CN102930392A - System for running information of transformer substation - Google Patents
System for running information of transformer substation Download PDFInfo
- Publication number
- CN102930392A CN102930392A CN2012104121792A CN201210412179A CN102930392A CN 102930392 A CN102930392 A CN 102930392A CN 2012104121792 A CN2012104121792 A CN 2012104121792A CN 201210412179 A CN201210412179 A CN 201210412179A CN 102930392 A CN102930392 A CN 102930392A
- Authority
- CN
- China
- Prior art keywords
- server
- ground wire
- transformer station
- working machine
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a system for running information of a transformer substation, and relates to a power station system. The system comprises a front-end working machine, a management machine and a server, wherein the server comprises a background server, a database server and a Web server; system communication adopts a Microsoft windows communication foundation (WCF) development interface; the front-end working machine is arranged on a special ground wire management computer of the transformer substation; after a grounding device is arranged or dismounted, the working machine records a state of a ground wire; the management machine manages the system through an office machine, such as adding the transformer substation and the grounding device; a manager remotely manage the system through a browser; the serve receives and processes service requests of the front-end working machine and the background Web server and returns processing results; and the server adopts a Microsoft WCF mode. The system is used for recording and displaying an arranging state and a dismounting state of the grounding wire in the transformer substation, comparing the states with information of the ground wire in a ground wire cabinet, displaying a running state of each ground wire in real time and timely sounding an alarm when finding a problem.
Description
Technical field
The present invention relates to a kind of electric power station system, particularly relate to a kind of system for transformer station's information operation.
Background technology
Have the systematic comparison of setting up and removing state that is used for ground wire in record and the demonstration transformer station now original, need a large amount of manpower and communications service, show the running status of each ground wire, pinpoint the problems and the alarm hysteresis.Difficulty is high, workload is large, the working time is intensive, so for becoming simple, efficient regular works for transformer station's information operation simplification, reduce artificial calculating and artificial workload, accomplish conveniently, accurately, fast to obtain running status, system is realized the data typing, inquires about, gathers, make system's operation careful, reasonable, tight, accurate, reduce work difficulty, improve data accuracy.Be conducive to advance the task management System Construction, refinement service management and cost control are set up take the lean management mode of activity as the basis, progressively realize changing from low level management to the lean operation, have the significance of reality.
Summary of the invention
The object of the present invention is to provide a kind of system for transformer station's information operation, system sets up and the dismounting state for ground wire in record and the demonstration transformer station, and exist information to compare with ground wire in the ground wire cabinet, and show in real time the running status of each ground wire, pinpointing the problems to reach alarm.
The objective of the invention is to be achieved through the following technical solutions:
A kind of system for transformer station's information operation, described system comprises that front end working machine, supervisor and three parts of server form, wherein server is divided into background server, database server and three parts of Web server, and the WCF of Microsoft development interface is adopted in system communication; The front end working machine adopts the WPF project mode on the ground wire management special purpose computer of transformer station, set up or remove after the earthing device, uses working machine record state of ground wire; Supervisor manages system with machine by office, and as adding transformer station, earthing device, managerial personnel use browser to carry out telemanagement; Server receives and processes the service request of front end working machine and backstage Web server and return result, and server adopts the WCF of Microsoft pattern.
Described a kind of system for the operation of transformer station information, there is information in the electric wire that described front end working machine is collected in the ground wire cabinet from single-chip microcomputer, compares with the information that records and reports to the police.
Described a kind of system for transformer station's information operation, the described supervisor management Web page uses the Silverlight plug-in unit.
Described a kind of system for the operation of transformer station information, described database server is used for save data and data query is provided, and database adopts the SQL Server of Microsoft database, 2000 or 2005 or 2008 versions.
Described a kind of system for transformer station's information operation, described Web server provides managerial personnel to carry out telemanagement, adopts the IIS of Microsoft as Web server.
Described a kind of system for transformer station's information operation, described system works is under the enterprise network environment, and client and server all adopts the existing hardware platform, and there is information in the ground wire that gathers in the ground wire cabinet with single-chip microcomputer and inputs client computer.
Advantage of the present invention and effect are:
1. there is information in the present invention's ground wire of using single-chip microcomputer to gather in the ground wire cabinet and inputs client computer, is used for record and shows setting up and the dismounting state of ground wire in the transformer station, and exist information to compare with ground wire in the ground wire cabinet.
2. client off-line operation of the present invention, automatic and server sync data behind the network-in-dialing use UKey and digital certificate to carry out the authentication of computer identity and keeper's identity, and managerial personnel use browser to carry out telemanagement.
3. operating personnel of the present invention uses private client record ground wire to set up and the dismounting situation, shows in real time the running status of each ground wire, pinpoints the problems and alarm.
Embodiment
The present invention is described in detail below in conjunction with embodiment.
The present invention is used for record and shows setting up and the dismounting state of ground wire in the transformer station, and exists information to compare with ground wire in the ground wire cabinet, employing Service-Oriented Architecture Based (SOA) .Net Framework 4.0 running environment.There is information in the ground wire that uses single-chip microcomputer to gather in the ground wire cabinet and inputs client computer.The client off-line operation, automatic and server sync data behind the network-in-dialing.Use UKey and digital certificate to carry out the authentication of computer identity and keeper's identity.Managerial personnel use browser to carry out telemanagement.The operating personnel uses private client record ground wire to set up and the dismounting situation.Show in real time the running status of each ground wire, pinpoint the problems and alarm.
The present invention is that front end working machine, supervisor and three parts of server form, and wherein server is divided into background server, database server and three parts of Web server.The WCF of Microsoft development interface is adopted in system communication.
The front end working machine: this part is operated on the ground wire management special purpose computer of transformer station, adopts the WPF project mode, and the staff sets up or removes after the earthing device, uses working machine record state of ground wire.There is information in the electric wire that the while working machine is collected in the ground wire cabinet from single-chip microcomputer, compares with the information of record, notes abnormalities and then sends warning.The front end working machine can work offline, and namely still can work when network breaks down, and behind network recovery data is synchronized to server.
Supervisor: power transformation operation work area managerial personnel manage system with machine by office in the office of oneself, as adding transformer station, earthing device etc.Managerial personnel use browser to carry out telemanagement, so network must be unimpeded.The management Web page uses the Silverlight plug-in unit to develop, and has good performance and user and experiences.
Server: background server receives and processes the service request of front end working machine and backstage Web server and return result, is the core of whole system.Background server adopts the WCF of Microsoft pattern to develop.
Database server: database server is used for save data and data query is provided.The native system database adopts the SQL Server of Microsoft database, 2000,2005 or 2008 versions.
Web server: Web server offers managerial personnel and carries out the telemanagement use.Native system adopts the IIS of Microsoft as Web server.
The system requirements environment: native system is operated under the enterprise network environment, and client and server all adopts the existing hardware platform.
There is information in the ground wire that native system uses single-chip microcomputer to gather in the ground wire cabinet and inputs client computer.
Software client: Windows XP system and above operating system .Net Framework 4.0 running environment, SQL Server 2000 and above the machine database.
Service end: Windows 2003 systems and above operating system .Net Framework 4.0 running environment, SQL Server 2000 and above database.
Security of system: native system adopts the PKI of enterprise as the software security measure.Managerial personnel use personal digital certificate to authenticate as administration authority, and the front end working machine uses digital certificate to guarantee computer identity, and server then is the identity with digital certificate proof oneself.Front end working machine digital certificate and keeper's digital certificate store have guaranteed the security of digital certificate self in USB Key.
Whole communications of front end working machine, management station and server use the HTTPS agreement to be encrypted transmission, have guaranteed data security.
Embodiment:
The front end working machine: the front end working machine should be configured to automatically login and automatically start the working machine program.If automatically do not start, from start menu, search and start " ground connection infosystem ".The start-up routine rear interface is as follows: the ground connection facility sets up: at the window top, click " setting up the ground connection facility ", following window occurs: equipment interval: selection will be set up the interval of ground connection facility.Earthing position: select under this interval can ground connection the position.Ground wire coding: if use ground wire to carry out ground connection, select a untapped ground wire.Grounding switch coding: if there is grounding switch in this position, select a grounding switch.Attention: the ground connection facility can only be in ground wire or the disconnecting link.Set up the people: select one and set up the people.By definite, the ground connection information recording/enters system at last.
Remove the ground connection facility: in main window, select the ground connection facility in the use,, click " removing the ground connection facility " then at the window top, following window occurs: equipment interval and earthing position read automatically, can not change.Remove the people: select one to carry out the personnel that remove operation.
Check that ground connection is historical:, click " checking that ground connection is historical " at the window top, following window occurs: what this window showed is the ground connection facility historical record of having removed, and that does not also remove can not show.
Equipment interval: selection will be set up the interval of ground connection facility.Earthing position: select under this interval can ground connection the position.Ground wire coding: if use ground wire to carry out ground connection, select a untapped ground wire.Grounding switch coding: if there is grounding switch in this position, select a grounding switch.Attention: the ground connection facility can only be in ground wire or the disconnecting link.Set up the people: select one and set up the people.By definite, the ground connection information recording/enters system at last.
Check ground state: acquiescence shows the ground state page during program start.If switch to " showing that ground connection the is historical " page, " the checking ground state " on window top is changeable tieback ground status page.This page only shows the ground connection facility that is in the ground connection.
Administrative section: managerial personnel use browser that system is managed.Open any browser, input management Web server network address can be opened the management Web page, owing to having used digital certificate as the authentication means, need to select certificate when opening the page, and is as follows: as to select the certificate with " keeper " printed words, then determine.If digital certificate is effective, advancing can the entrance management page.
Management mainly comprises the two large divisions: the ground connection information inquiry: click " ground connection information inquiry " in the master menu, can inquire about the Grounding of each transformer station, click " ground state inquiry " submenu, check the ground state of each transformer station: click " ground connection historical query " submenu, check that the ground connection of each transformer station is historical:
Back ground Information is safeguarded: use the various functions in this menu to carry out the maintenance of Back ground Information: click " user's maintenance " submenu and add, delete, revise ground wire workmen user.Clicking " electric substation " submenu adds, deletes or modification transformer station.Click " ground wire data maintenance " and manage the ground wire of each transformer station.Click " grounding switch data maintenance " and manage the grounding switch of each transformer station.Click the equipment interval that " equipment interval data maintenance " arranges each transformer station.Click the earthing position that " earthing position data maintenance " arranges each each equipment interval of transformer station.
System backup: native system exists client and the two-layer database of server, therefore needs respectively at client and server end backup database.
Claims (6)
1. system for the operation of transformer station information, it is characterized in that, described system comprises that front end working machine, supervisor and three parts of server form, wherein server is divided into background server, database server and three parts of Web server, and the WCF of Microsoft development interface is adopted in system communication; The front end working machine adopts the WPF project mode on the ground wire management special purpose computer of transformer station, set up or remove after the earthing device, uses working machine record state of ground wire; Supervisor manages system with machine by office, and as adding transformer station, earthing device, managerial personnel use browser to carry out telemanagement; Server receives and processes the service request of front end working machine and backstage Web server and return result, and server adopts the WCF of Microsoft pattern.
2. a kind of system for the operation of transformer station information according to claim 1 is characterized in that, there is information in the electric wire that described front end working machine is collected in the ground wire cabinet from single-chip microcomputer, compares with the information that records and reports to the police.
3. a kind of system for transformer station's information operation according to claim 1 is characterized in that, the described supervisor management Web page uses the Silverlight plug-in unit.
4. a kind of system for the operation of transformer station information according to claim 1, it is characterized in that, described database server is used for save data and data query is provided, and database adopts the SQL Server of Microsoft database, 2000 or 2005 or 2008 versions.
5. a kind of system for transformer station's information operation according to claim 1 is characterized in that, described Web server provides managerial personnel to carry out telemanagement, adopts the IIS of Microsoft as Web server.
6. a kind of system for the operation of transformer station information according to claim 1, it is characterized in that, described system works is under the enterprise network environment, and client and server all adopts the existing hardware platform, and there is information in the ground wire that gathers in the ground wire cabinet with single-chip microcomputer and inputs client computer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104121792A CN102930392A (en) | 2012-10-25 | 2012-10-25 | System for running information of transformer substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104121792A CN102930392A (en) | 2012-10-25 | 2012-10-25 | System for running information of transformer substation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102930392A true CN102930392A (en) | 2013-02-13 |
Family
ID=47645186
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012104121792A Pending CN102930392A (en) | 2012-10-25 | 2012-10-25 | System for running information of transformer substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102930392A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103199972A (en) * | 2013-03-25 | 2013-07-10 | 成都瑞科电气有限公司 | Double machine warm backup switching method and warm backup system achieved based on SOA and RS485 bus |
CN105450471A (en) * | 2015-12-03 | 2016-03-30 | 四川长虹电器股份有限公司 | Method and primary server for monitoring states of Tomcat |
CN105468763A (en) * | 2015-12-01 | 2016-04-06 | 广东电网有限责任公司电网规划研究中心 | Method for multi-person cooperation in big data operation |
CN112261043A (en) * | 2020-10-21 | 2021-01-22 | 深圳市思迅软件股份有限公司 | POS system data interaction method and device, computer equipment and storage medium |
CN112506514A (en) * | 2020-12-30 | 2021-03-16 | 江苏沙钢高科信息技术有限公司 | Multi-platform service sharing system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009301360A (en) * | 2008-06-13 | 2009-12-24 | Ricoh Co Ltd | Working state management device, working state management method, working state management program, collection device, and working state management system |
CN102255393A (en) * | 2011-07-29 | 2011-11-23 | 重庆大学 | Ground wire hanging anti-error blocking system and method thereof |
CN202197150U (en) * | 2011-09-01 | 2012-04-18 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | System for controlling state of earthing wire |
CN102509245A (en) * | 2011-10-21 | 2012-06-20 | 亿达信息技术有限公司 | Temporary grounding wire management method and system |
-
2012
- 2012-10-25 CN CN2012104121792A patent/CN102930392A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009301360A (en) * | 2008-06-13 | 2009-12-24 | Ricoh Co Ltd | Working state management device, working state management method, working state management program, collection device, and working state management system |
CN102255393A (en) * | 2011-07-29 | 2011-11-23 | 重庆大学 | Ground wire hanging anti-error blocking system and method thereof |
CN202197150U (en) * | 2011-09-01 | 2012-04-18 | 中国南方电网有限责任公司超高压输电公司检修试验中心 | System for controlling state of earthing wire |
CN102509245A (en) * | 2011-10-21 | 2012-06-20 | 亿达信息技术有限公司 | Temporary grounding wire management method and system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103199972A (en) * | 2013-03-25 | 2013-07-10 | 成都瑞科电气有限公司 | Double machine warm backup switching method and warm backup system achieved based on SOA and RS485 bus |
CN105468763A (en) * | 2015-12-01 | 2016-04-06 | 广东电网有限责任公司电网规划研究中心 | Method for multi-person cooperation in big data operation |
CN105450471A (en) * | 2015-12-03 | 2016-03-30 | 四川长虹电器股份有限公司 | Method and primary server for monitoring states of Tomcat |
CN112261043A (en) * | 2020-10-21 | 2021-01-22 | 深圳市思迅软件股份有限公司 | POS system data interaction method and device, computer equipment and storage medium |
CN112506514A (en) * | 2020-12-30 | 2021-03-16 | 江苏沙钢高科信息技术有限公司 | Multi-platform service sharing system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106157167B (en) | Secondary equipment remote control operation ticket system and implementation method of secondary equipment remote control operation ticket | |
CN103595131B (en) | On-line monitoring system of transformer device of transformer substation | |
CN102479413B (en) | Network invoicing system and method thereof | |
CN103745322A (en) | Province-city secondary system integrated comprehensive monitoring and process management system in power dispatching and implementation method for system | |
CN105574657A (en) | Intelligent police actual combat comprehensive application platform | |
CN103339611A (en) | Remote access appliance having mss functionality | |
CN103329109A (en) | System and method for monitoring and managing data center resources in real time incorporating manageability subsystem | |
CN103763117A (en) | Service and operation management system | |
CN102930392A (en) | System for running information of transformer substation | |
CN102333090A (en) | Internal control bastion host and security access method of internal network resources | |
CN103400226A (en) | Integrated tobacco industry information security, operation and maintenance application platform system | |
CN103778513A (en) | IT device operation and maintenance monitoring method based on two-dimensional codes | |
CN105893593A (en) | Data fusion method | |
CN103869771A (en) | Environment monitoring system | |
CN103324148A (en) | Equipment cabinet safety integrated management system and equipment cabinet safety integrated management system control method | |
CN101447064B (en) | Auditing management system and auditing management method | |
CN103944763A (en) | Network-assistant management system and method of electrical power system | |
CN107330580A (en) | Power marketing Base data platform construction method | |
CN104811506A (en) | Grease storage remote supervision system and method based on wireless sensor network | |
CN106779485A (en) | Total management system and data processing method based on SOA framework | |
CN106646110A (en) | Low-voltage distribution network fault positioning system based on GIS and Petri technologies | |
CN103716184A (en) | Operation maintenance system of multistage interconnection domain system | |
CN102855275B (en) | A kind of move database synchronous method that there is not knowledge based storehouse under wireless network environment and system | |
CN116307570A (en) | Subway vehicle electronic record system based on block chain technology | |
CN108876363A (en) | A kind of cross-border supervision reporting system based on double-strand framework block chain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130213 |