角α值;
③采用球面三角正、余弦公式计算全弯曲角γ、终点角特殊值π-φ1和终点角特殊值φ2;
④采用JJG-1型测斜仪校验台、测斜仪壳及与岩心间同轴式夹具,小口径测斜仪或定盘测斜仪进行测试:
先将小口径测斜仪或定盘测斜仪放置在JJG-1型测斜仪校验台的岩心间同轴式夹具内固定,校准天顶角θ和方位角α值,松动岩心间同轴式夹具,转动测斜仪和与之同轴固定的岩心,校准终点角特殊值π-φ1和终点角特殊值φ2,在岩心上按铅垂力方向(即测斜仪重锤所指方向)标记一条短母线,然后再按上述做法测相邻的下一个岩心试样,标出短母线;
这两条母线就构成全弯曲角所在平面与岩心柱面的交汇线;
在岩心圆柱面上标记了铅垂力方向,在过铅垂力标记点的水平椭圆上按方位角的值标记北(N)的方向。
进一步,所述小口径测斜仪选用JXK-2小口径测斜仪,定盘测斜仪选用JDP-1定盘测斜仪。
本发明可运用于声发射地面测量地应力,小口径钻孔岩心地面物探测量,块块岩心定向提高了地质编录质量,为科学化岩土力学及数字化地层学提供技术手段,确定岩石结构面产状,可建立具有完全代表性岩心的永久保存库。
本发明方法克服了传统方法因判定岩心是否断根时不可靠的缺点,具有操作简单,数据单解准确,实现成本低的优点。随着测斜仪的改进,其精度仍有提高的潜力。
附图说明
图1为本发明一球面三角说明图。
具体实施方式
以下结合附图和实施例对本发明作进一步说明。
参照图1,PP′为过球心O的直立直径,OP′AP和OP′BP为二直立大圆,OAB为倾斜大圆。
OA和OB为钻孔的相邻上、下二测程(孔段),θ1和θ2为天顶角,γ为全弯曲角,二直立大圆的二面夹角△α为方位角的改变值,二直立大圆与倾斜大圆的二面夹角φ1和φ2为上、下测程的终点角特殊值。
球面三角形ABP的三个边为θ1、θ2和γ,三个角为π-φ1、φ2和△α。已知任意的3个参数可求另外3个。
非定向岩心地面定向法,包括如下步骤:
①采样:由钻探现场或岩心库采取圆柱状岩心,要求有上下顺序未颠倒、长径比大于5~10的完整岩心;有所在孔段(即钻孔的相邻上、下二测程)的孔深、钻孔(含垂直孔)方位角和天顶角;有结构面特性和标志;在运输和检测中保持岩心原有完整状态;
另外对所取岩心上面和下面断口吻合的岩心,再多取一或多段岩心。有助于测量精度的提高。
②获取岩心试样已有孔斜数据:目前地质钻探钻孔孔斜测量测程为50m,石油钻井测程小于50m,用数学内插入法或赤平投影一球面三角法取得所采取各个岩心试样的天顶角θ和方位角α值;
③采用球面三角正、余弦公式计算全弯曲角γ、终点角特殊值π-φ1和终点角特殊值φ2;
④采用JJG-1型测斜仪校验台、测斜仪壳及与岩心间同轴式夹具, JXK-2小口径测斜仪或JDP-1定盘测斜仪进行测试:
先将JXK-2小口径测斜仪或JDP-1定盘测斜仪放置在JJG-1型测斜仪校验台的岩心间同轴式夹具内固定,校准天顶角θ和方位角α值,松动岩心间同轴式夹具,转动测斜仪和与之同轴固定的岩心,校准终点角特殊值π-φ1和终点角特殊值φ2,在岩心上按铅垂力方向(即测斜仪重锤所指方向)标记一条短母线,然后再按上述做法测相邻的下一个岩心试样,标出短母线;
这两条母线就构成全弯曲角所在平面与岩心柱面的交汇线;
在岩心圆柱面上标记了铅垂力方向,在过铅垂力标记点的水平椭圆上按方位角的值标记北(N)的方向。
Claims (2)
1.非定向岩心地面定向法,其特征在于:包括如下步骤:
①采样:由钻探现场或岩心库采取圆柱状岩心,要求有上下顺序未颠倒、长径比大于5~10的完整岩心;有所在孔段的孔深、钻孔方位角和天顶角;有结构面特性和标志;在运输和检测中保持岩心原有完整状态;
②获取岩心试样已有孔斜数据:地质钻探钻孔孔斜测量测程为50m,石油钻井测程小于50m,用数学内插入法或赤平投影一球面三角法取得所采取各个岩心试样的天顶角θ和方位角α值;
③采用球面三角正、余弦公式计算全弯曲角γ、终点角特殊值π-φ1和终点角特殊值φ2;
④采用JJG-1型测斜仪校验台、测斜仪壳及与岩心间同轴式夹具,小口径测斜仪或定盘测斜仪进行测试:
先将小口径测斜仪或JDP-1定盘测斜仪放置在JJG-1型测斜仪校验台的岩心间同轴式夹具内固定,校准天顶角θ和方位角α值,松动岩心间同轴式夹具,转动测斜仪和与之同轴固定的岩心,校准终点角特殊值π-φ1和终点角特殊值φ2,在岩心上按铅垂力方向标记一条短母线,然后再按上述做法测相邻的下一个岩心试样,标出短母线;
这两条母线就构成全弯曲角所在平面与岩心柱面的交汇线;
在岩心圆柱面上标记了铅垂力方向,在过铅垂力标记点的水平椭圆上按方位角的值标记北N的方向。
2.根据权利要求1所述的非定向岩心地面定向法,其特征在于:所述小口径测斜仪选用JXK-2小口径测斜仪,定盘测斜仪选用JDP-1定盘测斜仪。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210419775.3A CN102937436B (zh) | 2012-10-29 | 2012-10-29 | 非定向岩心地面定向法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210419775.3A CN102937436B (zh) | 2012-10-29 | 2012-10-29 | 非定向岩心地面定向法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102937436A true CN102937436A (zh) | 2013-02-20 |
CN102937436B CN102937436B (zh) | 2015-01-21 |
Family
ID=47696347
