CN102888792B - Mounting tool and mounting method of spring clip for steel rail vibration-absorption buckle piece - Google Patents
Mounting tool and mounting method of spring clip for steel rail vibration-absorption buckle piece Download PDFInfo
- Publication number
- CN102888792B CN102888792B CN201210430150.7A CN201210430150A CN102888792B CN 102888792 B CN102888792 B CN 102888792B CN 201210430150 A CN201210430150 A CN 201210430150A CN 102888792 B CN102888792 B CN 102888792B
- Authority
- CN
- China
- Prior art keywords
- spring clip
- erecting tools
- steel rail
- operate portions
- rail vibration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Clamps And Clips (AREA)
Abstract
The invention relates to the installation of a steel rail vibration-absorption buckle piece and provides a mounting tool of a spring clip for the vibration-absorption buckle piece, which is formed by a handle (1) and a working part (2), wherein the working part (2) is located at the front end of the handle (1); the front end part of the working part (2) is a bulge (3) which is used for being matched with a reserved hole on the steel rail vibration-absorption buckle piece to form a supporting point; and a strip-shaped notch or groove is formed at the front part of the working part. The mounting tool can effectively improve the mounting efficiency of the spring clip; in a mounting process, the spring clip is not impacted and the spring clip is limited in a long-strip-shaped opening to not generate deviation, so that the safety is effectively guaranteed; and the mounting tool has the characteristics of simple structure, convenience in carrying and convenience in use.
Description
Technical field
The present invention relates to the installation of steel rail vibration reduction fastener, be specifically related to erecting tools and the mounting method of a kind of steel rail vibration reduction fastener spring clip.
Background technology
At some rail fastenings, especially on steel rail vibration reduction fastener, for example, make the Damping fastening of steel rail suspending, need to use a kind of spring clip (as shown in Fig. 3, Fig. 6) to be fixedly clamped.The at present mounting means of this spring clip, mainly adopts the physics of hammer and so on to pound and hits spring clip, is impacted installation site after it is deformed.There are some defects in this mounting means:
1. spring clip has larger clamping force, needs larger strength, and easily make spring clip be offset while adopting hammer to impact, and installation effectiveness is low.
2. spring clip, in the time being subject to external impacts, if do not put in place, can make spring clip upspring on the contrary, safe not.
Summary of the invention
For addressing the above problem, the object of the invention is to propose erecting tools and the mounting method of a kind of steel rail vibration reduction fastener spring clip.
An erecting tools for spring clip for steel rail vibration reduction fastener, the erecting tools of described spring clip is made up of handle and operate portions; Described working position is in the front end of handle; The leading section of described operate portions is in order to coordinate with the preformed hole on steel rail vibration reduction fastener the projection that forms fulcrum; The front portion of described operate portions has bar v notch v or groove.
It between the described projection that the leading section of operate portions has and the main body of operate portions, is arc-shaped transition.
The described projection that is positioned at the leading section of operate portions is hook-shaped.
Adopt the erecting tools of steel rail vibration reduction fastener spring clip, the method for mounting spring folder, its concrete steps are as follows:
1) spring clip is vertically placed on to installation site, the two ends of spring clip are the corresponding position that will clamp respectively;
2), under spring clip erecting tools is overlapped, spring clip part is stretched in the bar v notch v or groove of spring clip erecting tools from top to bottom;
3) projection of the operate portions leading section of spring clip erecting tools is extend in the preformed hole on steel rail vibration reduction fastener, be stuck in preformed hole, form fulcrum;
4) hold handle, the application of force is by spring clip erecting tools to pressing down downwards, and the bar v notch v of erecting tools operate portions or the end of groove are against on spring clip; Continue the downward application of force, there is elastic deformation in spring clip under the effect of power, continues the downward application of force, and spring clip is pressed into installation site;
5) lift spring clip erecting tools, taken out, complete installation process.
Erecting tools and the mounting method of a kind of steel rail vibration reduction fastener spring clip that the present invention proposes, adopt technique scheme, can effectively improve spring clip installation effectiveness, when installation, not need spring clip to impact, and spring clip is limited in strip opening, can not be offset, effectively ensure safety, and have simple in structure, be easy to carry, feature easy to use.
Brief description of the drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the spring clip schematic diagram relating in the present invention.
Fig. 4 is the schematic three dimensional views of installation process of the present invention.
Fig. 5 is the position view that the present invention installs front spring clamp mounting tool.
Fig. 6 is that spring clip is pressed onto the schematic diagram after assigned position.
In figure: 1, handle, 2, operate portions, 3, projection, 4, bar v notch v, 5, the end of bar v notch v, 6, preformed hole.
Detailed description of the invention
With specific embodiment, the present invention is illustrated by reference to the accompanying drawings:
An erecting tools for spring clip for steel rail vibration reduction fastener, the erecting tools of described spring clip is made up of handle 1 and operate portions 2; Described operate portions 2 is positioned at the front end of handle 1; The leading section of described operate portions 2 is projection 3; Form fulcrum in order to coordinate with the preformed hole 6 on steel rail vibration reduction fastener; Described in this embodiment, projection 3 is hook-shaped; The front portion of described operate portions 2 has bar v notch v or groove, is bar v notch v 4 in this embodiment, with placing skew so that spring clip maintenance is stablized.
In conjunction with Fig. 1-6, adopt the erecting tools of steel rail vibration reduction fastener spring clip, the method for mounting spring folder, its concrete steps are as follows:
1) spring clip is vertically placed on to installation site, the two ends of spring clip are the corresponding position that will clamp respectively;
2), under the erecting tools of spring clip is overlapped, spring clip part is stretched in the bar v notch v 4 of spring clip erecting tools operate portions from top to bottom;
3) by spring clip erecting tools operate portions projection 3 extend in the preformed hole 6 on steel rail vibration reduction fastener, and be stuck in preformed hole, form fulcrum;
4) hold handle, the application of force is by spring clip erecting tools to pressing down downwards, and the end 5 of bar v notch v is against on spring clip; Continue the downward application of force, there is elastic deformation in spring clip under the effect of power, continues the downward application of force, and spring clip is pressed into installation site;
5) lift spring clip erecting tools, taken out, complete installation process.
Claims (4)
1. an erecting tools for spring clip for steel rail vibration reduction fastener, is characterized in that: the erecting tools of described spring clip is made up of handle (1) and operate portions (2); Described operate portions (2) is positioned at the front end of handle (1); The leading section of described operate portions (2) is the projection (3) that forms fulcrum in order to coordinate with the preformed hole on steel rail vibration reduction fastener; The front portion of described operate portions (2) has bar v notch v (4) or groove.
2. the erecting tools of spring clip for a kind of steel rail vibration reduction fastener according to claim 1, is characterized in that: between the described projection (3) that the leading section of operate portions (2) has and the main body of operate portions, be arc-shaped transition.
3. the erecting tools of spring clip for a kind of steel rail vibration reduction fastener according to claim 1, is characterized in that: the described projection (3) that is positioned at the leading section of operate portions is hook-shaped.
4. the erecting tools of steel rail vibration reduction fastener use spring clip described in employing claim 1-3, the method for mounting spring folder, is characterized in that: the concrete steps of described mounting spring clamping method are as follows:
1) spring clip is vertically placed on to installation site, the two ends of spring clip are the corresponding position that will clamp respectively;
2), under spring clip erecting tools is overlapped, spring clip part is stretched in the bar v notch v (4) or groove of spring clip erecting tools from top to bottom;
3) projection (3) of the operate portions leading section of spring clip erecting tools is extend in the preformed hole (6) on steel rail vibration reduction fastener, and be stuck in preformed hole, form fulcrum;
4) hold handle, the application of force is by spring clip erecting tools to pressing down downwards, and the end (5) of the bar v notch v of erecting tools operate portions or groove is against on spring clip; Continue the downward application of force, there is elastic deformation in spring clip under the effect of power, continues the downward application of force, and spring clip is pressed into installation site;
5) lift spring clip erecting tools, taken out, complete installation process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210430150.7A CN102888792B (en) | 2012-11-01 | 2012-11-01 | Mounting tool and mounting method of spring clip for steel rail vibration-absorption buckle piece |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210430150.7A CN102888792B (en) | 2012-11-01 | 2012-11-01 | Mounting tool and mounting method of spring clip for steel rail vibration-absorption buckle piece |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102888792A CN102888792A (en) | 2013-01-23 |
CN102888792B true CN102888792B (en) | 2014-08-20 |
Family
ID=47532460
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210430150.7A Active CN102888792B (en) | 2012-11-01 | 2012-11-01 | Mounting tool and mounting method of spring clip for steel rail vibration-absorption buckle piece |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102888792B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106120491B (en) * | 2016-08-22 | 2018-01-19 | 洛阳双瑞橡塑科技有限公司 | A kind of frock and assemble method for being used to assemble fastener |
CN212611728U (en) * | 2019-06-10 | 2021-02-26 | 洛阳双瑞橡塑科技有限公司 | Floating fixing device |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2947792B1 (en) * | 1998-07-21 | 1999-09-13 | 細川 誠二 | Clip attachment / detachment tool |
GB2433537A (en) * | 2005-12-22 | 2007-06-27 | Pandrol Ltd | Railway rail clip installation tool |
CN200946227Y (en) * | 2006-09-25 | 2007-09-12 | 郑铁利达实业开发总公司 | Spring-strip fast fixing tool |
CN101153476A (en) * | 2006-09-27 | 2008-04-02 | 郑铁利达实业开发总公司 | Elastic strip fixing machine |
CN201648881U (en) * | 2009-12-21 | 2010-11-24 | 什邡瑞邦机械有限责任公司 | Hydraulic spring fastener mounter |
KR200451871Y1 (en) * | 2008-09-17 | 2011-01-17 | 한국철도공사 | safety panpuller |
CN202148474U (en) * | 2011-07-04 | 2012-02-22 | 株洲旭阳机电科技开发有限公司 | Elastic bar fastening machine |
KR20120076919A (en) * | 2010-12-30 | 2012-07-10 | 한국철도공사 | Semiautomatic spring up puller |
CN202925403U (en) * | 2012-11-01 | 2013-05-08 | 洛阳双瑞橡塑科技有限公司 | Mounting tool of spring clamp for steel rail damping fastener |
-
2012
- 2012-11-01 CN CN201210430150.7A patent/CN102888792B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2947792B1 (en) * | 1998-07-21 | 1999-09-13 | 細川 誠二 | Clip attachment / detachment tool |
GB2433537A (en) * | 2005-12-22 | 2007-06-27 | Pandrol Ltd | Railway rail clip installation tool |
CN200946227Y (en) * | 2006-09-25 | 2007-09-12 | 郑铁利达实业开发总公司 | Spring-strip fast fixing tool |
CN101153476A (en) * | 2006-09-27 | 2008-04-02 | 郑铁利达实业开发总公司 | Elastic strip fixing machine |
KR200451871Y1 (en) * | 2008-09-17 | 2011-01-17 | 한국철도공사 | safety panpuller |
CN201648881U (en) * | 2009-12-21 | 2010-11-24 | 什邡瑞邦机械有限责任公司 | Hydraulic spring fastener mounter |
KR20120076919A (en) * | 2010-12-30 | 2012-07-10 | 한국철도공사 | Semiautomatic spring up puller |
CN202148474U (en) * | 2011-07-04 | 2012-02-22 | 株洲旭阳机电科技开发有限公司 | Elastic bar fastening machine |
CN202925403U (en) * | 2012-11-01 | 2013-05-08 | 洛阳双瑞橡塑科技有限公司 | Mounting tool of spring clamp for steel rail damping fastener |
Also Published As
Publication number | Publication date |
---|---|
CN102888792A (en) | 2013-01-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202925403U (en) | Mounting tool of spring clamp for steel rail damping fastener | |
CN102888792B (en) | Mounting tool and mounting method of spring clip for steel rail vibration-absorption buckle piece | |
EP2532487A3 (en) | Impacting tool | |
CN205438436U (en) | Hammer nail appurtenance | |
CN201455838U (en) | Fixture | |
CN202500066U (en) | Bolt fastening-type mining rail-fixation device | |
CN203770351U (en) | Square nut fastener for cable bridge installation | |
CN202910200U (en) | Riveting tool of reed and pin of microswitch | |
CN104405736A (en) | Clamping buckle | |
CN202148470U (en) | Rail fixer capable of being quickly mounted and dismounted | |
CN205063191U (en) | Draw reinforcing bar fixing base to one side | |
CN202029116U (en) | Damping hammer | |
CN203247074U (en) | Barrel cover pressing-in device | |
CN201781236U (en) | Electric wire clip row | |
CN202982966U (en) | Elastic life-saving hammer | |
CN103341748A (en) | Locating mechanism for valve core taking and placing | |
CN202357095U (en) | Mounting device for hand brake cable clamp | |
CN202129780U (en) | Hammer | |
CN202753129U (en) | Novel pull-out device structure | |
CN102380849A (en) | Broken nail removing device | |
CN206503805U (en) | Embedded board before a kind of kuppe | |
CN201320750Y (en) | Clamping plate for driving nail | |
CN201371433Y (en) | Screwdriver with sleeve | |
CN202498515U (en) | Nail clamping device | |
CN202946500U (en) | Anti-skidding nail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |