CN102916487A - System and method for realizing low-frequency self-starting of unit - Google Patents

System and method for realizing low-frequency self-starting of unit Download PDF

Info

Publication number
CN102916487A
CN102916487A CN2012103749963A CN201210374996A CN102916487A CN 102916487 A CN102916487 A CN 102916487A CN 2012103749963 A CN2012103749963 A CN 2012103749963A CN 201210374996 A CN201210374996 A CN 201210374996A CN 102916487 A CN102916487 A CN 102916487A
Authority
CN
China
Prior art keywords
unit
starting
self
low
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103749963A
Other languages
Chinese (zh)
Inventor
于粟
赵海涛
张丽英
黄琢
李明
陈万祥
王千
王湛
于海东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Northeast Electric Power Research Institute Co Ltd
Liaoning Dongke Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Northeast Electric Power Research Institute Co Ltd
Liaoning Dongke Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd, Northeast Electric Power Research Institute Co Ltd, Liaoning Dongke Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN2012103749963A priority Critical patent/CN102916487A/en
Publication of CN102916487A publication Critical patent/CN102916487A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to the technical field of a system and a method for realizing the low-frequency self-starting of a unit, which can be the improvement of an emergency automatic-control technology for a power generation unit of a power system for guaranteeing the stability of a power grid. According to the system, an in-place monitoring control element, a PLC (programmable logic controller), an upper computer server, an operator station and relevant network equipments form the redundancy configuration of a communication path of important equipment. The system and the method are realized depending on a computer supervisory control system of a power plant, the investment is smaller, the coupling with other control logics is low, the movement is sensitive and reliable, the parameter setting is comprehensive and simple, and the commonality is stronger. Meanwhile, the system and the method can be perfectly combined with an automatic power generation control system in the existing power plant, and the problem that the conflict with the control logic of the automatic power generation control system after the low-frequency self-starting control can be avoided through effective measures, so as to provide an effective guarantee for the processing for emergent accidents of the power plant under the special condition.