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210419775.3A Active CN102937436B (zh) | 2012-10-29 | 2012-10-29 | 非定向岩心地面定向法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102937436B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105781528A (zh) * | 2016-03-29 | 2016-07-20 | 深圳市钻通工程机械股份有限公司 | 一种水平轴面偏移测量仪的测量方法及其系统 |
CN105909237A (zh) * | 2016-04-27 | 2016-08-31 | 高森 | 用岩心取代测斜仪的钻孔随钻测斜法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201396092Y (zh) * | 2009-03-14 | 2010-02-03 | 中国矿业大学 | 岩心定向装置 |
US20100282516A1 (en) * | 2007-11-02 | 2010-11-11 | Buchanan Steve E | Formation coring apparatus and methods |
-
2012
- 2012-10-29 CN CN201210419775.3A patent/CN102937436B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100282516A1 (en) * | 2007-11-02 | 2010-11-11 | Buchanan Steve E | Formation coring apparatus and methods |
CN201396092Y (zh) * | 2009-03-14 | 2010-02-03 | 中国矿业大学 | 岩心定向装置 |
Non-Patent Citations (2)
Title |
---|
GAO SEN: "CALCULATION OF THE DIRECTIONAL CORING AND DEFLECTION DRILLING", 《中南矿冶学院学报》 * |
高森: "介绍一种单孔岩心定向法", 《地质与勘探》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105781528A (zh) * | 2016-03-29 | 2016-07-20 | 深圳市钻通工程机械股份有限公司 | 一种水平轴面偏移测量仪的测量方法及其系统 |
CN105781528B (zh) * | 2016-03-29 | 2019-05-31 | 深圳市钻通工程机械股份有限公司 | 一种水平轴面偏移测量仪的测量方法及其系统 |
CN105909237A (zh) * | 2016-04-27 | 2016-08-31 | 高森 | 用岩心取代测斜仪的钻孔随钻测斜法 |
Also Published As
Publication number | Publication date |
---|---|
CN102937436B (zh) | 2015-01-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105134194B (zh) | 一种通过单个钻孔测量地应力的装置及测量方法 | |
CN103954229B (zh) | 一种地下硐室全断面变形自动监测设备及应用所述设备的方法 | |
CN202041167U (zh) | 一种钻孔内围岩三向变形测量装置 | |
CN101482409B (zh) | 岩体裂隙方向和倾角测量方法 | |
CN103513016A (zh) | 采用传感柱的软岩多测点地应力测试方法 | |
CN104807563A (zh) | 基于钻孔显微数字摄像的非接触式地应力测试装置及方法 | |
CN106640046B (zh) | 一种旋转工具面角测试装置 | |
CN103528718A (zh) | 采用连接杆的软岩多测点地应力测试方法 | |
CN204630758U (zh) | 一种地应力测试二次可变角度取芯装置 | |
CN104931353B (zh) | 煤柱塑性区测试方法和测试装置 | |
CN104866709A (zh) | 一种地下工程锚注质量评价方法 | |
CN103195425B (zh) | 一种煤矿巷道围岩强度原位快速测定方法 | |
CN102830051B (zh) | 一种振荡试验系统中的岩体裂隙产状识别系统 | |
Zou et al. | A proposed method for estimating in-situ stress direction using panoramic stereo-pair imaging and stressed borehole geometric shapes | |
CN102937436B (zh) | 非定向岩心地面定向法 | |
CN109946008A (zh) | 一种球形包体真三维原岩应力解除法测量装置及测量方法 | |
CN205940327U (zh) | 一种地质工程测角仪 | |
CN107063180A (zh) | 便携式岩土工程双轴测斜仪 | |
CN201780176U (zh) | 一种深孔地应力测试罗盘定向仪 | |
CN111765858A (zh) | 位移测量方法、装置、测斜仪和计算机存储介质 | |
CN105547742B (zh) | 煤样采样方法和装置 | |
CN108489363A (zh) | 便携式岩芯结构面倾角野外测量装置 | |
CN211525925U (zh) | 一种隧道工程稳定性监测连续观测收敛的测量装置 | |
CN203572682U (zh) | 一种地应力测试二次定角度取芯装置 | |
CN210685964U (zh) | 一种钻孔角度测定仪 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |