CN102912330B - Processing process for coating copper to steel pipe - Google Patents

Processing process for coating copper to steel pipe Download PDF

Info

Publication number
CN102912330B
CN102912330B CN201210377677.8A CN201210377677A CN102912330B CN 102912330 B CN102912330 B CN 102912330B CN 201210377677 A CN201210377677 A CN 201210377677A CN 102912330 B CN102912330 B CN 102912330B
Authority
CN
China
Prior art keywords
copper
groove
color
covering
cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210377677.8A
Other languages
Chinese (zh)
Other versions
CN102912330A (en
Inventor
马功权
田四光
程华
李文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Taitong Refrigeration Technology Co Ltd
Original Assignee
Hefei Great Wall Refrigeration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Great Wall Refrigeration Technology Co Ltd filed Critical Hefei Great Wall Refrigeration Technology Co Ltd
Priority to CN201210377677.8A priority Critical patent/CN102912330B/en
Publication of CN102912330A publication Critical patent/CN102912330A/en
Application granted granted Critical
Publication of CN102912330B publication Critical patent/CN102912330B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chemical Treatment Of Metals (AREA)
  • Investigating Or Analysing Materials By Optical Means (AREA)

Abstract

The invention relates to a steel pipe processing technology in the field of refrigeration, in particular to a processing process for coating copper to a steel pipe. The processing process comprises the steps as follows: uniformly laying a layer of solid copper sulfate at the bottom of a copper coating reaction groove, controlling the usage amount of the solid copper sulfate to be 38-42 kg, starting a circulating pump, driving groove liquid in a copper coating groove into the copper coating reaction groove, when the groove liquid in the copper coating reaction groove reaches a certain liquid level, reflowing to the copper coating groove through a guide hole, controlling an inlet valve of the circulating pump, and keeping the liquid levels of the copper coating groove and the copper coating reaction groove to be stable; placing a pipe into the copper coating reaction groove, guaranteeing the groove liquid to fully immerse the pipe by 20-30 mm, and observing the liquid levels of the reaction groove and the copper coating groove so as to promptly adjust the liquid levels; observing the color and the luster of the surface of the pipe after being coated with the copper; and if the color and the luster of the surface of the pipe are found to be bright and the color is found to be golden yellow, stopping copper coating, taking out the pipe, and carrying out subsequent processing such as washing and passivating. The processed product has the characteristics as follows: the quality is higher, the color and the luster of the surface are bright, the color is golden yellow, the adhesion force is compact, and phenomena such as missing coating, stripping, dropping, porphyritic block stacking and the like of a coating on the surface are avoided.

Description

Steel pipe covers Copper fabrication technique
Technical field
The present invention relates to refrigerating field steel pipe processing technology, specifically relate to a kind of steel pipe and cover Copper fabrication technique.
Background technology
In refrigeration technology field, for the steel pipe of refrigeration equipment, in its course of processing, need to cover Copper treatment to its surface, to form the general golden yellow copper coating of bright in color.Phenomenons such as existingly covering in copper processing techniques, copper clad steel pipe after treatment, top coat easily exists holiday, peel off and come off occurs, has a strong impact on quality product.
Summary of the invention
In order to solve the technical problem existed in prior art, the good steel pipe of a kind for the treatment of effect is the object of the present invention is to provide to cover Copper fabrication technique.
The technical solution used in the present invention is as follows:
Steel pipe covers Copper fabrication technique, it is characterized in that, step is as follows:
1., by 10m 3cover copper groove and 10m 3cover copper reactive tank to clean up, ensure in groove without any impurity, booty; Inspection covers copper groove and covers copper reactive tank whether have damage, leak phenomenon, runs well in order to avoid affect unit; Whether inspection recycle pump, heat pump work well;
2., to covering in copper groove adding water to half liquid level, adding and covering copper agent 75 ~ 85kg, 45 ~ 55kg vitriol oil fast, then moisturizing is to notch 50 ~ 80mm place;
Then open heat pump, will cover tank liquor temperature in copper groove and be raised to 20 ~ 35 DEG C, then add 70 ~ 80kg solid sulphuric acid copper, limit edged stirs, and copper sulfate can fully be dissolved, and now tank liquor color is general sky blue;
3., to covering copper reaction tank bottom even lay one deck solid sulphuric acid copper, solid sulphuric acid copper consumption is 38 ~ 42kg, start recycle pump, being squeezed into by the tank liquor covered in copper groove covers in copper reactive tank, when covering that in copper reactive tank, tank liquor reaches certain liquid level, be back to by targeting port and cover copper groove, controlled circulation pump inlet valve, keep covering copper groove and covering copper reactive tank level stability;
4., by tubing be positioned over and cover in copper reactive tank, guarantee the complete submergence tubing of tank liquor 20 ~ 30mm, observing response groove and cover copper tank liquor position, to adjust in time;
5., observing tubing covers copper rear surface color and luster, if when finding more shallow, the tarnish of color, add 9 ~ 11kg solid sulphuric acid copper, 4 ~ 6kg vitriol oil and 4 ~ 6kg and cover copper agent fast to covering in copper reactive tank, and stir, continuous observation color;
If 6. find tube surfaces bright in color, the general golden yellow of color, then stop covering copper, take out tubing, carry out follow-up washing, passivation processing.
Cover the tubing after Copper fabrication processes through steel pipe of the present invention, quality product is higher, its surface color light, the general golden yellow of color, and sticking power is tight, top coat without holiday, peel off, come off, the phenomenon such as plaque-like block accumulation.
Embodiment
Below in conjunction with embodiment, the present invention is further illustrated, and wherein, all raw materials are commercial grade.
Embodiment 1
1., by 10m 3cover copper groove and 10m 3cover copper reactive tank to clean up, ensure in groove without any impurity, booty; Inspection covers copper groove and covers copper reactive tank whether have damage, leak phenomenon, runs well in order to avoid affect unit; Whether inspection recycle pump, heat pump work well;
2., to covering in copper groove add water to half liquid level, add and cover copper agent 75kg, 55kg vitriol oil fast, then moisturizing is to notch 50 ~ 55mm place;
Then open heat pump, will cover tank liquor temperature in copper groove and be raised to 20 DEG C, then add 75kg solid sulphuric acid copper, limit edged stirs, and copper sulfate can fully be dissolved, and now tank liquor color is general sky blue;
3., to covering copper reaction tank bottom even lay one deck solid sulphuric acid copper, solid sulphuric acid copper consumption is 42kg, start recycle pump, being squeezed into by the tank liquor covered in copper groove covers in copper reactive tank, when covering that in copper reactive tank, tank liquor reaches certain liquid level, be back to by targeting port and cover copper groove, controlled circulation pump inlet valve, keep covering copper groove and covering copper reactive tank level stability;
4., by tubing be positioned over and cover in copper reactive tank, guarantee the complete submergence tubing of tank liquor 20 ~ 24mm, observing response groove and cover copper tank liquor position, to adjust in time;
5., observing tubing covers copper rear surface color and luster, if when finding more shallow, the tarnish of color, add 9kg solid sulphuric acid copper, the 4kg vitriol oil and 5.5kg and cover copper agent fast to covering in copper reactive tank, and stir, continuous observation color;
If 6. find tube surfaces bright in color, the general golden yellow of color, then stop covering copper, take out tubing, carry out follow-up washing, passivation processing.
Embodiment 2
1., by 10m 3cover copper groove and 10m 3cover copper reactive tank to clean up, ensure in groove without any impurity, booty; Inspection covers copper groove and covers copper reactive tank whether have damage, leak phenomenon, runs well in order to avoid affect unit; Whether inspection recycle pump, heat pump work well;
2., to covering in copper groove add water to half liquid level, add and cover copper agent 78kg, 53kg vitriol oil fast, then moisturizing is to notch 60 ~ 65mm place;
Then open heat pump, will cover tank liquor temperature in copper groove and be raised to 24 DEG C, then add 70kg solid sulphuric acid copper, limit edged stirs, and copper sulfate can fully be dissolved, and now tank liquor color is general sky blue;
3., to covering copper reaction tank bottom even lay one deck solid sulphuric acid copper, solid sulphuric acid copper consumption is 38kg, start recycle pump, being squeezed into by the tank liquor covered in copper groove covers in copper reactive tank, when covering that in copper reactive tank, tank liquor reaches certain liquid level, be back to by targeting port and cover copper groove, controlled circulation pump inlet valve, keep covering copper groove and covering copper reactive tank level stability;
4., by tubing be positioned over and cover in copper reactive tank, guarantee the complete submergence tubing of tank liquor 23 ~ 25mm, observing response groove and cover copper tank liquor position, to adjust in time;
5., observing tubing covers copper rear surface color and luster, if when finding more shallow, the tarnish of color, add 10kg solid sulphuric acid copper, the 5kg vitriol oil and 6kg and cover copper agent fast to covering in copper reactive tank, and stir, continuous observation color;
If 6. find tube surfaces bright in color, the general golden yellow of color, then stop covering copper, take out tubing, carry out follow-up washing, passivation processing.
Embodiment 3
1., by 10m 3cover copper groove and 10m 3cover copper reactive tank to clean up, ensure in groove without any impurity, booty; Inspection covers copper groove and covers copper reactive tank whether have damage, leak phenomenon, runs well in order to avoid affect unit; Whether inspection recycle pump, heat pump work well;
2., to covering in copper groove add water to half liquid level, add and cover copper agent 80kg, 50kg vitriol oil fast, then moisturizing is to notch 70 ~ 80mm place;
Then open heat pump, will cover tank liquor temperature in copper groove and be raised to 26 DEG C, then add 80kg solid sulphuric acid copper, limit edged stirs, and copper sulfate can fully be dissolved, and now tank liquor color is general sky blue;
3., to covering copper reaction tank bottom even lay one deck solid sulphuric acid copper, solid sulphuric acid copper consumption is 39kg, start recycle pump, being squeezed into by the tank liquor covered in copper groove covers in copper reactive tank, when covering that in copper reactive tank, tank liquor reaches certain liquid level, be back to by targeting port and cover copper groove, controlled circulation pump inlet valve, keep covering copper groove and covering copper reactive tank level stability;
4., by tubing be positioned over and cover in copper reactive tank, guarantee the complete submergence tubing of tank liquor 25 ~ 28mm, observing response groove and cover copper tank liquor position, to adjust in time;
5., observing tubing covers copper rear surface color and luster, if when finding more shallow, the tarnish of color, add 11kg solid sulphuric acid copper, the 5.5kg vitriol oil and 4kg and cover copper agent fast to covering in copper reactive tank, and stir, continuous observation color;
If 6. find tube surfaces bright in color, the general golden yellow of color, then stop covering copper, take out tubing, carry out follow-up washing, passivation processing.
Embodiment 4
1., by 10m 3cover copper groove and 10m 3cover copper reactive tank to clean up, ensure in groove without any impurity, booty; Inspection covers copper groove and covers copper reactive tank whether have damage, leak phenomenon, runs well in order to avoid affect unit; Whether inspection recycle pump, heat pump work well;
2., to covering in copper groove add water to half liquid level, add and cover copper agent 82kg, 48kg vitriol oil fast, then moisturizing is to notch 65 ~ 75mm place;
Then open heat pump, will cover tank liquor temperature in copper groove and be raised to 30 DEG C, then add 78kg solid sulphuric acid copper, limit edged stirs, and copper sulfate can fully be dissolved, and now tank liquor color is general sky blue;
3., to covering copper reaction tank bottom even lay one deck solid sulphuric acid copper, solid sulphuric acid copper consumption is 40kg, start recycle pump, being squeezed into by the tank liquor covered in copper groove covers in copper reactive tank, when covering that in copper reactive tank, tank liquor reaches certain liquid level, be back to by targeting port and cover copper groove, controlled circulation pump inlet valve, keep covering copper groove and covering copper reactive tank level stability;
4., by tubing be positioned over and cover in copper reactive tank, guarantee the complete submergence tubing of tank liquor 26 ~ 30mm, observing response groove and cover copper tank liquor position, to adjust in time;
5., observing tubing covers copper rear surface color and luster, if when finding more shallow, the tarnish of color, add 10.5kg solid sulphuric acid copper, the 4.5kg vitriol oil and 4.5kg and cover copper agent fast to covering in copper reactive tank, and stir, continuous observation color;
If 6. find tube surfaces bright in color, the general golden yellow of color, then stop covering copper, take out tubing, carry out follow-up washing, passivation processing.
Embodiment 5
1., by 10m 3cover copper groove and 10m 3cover copper reactive tank to clean up, ensure in groove without any impurity, booty; Inspection covers copper groove and covers copper reactive tank whether have damage, leak phenomenon, runs well in order to avoid affect unit; Whether inspection recycle pump, heat pump work well;
2., to covering in copper groove add water to half liquid level, add and cover copper agent 85kg, 45kg vitriol oil fast, then moisturizing is to notch 55 ~ 70mm place;
Then open heat pump, will cover tank liquor temperature in copper groove and be raised to 35 DEG C, then add 72kg solid sulphuric acid copper, limit edged stirs, and copper sulfate can fully be dissolved, and now tank liquor color is general sky blue;
3., to covering copper reaction tank bottom even lay one deck solid sulphuric acid copper, solid sulphuric acid copper consumption is 41kg, start recycle pump, being squeezed into by the tank liquor covered in copper groove covers in copper reactive tank, when covering that in copper reactive tank, tank liquor reaches certain liquid level, be back to by targeting port and cover copper groove, controlled circulation pump inlet valve, keep covering copper groove and covering copper reactive tank level stability;
4., by tubing be positioned over and cover in copper reactive tank, guarantee the complete submergence tubing of tank liquor 28 ~ 30mm, observing response groove and cover copper tank liquor position, to adjust in time;
5., observing tubing covers copper rear surface color and luster, if when finding more shallow, the tarnish of color, add 9.5kg solid sulphuric acid copper, the 6kg vitriol oil and 5kg and cover copper agent fast to covering in copper reactive tank, and stir, continuous observation color;
If 6. find tube surfaces bright in color, the general golden yellow of color, then stop covering copper, take out tubing, carry out follow-up washing, passivation processing.
Above content is only conceive example and explanation to the present invention; affiliated those skilled in the art make various amendment to described specific embodiment or supplement or adopt similar mode to substitute; only otherwise depart from the design of invention or surmount this scope as defined in the claims, protection scope of the present invention all should be belonged to.

Claims (1)

1. steel pipe covers Copper fabrication technique, it is characterized in that, step is as follows:
1., by 10m 3cover copper groove and 10m 3cover copper reactive tank to clean up, ensure in groove without any impurity, booty; Inspection covers copper groove and covers copper reactive tank whether have damage, leak phenomenon, runs well in order to avoid affect unit; Whether inspection recycle pump, heat pump work well;
2., to covering in copper groove adding water to half liquid level, adding and covering copper agent 75 ~ 85kg, 45 ~ 55kg vitriol oil fast, then moisturizing is to notch 50 ~ 80mm place;
Then open heat pump, will cover tank liquor temperature in copper groove and be raised to 20 ~ 35 DEG C, then add 70 ~ 80kg solid sulphuric acid copper, limit edged stirs, and copper sulfate can fully be dissolved, and now tank liquor color is general sky blue;
3., to covering copper reaction tank bottom even lay one deck solid sulphuric acid copper, solid sulphuric acid copper consumption is 38 ~ 42kg, start recycle pump, being squeezed into by the tank liquor covered in copper groove covers in copper reactive tank, when covering that in copper reactive tank, tank liquor reaches certain liquid level, be back to by targeting port and cover copper groove, controlled circulation pump inlet valve, keep covering copper groove and covering copper reactive tank level stability;
4., by tubing be positioned over and cover in copper reactive tank, guarantee the complete submergence tubing of tank liquor 20 ~ 30mm, observing response groove and cover copper tank liquor position, to adjust in time;
5., observing tubing covers copper rear surface color and luster, if when finding more shallow, the tarnish of color, add 9 ~ 11kg solid sulphuric acid copper, 4 ~ 6kg vitriol oil and 4 ~ 6kg and cover copper agent fast to covering in copper reactive tank, and stir, continuous observation color;
If 6. find tube surfaces bright in color, the general golden yellow of color, then stop covering copper, take out tubing, carry out follow-up washing, passivation processing.
CN201210377677.8A 2012-09-30 2012-09-30 Processing process for coating copper to steel pipe Expired - Fee Related CN102912330B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210377677.8A CN102912330B (en) 2012-09-30 2012-09-30 Processing process for coating copper to steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210377677.8A CN102912330B (en) 2012-09-30 2012-09-30 Processing process for coating copper to steel pipe

Publications (2)

Publication Number Publication Date
CN102912330A CN102912330A (en) 2013-02-06
CN102912330B true CN102912330B (en) 2015-04-22

Family

ID=47610897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210377677.8A Expired - Fee Related CN102912330B (en) 2012-09-30 2012-09-30 Processing process for coating copper to steel pipe

Country Status (1)

Country Link
CN (1) CN102912330B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107876697A (en) * 2017-11-27 2018-04-06 安徽省岳西缸套有限公司 The production technology of gold cylinder sleeve

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1075174A (en) * 1993-01-17 1993-08-11 河北工学院 Rust-resisting process technology for copper-platedwelding-wire
CN102029089A (en) * 2010-08-31 2011-04-27 北大方正集团有限公司 System and method for circulating and filtering chemical copper deposition solution

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1075174A (en) * 1993-01-17 1993-08-11 河北工学院 Rust-resisting process technology for copper-platedwelding-wire
CN102029089A (en) * 2010-08-31 2011-04-27 北大方正集团有限公司 System and method for circulating and filtering chemical copper deposition solution

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
置换镀铜气保焊丝生产工艺研究;陈启武;《金属制品》;20011231;第27卷(第6期);17-19 *

Also Published As

Publication number Publication date
CN102912330A (en) 2013-02-06

Similar Documents

Publication Publication Date Title
CN101671825B (en) Pre-treating technique for composite metal plastic pipe
CN107513681B (en) Hot-dip galvanizing process
CN102719785B (en) Production technology of preprocessing copper-clad steel wire matrix
CN103352217B (en) Turn blue anti-corrosion treatment process for a kind of surface of workpiece
CN105648379A (en) Hot-dip galvanizing technology
CN104328371A (en) Hot dip galvanizing technique for implementing corrosion resistance and rust resistance of steel tube
CN103668030A (en) Improved hot galvanizing method of iron handicraft or furniture
CN103498095A (en) Low-cost corrosion resistant color coated sheet used for lift and production method thereof
CN102618895A (en) Cyanide-free plating solution and its preparation method
CN101899635A (en) Hot galvanizing method
CN102912330B (en) Processing process for coating copper to steel pipe
CN101692382A (en) Hydrogen removing method for radiator for transformer
CN101310968A (en) Color fingerprint resistant sheet and process method thereof
CN102424966A (en) Process for phosphating surface of spring steel plate
CN106367705A (en) Secondary galvanizing technology for structural steel containing silicon
CN109504928A (en) Electric power tower steelwork hot galvanizing production method
CN101041900A (en) Zinc plating deactivation liquid
CN102363882A (en) Comprehensive treatment agent used before spray coating of galvanized steel sheet, and preparation method of comprehensive treatment agent
CN104250733A (en) Cold-rolled plate surface passivation liquid
CN103233193A (en) Bolt surface zinc plating layer production method
CN107164751B (en) A kind of steel surface antirust agent combination product and its application
CN106811708A (en) The galvanized method of steel plate
CN104250754A (en) Cold-rolled plate surface passivation technology
CN104250778A (en) Phosphatization liquid for wire rod drawing and hot-galvanizing pretreatment
CN105568274A (en) Environment-friendly galvanizing passivator and preparation method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Processing process for coating copper to steel pipe

Effective date of registration: 20161209

Granted publication date: 20150422

Pledgee: Merchants Bank of Hefei Economic Development Zone Branch

Pledgor: Hefei Great Wall Refrigeration Technology Co., Ltd.

Registration number: 2016340000100

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20170809

Granted publication date: 20150422

Pledgee: Merchants Bank of Hefei Economic Development Zone Branch

Pledgor: Hefei Great Wall Refrigeration Technology Co., Ltd.

Registration number: 2016340000100

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190213

Address after: 230601 Tiandu Road 139, Hefei Economic and Technological Development Zone, Anhui Province

Patentee after: HEFEI TAITONG REFRIGERATING TECHNOLOGY CO., LTD.

Address before: 230601 Peach Blossom Industrial Zone, Hefei Economic and Technological Development Zone, Anhui Province

Patentee before: Hefei Great Wall Refrigeration Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150422

Termination date: 20190930