CN102912809A - Construction method for bearing platform with bottom surface in hard impervious bed - Google Patents

Construction method for bearing platform with bottom surface in hard impervious bed Download PDF

Info

Publication number
CN102912809A
CN102912809A CN2012104381889A CN201210438188A CN102912809A CN 102912809 A CN102912809 A CN 102912809A CN 2012104381889 A CN2012104381889 A CN 2012104381889A CN 201210438188 A CN201210438188 A CN 201210438188A CN 102912809 A CN102912809 A CN 102912809A
Authority
CN
China
Prior art keywords
cofferdam
layer
bearing platform
bracing ring
impervious layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104381889A
Other languages
Chinese (zh)
Other versions
CN102912809B (en
Inventor
李艳哲
夏学军
周功建
耿克强
冯文园
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No.1 Engineering Co., Ltd., Zhongtie Bridge Bureau Group
China Railway Major Bridge Engineering Group Co Ltd MBEC
Original Assignee
No1 Engineering Co Ltd Zhongtie Bridge Bureau Group
China Railway Major Bridge Engineering Co Ltd
China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No1 Engineering Co Ltd Zhongtie Bridge Bureau Group, China Railway Major Bridge Engineering Co Ltd, China Railway Major Bridge Engineering Group Co Ltd MBEC filed Critical No1 Engineering Co Ltd Zhongtie Bridge Bureau Group
Priority to CN201210438188.9A priority Critical patent/CN102912809B/en
Publication of CN102912809A publication Critical patent/CN102912809A/en
Application granted granted Critical
Publication of CN102912809B publication Critical patent/CN102912809B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses a construction method for a bearing platform with the bottom surface in a hard impervious bed; and the construction method comprises the following steps of: erecting an artificial rotary island or platform around a bearing platform design position; constructing a dilling pile; inserting an inner steel plate pile to the top surface of the impervious bed, so as to form an inner cofferdam; inserting an outer steel plate pile to the top surface of the impervious bed, so as to form an outer cofferdam; grouting between the inner and outer cofferdams so as to form an artificial impervious bed; arranging a supporting ring in an area enclosed by the inner cofferdam; propping the supporting ring against the inner wall of the inner cofferdam through a plurality of inner supports; sucking sludge and taking soils in the inner cofferdam by using a stage-by-stage following mode of the supporting ring; pumping out water in the inner cofferdam; excavating the hard impervious bed to the bottom surface of the bearing platform without water; and then constructing the bearing platform under an environment without water. According to the invention, bottom sealing is not carried out in the cofferdam, so that large-scale rock excavation for bottom sealing is avoided; moreover, high material utilization rate and convenience in use are achieved.

Description

The bottom surface is positioned at the bearing platform construction method of hard impervious layer
Technical field
The present invention relates to the Bored Pile of Bridge construction, be specifically related to the bearing platform construction method that the bottom surface is positioned at hard impervious layer.
Background technology
Cushion cap refers to as bearing, distribute the load by the pier shaft transmission, the reinforced concrete platform on each top of connection that arranges at the foundation pile top.Cushion cap is several even the tens piles formation pile foundation that links together the important component part of pile foundation.
At present, be positioned at cushion cap below the impervious layer for the bottom, the general mode that is aided with cement mixing pile or grouting curtain by the clay cofferdam that adopts when water level is low is constructed.But for the deep water riverbed with hard impervious layer (about the nearly 10m of the wet season depth of water), and covering layer can run into following difficulties when adopting steel sheet pile cofferdam construction when thinner:
(1) since the general steel plate pile cofferdam to insert the degree of depth of hard impervious layer more shallow, can't guarantee Stability Analysis of Structures;
(2) impervious layer excavation difficulty can't guarantee the thickness of bottom concrete, thereby can not guarantee the anhydrous construction environment of cushion cap;
(3) covering layer is thinner, and soil can not form the build-in at the bottom of the steel sheet pile stake naturally.
This shows, the conventional construction method can run into a lot of difficulties carrying out the bottom surface when being positioned at the deep water bearing platform construction of hard impervious layer, affects construction speed and construction quality.
Summary of the invention
Technical problem to be solved by this invention is to solve the deep water cushion cap that the bottom surface is positioned at hard impervious layer, and difficulty of construction is large, affects the problem of construction speed and construction quality.
In order to solve the problems of the technologies described above, the technical solution adopted in the present invention provides the bearing platform construction method that a kind of bottom surface is positioned at hard impervious layer, may further comprise the steps:
Set up artificial rotary island or platform around the cap design of pile position, then utilize artificial rotary island or platform construction drilled pile;
Utilize artificial rotary island or the stake of platform inserted to play inner layer steel plate to the end face of impervious layer, form the internal layer cofferdam;
The stake of inserted to play outer layer plate forms outer cofferdam to the impervious layer end face outside the inner layer steel plate stake;
The top in inside and outside layer cofferdam is connected and fixed by connector;
Bottom slip casting between inside and outside layer cofferdam forms artificial impervious layer;
In internal layer cofferdam institute region bracing ring is set, and described bracing ring is resisted against on the inwall in described internal layer cofferdam by many inner supports, the mode that then adopts bracing ring to follow up is step by step inhaled mud and is fetched earth in the internal layer cofferdam;
Extract the water in the internal layer cofferdam out, and excavate hard impervious layer, form water-less environment, then construction bearing platform.
In said method, the end face of the impervious layer in described artificial impervious layer and riverbed bonding realizes sealing.
In said method, the concrete steps that bracing ring follows up step by step are as follows:
The lower end of rigid rod is propped up bracing ring, on surfacing in the upper end; The upper end of circulation hammering rigid rod progressively falls bracing ring.
In said method, in every one deck position of fetching earth, the end face of bracing ring remains at the above 40cm of native face~50 centimetres.
In said method, bracing ring and inner support are finally transferred near the stake position at the end, replace the stake naturally native build-in at the end.
In said method, place before the bracing ring, at first the top with inside and outside layer steel sheet pile connects as one by a plurality of connectors that the interval arranges.
The present invention, utilize bracing ring and the inner support of the bottom, naturally native build-in at the bottom of transferring to correct position near the stake end and replacing, utilization slip casting in the interlayer of inside and outside layer steel sheet pile forms artificial impervious layer and realizes sealing, avoiding carrying out large-scale hard impervious layer for back cover excavates, and material therefor falls with rate high, easy construction.
Description of drawings
Fig. 1 is the construction schematic diagram of step 1 of the present invention;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the construction schematic diagram of step 2 of the present invention;
Fig. 4 is the top view of Fig. 3;
Fig. 5 is the construction schematic diagram of step 3~step 5 of the present invention;
Fig. 6 is the top view of Fig. 5;
Fig. 7 is the construction schematic diagram of step 6 of the present invention;
Fig. 8 is the top view of Fig. 7;
Fig. 9 is the construction schematic diagram of step 7 of the present invention;
Figure 10 is the top view of Fig. 9.
The specific embodiment
When adopting the steel sheet pile cofferdam construction cushion cap in the deep water riverbed, if meet with hard impervious layer, then steel sheet pile can't inserted to play enter impervious layer, and soil can not form the build-in at the bottom of the steel sheet pile stake naturally, therefore, is unsafe with common steel sheet pile cofferdam structure.For this reason, the invention provides the bearing platform construction method that a kind of bottom surface is positioned at hard impervious layer, utilize the method bottom surface of can constructing easily to be positioned at the cushion cap 11(of waterproof aspect line of demarcation below 2 as shown in Figure 1), and can guarantee constructing structure safety, bearing platform construction can carry out smoothly.Among Fig. 1, waterproof aspect line of demarcation is respectively covering layer 3 and riverbed face 4 more than 2, and method provided by the invention is particularly useful for the construction of deepwater regions.
In shallow water area or construction drill stake in dry season, carry out the cofferdam assembly unit, can select manually to build the island and realize, in deepwater regions or wet season, then need the construction of platform construction.Manually build the island identical with the major function of construction of platform, all provide Drilling Platform for Bored Pile Construction, cofferdam inserted to play equipment erect-position platform.Manually build the island and also have a miscellaneous function, with the scar upper caldding layer, the sheet pile of inserted to play is played stabilization.
The below makes detailed explanation to the present invention manually to build the island by reference to the accompanying drawings as example.
Step 1: utilize low water stage period, set up artificial rotary island 5 around the design attitude of cushion cap 11, then utilize artificial rotary island 5 construction drill stakes 1, see Fig. 1, Fig. 2;
Step 2: inserted to play one circle inner layer steel plate stake 6 on artificial rotary island 5, inner layer steel plate stake 6 inserted to plays no longer continue inserted to play during to the end face of impervious layer, form the internal layer cofferdam, see Fig. 3, Fig. 4;
Step 3: suitable spacing is selected in the outer ring in inner layer steel plate stake 6, and inserted to play one circle outer layer plate stake 7 forms outer cofferdam to the impervious layer end face again, sees Fig. 5, Fig. 6;
Step 4: the top of inside and outside layer steel sheet pile connects as one by the connector 8 that a plurality of intervals arrange respectively, sees Fig. 5, Fig. 6;
Step 5: slip casting between inside and outside layer cofferdam, so artificial impervious layer 9 is formed on the bottom between inside and outside layer cofferdam, the end face bonding of the impervious layer in artificial impervious layer 9 and riverbed realizes sealing, sees Fig. 5, Fig. 6;
By above-mentioned steps, formed the double-layer plate pile cofferdam of sandwich, and the soil in the interlayer has been processed, form all force structures of energy sealing of side, bottom surface.
Step 6: bracing ring 10 is set on the inwall around inner layer steel plate stake 6, and by many inner supports 12 bracing ring 10 is resisted against on the inwall of inner layer steel plate stake 6 and reinforces, then adopt the mode of the bracing ring 10 substep follow-ups suction mud that in the internal layer cofferdam, fetches earth.The specific practice of bracing ring 10 substep follow-ups is: select the suitable rigid bar, the lower end props up bracing ring 10, on surfacing in the upper end, upper end with equipment hammering rigid rods such as pile hammer, by rigid rod some positions cocycle hammering around bracing ring 10, bracing ring 10 and inner support 12 are progressively fallen.The follow-up of bracing ring 10 substep is fetched earth and is inhaled in the process of mud, and the end face of bracing ring 10 remains at the above 40cm of native face~50 centimetres, sees Fig. 7, Fig. 8; Bracing ring 10 and inner support 12 are finally transferred near the stake position at the end, replace the naturally native build-in at the stake end to take out.
Step 7: the water in the internal layer cofferdam is extracted out, and the hard impervious layer of anhydrous excavation is to the cushion cap bottom surface, and then the water-less environment construction bearing platform 11, see Fig. 9, Figure 10.
Method provided by the invention, solved the difficult problem of the deep water bearing platform construction that is positioned at hard impervious layer, the job practices that adopts this invention to provide, both avoided excavating for the large-scale impervious layer that back cover carries out, again can be by bonding inside and outside, layer steel sheet pile interlayer and impervious layer, play the effect of cofferdam sealing, and material therefor is high with rate, easy construction.
The present invention is not limited to above-mentioned preferred forms, and anyone should learn the structural change of making under enlightenment of the present invention, and every have identical or close technical scheme with the present invention, all falls within protection scope of the present invention.

Claims (5)

1. the bottom surface is positioned at the bearing platform construction method of hard impervious layer, it is characterized in that, may further comprise the steps:
Set up artificial rotary island or platform around the cap design of pile position, then utilize artificial rotary island or platform construction drilled pile;
Utilize artificial rotary island or the stake of platform inserted to play inner layer steel plate to the end face of impervious layer, form the internal layer cofferdam;
The stake of inserted to play outer layer plate forms outer cofferdam to the impervious layer end face outside the inner layer steel plate stake;
The top in inside and outside layer cofferdam is connected and fixed by connector;
Bottom slip casting between inside and outside layer cofferdam forms artificial impervious layer;
In internal layer cofferdam institute region bracing ring is set, and described bracing ring is resisted against on the inwall in described internal layer cofferdam by many inner supports, the mode that then adopts bracing ring to follow up is step by step inhaled mud and is fetched earth in the internal layer cofferdam;
Extract the water in the internal layer cofferdam out, and excavate hard impervious layer, form water-less environment, then construction bearing platform.
2. bottom surface as claimed in claim 1 is positioned at the bearing platform construction method of hard impervious layer, it is characterized in that, the end face bonding of the impervious layer in described artificial impervious layer and riverbed realizes sealing.
3. bottom surface as claimed in claim 1 is positioned at the bearing platform construction method of hard impervious layer, it is characterized in that, the concrete steps that bracing ring follows up step by step are as follows:
The lower end of rigid rod is propped up bracing ring, on surfacing in the upper end; The upper end of circulation hammering rigid rod progressively falls bracing ring; The end face of bracing ring remains at the above 40cm of native face~50 centimetres.
4. bottom surface as claimed in claim 1 is positioned at the bearing platform construction method of hard impervious layer, it is characterized in that, bracing ring and inner support are finally transferred near the stake position at the end, replaces the stake naturally native build-in at the end.
5. bottom surface as claimed in claim 1 is positioned at the bearing platform construction method of hard impervious layer, it is characterized in that, places before the bracing ring, and at first the top with inside and outside layer steel sheet pile connects as one by a plurality of connectors that the interval arranges.
CN201210438188.9A 2012-11-06 2012-11-06 Construction method for bearing platform with bottom surface in hard impervious bed Active CN102912809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210438188.9A CN102912809B (en) 2012-11-06 2012-11-06 Construction method for bearing platform with bottom surface in hard impervious bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210438188.9A CN102912809B (en) 2012-11-06 2012-11-06 Construction method for bearing platform with bottom surface in hard impervious bed

Publications (2)

Publication Number Publication Date
CN102912809A true CN102912809A (en) 2013-02-06
CN102912809B CN102912809B (en) 2014-12-10

Family

ID=47611359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210438188.9A Active CN102912809B (en) 2012-11-06 2012-11-06 Construction method for bearing platform with bottom surface in hard impervious bed

Country Status (1)

Country Link
CN (1) CN102912809B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612174A (en) * 2014-12-26 2015-05-13 浙江大学城市学院 Ultrasoft soil brick molding bed auxiliary bearing platform structure and construction method thereof
CN108589543A (en) * 2018-05-14 2018-09-28 中铁七局集团有限公司勘测设计研究院 The construction method for building island steel sheet-pile cofferdam formula drilled pile platform suitable for formation geology
CN111456049A (en) * 2020-03-16 2020-07-28 中铁大桥局集团有限公司 Construction method of steel sheet pile cofferdam of water area covering-layer-free low pile cap
CN114215093A (en) * 2021-12-30 2022-03-22 中铁大桥局集团有限公司 Bearing platform foundation construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06220865A (en) * 1993-01-27 1994-08-09 Shimizu Corp Double cofferdam process
CN1837511A (en) * 2006-04-07 2006-09-27 上海市政工程设计研究总院 Double-rowed cofferdam and method for manufacturing the same
CN101538833A (en) * 2009-04-10 2009-09-23 中交一航局第二工程有限公司 Vertical subsection double-wall steel cofferdam water stopping construction method
CN101838994A (en) * 2010-05-20 2010-09-22 中铁六局集团有限公司 Construction method of steel sheet pile cofferdam for integral type steel purlin
CN101838993A (en) * 2010-05-17 2010-09-22 中铁二十局集团有限公司 Construction technology of steel sheet pile cofferdam for Yellow River Channel internal support table construction
CN102191777A (en) * 2011-05-12 2011-09-21 广州市市政集团有限公司 Steel sheet pile coefferdam structure and topdown construction method thereof
JP4793634B2 (en) * 2006-02-03 2011-10-12 清水建設株式会社 Temporary deadline construction method
CN202401462U (en) * 2011-11-11 2012-08-29 中交四航局第一工程有限公司 Deep-water single-wall steel sheet pile cofferdam structure with small soil penetration depth

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06220865A (en) * 1993-01-27 1994-08-09 Shimizu Corp Double cofferdam process
JP4793634B2 (en) * 2006-02-03 2011-10-12 清水建設株式会社 Temporary deadline construction method
CN1837511A (en) * 2006-04-07 2006-09-27 上海市政工程设计研究总院 Double-rowed cofferdam and method for manufacturing the same
CN101538833A (en) * 2009-04-10 2009-09-23 中交一航局第二工程有限公司 Vertical subsection double-wall steel cofferdam water stopping construction method
CN101838993A (en) * 2010-05-17 2010-09-22 中铁二十局集团有限公司 Construction technology of steel sheet pile cofferdam for Yellow River Channel internal support table construction
CN101838994A (en) * 2010-05-20 2010-09-22 中铁六局集团有限公司 Construction method of steel sheet pile cofferdam for integral type steel purlin
CN102191777A (en) * 2011-05-12 2011-09-21 广州市市政集团有限公司 Steel sheet pile coefferdam structure and topdown construction method thereof
CN202401462U (en) * 2011-11-11 2012-08-29 中交四航局第一工程有限公司 Deep-water single-wall steel sheet pile cofferdam structure with small soil penetration depth

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612174A (en) * 2014-12-26 2015-05-13 浙江大学城市学院 Ultrasoft soil brick molding bed auxiliary bearing platform structure and construction method thereof
CN108589543A (en) * 2018-05-14 2018-09-28 中铁七局集团有限公司勘测设计研究院 The construction method for building island steel sheet-pile cofferdam formula drilled pile platform suitable for formation geology
CN111456049A (en) * 2020-03-16 2020-07-28 中铁大桥局集团有限公司 Construction method of steel sheet pile cofferdam of water area covering-layer-free low pile cap
CN111456049B (en) * 2020-03-16 2021-09-14 中铁大桥局集团有限公司 Construction method of steel sheet pile cofferdam of water area covering-layer-free low pile cap
CN114215093A (en) * 2021-12-30 2022-03-22 中铁大桥局集团有限公司 Bearing platform foundation construction method
CN114215093B (en) * 2021-12-30 2023-09-19 中铁大桥局集团有限公司 Construction method of bearing platform foundation

Also Published As

Publication number Publication date
CN102912809B (en) 2014-12-10

Similar Documents

Publication Publication Date Title
CN111827274B (en) High-strength grouting method for marine wind power weakly-weathered bedrock single-pile socketed foundation
CN100464055C (en) Construction method of shallow buried underground excavating tunnel super large section using PBA method
CN101139838B (en) Construction method for high artesian area ultra-deep foundation pit
US9567720B2 (en) Offshore platform for a marine environment
CN106677189B (en) A kind of taper pile wall supporting type foundation pit supporting construction and its construction method
CN105089061B (en) Ultra-deep foundation pit supporting method
CN103437371B (en) Construction method of water drainage uplift pile
CN103898916B (en) Mini stake Composite Braced Retaining Structure and construction method
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN106958254A (en) Latch steel pipe and reinforced concrete combination pile cofferdam and its construction method
CN103882858A (en) Construction method of micro-piles with diameter of 300 mm
CN102912809B (en) Construction method for bearing platform with bottom surface in hard impervious bed
CN102116030A (en) Combined bracing structure for foundation pit and construction method thereof
CN105714748A (en) Excavating construction method for surge shaft in gravel and sandy soil layer
CN109403350A (en) Foundation pit supporting construction and foundation pit supporting method
CN103015446B (en) Method for constructing bearing platform on deepwater and rigid impermeable layer
CN107964971B (en) A kind of precipitation method of the subway station using the construction of PBA engineering method
CN107975040A (en) Circular top pipe working pit multiple material handling method of deep foundation pit construction method
CN204311456U (en) Foundation ditch strengthening structure
CN108625388A (en) A kind of sleeve combination formula large diameter single pile foundation and its construction method suitable for Shallow Bedrock geological conditions
CN105040705A (en) Ground foundation treatment construction technology under multi-karst-cave geological conditions
CN101319501B (en) Construction method of deep foundation ditch
CN107165640A (en) Tunnels and underground engineering surely builds method certainly
CN209482313U (en) Foundation pit supporting construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: NO.1 ENGINEERING CO., LTD., ZHONGTIE BRIDGE BUREAU

Free format text: FORMER OWNER: NO.1 ENGINEERING CO., LTD., ZHONGTIE BRIDGE BUREAU GROUP GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Effective date: 20150306

Owner name: GROUP CO., LTD., ZHONGTIE DAQIAO BUREAU

Free format text: FORMER OWNER: CHINA ZHONGTIE MAJOR BRIDGE ENGINEERING CO., LTD.

Effective date: 20150306

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430074 WUHAN, HUBEI PROVINCE TO: 430050 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150306

Address after: 430050 Hanyang Road, Hanyang District, Hubei, No. 38, No.

Patentee after: Group Co., Ltd., Zhongtie Daqiao Bureau

Patentee after: No.1 Engineering Co., Ltd., Zhongtie Bridge Bureau Group

Address before: 430074 Hubei province Wuhan Dongxin East Lake New Technology Development Zone Road SBI Venture Street No. 6 Building 12 layer

Patentee before: China Zhongtie Major Bridge Engineering Co., Ltd.

Patentee before: No.1 Engineering Co., Ltd., Zhongtie Bridge Bureau Group