Description

Unit low frequency self-starting system and method
Technical field
The present invention relates to the technical field of a kind of unit low frequency self-starting system and method, is for ensureing that the stabilization of power grids is for the improvement of the urgent automatic control technology of electric power system generating set.
Background technology
Low all self-starting devices are maintenance system frequency stabilizations and setting, under accident conditions, electric power system loses a large amount of power supplys causes power that serious imbalance occurs and system frequency sharply descends, to cause a series of serious consequence and loss to the electricity consumption user, in this case, low all self-starting device actions, drop into unit for subsequent use, increase system power, with the systems stabilisation frequency, ensure the quality of power supply.Development along with electric power system, the continuous growth of net capacity, society is more and more higher to the requirement of the quality of power supply, significantly reduce when system's unit output occurring, in the lower situation of mains frequency, the unit primary frequency modulation might not satisfy the stable needs of system frequency, and in general the adjustable range of unit primary frequency modulation is 10% of its rated capacity.As a kind of processing method to system burst sexual behavior part, the power plant unit improves the stability of electric power system in the serious immediately self-starting systems stabilisation preferably during low week of system.From technological layer, utilize existing computer supervisory control system can realize preferably unit self-starting during low week in system in the hydroelectric plant.
Summary of the invention
In order to solve the deficiencies in the prior art part, the invention provides a kind of unit low frequency self-starting system and method, its objective is and to combine by automatic electricity generation control system perfect and existing power plant, use effective means to avoid mutually conflicting with the automatic electricity generation control system control logic behind low all self-starting control actions.
The present invention is achieved by the following technical solutions:
Unit low frequency self-starting system at hardware aspect, is made of the communication path redundant configuration of visual plant terrain Monitoring and Controlling element, PLC, host computer server, operator station and related network device; The terrain slave computer is bus structures, and terrain Monitoring and Controlling element and PLC equipment interconnect by the MB+ network; The host computer network is star-shaped network structure, and PLC, host computer server, operator station all interconnect by optical fiber or twisted-pair feeder.
Grid Ethernet is main communication media, and equipment component is by serial communication, and network configuration is the layer distributed structure, and the core of the superiors is that computer server is responsible for processing comparatively complicated problem such as data storage and processing, complex logic computing; The intermediate layer is slave computer PLC control unit; Terrain Monitoring and Controlling element is the execution unit of bottom; Thereby combined with slave computer PLC control unit by computer supervisory control system and to have realized a kind of comparatively general and AGC and the automatic low all self-starting modes of variable element that match of startup-shutdown strategy.
Unit low frequency self-start method is: when satisfying unit low frequency self-starting system low frequency self-starting condition, set unit and will enter unit self-starting flow process, idiographic flow is as follows:
(1) sends alarm signal and remind the low all self-starting actions of operations staff;
(2) owing to full factory deferrable load after the unit self-starting will change, if system drops into AGC and automatic startup-shutdown control may cause the automatic startup-shutdown of unit system moving, control so at first will withdraw from the automatic startup-shutdown of all controlled units after low all self-starting actions;
(3) send the start order, enter unit Auto Power On flow process;
(4) cycle criterion set state after unit enters the generating attitude, is automatic power regulation with unit Power Regulation setting state; If unit is AGC input state then distributes unit load according to the AGC control strategy, if unit does not drop into AGC control then unit load is adjusted to assumed load.
After described unit low frequency self-starting system drops into low all self-starting control, the system state monitoring flow process will be enabled in running background cycle monitoring system state automatically, and idiographic flow is as follows:
(1) take 1 second as a monitoring periods, system monitoring flow process per second automatic monitoring system state;
(2) monitoring system frequency at first, if system frequency too low (<48Hz) then be judged to be system blackout maintenance or sensor fault, this monitoring is skipped in counter O reset;
(3) if system frequency is lower than the setpoint frequency lower bound, carry out next step monitoring, otherwise this monitoring end, next monitoring periods is waited in counter O reset;
(4) if system voltage excessively low (<44kV) decision-making system is in the interruption maintenance state, finishes this monitoring, next monitoring periods is waited in counter O reset;
(5) satisfy frequency and voltage triggered condition, counter+1;
(6) if counter values greater than low all delay times of setting, carry out next step operation, otherwise wait for next monitoring periods;
(7) if unit is set as low all self-starting units and is in stand-by state then starts unit, otherwise continue to wait for.
Advantage and beneficial effect: system of the present invention relies on power plant's computer supervisory control system to realize, invest littlely, and low with other control logic couplings, it is reliable to be active in one's movements, and parameter arranges comprehensively simply, and versatility is stronger.Can combine by automatic electricity generation control system perfect and existing power plant simultaneously, use effective means to avoid behind low all self-starting control actions and the conflicting problem of automatic electricity generation control system control logic, processing for power plant's emergency episode under special circumstances provides effective guarantee.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is done further to describe in detail.
Fig. 1 is system state monitoring flow chart of the present invention;
Fig. 2 is unit self-starting flow chart of the present invention.
Embodiment
The present invention is a kind of unit low frequency self-starting system and method, and system utilizes computer supervisory control system to combine with slave computer PLC control unit and realized that a kind of comparatively general variable element that matches with AGC and automatic startup-shutdown strategy hangs down all self-starting modes,
Unit low frequency self-starting system is made of the communication path redundant configuration safeguards system reliability of visual plant at hardware aspect terrain Monitoring and Controlling element, PLC, host computer server, operator station and related network device.
Grid Ethernet is main communication media, and equipment component is by serial communication, and network configuration is the layer distributed structure, and the core of the superiors is that computer server is responsible for processing comparatively complicated problem such as data storage and processing, complex logic computing etc.; The chief leading cadre of operator station machine interactive function; The intermediate layer is slave computer PLC control unit, mainly is responsible for data relay, sequential control, reaches urgent interrupt response; Terrain Monitoring and Controlling element is the execution unit of bottom.Thereby combined with slave computer PLC control unit by computer supervisory control system and to have realized a kind of comparatively general and AGC and the automatic low all self-starting modes of variable element that match of startup-shutdown strategy.
Major function of the present invention is as follows:
1, after unit low frequency self-starting system frequency is lower than the setpoint frequency certain hour, automatically starts and specify low all self-starting units;
2, according to unit low frequency self-starting system demand, can independently set low all self-starting frequencies and unit starting time of delay;
3, when power plant has many units to possess as low all self-starting machine set conditions, can specify unit as low all self-starting units;
4, when there are many outlets in power plant, can specify to monitor that specific outlet frequency is as low all self-startings condition of setting out;
5, can with AGC and the perfect cooperation of the automatic startup-shutdown of unit system;
6, after unit low frequency self-starting system triggers low all self-starting functions, when starting the self-starting unit, send alarm signal and remind the operations staff to carry out corresponding accident treatment.
Concrete function is described below:
1, monitoring image
The monitoring image of unit low frequency self-starting system low frequency self-starting is integrated in the power of the assembling unit control desk picture state that arranges of display system low frequency self-starting.When showing the machine group number, represent that current this unit is set as low frequency self-starting unit, represent that when showing " excision " system does not set low all self-starting units.In the state information left side " setting " button is arranged, click keys can enter system's low frequency self-starting picture is set.
2, parameter setting
Enter after the self-starting of unit low frequency self-starting system low frequency arranges picture, for each unit is provided with a parameter form is set in the picture.Form divides two parts: data show, the parameter setting.
Wherein the data demonstration comprises following content:
(1) circuit picks up: expression unit low frequency self-starting system is monitoring that circuit now.Hill, Shuan Gou power station monitor the 220kV circuit.And the Shi Long power station monitors the turquoise A-wire at the circuit breaker of turquoise A-wire, the first and second isolation switchs during all in the position of closing, and monitors turquoise second line in other situations;
(2) line frequency: show the system frequency of the circuit that monitors, be accurate to 2 decimals, unit is Hz;
(3) line voltage distribution: show the system voltage of the circuit that monitors, being shown to 2 decimal units is kV;
(4) set state: present current set state is respectively: stand-by state, Light Condition, idling conditions, generating state, five states of not stationary state.
Wherein the parameter setting comprises following content:
(1) low all self-startings (dropping into/withdraw from): whether what set this TV station unit is low all self-starting units.Being that other units of same power station withdraw from low all self-starting functions automatically when a unit is set to low all self-starting units, is that low all self-starting functions are withdrawed from the power station automatically when all units of same power station all withdraw from low all self-starting functions.
(2) frequency setting: the trigger rate that unit low frequency self-starting action is set.Be accurate to 2 of decimal points, unit is Hz, and scope is 0-50, default value 49.25Hz;
(3) delay time: after line frequency continues to be lower than setpoint frequency and reaches the duration that delay time sets, unit will start automatically.Be accurate to integer-bit, the S of unit, scope 0-100, default value 5S;
(4) load is given: after the self-starting of unit low frequency is set, and automatically given burden with power.Be accurate to integer-bit, the MW of unit, scope 0-full load, default value is at full capacity.
3, fault alarm
When unit satisfies system's low frequency self-starting condition, and when automatically starting.Supervisory control system will be sent failure alarm signal when sending the start order, alarm signal can be inquired about in electric fault.
Functions implementing the present invention are as follows:
1, system state monitoring flow process.
As shown in Figure 1, after unit low frequency self-starting system drops into low all self-starting control, the system state monitoring flow process will be enabled in running background cycle monitoring system state automatically, and idiographic flow is as follows:
(1) take 1 second as a monitoring periods, system monitoring flow process per second automatic monitoring system state;
(2) monitoring system frequency at first, if system frequency too low (<48Hz) then be judged to be system blackout maintenance or sensor fault, this monitoring is skipped in counter O reset;
(3) if system frequency is lower than the setpoint frequency lower bound, carry out next step monitoring, otherwise this monitoring end, next monitoring periods is waited in counter O reset;
(4) if system voltage excessively low (<44kV) decision-making system is in the interruption maintenance state, finishes this monitoring, next monitoring periods is waited in counter O reset;
(5) satisfy frequency and voltage triggered condition, counter+1;
(6) if counter values greater than low all delay times of setting, carry out next step operation, otherwise wait for next monitoring periods;
(7) if unit is set as low all self-starting units and is in stand-by state then starts unit, otherwise continue to wait for.
2, unit self-starting flow process.
As shown in Figure 2, when satisfying unit low frequency self-starting system low frequency self-starting condition, set unit and will enter unit self-starting flow process, idiographic flow is as follows:
(1) sends alarm signal and remind the low all self-starting actions of operations staff;
(2) owing to full factory deferrable load after the unit self-starting will change, if system drops into AGC and automatic startup-shutdown control may cause the automatic startup-shutdown of unit system moving, control so at first will withdraw from the automatic startup-shutdown of all controlled units after low all self-starting actions;
(3) send the start order, enter unit Auto Power On flow process;
(4) cycle criterion set state after unit enters the generating attitude, is automatic power regulation with unit Power Regulation setting state.If unit is AGC input state then distributes unit load according to the AGC control strategy, if unit does not drop into AGC control then unit load is adjusted to assumed load.

Claims (3)

1. unit low frequency self-starting system is characterized in that: at hardware aspect, be made of the communication path redundant configuration of visual plant terrain Monitoring and Controlling element, PLC, host computer server, operator station and related network device; The terrain slave computer is bus structures, and terrain Monitoring and Controlling element and PLC equipment interconnect by the MB+ network; The host computer network is star-shaped network structure, and PLC, host computer server, operator station all interconnect by optical fiber or twisted-pair feeder;
Grid Ethernet is main communication media, and equipment component is by serial communication, and network configuration is the layer distributed structure, and the core of the superiors is that computer server is responsible for processing comparatively complicated problem such as data storage and processing, complex logic computing; The intermediate layer is slave computer PLC control unit; Terrain Monitoring and Controlling element is the execution unit of bottom; Thereby combined with slave computer PLC control unit by computer supervisory control system and to have realized a kind of comparatively general and AGC and the automatic low all self-starting modes of variable element that match of startup-shutdown strategy.
2. unit low frequency self-start method is characterized in that: when satisfying unit low frequency self-starting system low frequency self-starting condition, set unit and will enter unit self-starting flow process, idiographic flow is as follows:
(1) sends alarm signal and remind the low all self-starting actions of operations staff;
(2) owing to full factory deferrable load after the unit self-starting will change, if system drops into AGC and automatic startup-shutdown control may cause the automatic startup-shutdown of unit system moving, control so at first will withdraw from the automatic startup-shutdown of all controlled units after low all self-starting actions;
(3) send the start order, enter unit Auto Power On flow process;
(4) cycle criterion set state after unit enters the generating attitude, is automatic power regulation with unit Power Regulation setting state; If unit is AGC input state then distributes unit load according to the AGC control strategy, if unit does not drop into AGC control then unit load is adjusted to assumed load.
3. unit low frequency self-start method according to claim 2, it is characterized in that: after described unit low frequency self-starting system drops into low all self-starting control, the system state monitoring flow process will be enabled in running background cycle monitoring system state automatically, and idiographic flow is as follows:
(1) take 1 second as a monitoring periods, system monitoring flow process per second automatic monitoring system state;
(2) monitoring system frequency at first, if system frequency too low (<48Hz) then be judged to be system blackout maintenance or sensor fault, this monitoring is skipped in counter O reset;
(3) if system frequency is lower than the setpoint frequency lower bound, carry out next step monitoring, otherwise this monitoring end, next monitoring periods is waited in counter O reset;
(4) if system voltage excessively low (<44kV) decision-making system is in the interruption maintenance state, finishes this monitoring, next monitoring periods is waited in counter O reset;
(5) satisfy frequency and voltage triggered condition, counter+1;
(6) if counter values greater than low all delay times of setting, carry out next step operation, otherwise wait for next monitoring periods;
(7) if unit is set as low all self-starting units and is in stand-by state then starts unit, otherwise continue to wait for.
CN2012103749963A 2012-10-08 2012-10-08 System and method for realizing low-frequency self-starting of unit Pending CN102916487A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103749963A CN102916487A (en) 2012-10-08 2012-10-08 System and method for realizing low-frequency self-starting of unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103749963A CN102916487A (en) 2012-10-08 2012-10-08 System and method for realizing low-frequency self-starting of unit

Publications (1)

Publication Number Publication Date
CN102916487A true CN102916487A (en) 2013-02-06

Family

ID=47614763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103749963A Pending CN102916487A (en) 2012-10-08 2012-10-08 System and method for realizing low-frequency self-starting of unit

Country Status (1)

Country Link
CN (1) CN102916487A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103453199A (en) * 2013-09-13 2013-12-18 国家电网公司 Method for ensuring normal starting of unit in case of loss of position signals of bypass valve of main water inlet valve
CN112671013A (en) * 2021-01-07 2021-04-16 福建仙游抽水蓄能有限公司 Frequency logic control method for locking unit start and stop

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010142076A (en) * 2008-12-15 2010-06-24 Shimizu Corp Independent operation system utilizing generation power supply unit for energy storage and emergency
CN101958535A (en) * 2009-07-13 2011-01-26 长沙高新开发区星联电力自动化技术有限公司 Microcomputer type frequency and voltage automatic control system
CN202856449U (en) * 2012-10-08 2013-04-03 辽宁省电力有限公司电力科学研究院 Low-frequency self-startup system for set

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010142076A (en) * 2008-12-15 2010-06-24 Shimizu Corp Independent operation system utilizing generation power supply unit for energy storage and emergency
CN101958535A (en) * 2009-07-13 2011-01-26 长沙高新开发区星联电力自动化技术有限公司 Microcomputer type frequency and voltage automatic control system
CN202856449U (en) * 2012-10-08 2013-04-03 辽宁省电力有限公司电力科学研究院 Low-frequency self-startup system for set

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
叶忠旺: "沙溪口水电厂机组低频自启动方案设计及实施", 《福建电力与电工》, vol. 22, no. 3, 30 September 2002 (2002-09-30) *
吴玮: "白山梯级水电厂远方集中监控的实现", 《水电厂自动化》, no. 4, 30 November 2007 (2007-11-30), pages 72 - 74 *
杨钊等: "水力发电厂辅助设备可编程控制系统", 《河北工业科技》, vol. 18, no. 6, 30 June 2001 (2001-06-30) *
段振国等: "白山常规机组与抽水储能机组混合监控技术", 《2009全国水电自动化技术学术交流研讨会暨全国水电厂自动化技术信息网成立30周年纪念座谈会论文集》, 1 September 2009 (2009-09-01) *
赵海涛等: "丰满发电厂计算机监控系统通信子系统研制", 《东北电力技术》, no. 7, 31 July 2007 (2007-07-31) *
顾海东: "利用监控系统已有功能实现水电厂机组低周自启动", 《水电厂自动化》, no. 2, 30 June 2007 (2007-06-30) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103453199A (en) * 2013-09-13 2013-12-18 国家电网公司 Method for ensuring normal starting of unit in case of loss of position signals of bypass valve of main water inlet valve
CN103453199B (en) * 2013-09-13 2016-09-07 国家电网公司 The method that unit normally starts is ensured during main water intaking valve bypass valve position dropout
CN112671013A (en) * 2021-01-07 2021-04-16 福建仙游抽水蓄能有限公司 Frequency logic control method for locking unit start and stop

Similar Documents

Publication Publication Date Title
CN102324741B (en) Micro-power grid off-grid energy balance and control device and method
CN102684303B (en) Intelligent power load batcher and electric equipment control system
CN105841305B (en) A kind of group control of equipment system
JPWO2013103011A1 (en) Power system stabilization system and power system stabilization method
CN109713704B (en) Communication interruption safety control method, system and medium for power grid side battery energy storage power station
CN109687508A (en) A kind of generation of electricity by new energy unit fast frequency response control mehtod and device
CN102801208A (en) Multi-path power supply intelligent scheduling manager and control method thereof
CN110011353B (en) Parallel operation control system and method for diesel generator power supply and distribution system
US11418054B2 (en) Methods and apparatus for power generation and distribution
CN104052078A (en) Regulation and control method and system for switching grid-connected operation mode to island operation mode of microgrid
CN103124070A (en) Coordination control method for micro-grid system
CN205353728U (en) Electrostatic precipitator shakes and beats heating PLC two -node cluster hot backup control system
CN102315465A (en) Vanadium redox flow battery control system based on PLC, control method and control device thereof
CN102916487A (en) System and method for realizing low-frequency self-starting of unit
CN202856449U (en) Low-frequency self-startup system for set
CN202050283U (en) Automatic stand-by power switching device in transformer substation region
CN104242449B (en) A kind of serve scheduling application remote viewing information management realize method
CN207504787U (en) A kind of low voltage motor control system
WO2018172397A1 (en) Method for operating an electrical system having a plurality of electrical loads, power supply unit, and electrically operated system
CN201156680Y (en) Automatic throw-in equipment of adaptive standby power supply
CN202931028U (en) Intelligent monitoring device of distribution transformer
CN203039437U (en) Power distribution box provided with PLC intelligent controller
CN204334379U (en) The V/f-with hysteretic characteristic falls down vertical microgrid inverter power supply
CN114744748A (en) Logic control method of data center diesel engine parallel machine control system
CN202196831U (en) Vanadium redox flow battery control system based on programmable logic controller (PLC) and control equipment of vanadium redox flow battery control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130206