CN102930123A - Computing method and computing system for whole life cycle cost of cable - Google Patents

Computing method and computing system for whole life cycle cost of cable Download PDF

Info

Publication number
CN102930123A
CN102930123A CN2011102257204A CN201110225720A CN102930123A CN 102930123 A CN102930123 A CN 102930123A CN 2011102257204 A CN2011102257204 A CN 2011102257204A CN 201110225720 A CN201110225720 A CN 201110225720A CN 102930123 A CN102930123 A CN 102930123A
Authority
CN
China
Prior art keywords
cost
cable
expense
life cycle
present worth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102257204A
Other languages
Chinese (zh)
Inventor
韩天祥
李莉华
郑旭
李红雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Power Test and Research Institute Co Ltd
Original Assignee
East China Power Test and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Power Test and Research Institute Co Ltd filed Critical East China Power Test and Research Institute Co Ltd
Priority to CN2011102257204A priority Critical patent/CN102930123A/en
Publication of CN102930123A publication Critical patent/CN102930123A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a computing method and a computing system for whole life cycle cost of a cable. The computing method comprises the following steps of: computing a present value of initial investment of the cable, computing the present value of operating cost in a whole life cycle of the cable, computing the present value of overhaul and maintenance cost in the whole life cycle of the cable, computing the present value of failure cost in the whole life cycle of the cable, computing the present value of retirement disposal cost in the whole life cycle of the cable, and computing sum of the present values in the whole life cycle of the cable. According to the computing method and the computing system provided by the invention, time value of capital is taken into consideration, a best solution can be obtained, the problems on initial investment as well as total and long-term economy are solved in a better manner, and the purposes of saving energy, improving environment and promoting low-carbon economic development are achieved.

Description

The computing method of the overall life cycle cost of cable and computing system
Technical field
The present invention relates to a kind of computing method and computing system of overall life cycle cost (Life Cycle Cost, LCC) of cable.
Background technology
Along with the development of Re-search on Urbanization, the urban district cableization has become the main direction of Construction of Intercity Network.Because the cable construction fund is invested greatly, is involved a wide range of knowledge, life cycle is long, so when carrying out the cable construction, must consider power grid construction and urban construction as a whole, adhere to electrical network and city synchronized development, the leading principle of electrical network appropriateness satisfies the growth needs of load 10-15, thereby, the design selection of high-tension cable is not only the initial cost of considering cable and correlation engineering thereof, also will carry out the accounting of overall life cycle cost, obtaining overall life cycle cost is minimum design selection scheme.
Summary of the invention
The object of the present invention is to provide a kind of computing method of overall life cycle cost of cable.
Another object of the present invention is to provide a kind of computing system of overall life cycle cost of cable.
A kind of computing method of overall life cycle cost of cable comprise the steps: to calculate the present worth of the initial Meteorological of described cable; According to the present worth of each annual operating cost in the life cycle management of described cable, calculate the present worth of the operating cost in the described cable life cycle management; According to the present worth of each annual overhaul maintenance cost in the life cycle management of described cable, calculate the present worth of the repair and maintenance expense in the described cable life cycle management; According to the present worth of each annual failure cost in the life cycle management of described cable, calculate the present worth of the failure cost in the described cable life cycle management; According to the present worth of the retired disposal costs of described cable, calculate the present worth of retired disposal costs in the described cable life cycle management; According to the present worth summation in the described cable life cycle management of present value computation of the present worth of the initial Meteorological in the described cable life cycle management, the present worth of operating cost, the present worth of repair and maintenance expense, the present worth of failure cost, retired disposal costs.
The preferred a kind of technical scheme of said method, the present worth of the initial Meteorological of described cable comprise at least a expense in the expense of state monitoring apparatus of the Installation and Debugging expense of the purchase commodity of described cable body, described cable body and described cable body.
The preferred a kind of technical scheme of said method, the purchase commodity of described cable body comprises that described cable body buys at least a expense in expense, specific purpose tool expense, first standby redundancy expense, Site Service expense, supplier's traffic expense, the premium of insurance, and the Installation and Debugging expense of described cable body comprises at least a expense in the front debugging charge of construction mounting cost, proprietor's traffic expense, putting equipment in service.
The preferred a kind of technical scheme of said method, the present worth of described each annual operating cost comprise that described cable year wear and tear expense, annual day-to-day operation patrol and examine at least a expense in the expense.
The preferred a kind of technical scheme of said method, the described annual day-to-day operation expense of patrolling and examining comprise the tour cost of equipment, Master Cost of Daily Round Check needs and make an inspection tour at least a expense in the labour cost.
The preferred a kind of technical scheme of said method, the present worth of described each annual overhaul maintenance cost comprises at least a expense in periodicmaintenance expense and the testing expenses.
The preferred a kind of technical scheme of said method, the present worth of described each annual failure cost comprise at least a expense in corrective maintenance costs, the breakdown loss expense.
The preferred a kind of technical scheme of said method, the present worth of the retired disposal costs of described cable are the expense of the retired disposal cost deduction of described cable cable salvage value.
The preferred a kind of technical scheme of said method is stated at least a expense in the expenses of environmental protection when the retired disposal cost of cable comprises cable body dismounting labour cost, cost of equipment, traffic expense, equipment is retired processes.
The preferred a kind of technical scheme of said method, calculate the present worth summation in the described cable life cycle management after, calculate the uniform annuity of described cable in life cycle management.
A kind of computing system of overall life cycle cost of cable, comprise: the computing system of initial Meteorological, the computing system collection of described initial Meteorological is also calculated the initial Meteorological of cable, calculates the present worth of the initial Meteorological of described cable according to described initial Meteorological; The computing system of operating cost, the computing system collection of described operating cost is also calculated the present worth of each annual operating cost in the life cycle management of described cable, according to the present worth of described each annual operating cost, calculate the present worth of the operating cost in the described cable life cycle management; The computing system of repair and maintenance expense, the computing system collection of described repair and maintenance expense is also calculated the present worth of each annual overhaul maintenance cost in the life cycle management of described cable, according to the present worth of described each annual overhaul maintenance cost, calculate the present worth of the repair and maintenance expense in the described cable life cycle management; The computing system of failure cost, the computing system collection of described failure cost is also calculated the present worth of each annual failure cost in the life cycle management of described cable, according to the present worth of described each annual failure cost, calculate the present worth of the failure cost in the described cable life cycle management; The computing system of retired disposal costs, the computing system collection of described retired disposal costs is also calculated the present worth of the retired disposal costs of described cable, according to the present worth of described retired disposal costs, calculates the present worth of retired disposal costs in the described cable life cycle management; The total expenses computing system, described total expenses computing system is according to the present worth summation in the described cable life cycle management of present value computation of the present worth of the initial Meteorological in the described cable life cycle management, the present worth of operating cost, the present worth of repair and maintenance expense, the present worth of failure cost, retired disposal costs.
Compared with prior art, the computing method of the overall life cycle cost of cable of the present invention and computing system have been considered the time value of fund, and namely present worth and the final value with fund characterizes.Adopt quantity decision, after various costs are superimposed, finally with the foundation of cost as judgement, weigh the input-output ratio of equipment comprehensive, scientifically, to obtain best scheme, process preferably the problem of the first cost of investment and whole and long-range economy, reach and save the energy, improve environment and promote the purpose that low-carbon economy develops.
Description of drawings
Fig. 1 is the process flow diagram of computing method of the overall life cycle cost of cable of the present invention.
Fig. 2 is the block scheme of computing system of the overall life cycle cost of cable of the present invention.
Embodiment
For making the purpose, technical solutions and advantages of the present invention clearer, the present invention is described in further detail below in conjunction with accompanying drawing.
See also Fig. 1, the process flow diagram of the computing method of the overall life cycle cost of Fig. 1 cable of the present invention.The computing method of the overall life cycle cost of cable of the present invention mainly comprise the steps:
Step 1: the present worth of calculating the initial Meteorological CI of described cable.Concrete, the initial Meteorological of described cable comprises Installation and Debugging expense and some other fees of the purchase commodity of described cable body, described cable body, such as the special debug-item expense of cable body and the state monitoring apparatus expense of purchasing possibly.The initial Meteorological of described cable can be the summation of purchase commodity, Installation and Debugging expense and the other fees of cable body, and the initial Meteorological of described cable also can comprise at least a expense in purchase commodity, Installation and Debugging expense and the other fees of described cable body.
The purchase commodity of described cable body comprises described cable body purchase expense, specific purpose tool expense, first standby redundancy expense, Site Service expense, supplier's traffic expense, premium of insurance.The purchase commodity of described cable body can buy for described cable body take, the summation of specific purpose tool expense, first standby redundancy expense, Site Service expense, supplier's traffic expense, premium of insurance, the purchase commodity of described cable body also can comprise described cable body buy take, specific purpose tool takes, the first at least a expense in standby redundancy expense, Site Service expense, supplier's traffic expense, the premium of insurance.Preferably, described cable body purchase commodity is the price after technology and scope of supply adjustment take producer's price as the basis.
The Installation and Debugging expense of described cable body mainly is the cable laying mounting cost, comprises building mounting cost, proprietor's traffic expense, the front debugging charge of putting equipment in service.The Installation and Debugging expense of described cable body is for building the summation of the debugging charge before mounting cost, proprietor's traffic expense, the putting equipment in service, and the Installation and Debugging expense of described cable body also can comprise at least a expense of building in the front debugging charge of mounting cost, proprietor's traffic expense, putting equipment in service.
The initial Meteorological CI of the described cable that calculates is the present worth of the initial Meteorological CI of described cable.After obtaining present worth, multiply by again (1+i) aObtain corresponding final value, wherein, i represents interest rate, and a is the life-span of cable body, take year as unit.Here and hereinafter, present worth refers to calculate the then value of initial end of year, and final value refers to calculate the then value of time termination.
Step 2: according to the present worth of each annual operating cost CO in the life cycle management of described cable, calculate the present worth of the operating cost in the described cable life cycle management.Concrete, described each annual operating cost comprise described cable year wear and tear expense and annual day-to-day operation patrol and examine expense.N year operating cost is the summation that described cable n year wear and tear expense and n year day-to-day operation are patrolled and examined expense, certainly, described each annual operating cost also can comprise cable year wear and tear expense and annual day-to-day operation patrol and examine at least a expense in the expense.
The described annual day-to-day operation expense of patrolling and examining comprises tour cost of equipment, the Master Cost of Daily Round Check needs and makes an inspection tour labour cost.Year day-to-day operation patrol and examine that action comprises that environment is maked an inspection tour, specialty checks, ground temperature detects, induction current test, spy are patrolled, infrared detection, ultraviolet detect.The described annual day-to-day operation expense of patrolling and examining can be the summation of making an inspection tour cost of equipment, Master Cost and making an inspection tour labour cost, and described annual day-to-day operation is patrolled and examined expense also can be for making an inspection tour at least a expense in cost of equipment, Master Cost and the tour labour cost.Further, cable year wear and tear expense=cable year loss of electricity * cost electricity price=(year AC resistance loss of electricity+year dielectric loss electric weight) * cost electricity price; Annual daily walkaround inspection expense=(environment is maked an inspection tour expense+professional inspection charge+ground temperature testing cost+induction current testing expense+spy expense of patrolling+sampling observation expense+other expenditure) * unit length.
N year operating cost CO in the life cycle management of the described cable that calculates is the present worth of described cable n year operating cost CO.After obtaining present worth, multiply by again (1+i) -n, can obtain the present worth of the life cycle management of cable corresponding to n year operating cost CO.According to the principle of similitude, utilize said method, can obtain respectively spending operating cost in the life cycle management of described cable, thereby present worth of the life cycle management of the cable that each degree operating cost is corresponding is cumulative, can obtains the present worth of the operating cost in the whole cable life cycle management.After obtaining present worth, multiply by again (1+i) aObtain the final value of the operating cost in the whole cable life cycle management.
Step 3: according to the present worth of each annual overhaul maintenance cost CM in the life cycle management of described cable, calculate the present worth of the repair and maintenance expense in the described cable life cycle management.Concrete, described each annual overhaul maintenance cost comprises periodicmaintenance expense and testing expenses.Described each annual overhaul maintenance cost can be the summation of periodicmaintenance expense and testing expenses, for example, the repair and maintenance expense in n year=periodic maintenance expense * unit length, described each annual overhaul maintenance cost also can be at least a expense in periodicmaintenance expense and the testing expenses.The artificial material expense of needs when preferably, described periodicmaintenance expense comprises periodicmaintenance.Content of the test comprises cable grounding resistance measurement, sheath remote measurement, local discharge test.Further, periodic maintenance is 3 years one-periods, if but the one's last year in cycle just in time is 3 multiple, then the repair and maintenance expense does not occur in this year.
N annual overhaul maintenance cost CM in the life cycle management of the described cable that calculates is the present worth of described cable n annual overhaul maintenance cost CM.After obtaining present worth, multiply by again (1+i) -n, can obtain the present worth of the life cycle management of cable corresponding to n annual overhaul maintenance cost CM.According to the principle of similitude, utilize said method, can obtain each annual overhaul maintenance cost in the life cycle management of described cable, thereby the present worth of the life cycle management of the cable that each annual overhaul maintenance cost is corresponding is cumulative, can obtain the present worth of the repair and maintenance expense in the whole cable life cycle management.After obtaining present worth, multiply by again (1+i) aObtain the final value of the repair and maintenance expense in the whole cable life cycle management.
Step 4: according to the present worth of each annual failure cost CF in the life cycle management of described cable, calculate the present worth of the failure cost in the described cable life cycle management.Concrete, each annual failure cost comprises corrective maintenance costs, breakdown loss expense in the life cycle management of described cable.Described corrective maintenance costs mainly comprises inspection of fault and rehabilitation expense.Described breakdown loss expense comprises interruption cost.The summation that described each annual failure cost can take for corrective maintenance costs and breakdown loss, for example: the failure cost=corrective maintenance costs in n year+breakdown loss takes=amounts to single failure expense * failure rate * unit length, wherein, amount to the single failure expense and comprise the expense of reparation, cooperation expense, electric quantity loss expense etc.; Failure rate is the annual number of stoppages/cable installation length, considers to calculate according to producer's bid information to obtain; Unit length is directly inputted by the owner.Described each annual failure cost also can be corrective maintenance costs and the breakdown loss at least a expense in taking.
N year failure cost CF in the life cycle management of the described cable that calculates is the present worth of described cable n year failure cost CF.After obtaining present worth, multiply by again (1+i) -n, can obtain the present worth of the life cycle management of cable corresponding to n year failure cost.According to the principle of similitude, utilize said method, can obtain each annual failure cost in the life cycle management of described cable, thereby the present worth of the life cycle management of the cable that each annual failure cost is corresponding is cumulative, can obtains the present worth of the failure cost in the whole cable life cycle management.After obtaining present worth, multiply by again (1+i) aObtain the final value of the failure cost in the whole cable life cycle management.
Step 5: according to the present worth of the retired disposal costs CD of described cable, calculate the present worth of retired disposal costs in the described cable life cycle management.Concrete, the present worth of the retired disposal costs of described cable is the expense of the retired disposal cost deduction of described cable cable salvage value.The retired disposal cost of described cable comprises the summation of the expenses of environmental protection when cable body is removed labour cost, cost of equipment, traffic expense, the retired processing of equipment, at least a expense in the expenses of environmental protection when the retired disposal cost of described cable also can comprise cable body dismounting labour cost, cost of equipment, traffic expense, the retired processing of equipment.Preferably, the volume of the density of the unit price * copper of the expense=copper of cable salvage value * unit length copper, wherein, the unit price of copper is estimated definite by the market price; The volume of unit length copper=3 π r 2L, wherein, r is the cable interface radius, L is unit length.
The retired disposal costs CD of the described cable that calculates is the present worth (also can become final value) of the retired disposal costs of described cable.After obtaining present worth, multiply by again (1+i) -a, can obtain the present worth of the retired disposal costs of the cable in the whole cable life cycle management.
Step 6: according to the present worth summation in the described cable life cycle management of present value computation of the present worth of the initial Meteorological in the described cable life cycle management, the present worth of operating cost, the present worth of repair and maintenance expense, the present worth of failure cost, retired disposal costs.
The computing method of the overall life cycle cost of cable of the present invention have been considered the time value of fund, and namely present worth and the final value with fund characterizes.For the cable of different life cycles, after calculating the overall life cycle cost of cable, adopt the method for uniform annuity relatively, namely can in the cable of different model, select the most appropriate cable.Uniform annuity=the LCC of the overall life cycle cost of cable Present worth* i (1+i) a/ [(1+i) a-1].
The computing method of the overall life cycle cost of cable of the present invention are applicable to various types of cables, especially high-tension cable, considered that comprehensively equipment is in systems organization, design, the overall process making, purchase, install, move, keep in repair, transform, upgrade until scrap, by considering as a whole, make whole life cycle cost minimum.Adopt quantity decision, after various costs are superimposed, finally with the foundation of cost as judgement, weigh the input-output ratio of equipment comprehensive, scientifically, to obtain best scheme, process preferably the problem of the first cost of investment and whole and long-range economy, reach and save the energy, improve environment and promote the purpose that low-carbon economy develops.Method of the present invention can be applied in the bid, bid, assessment of bids process of cable.
See also Fig. 2, Fig. 2 is the block scheme of computing system of the overall life cycle cost of cable of the present invention.The computing system of the overall life cycle cost of cable of the present invention comprises computing system and the total expenses computing system of the computing system of initial Meteorological, the computing system of operating cost, the computing system of repair and maintenance expense, the computing system of failure cost, retired disposal costs, and described total expenses computing system is connected respectively with the computing system of described initial Meteorological, the computing system of operating cost, the computing system of repair and maintenance expense, the computing system of failure cost, the computing system of retired disposal costs.
The computing system collection of described initial Meteorological is also calculated the initial Meteorological of cable, calculates the present worth of the initial Meteorological of described cable according to described initial Meteorological.Concrete, the expense of the computing system collection of described initial Meteorological comprises Installation and Debugging expense and some other fees of the purchase commodity of described cable body, described cable body, such as the special debug-item expense of cable body and the state monitoring apparatus expense of purchasing possibly.The purchase commodity of described cable body comprises described cable body purchase expense, specific purpose tool expense, first standby redundancy expense, Site Service expense, supplier's traffic expense, premium of insurance.The Installation and Debugging expense of described cable body mainly is the cable laying mounting cost, comprises building mounting cost, proprietor's traffic expense, the front debugging charge of putting equipment in service.The initial Meteorological of described cable is the summation of purchase commodity, Installation and Debugging expense and the other fees of cable body, thereby obtains the present worth of the initial Meteorological CI of described cable.After obtaining present worth, multiply by again (1+i) aObtain its corresponding final value, wherein, i represents interest rate, and a is the life-span of cable body, take year as unit.
The computing system collection of described operating cost is also calculated the present worth of each annual operating cost in the life cycle management of described cable, according to the present worth of described each annual operating cost, calculates the present worth of the operating cost in the described cable life cycle management.Concrete, the expense of the computing system collection of described operating cost comprise described cable year wear and tear expense and annual day-to-day operation patrol and examine expense.The described annual day-to-day operation expense of patrolling and examining comprises tour cost of equipment, the Master Cost of Daily Round Check needs and makes an inspection tour labour cost.Year day-to-day operation patrol and examine that action comprises that environment is maked an inspection tour, specialty checks, ground temperature detects, induction current test, spy are patrolled, infrared detection, ultraviolet detect.Further, cable year wear and tear expense=cable year loss of electricity * cost electricity price=(year AC resistance loss of electricity+year dielectric loss electric weight) * cost electricity price; Annual daily walkaround inspection expense=(environment is maked an inspection tour expense+professional inspection charge+ground temperature testing cost+induction current testing expense+spy expense of patrolling+sampling observation expense+other expenditure) * unit length.
N year operating cost is that described cable n year wear and tear expense and n year day-to-day operation are patrolled and examined the summation of expense, thereby obtains the present worth of described cable n year operating cost CO.After obtaining present worth, multiply by again (1+i) -n, can obtain the present worth of the life cycle management of cable corresponding to n year operating cost CO.According to the principle of similitude, utilize said method, can obtain respectively spending operating cost in the life cycle management of described cable, thereby present worth of the life cycle management of the cable that each degree operating cost is corresponding is cumulative, can obtains the present worth of the operating cost in the whole cable life cycle management.After obtaining present worth, multiply by again (1+i) aObtain the final value of the operating cost in the whole cable life cycle management.
The computing system collection of described repair and maintenance expense is also calculated the present worth of each annual overhaul maintenance cost in the life cycle management of described cable, according to the present worth of described each annual overhaul maintenance cost, calculate the present worth of the repair and maintenance expense in the described cable life cycle management.Concrete, the expense of the computing system collection of described repair and maintenance expense comprises periodicmaintenance expense and testing expenses.The artificial material expense of needs when preferably, described periodicmaintenance expense comprises periodicmaintenance.Content of the test comprises cable grounding resistance measurement, sheath remote measurement, local discharge test.Further, periodic maintenance is 3 years one-periods, if but the one's last year in cycle just in time is 3 multiple, then the repair and maintenance expense does not occur in this year.
Described each annual overhaul maintenance cost can be the summation of periodicmaintenance expense and testing expenses, for example, the repair and maintenance in n year expense=periodic maintenance expense * unit length, thus the present worth of described cable n annual overhaul maintenance cost CM obtained.After obtaining present worth, multiply by again (1+i) -n, can obtain the present worth of the life cycle management of cable corresponding to n annual overhaul maintenance cost CM.According to the principle of similitude, utilize said method, can obtain each annual overhaul maintenance cost in the life cycle management of described cable, thereby the present worth of the life cycle management of the cable that each annual overhaul maintenance cost is corresponding is cumulative, can obtain the present worth of the repair and maintenance expense in the whole cable life cycle management.After obtaining present worth, multiply by again (1+i) aObtain the final value of the repair and maintenance expense in the whole cable life cycle management.
The computing system collection of described failure cost is also calculated the present worth of each annual failure cost in the life cycle management of described cable, according to the present worth of described each annual failure cost, calculates the present worth of the failure cost in the described cable life cycle management.Concrete, the expense of the computing system collection of described failure cost comprises corrective maintenance costs, breakdown loss expense.Described corrective maintenance costs mainly comprises inspection of fault and rehabilitation expense.Described breakdown loss expense comprises interruption cost.
The summation that described each annual failure cost can take for corrective maintenance costs and breakdown loss, for example: the failure cost=corrective maintenance costs in n year+breakdown loss takes=amounts to single failure expense * failure rate * unit length, wherein, amount to the single failure expense and comprise the expense of reparation, cooperation expense, electric quantity loss expense etc.; Failure rate is the annual number of stoppages/cable installation length, considers to calculate according to producer's bid information to obtain; Unit length is directly inputted by the owner.After the present worth of n year failure cost, multiply by again (1+i) in the life cycle management of the described cable that calculates -n, can obtain the present worth of the life cycle management of cable corresponding to n year failure cost.According to the principle of similitude, utilize said method, can obtain each annual failure cost in the life cycle management of described cable, thereby the present worth of the life cycle management of the cable that each annual failure cost is corresponding is cumulative, can obtains the present worth of the failure cost in the whole cable life cycle management.After obtaining present worth, multiply by again (1+i) aObtain the final value of the failure cost in the whole cable life cycle management.
The computing system collection of described retired disposal costs is also calculated the present worth of the retired disposal costs of described cable, according to the present worth of described retired disposal costs, calculates the present worth of retired disposal costs in the described cable life cycle management.The expense of the computing system collection of described retired disposal costs comprises the expense of the retired disposal cost of cable and cable salvage value.The retired disposal cost of described cable comprises the expenses of environmental protection when cable body is removed labour cost, cost of equipment, traffic expense, the retired processing of equipment.The volume of the density of the unit price * copper of the expense=copper of cable salvage value * unit length copper, wherein, the unit price of copper is estimated definite by the market price; The volume of unit length copper=3 π r 2L, wherein, r is the cable interface radius, L is unit length.The present worth of the retired disposal costs of described cable is the expense of the retired disposal cost deduction of described cable cable salvage value, thereby obtains the present worth of the retired disposal costs of described cable.After obtaining present worth, multiply by again (1+i) -a, can obtain the present worth of the retired disposal costs of the cable in the whole cable life cycle management.
Described total expenses computing system is according to the present worth summation in the described cable life cycle management of present value computation of the present worth of the initial Meteorological in the described cable life cycle management, the present worth of operating cost, the present worth of repair and maintenance expense, the present worth of failure cost, retired disposal costs.
In situation without departing from the spirit and scope of the present invention, can also consist of many very embodiment of big difference that have.Should be appreciated that except as defined by the appended claims, the present invention is not limited at the specific embodiment described in the instructions.

Claims (11)

1. the computing method of the overall life cycle cost of a cable is characterized in that, comprise the steps:
Calculate the present worth of the initial Meteorological of described cable;
According to the present worth of each annual operating cost in the life cycle management of described cable, calculate the present worth of the operating cost in the described cable life cycle management;
According to the present worth of each annual overhaul maintenance cost in the life cycle management of described cable, calculate the present worth of the repair and maintenance expense in the described cable life cycle management;
According to the present worth of each annual failure cost in the life cycle management of described cable, calculate the present worth of the failure cost in the described cable life cycle management;
According to the present worth of the retired disposal costs of described cable, calculate the present worth of retired disposal costs in the described cable life cycle management;
According to the present worth summation in the described cable life cycle management of present value computation of the present worth of the initial Meteorological in the described cable life cycle management, the present worth of operating cost, the present worth of repair and maintenance expense, the present worth of failure cost, retired disposal costs.
2. the computing method of the overall life cycle cost of cable as claimed in claim 1 is characterized in that: the present worth of the initial Meteorological of described cable comprises at least a expense in the expense of state monitoring apparatus of the Installation and Debugging expense of the purchase commodity of cable body, cable body and cable body.
3. the computing method of the overall life cycle cost of cable as claimed in claim 2, it is characterized in that: the purchase commodity of described cable body comprises that cable body buys at least a expense in expense, specific purpose tool expense, first standby redundancy expense, Site Service expense, supplier's traffic expense, the premium of insurance, and the Installation and Debugging expense of described cable body comprises at least a expense in the front debugging charge of construction mounting cost, proprietor's traffic expense, putting equipment in service.
4. the computing method of the overall life cycle cost of cable as claimed in claim 1 is characterized in that: the present worth of described each annual operating cost comprises that cable year wear and tear expense, annual day-to-day operation patrol and examine at least a expense in the expense.
5. the computing method of the overall life cycle cost of cable as claimed in claim 4 is characterized in that: the described annual day-to-day operation expense of patrolling and examining comprises tour cost of equipment, the Master Cost of Daily Round Check needs and makes an inspection tour at least a expense in the labour cost.
6. the computing method of the overall life cycle cost of cable as claimed in claim 1, it is characterized in that: the present worth of described each annual overhaul maintenance cost comprises at least a expense in periodicmaintenance expense and the testing expenses.
7. the computing method of the overall life cycle cost of cable as claimed in claim 1 is characterized in that: the present worth of described each annual failure cost comprises at least a expense in corrective maintenance costs, the breakdown loss expense.
8. the computing method of the overall life cycle cost of cable as claimed in claim 1 is characterized in that: the present worth of the retired disposal costs of described cable is the expense of the retired disposal cost deduction of cable cable salvage value.
9. the computing method of the overall life cycle cost of cable as claimed in claim 8 is characterized in that: at least a expense in the expenses of environmental protection when the retired disposal cost of described cable comprises cable body dismounting labour cost, cost of equipment, traffic expense, the retired processing of equipment.
10. such as the computing method of the overall life cycle cost of the described cable of any one in the claim 1 to 9, it is characterized in that: after calculating the present worth summation in the described cable life cycle management, calculate the uniform annuity of described cable in life cycle management.
11. the computing system of the overall life cycle cost of a cable is characterized in that, comprising:
The computing system of initial Meteorological, the computing system collection of described initial Meteorological is also calculated the initial Meteorological of cable, calculates the present worth of the initial Meteorological of described cable according to described initial Meteorological;
The computing system of operating cost, the computing system collection of described operating cost is also calculated the present worth of each annual operating cost in the life cycle management of described cable, according to the present worth of described each annual operating cost, calculate the present worth of the operating cost in the described cable life cycle management;
The computing system of repair and maintenance expense, the computing system collection of described repair and maintenance expense is also calculated the present worth of each annual overhaul maintenance cost in the life cycle management of described cable, according to the present worth of described each annual overhaul maintenance cost, calculate the present worth of the repair and maintenance expense in the described cable life cycle management;
The computing system of failure cost, the computing system collection of described failure cost is also calculated the present worth of each annual failure cost in the life cycle management of described cable, according to the present worth of described each annual failure cost, calculate the present worth of the failure cost in the described cable life cycle management;
The computing system of retired disposal costs, the computing system collection of described retired disposal costs is also calculated the present worth of the retired disposal costs of described cable, according to the present worth of described retired disposal costs, calculates the present worth of retired disposal costs in the described cable life cycle management;
The total expenses computing system, described total expenses computing system is according to the present worth summation in the described cable life cycle management of present value computation of the present worth of the initial Meteorological in the described cable life cycle management, the present worth of operating cost, the present worth of repair and maintenance expense, the present worth of failure cost, retired disposal costs.
CN2011102257204A 2011-08-08 2011-08-08 Computing method and computing system for whole life cycle cost of cable Pending CN102930123A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102257204A CN102930123A (en) 2011-08-08 2011-08-08 Computing method and computing system for whole life cycle cost of cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102257204A CN102930123A (en) 2011-08-08 2011-08-08 Computing method and computing system for whole life cycle cost of cable

Publications (1)

Publication Number Publication Date
CN102930123A true CN102930123A (en) 2013-02-13

Family

ID=47644920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102257204A Pending CN102930123A (en) 2011-08-08 2011-08-08 Computing method and computing system for whole life cycle cost of cable

Country Status (1)

Country Link
CN (1) CN102930123A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103308800A (en) * 2013-06-03 2013-09-18 国家电网公司 LCAM (life cycle asset management) real-time evaluating system and evaluating method for power transformer based on real-time monitoring
CN103678909A (en) * 2013-12-11 2014-03-26 中国能源建设集团广东省电力设计研究院 Submarine cable life cycle cost computing method and submarine cable type selecting method
CN104036368A (en) * 2014-06-26 2014-09-10 国家电网公司 Method and device for asset collection
CN104573351A (en) * 2014-12-29 2015-04-29 云南电网公司电力科学研究院 Method for calculating full life circle of transmission line
CN104751375A (en) * 2015-04-03 2015-07-01 国家电网公司 Power cable reliability estimation method based on time varying stress-intensity interference model
CN104765960A (en) * 2015-04-03 2015-07-08 国家电网公司 Method for estimating accumulation amount of electric heat degradation of power cable with consideration of random process
CN105243520A (en) * 2015-11-18 2016-01-13 国网上海市电力公司 Full life-cycle cost evaluation method based on power cable heat transfer model
CN105488637A (en) * 2015-12-29 2016-04-13 国网浙江省电力公司 Calculation method for data asset whole life cycle cost
CN108319785A (en) * 2018-02-05 2018-07-24 三峡大学 A kind of cable run steel bracket selection method based on evaluation of life cycle cost
CN108399286A (en) * 2018-02-05 2018-08-14 三峡大学 A kind of cable run steel bracket evaluation of life cycle cost method
CN110837898A (en) * 2019-10-25 2020-02-25 袁茂银 Underground cable fault repairing method and device based on model selection
CN110866839A (en) * 2019-10-25 2020-03-06 袁茂银 Underground cable fault repairing method and device based on multiple models

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002251416A (en) * 2001-02-23 2002-09-06 Matsushita Electric Works Ltd Design support device
KR20050079912A (en) * 2005-05-03 2005-08-11 (주)화인씨이엠테크 A method for lcc-based multi-stage decision making for design
CN101246566A (en) * 2007-11-30 2008-08-20 天津理工大学 Building continuous design method based on full life cycle cost estimation
CN101446985A (en) * 2007-11-28 2009-06-03 上海市电力公司 LCC control method for power system equipment
KR20090119356A (en) * 2008-05-16 2009-11-19 (주) 코네스코퍼레이션 Method for transporting neuclear waste through life cycle cost analysis
CN101799889A (en) * 2009-02-06 2010-08-11 华东电力试验研究院有限公司 Expense estimation method of oil immersed transformer based on whole life cycle cost model
CN201654838U (en) * 2010-02-03 2010-11-24 上海市电力公司 Asset life-cycle information integrated control device applicable to electric power systems
CN102142111A (en) * 2010-02-03 2011-08-03 上海市电力公司 Asset life information integrated control method and device suitable for power system
KR101202772B1 (en) * 2010-09-06 2012-11-19 아주대학교산학협력단 Life cycle cost assessment method of sustainable building

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002251416A (en) * 2001-02-23 2002-09-06 Matsushita Electric Works Ltd Design support device
KR20050079912A (en) * 2005-05-03 2005-08-11 (주)화인씨이엠테크 A method for lcc-based multi-stage decision making for design
CN101446985A (en) * 2007-11-28 2009-06-03 上海市电力公司 LCC control method for power system equipment
CN101246566A (en) * 2007-11-30 2008-08-20 天津理工大学 Building continuous design method based on full life cycle cost estimation
KR20090119356A (en) * 2008-05-16 2009-11-19 (주) 코네스코퍼레이션 Method for transporting neuclear waste through life cycle cost analysis
CN101799889A (en) * 2009-02-06 2010-08-11 华东电力试验研究院有限公司 Expense estimation method of oil immersed transformer based on whole life cycle cost model
CN201654838U (en) * 2010-02-03 2010-11-24 上海市电力公司 Asset life-cycle information integrated control device applicable to electric power systems
CN102142111A (en) * 2010-02-03 2011-08-03 上海市电力公司 Asset life information integrated control method and device suitable for power system
KR101202772B1 (en) * 2010-09-06 2012-11-19 아주대학교산학협력단 Life cycle cost assessment method of sustainable building

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
刘宝平等: "四、资金时间价值的计算方法", 《技术经济学》 *
尹来宾等: "基于全生命周期费用(LCC)的配电装置改造的研究", 《电力系统保护与控制》 *
梅志农等: "上海世博变电站工程中的LCC实践", 《上海电力》 *
郭峰等: "输电线路全寿命周期成本设计", 《电力建设》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103308800B (en) * 2013-06-03 2015-12-23 国家电网公司 Based on the power transformer LCAM real time evaluating method of Real-Time Monitoring
CN103308800A (en) * 2013-06-03 2013-09-18 国家电网公司 LCAM (life cycle asset management) real-time evaluating system and evaluating method for power transformer based on real-time monitoring
CN103678909A (en) * 2013-12-11 2014-03-26 中国能源建设集团广东省电力设计研究院 Submarine cable life cycle cost computing method and submarine cable type selecting method
CN103678909B (en) * 2013-12-11 2017-01-25 中国能源建设集团广东省电力设计研究院有限公司 Submarine cable life cycle cost obtaining method and submarine cable type selecting method
CN104036368A (en) * 2014-06-26 2014-09-10 国家电网公司 Method and device for asset collection
CN104573351A (en) * 2014-12-29 2015-04-29 云南电网公司电力科学研究院 Method for calculating full life circle of transmission line
CN104765960B (en) * 2015-04-03 2017-11-17 国家电网公司 Consider the power cable electric heating degeneration cumulant evaluation method of random process
CN104751375A (en) * 2015-04-03 2015-07-01 国家电网公司 Power cable reliability estimation method based on time varying stress-intensity interference model
CN104765960A (en) * 2015-04-03 2015-07-08 国家电网公司 Method for estimating accumulation amount of electric heat degradation of power cable with consideration of random process
CN105243520A (en) * 2015-11-18 2016-01-13 国网上海市电力公司 Full life-cycle cost evaluation method based on power cable heat transfer model
CN105488637A (en) * 2015-12-29 2016-04-13 国网浙江省电力公司 Calculation method for data asset whole life cycle cost
CN108319785A (en) * 2018-02-05 2018-07-24 三峡大学 A kind of cable run steel bracket selection method based on evaluation of life cycle cost
CN108399286A (en) * 2018-02-05 2018-08-14 三峡大学 A kind of cable run steel bracket evaluation of life cycle cost method
CN108399286B (en) * 2018-02-05 2021-06-01 武汉大云物移智科技有限公司 Cable line steel support whole life cycle cost evaluation method
CN108319785B (en) * 2018-02-05 2021-06-04 武汉大云物移智科技有限公司 Cable line steel support model selection method based on life cycle cost evaluation
CN110837898A (en) * 2019-10-25 2020-02-25 袁茂银 Underground cable fault repairing method and device based on model selection
CN110866839A (en) * 2019-10-25 2020-03-06 袁茂银 Underground cable fault repairing method and device based on multiple models

Similar Documents

Publication Publication Date Title
CN102930123A (en) Computing method and computing system for whole life cycle cost of cable
CN106093652B (en) A kind of non-intrusive electrical load monitoring System and method for having self-learning function
CN102208809B (en) Reliability assessment method for distribution network including photovoltaic power supply
US20140351010A1 (en) System and method of democratizing power to create a meta-exchange
CN102116857B (en) Method for checking electric quantity at power grid gate
CN104391202A (en) Abnormal electricity consumption judging method based on analysis of abnormal electric quantity
CN103995962A (en) Online real-time calculation and analysis method of equipped wire loss
CA2743667A1 (en) System and method of democratizing power to create a meta-exchange
CN103646358A (en) Method for detecting planned maintenance cycle of power grid related to power equipment time-varying failure rate
CN105956781A (en) Power grid equipment life cycle cost calculation method
CN104374993A (en) Electricity larceny prevention method and device based on power internet of things and processor
CN109450089A (en) A kind of area's low-voltage recognition methods, device and terminal device
JP2014095941A (en) Photovoltaic power generation output estimation device
CN105932773B (en) A kind of intelligent charging electricity anti-theft system
CN105243520A (en) Full life-cycle cost evaluation method based on power cable heat transfer model
Rai et al. Power Intelligence and Asset Monitoring for System
CN114660412A (en) Electric energy quality monitoring system based on intelligent electric energy meter and monitoring method thereof
CN104463713A (en) Power transmission line economic current density calculating method and system
Khazaee et al. Distribution loss reduction in residential and commercial pilots by using AMI system
CN102760246A (en) High-pressure cable design and type selection data processing method based on life circle cost management
CN113687293A (en) Line loss abnormity intelligent analysis method based on big data
CN104063757B (en) Transformer substation main electrical connection assessment method suitable for different development stages of power grids
CN105139275A (en) Method for establishing distributed photovoltaic power stealing cost benefit evaluation model
CN114152909A (en) Medium-high voltage misalignment analysis system based on big data
CN113376456A (en) Cloud platform-based method for analyzing and managing electric quantity and electric charge of large electric power user

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130213