CN102902853A - Method for regional statistics of cable length and soft system for auxiliary statistics - Google Patents

Method for regional statistics of cable length and soft system for auxiliary statistics Download PDF

Info

Publication number
CN102902853A
CN102902853A CN2012103586025A CN201210358602A CN102902853A CN 102902853 A CN102902853 A CN 102902853A CN 2012103586025 A CN2012103586025 A CN 2012103586025A CN 201210358602 A CN201210358602 A CN 201210358602A CN 102902853 A CN102902853 A CN 102902853A
Authority
CN
China
Prior art keywords
node
statistics
cable
module
zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103586025A
Other languages
Chinese (zh)
Inventor
王平
林从飞
黎钧柏
王金苓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxin Shipbuilding and Heavy Industry Co Ltd
Original Assignee
Guangxin Shipbuilding and Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxin Shipbuilding and Heavy Industry Co Ltd filed Critical Guangxin Shipbuilding and Heavy Industry Co Ltd
Priority to CN2012103586025A priority Critical patent/CN102902853A/en
Publication of CN102902853A publication Critical patent/CN102902853A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method for regional statistics of cable length. According to the method, the time of statistics is effectively shortened, and the working capacity of statistics is effectively reduced, so that the work efficiency is improved. The method particularly comprises the following steps: A. modeling in a regional manner; B. recording a region node; C. recording the trend of the region node; D. determining the trend of a region; E. carrying out model combination, and combing a node sequence according to the zone order, and simultaneously acquiring a corresponding node coordinate; F. calculating the path distance between the nodes, and summating; and G. establishing a cable hand book according to the node numbering and data acquired by the calculation. Moreover, the invention further provides a soft system for auxiliary statistics, which comprises a recording module, a sequencing module, a coordinate obtaining module, a statistics module and a generating module and can conduct the statistics on the cable length and bus cable length in each region; and moreover, the operation is simple so that the statistics work is convenient and efficient.

Description

The method of subregion statistics length of cable and the floppy disk system of ancillary statistics
Technical field
The present invention relates to the method for subregion statistics length of cable and the floppy disk system of ancillary statistics
Background technology
The method of existing statistics shipboard cable length generally is after ship model is set up fully, by designer's defined node of being responsible for the making of cable handbook specially and node trend, finishes statistics by area of computer aided again, collects into the book.There is following problem in said method: 1, statistics depends on the time that ship model is set up fully start time, causes cycle of adding up longer; 2, general ship model designs by multidigit designer subregion, but everyone deadline differ, cause to a certain extent the work holdup; 3, be responsible for the designer that the cable handbook makes specially and be unfamiliar with comparatively speaking ship model, cause the efficient of adding up not high.Generally speaking, caused personnel and temporal waste, be unfavorable for increasing work efficiency.
Summary of the invention
For above-mentioned background, the first purpose of the present invention is to propose the method for subregion statistics length of cable, and the method can effectively shorten time and the workload of statistics, increases work efficiency.
Said method comprises the steps:
A, subregion modeling with the model partition zone, are responsible for respectively the zones of different design of model according to the actual design situation by some designers, described each zone is numbered respectively;
B, Area Node record, each designer defines the cable node in this zone after regional modeling is finished, and described definition refers on model node be carried out location confirmation and number with set form;
C, Area Node move towards record, press the cable trend of designer's appointment with above-mentioned node sequencing, are formed on the sequence node in this zone;
D, regional strike are determined, specify cable to pass through successively zone sequence;
E, carry out model combination, and make up each Area Node sequence according to regional strike, obtain simultaneously corresponding node coordinate;
F, the above-mentioned internodal path distance of calculating and summation;
G, the numbering according to above-mentioned zone, node serial number and computed information are compiled into the cable handbook.
Such scheme has following advantage:
1, the designer who finishes at first regional model can begin defined node, carry out simultaneously so that the work of length of cable statistics can be set up with model, effectively shortens the time of whole statistics.
2, the designer who is responsible for each regional model foundation can finish each regional node definition work very quickly according to the cable wiring requirement, has exempted from but the trouble that the statistician wants first learning model to add up again, thereby has greatly increased work efficiency.
In addition, the present invention also proposes the floppy disk system for ancillary statistics, comprises
Logging modle is used at built each Area Node of model mark, will store each Area Node information and regional strike, and described nodal information comprises node serial number, node location and node trend;
Order module, the node trend that is used for setting according to the user sorts, stores node with regional strike information, forms corresponding sequence node;
Coordinate obtaining module is used for obtaining coordinate figure corresponding to each node;
Statistical module is used for calculating each euclidean distance between node pair and total path length according to each node coordinate value;
Generation module is used for according to numbering, node serial number generation corresponding to the computed information cable wiring form of above-mentioned zone or exports external unit to.
Further, above-mentioned floppy disk system also includes
Judge module is used for the positional information according to form and the node of nodes encoding, checks the rationality of the nodal information that obtains.
Above-mentioned floppy disk system advantage is, can add up each regional length of cable and bus length of cable, and simple to operate, makes statistical work convenient, efficient.More be provided with judge module, the rationality of Intelligent Measurement data ensures the accurate of statistics.
Description of drawings
Fig. 1 is the present invention's method step.
Fig. 2 is the present invention's floppy disk system functional framework schematic diagram.
Fig. 3 is the present invention's floppy disk system processing flow chart.
Embodiment
By reference to the accompanying drawings following, the technical scheme that the present invention adopted is described below:
The method of subregion statistics length of cable comprises the steps:
A, subregion modeling with the model partition zone, are responsible for respectively the zones of different design of model according to the actual design situation by some designers;
B, Area Node record, each designer defines the cable node in this zone after regional modeling is finished, and described definition refers on model node be carried out location confirmation and number with set form;
C, Area Node move towards record, and each designer is formed on the node that moves towards in this zone with above-mentioned node sequencing;
D, regional strike are determined, refer to that cable passes through zone sequence successively;
E, carry out model combination, and according to above-mentioned zone sequential combination sequence node, obtain simultaneously corresponding node coordinate;
F, the above-mentioned internodal path distance of calculating, and summation;
G, according to above-mentioned node serial number and computed information, be compiled into the cable handbook.
The floppy disk system of ancillary statistics comprises
Logging modle is used at built each Area Node of model mark, will store each Area Node information and regional strike, and described nodal information comprises node serial number, node location and node trend;
Order module, the node trend that is used for setting according to the user sorts, stores node with regional strike information, forms corresponding sequence node;
Coordinate obtaining module is used for obtaining coordinate figure corresponding to each node;
Statistical module is used for calculating each euclidean distance between node pair and total path length according to each node coordinate value;
Generation module is used for according to numbering, node serial number generation corresponding to the computed information cable wiring form of above-mentioned zone or exports external unit to.
And
Judge module is used for the positional information according to form and the node of nodes encoding, checks the rationality of the nodal information that obtains.
Idiographic flow is:
The regional strike of cable is set by the designer who finishes at first zone design, and the system call logging modle is stored this regional strike information;
Each designer carries out node definition to regions module and the node trend is set, and the system call logging modle is stored the nodal information in this zone;
System establishes and uses order module, according to nodal information, regional strike information the sequence node of storage is sorted;
Merge each regions module, the system call coordinate obtaining module is obtained coordinate corresponding to each node;
Statistical module calculates each euclidean distance between node pair and total path length according to each node coordinate value;
Final by generation module, according to numbering, node serial number generation corresponding to the computed information cable wiring form of above-mentioned zone or export external unit to.
In the middle of the above-mentioned flow process, system call judge module, the rationality of the nodal information that inspection is obtained.
Such scheme is better embodiment of the present invention, can not think that above-mentioned embodiment limits protection scope of the present invention.Mens all and of the present invention, system framework is identical, similar or improvement, the conversion done based on this, all belongs to the protection domain of this patent.

Claims (4)

1. the method for a subregion statistics length of cable comprises the steps:
A, subregion modeling with the model partition zone, are responsible for respectively the zones of different design of model according to the actual design situation by some designers, described each zone is numbered respectively;
B, Area Node record, each designer defines the cable node in this zone after regional modeling is finished, and described definition refers on model node be carried out location confirmation and number with set form;
C, Area Node move towards record, press the cable trend of designer's appointment with above-mentioned node sequencing, are formed on the sequence node in this zone;
D, regional strike are determined, specify cable to pass through successively zone sequence;
E, carry out model combination, and make up each Area Node sequence according to regional strike, obtain simultaneously corresponding node coordinate;
F, the above-mentioned internodal path distance of calculating and summation;
G, the numbering according to above-mentioned zone, node serial number and computed information are compiled into the cable handbook.
2. the method for length of cable is added up in subregion according to claim 1, it is characterized in that: described step D is by at first designer's execution of completing steps C.
3. the floppy disk system of an ancillary statistics length of cable is characterized in that: comprise
Logging modle is used at built each Area Node of model mark, will store each Area Node information and regional strike, and described nodal information comprises node serial number, node location and node trend;
Order module, the node trend that is used for setting according to the user sorts, stores node with regional strike information, forms corresponding sequence node;
Coordinate obtaining module is used for obtaining coordinate figure corresponding to each node;
Statistical module is used for calculating each euclidean distance between node pair and total path length according to each node coordinate value;
Generation module is used for according to numbering, node serial number generation corresponding to the computed information cable wiring form of above-mentioned zone or exports external unit to.
4. the floppy disk system of an ancillary statistics length of cable is characterized in that: also include a judge module,
Be used for the positional information according to form and the node of nodes encoding, check the rationality of the nodal information that obtains.
CN2012103586025A 2012-09-24 2012-09-24 Method for regional statistics of cable length and soft system for auxiliary statistics Pending CN102902853A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103586025A CN102902853A (en) 2012-09-24 2012-09-24 Method for regional statistics of cable length and soft system for auxiliary statistics

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103586025A CN102902853A (en) 2012-09-24 2012-09-24 Method for regional statistics of cable length and soft system for auxiliary statistics

Publications (1)

Publication Number Publication Date
CN102902853A true CN102902853A (en) 2013-01-30

Family

ID=47575083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103586025A Pending CN102902853A (en) 2012-09-24 2012-09-24 Method for regional statistics of cable length and soft system for auxiliary statistics

Country Status (1)

Country Link
CN (1) CN102902853A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105893525A (en) * 2016-03-30 2016-08-24 努比亚技术有限公司 Data statistic device and method
CN110707618A (en) * 2019-09-18 2020-01-17 平安科技(深圳)有限公司 Method and device for acquiring length of wiring cable, computer equipment and storage medium
CN113866683A (en) * 2021-09-18 2021-12-31 上海外高桥造船有限公司 Ship cable detection method
CN113884039A (en) * 2021-09-17 2022-01-04 沪东中华造船(集团)有限公司 Container ship cable length estimation method based on multivariate analysis

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
姚胜华,刘正,游宇: "船舶电缆长度计算研究", 《管理与技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105893525A (en) * 2016-03-30 2016-08-24 努比亚技术有限公司 Data statistic device and method
CN110707618A (en) * 2019-09-18 2020-01-17 平安科技(深圳)有限公司 Method and device for acquiring length of wiring cable, computer equipment and storage medium
CN110707618B (en) * 2019-09-18 2022-07-15 平安科技(深圳)有限公司 Method and device for acquiring length of wiring cable, computer equipment and storage medium
CN113884039A (en) * 2021-09-17 2022-01-04 沪东中华造船(集团)有限公司 Container ship cable length estimation method based on multivariate analysis
CN113884039B (en) * 2021-09-17 2023-08-08 沪东中华造船(集团)有限公司 Multi-element analysis-based container ship cable length estimation method
CN113866683A (en) * 2021-09-18 2021-12-31 上海外高桥造船有限公司 Ship cable detection method

Similar Documents

Publication Publication Date Title
CN105138769B (en) A kind of temporal model generation method and device for programmable circuit
CN112700027A (en) Multi-precision index comprehensive evaluation method and system for electric power prediction model
CN102902853A (en) Method for regional statistics of cable length and soft system for auxiliary statistics
CN102750407B (en) Automatic processing and converting method for computer-aided design (CAD) /computer-aided engineering (CAE) data
CN108121530A (en) A kind of conceptual design analysis method of multidisciplinary complex product
CN105373668B (en) Chip layout design method
CN101673198A (en) Method for verifying consistency of dynamic behavior in UML model and time-sequence contract
CN108733911A (en) Building aluminum alloy pattern plate construction code Design method based on three-dimensional digital model
CN109684731A (en) A kind of efficient detailed routing driving track allocation algorithm
Kim et al. Pulser gating: A clock gating of pulsed-latch circuits
Azizi A note on data envelopment analysis with missing values: an interval DEA approach
CN101719177B (en) Method and device for on-chip system modeling and simulation
CN103885867A (en) Online evaluation method of performance of analog circuit
CN103631996A (en) Product structure and process parallel design method based on model maturity
CN102799960A (en) Parallel operation flow anomaly detection method oriented to data model
CN103617342A (en) Power grid state estimation multi-algorithm fusion system
CN107122509A (en) A kind of Pro/E designs a model geometry light weight method
Zhang et al. Research on flexible transfer line schematic design using hierarchical process planning
CN107463151B (en) A kind of complex surface machining multidimensional knowledge cloud cooperating service method
CN112733345A (en) Automatic three-dimensional marking method and system for aviation bolt
CN105138750A (en) Scalable multi-line crossing machine body wireframe model building method
CN101930566A (en) Hydrological experimental simulation system and method based on parallel system
CN110517350B (en) Preprocessing method and processor of Monte Carlo particle transport calculation program
CN114896677B (en) BIM (building information modeling) -based construction simulation method and system
CN103793597B (en) Model similarity measuring method based on complete backbone subsystems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130130