CN102926545A - Method for constructing block base - Google Patents

Method for constructing block base Download PDF

Info

Publication number
CN102926545A
CN102926545A CN2012104432467A CN201210443246A CN102926545A CN 102926545 A CN102926545 A CN 102926545A CN 2012104432467 A CN2012104432467 A CN 2012104432467A CN 201210443246 A CN201210443246 A CN 201210443246A CN 102926545 A CN102926545 A CN 102926545A
Authority
CN
China
Prior art keywords
concrete block
cage
reinforcement
concrete blocks
flake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104432467A
Other languages
Chinese (zh)
Other versions
CN102926545B (en
Inventor
罗广迪
司崇杰
王文伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINJIANG MEITE INTELLIGENT SECURITY ENGINEERING Co Ltd
Original Assignee
XINJIANG MEITE INTELLIGENT SECURITY ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINJIANG MEITE INTELLIGENT SECURITY ENGINEERING Co Ltd filed Critical XINJIANG MEITE INTELLIGENT SECURITY ENGINEERING Co Ltd
Priority to CN201210443246.7A priority Critical patent/CN102926545B/en
Publication of CN102926545A publication Critical patent/CN102926545A/en
Application granted granted Critical
Publication of CN102926545B publication Critical patent/CN102926545B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a method for constructing a block base, which comprises the steps that: flake concrete blocks are built and pressed, a reinforcing bar framework passes through holes which are arranged on the flake concrete blocks which are built and pressed, the all flake concrete blocks which are built and pressed together are connected, the two ends of the reinforcing bar framework are pressed fit by utilizing steel plates, the steel plates are closely fixed on the reinforcing bar framework to fix the flake concrete blocks which are built and pressed and the reinforcing bar framework to be fixed together, and the fixed flake concrete blocks are adhered through U-type concrete blocks. Because the flake concrete blocks are light in quality, the shapes of the flake concrete blocks can be designed according to actual requirement, the flake concrete blocks are simple to produce and process, are convenient to transport, can be produced in advance, can be reused, and are convenient to combine and construct and low in production and human cost. The method for constructing the block base achieves the purpose of simple construction, convenient transportation and reusability.

Description

The job practices of packaged pedestal
Technical field
The present invention relates to the fixed building field, particularly, relate to a kind of job practices of packaged pedestal.
Background technology
At present, all to build in advance in the construction of building pedestal, particularly integrated mill with certain supporting role the vertical rod that is seen everywhere, Jian Ta in the heavy construction construction.For a long time pedestal construction all is early to implement in the building operations, and great function is being brought into play in whole building operations.
Existing pedestal adopts the concrete monobloc cast, and volume is large, and quality is heavy, be unfavorable for long distance transportation, and often some remote job sites do not possess processing conditions, need in earlier stage finish to build, be transported to the job site, this has not only increased construction cost again, has also prolonged construction period.Traditional pedestal needs many people to make a concerted effort in installation process, and pedestal is placed on the precalculated position, sometimes even need to employ Large-scale Hoisting equipment, brings larger difficulty to construction.After pedestal was used to complete during part zero, the dismounting pedestal is difficulty comparatively, and used pedestal is difficult to reuse, and abandoned at the construction field (site), caused the wasting of resources.
Summary of the invention
The object of the invention is to, for the problems referred to above, propose a kind of job practices of packaged pedestal, with realize that construction is simple, the advantage of convenient transportation and reusable advantage.
For achieving the above object, the technical solution used in the present invention is:
A kind of job practices of packaged pedestal may further comprise the steps:
The sheet concrete block is built pressure;
Cage of reinforcement passed the hole on the sheet concrete block of above-mentioned base pressing, connect the coarctate whole sheet concrete blocks in above-mentioned base;
Above-mentioned cage of reinforcement two ends are utilized the steel plate pressing, steel plate is fastened on the cage of reinforcement, sheet concrete block and the cage of reinforcement that press at the above-mentioned base that makes are fixed together;
Carry out the above-mentioned sheet concrete block that fixes bonding with U-shaped concrete block.
According to a preferred embodiment of the invention, above-mentioned the sheet concrete block is built in the pressure, the sheet concrete block adopts the overlapping mode of tooled joint to build pressure, and the sheet concrete block above is namely successively built pressure perpendicular to following sheet concrete block.
According to a preferred embodiment of the invention, above-mentioned steel plate is fastened on the cage of reinforcement, adopts screw to fix.
According to a preferred embodiment of the invention, the length of above-mentioned cage of reinforcement is adjustable.
Technical scheme of the present invention, concrete pedestal by monobloc cast is divided into sheet concrete block and cage of reinforcement two parts, but connect the sheet concrete block by cage of reinforcement, the mixed energy of sheet soil block is combined, fastening by the fixing compressing tablet in cage of reinforcement top again, add a cover two sheet U-shaped concrete blocks, final integral forms the pedestal with higher-strength.Because of sheet concrete block lighter weight, design shape according to actual needs, production and processing is simple, and convenient transportation can be produced in advance, reuses, and combination construction is convenient, and the production human cost is little.Reached that construction is simple, convenient transportation and reusable purpose.
Below by drawings and Examples, technical scheme of the present invention is described in further detail.
Description of drawings
Fig. 1 is that the described sheet concrete block of the embodiment of the invention adopts the structural representation after the overlapping mode of tooled joint is built pressure;
Fig. 2 is the described cage of reinforcement structural representation of the embodiment of the invention;
Fig. 3 is the job practices construction combination of the described packaged pedestal of the embodiment of the invention;
Fig. 4 is the pedestal overall structure schematic diagram after the described combination of the embodiment of the invention.
1-U matrix shape concrete block.
The specific embodiment
Below in conjunction with accompanying drawing the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein only is used for description and interpretation the present invention, is not intended to limit the present invention.
As shown in Figures 1 to 4, a kind of job practices of packaged pedestal may further comprise the steps:
The sheet concrete block is built pressure;
Cage of reinforcement passed the hole on the sheet concrete block of above-mentioned base pressing, connect and build coarctate whole sheet concrete blocks;
The cage of reinforcement two ends are utilized the steel plate pressing, steel plate is fastened on the cage of reinforcement, sheet concrete block and the cage of reinforcement that press at the base that makes are fixed together;
Carry out the sheet concrete block that fixes bonding with U-shaped concrete block.
Wherein, the sheet concrete block is built in the pressure, the sheet concrete block adopts the overlapping mode of tooled joint to build pressure, and namely top sheet concrete block is successively built pressure perpendicular to following sheet concrete block.Adopt screw that steel plate is fastened on the cage of reinforcement.And the length of cage of reinforcement is adjustable.
It should be noted that at last: the above only is the preferred embodiments of the present invention, be not limited to the present invention, although with reference to previous embodiment the present invention is had been described in detail, for a person skilled in the art, it still can be made amendment to the technical scheme that aforementioned each embodiment puts down in writing, and perhaps part technical characterictic wherein is equal to replacement.Within the spirit and principles in the present invention all, any modification of doing, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (4)

1. the job practices of a packaged pedestal is characterized in that, may further comprise the steps:
The sheet concrete block is built pressure;
Cage of reinforcement passed the hole on the sheet concrete block of above-mentioned base pressing, connect the coarctate whole sheet concrete blocks in above-mentioned base;
Above-mentioned cage of reinforcement two ends are utilized the steel plate pressing, steel plate is fastened on the cage of reinforcement, sheet concrete block and the cage of reinforcement that press at the above-mentioned base that makes are fixed together;
Carry out the above-mentioned sheet concrete block that fixes bonding with U-shaped concrete block.
2. the job practices of packaged pedestal according to claim 1, it is characterized in that, above-mentioned the sheet concrete block is built in the pressure, the sheet concrete block adopts the overlapping mode of tooled joint to build pressure, and the sheet concrete block above is namely successively built pressure perpendicular to following sheet concrete block.
3. the job practices of packaged pedestal according to claim 1 and 2 is characterized in that, above-mentioned steel plate is fastened on the cage of reinforcement, adopts screw to fix.
4. the job practices of packaged pedestal according to claim 1 is characterized in that, the length of above-mentioned cage of reinforcement is adjustable.
CN201210443246.7A 2012-11-08 2012-11-08 The construction method of block base Active CN102926545B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210443246.7A CN102926545B (en) 2012-11-08 2012-11-08 The construction method of block base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210443246.7A CN102926545B (en) 2012-11-08 2012-11-08 The construction method of block base

Publications (2)

Publication Number Publication Date
CN102926545A true CN102926545A (en) 2013-02-13
CN102926545B CN102926545B (en) 2015-10-28

Family

ID=47641461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210443246.7A Active CN102926545B (en) 2012-11-08 2012-11-08 The construction method of block base

Country Status (1)

Country Link
CN (1) CN102926545B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014201991A (en) * 2013-04-08 2014-10-27 タカノ株式会社 Support of structure
CN109763511A (en) * 2018-06-13 2019-05-17 吉林省长春电力勘测设计院有限公司 A kind of power network line straight line pole basis
RU193712U1 (en) * 2019-08-12 2019-11-11 Закрытое акционерное общество "Русские Башни" MAST FOUNDATION BASE
CN113565123A (en) * 2021-07-15 2021-10-29 中建一局集团第二建筑有限公司 Movable type variable-counterweight steel structure temporary support foundation and installation method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6210333A (en) * 1985-07-08 1987-01-19 Kiyoshi Goto Fundation work for pier of reinforced base frame
US5564235A (en) * 1994-08-29 1996-10-15 Butler; Michael Foundation and floor construction means
CN202247940U (en) * 2011-10-12 2012-05-30 颜丙申 Base type hollow square equipment foundation
CN202482887U (en) * 2011-12-31 2012-10-10 电联工程技术有限公司 Concrete precast-assemble foundation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6210333A (en) * 1985-07-08 1987-01-19 Kiyoshi Goto Fundation work for pier of reinforced base frame
US5564235A (en) * 1994-08-29 1996-10-15 Butler; Michael Foundation and floor construction means
CN202247940U (en) * 2011-10-12 2012-05-30 颜丙申 Base type hollow square equipment foundation
CN202482887U (en) * 2011-12-31 2012-10-10 电联工程技术有限公司 Concrete precast-assemble foundation

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014201991A (en) * 2013-04-08 2014-10-27 タカノ株式会社 Support of structure
CN109763511A (en) * 2018-06-13 2019-05-17 吉林省长春电力勘测设计院有限公司 A kind of power network line straight line pole basis
RU193712U1 (en) * 2019-08-12 2019-11-11 Закрытое акционерное общество "Русские Башни" MAST FOUNDATION BASE
CN113565123A (en) * 2021-07-15 2021-10-29 中建一局集团第二建筑有限公司 Movable type variable-counterweight steel structure temporary support foundation and installation method thereof
CN113565123B (en) * 2021-07-15 2022-07-01 中建一局集团第二建筑有限公司 Movable type variable-counterweight steel structure temporary support foundation and installation method thereof

Also Published As

Publication number Publication date
CN102926545B (en) 2015-10-28

Similar Documents

Publication Publication Date Title
CN202248876U (en) Shear wall door/window opening formwork composite device
CN201786041U (en) Steel support
CN102926545A (en) Method for constructing block base
CN215760469U (en) Building structure movement joint position shear force wall aluminum mould board location reinforcement device
CN203412292U (en) Detachable discharging platform
CN207863474U (en) A kind of installation form structure for building
CN101476330B (en) Mass concrete elastic base and its construction method
CN206397136U (en) Assembled aluminum template masonry shearwalls reinforced concrete structural column
CN206815804U (en) A kind of new builder's jack girder steel built-in fitting
CN207228624U (en) A kind of tool-type shaped rc columns template
CN201339320Y (en) High-altitude overhanging hanging reinforced concrete hanging bracket
CN103306474A (en) Integrated wood formwork
CN202108244U (en) Pulling fixing piece
CN207363256U (en) A kind of type quick detaching beam bottom mother plate supporting rack
CN203487782U (en) Self-bearing type detachable steel bar truss template connecting piece
CN202299419U (en) Extensible supporting device for moldboard
CN102433961A (en) Prefabricated beam structure construction member
CN202299426U (en) Back shoring and counter bracing mechanism for formwork erection of building deformation joint
CN206987374U (en) A kind of formwork reinforcement system external corner fixture
CN110919825A (en) Large die table die for plate type prefabricated part assembly line construction
CN202577967U (en) Steel stair step template
CN215053284U (en) Novel independent support of post-cast strip for bearing stress by using original structure
CN206028597U (en) Processingequipment and system of processing of steel reinforcement cage
CN205476444U (en) Light -duty support post based on low level jacking die carrier system
CN205036162U (en) Basis is kept off to prefabricated enclosing of repeatedly usable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant