CN102882329B - Installation component of permanent magnetic ring and assembly method thereof - Google Patents

Installation component of permanent magnetic ring and assembly method thereof Download PDF

Info

Publication number
CN102882329B
CN102882329B CN201210268181.7A CN201210268181A CN102882329B CN 102882329 B CN102882329 B CN 102882329B CN 201210268181 A CN201210268181 A CN 201210268181A CN 102882329 B CN102882329 B CN 102882329B
Authority
CN
China
Prior art keywords
permanent
ring
magnetic clamp
magnetic
mount pad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210268181.7A
Other languages
Chinese (zh)
Other versions
CN102882329A (en
Inventor
徐建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhenjiang New Energy Euqipment Co., Ltd.
Original Assignee
Jiangyin Zhenjiang Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangyin Zhenjiang Steel Structure Co Ltd filed Critical Jiangyin Zhenjiang Steel Structure Co Ltd
Priority to CN201210268181.7A priority Critical patent/CN102882329B/en
Publication of CN102882329A publication Critical patent/CN102882329A/en
Application granted granted Critical
Publication of CN102882329B publication Critical patent/CN102882329B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Magnetic Bearings And Hydrostatic Bearings (AREA)

Abstract

The invention discloses an installation component of a permanent magnetic ring and an assembly method thereof. The installation component comprises an installation base, a permanent magnetic ring, a magnetic bearing rotor and a rotor shaft, wherein a flange disk is arranged at one end of the installation base, a convex ring is arranged on the end face of the flange disk, the outer ring of the convex ring and the inner ring of the permanent magnetic ring are sleeved together, threaded holes are uniformly distributed on the flange disk, and copper bolts are screwed into the threaded holes; and the magnetic bearing rotor is formed by superimposing a plurality of ring-shaped silicon sheet steels in a cylindrical structure, pressure plates are arranged at the two ends of the silicon sheet steels in the cylindrical structure, a 'Bike' hole matched with the outer ring of the permanent magnetic ring is formed in one pressure plate at one end of the cylindrical silicon sheet steels; the rotor shaft is in interference fit with the inner wall of the silicon sheet steels in the cylindrical structure, and is in movable fit with the inner wall of the installation base. By adopting the installation component of the permanent magnetic ring and the assembly method thereof, the permanent magnetic ring can be simply, conveniently, quickly and accurately installed on a ferromagnetic component, e.g. the permanent magnetic ring is installed on the rotor of a wind power generator.

Description

A kind of installation component of permanent magnetism ring and assembly method
Technical field
The present invention relates to a kind of specific purpose tool of magnet ring installation and the assembly method of magnetic ring member, be specifically related to a kind of installation component and assembly method of permanent magnetism ring.
Background technology
In the prior art, permanent-magnet materials is because its material itself has stronger magnetic, if while attaching it in steel and iron parts, because the suction-combining force is larger, and the most of toughness of permanent-magnet materials is poor, embrittlement easily occurs in the time being subject to impact force action even broken.In the time that being installed, permanent magnetism workpiece also easily there is in addition industrial accident.How safe, convenient, efficiently permanent magnetism workpiece is installed, the permanent magnetism workpiece of especially large molded dimension becomes those skilled in the art a technical problem to be solved.
Summary of the invention
The object of the invention is to overcome the defect existing in prior art, provide a kind of can be safe, convenient, permanent magnetism annular element is installed accurately and efficiently special tooling and special assembly method.
For achieving the above object, technical scheme of the present invention is the installation component of a kind of permanent magnetism ring of design, it is characterized in that, described assembly comprises mount pad, permanent-magnetic clamp, magnetic bearing rotor and armature spindle, described mount pad is tube-in-tube structure, one end at described sleeve is provided with ring flange, end face at described ring flange is provided with bulge loop, the interior ring of described bulge loop and the inwall of sleeve form shoulder hole structure, the interior ring of the outer shroud of described bulge loop and permanent-magnetic clamp is suitable, on described ring flange, be evenly equipped with screw, in described screw, screw in the bolt of existing nonmagnetic substance; Described magnetic bearing rotor is superimposed as tubular structure by some annular silicon steel sheets, two ends at described tubular structure silicon steel sheet are provided with pressing plate, therein the pressing plate of one end be provided with coordinate with permanent-magnetic clamp outer shroud must gram hole, the inwall interference fit of described armature spindle and tubular structure silicon steel sheet, described armature spindle moves and coordinates with the inwall of tube-in-tube structure mount pad.
For the ease of manual or clamping device, mount pad is clamped, wherein preferred technical scheme is, is provided with bulge loop or must gram hole on the outer wall of the described sleeve other end, is provided with annular knurl at described bulge loop or the appearance shop front that must gram hole.
For the ease of using, be convenient to processing further preferred technical scheme be, described permanent-magnetic clamp is circular rings, described sleeve is circular sleeve, described tubular structure is rounded cylindrical structure.
For the ease of being fastenedly connected of silicon steel sheet, further preferred technical scheme is, described some annular silicon steel sheets and pressing plate are serially connected by drift bolt.
For the ease of coordinating of armature spindle and mount pad, further preferred technical scheme is that described armature spindle is multidiameter structure.
For achieving the above object, another technical scheme of the present invention is the assembly method of a kind of permanent magnetism ring of design, it is characterized in that, described assembly method comprises:
S1: by the bolt of existing nonmagnetic substance described in claim 1, screw in several screws on the ring flange of mount pad one end, and make the nut end of bolt be positioned at cover the same side of mount pad, the end face of ring flange is stretched out in the end of bolt;
S2: the end that permanent-magnetic clamp is placed on to bolt, do to be made by ferrous materials owing to installing, between its permanent-magnetic clamp and mount pad, under the effect of magnetic force, can not come off, adjust the position of permanent-magnetic clamp, the outer shroud of the bulge loop on the interior ring of permanent-magnetic clamp and the end face of ring flange is aligned;
S3: screw out several bolts simultaneously, the outer shroud of the bulge loop on the interior ring of permanent-magnetic clamp and the end face of ring flange is worked good; Ring flange and permanent-magnetic clamp are pulled together;
S4:S4: rotor magnetic bearing is placed in electric furnace, heats under certain set temperature, and have dilation dimension after testing its endoporus heating;
S5: rotor magnetic bearing is inserted on armature spindle, and measure the surface temperature that rotor magnetic bearing top board must gram hole with thermal detector, in the time being down to 150 DEG C, at once by the permanent-magnetic clamp on mount pad by location and installation guiding mechanism by permanent-magnetic clamp pack into rotor magnetic bearing top board end must gram hole in;
S6: be cooled to after normal temperature until magnetic bearing rotor, magnetic bearing rotor and armature spindle and permanent-magnetic clamp form interference fit, then the bolt on the ring flange of mount pad is screwed in, departs from mount pad and permanent-magnetic clamp.
For the ease of processing, easy to use, preferred technical scheme is that in described S1 step, the bolt of existing nonmagnetic substance is brass bolt.
For the ease of regulating the position of permanent-magnetic clamp, can not make again it come off simultaneously, preferred technical scheme also has, and in described S1 step, to stretch out the end face distance of ring flange be 6 ~ 8mm in the end of bolt.
Install smoothly for the ease of the interference fit of armature spindle and tubular magnetic bearing rotor, preferred technical scheme also has, and the setting heating-up temperature in described S4 step is 380 DEG C.
In order to ensure that permanent-magnetic clamp has the suction-combining force entering by force, be simultaneously convenient to again processing and manufacturing, and cost is lower, preferred technical scheme also has, and the permanent-magnetic clamp in described S2 step is a kind ofly to make with samarium-cobalt material.
Advantage of the present invention and beneficial effect are: adopt installation component and the assembly method of this permanent magnetism ring, and can be easy, fast and accurately permanent-magnetic clamp is installed on ferromagnetic component.For example permanent-magnetic clamp is installed on the rotor of wind power generator.
Brief description of the drawings
Fig. 1 is mount pad and permanent-magnetic clamp Primary Location structural representation in the present invention;
Fig. 2 is the structural representation after mount pad and permanent-magnetic clamp adhesive in the present invention;
Fig. 3 is the structural representation that in the present invention, mount pad and permanent-magnetic clamp coordinate with armature spindle;
Fig. 4 is the structural representation that in the present invention, mount pad and permanent-magnetic clamp coordinate with magnetic bearing rotor and armature spindle;
Fig. 5 be in the present invention mount pad with the magnetic bearing rotor disengaged position structure chart after permanent-magnetic clamp has been installed.
Embodiment
Below in conjunction with drawings and Examples, the specific embodiment of the present invention is further described.Following examples are only for technical scheme of the present invention is more clearly described, and can not limit the scope of the invention with this.
As shown in Fig. 1 ~ 5, the present invention is a kind of installation component of permanent magnetism ring, this assembly comprises mount pad 1, permanent-magnetic clamp 2, magnetic bearing rotor 3 and armature spindle 4, mount pad 1 is tube-in-tube structure, is provided with ring flange 5 in one end of sleeve, is provided with bulge loop 6 at the end face of ring flange 5, the interior ring of bulge loop 6 and the inwall of sleeve form shoulder hole structure, the interior ring of the outer shroud of bulge loop 6 and permanent-magnetic clamp 2 is suitable, on ring flange 5, is evenly equipped with screw, screws in brass bolt 7 in screw; Magnetic bearing rotor 3 is superimposed as tubular structure by some annular silicon steel sheets, be provided with pressing plate 8 at the two ends of tubular structure silicon steel sheet, therein the pressing plate 8 of one end be provided with coordinate with the outer shroud of permanent-magnetic clamp 2 must gram hole, the inwall interference fit of armature spindle 4 and tubular structure silicon steel sheet, armature spindle 4 moves and coordinates with the inwall of tube-in-tube structure mount pad 1.
For the ease of manual or clamping device, mount pad is clamped in the present invention, wherein preferred embodiment is, is provided with bulge loop or must gram hole on the outer wall of the sleeve other end, is provided with annular knurl at bulge loop or the appearance shop front that must gram hole.
For the ease of using, being convenient to process further preferred embodiment be in the present invention, described permanent-magnetic clamp 2 is circular rings, and described sleeve is circular sleeve, and described tubular structure is rounded cylindrical structure.
In the present invention for the ease of being fastenedly connected of silicon steel sheet, further preferred embodiment is, described some annular silicon steel sheets and pressing plate are serially connected by drift bolt.
For the ease of the coordinating of armature spindle and mount pad, further preferred technical scheme is that described armature spindle 4 is multidiameter structure in the present invention.
For achieving the above object, another embodiment of the invention is the assembly method of a kind of permanent magnetism ring of design, and described assembly method comprises:
The first step: by the brass bolt in the installation component of permanent magnetism ring, screw in several screws on mount pad 1 one end ring flange 5, and make the nut end of bolt 7 be positioned at cover the same side of mount pad 1, the end face of ring flange 5 is stretched out in the end of bolt 7;
Second step: the end that permanent-magnetic clamp 1 is placed on to bolt 7, do to be made by ferrous materials owing to installing, between its permanent-magnetic clamp 2 and mount pad 1, under the effect of magnetic force, can not come off, adjust the position of permanent-magnetic clamp 2, the outer shroud of the bulge loop 6 on the interior ring of permanent-magnetic clamp 2 and the end face of ring flange 5 is aligned;
The 3rd step: screw out several bolts 7 simultaneously, the outer shroud of the bulge loop 6 on the interior ring of permanent-magnetic clamp 2 and the end face of ring flange 5 is worked good; Ring flange 5 and permanent-magnetic clamp 2 are pulled together;
The 4th step: rotor magnetic bearing is placed in electric furnace, heats under certain set temperature, and have dilation dimension after testing its endoporus heating;
The 5th step: rotor magnetic bearing is inserted on armature spindle, and measure the surface temperature that rotor magnetic bearing top board must gram hole with thermal detector, in the time being down to 150 DEG C, at once by the permanent-magnetic clamp on mount pad by location and installation guiding mechanism by permanent-magnetic clamp pack into rotor magnetic bearing top board end must gram hole in;
The 6th step: be cooled to after normal temperature until magnetic bearing rotor 3, magnetic bearing rotor 3 forms interference fit with armature spindle 4 and permanent-magnetic clamp 2, then the bolt on the ring flange of mount pad 157 is screwed in, and mount pad 1 and permanent-magnetic clamp 2 are departed from.
For the ease of regulating the position of permanent-magnetic clamp 2, can not make again it come off in the present invention, preferred embodiment also has simultaneously, and in the described first step, to stretch out the end face distance of ring flange 5 be 6 ~ 8mm in the end of bolt 7.
Install smoothly for the ease of armature spindle 4 and the interference fit of tubular magnetic bearing rotor 3 in the present invention, preferred embodiment also has, and the setting heating-up temperature in described the 4th step is 380 DEG C.
In the present invention in order to ensure that permanent-magnetic clamp has the suction-combining force entering by force, be convenient to again processing and manufacturing, and cost is lower simultaneously, preferred technical scheme also has, and the permanent-magnetic clamp 2 in described second step is a kind ofly to make with samarium-cobalt material.
Embodiment 1
Mount pad 1 can be formed by 20 steel processing and fabricatings, on the end face of ring flange 5 that is provided with boss, there is the screw of 4 M10, boss is that the external diameter of φ 60 × 3 coordinates with the Internal hole positioning of permanent-magnetic clamp 2, can be used as the use of the location of permanent-magnetic clamp on mount pad, endoporus φ 4 is coaxial with boss external diameter φ 60 simultaneously, 40 sections of matched in clearance of φ with armature spindle 4, the other end external diameter of mount pad 1 is equivalent to a handle, rear end protruding also or must gram bore portion be while preventing manual operations, to be subject to the impact of strong magnetic force and landing, permanent-magnetic clamp 2 and magnetic bearing rotor 3 clashed into mutually and damage permanent-magnetic clamp.
Copper bolt 7 is used for adjusting the secure localization of permanent-magnetic clamp 2 and mount pad 1, and can effectively make permanent-magnetic clamp 2 separate with mount pad 1.
Permanent-magnetic clamp 2 is a kind ofly to make with samarium-cobalt material, has very strong magnetic after magnetizing.
Magnetic bearing rotor 3 is to be formed by stacking by many silicon steel sheets and two end clamp plates 8, coordinates by the large magnitude of interference with armature spindle 4, needs shrink-on just can complete.
Armature spindle 4 is high-speed rotating shafts of flywheel energy storage wind-driven generator Flywheel, and its material is non-magnetic stainless steel.
Its installation steps are:
The first step faces up the locating flange dish 5 on mount pad 1, handle end can be fixed on bench vice, the copper bolt 7 flange surface 6 ~ 8mm that back-outs, hand-held permanent-magnetic clamp 2 moves to copper bolt 7 from top by permanent-magnetic clamp, feel has obvious magneticaction, manually adjust, make the positioning convex ring φ 60 on the basic alignment flange dish of its endoporus, as shown in Figure 1.
Four copper bolts 7 are synchronously adjusted downwards, can suitably manually be adjusted the aligned position of permanent-magnetic clamp 2 holes and bulge loop simultaneously, until permanent-magnetic clamp and bulge loop and flange surface are located adhesive completely, as shown in Figure 2 for second.
The 3rd step is because the cooperation in permanent-magnetic clamp 2 and magnetic bearing rotor 3 holes is interference fit, and the waste heat while utilizing magnetic bearing rotor 3 with armature spindle 4 hot jacket, gets ready in advance, in the time of 150 DEG C, permanent-magnetic clamp 2 hot jackets is packed in the hole of magnetic bearing rotor 3, as shown in Figure 3,4.
The 4th step is after lowering the temperature, permanent-magnetic clamp 2 is clamped by magnetic bearing rotor 3, if at this moment directly mount pad 1 upwards generally cannot be removed, because permanent-magnetic clamp 2 can be very large with the suction-combining force of 5, mount pad ring flange, only have with 4 copper bolts 7 stubborn downwards, allow permanent-magnetic clamp 2 and the flange surface of mount pad 1 have the distance of 6 ~ 8mm, now can like a cork mount pad 1 be removed between permanent-magnetic clamp 2 and armature spindle 4, as shown in Figure 5.
The feature of this assembly method is
If do not use mount pad 1, that uncontrollable its magnet ring 2 arrives correct installation site by hand grip, and because magnetic force is excessive, probably cause permanent-magnetic clamp 2 and magnetic bearing rotor 3 to clash into, cause permanent-magnetic clamp 2 breakages and scrap, be difficult to for the moment damaged magnet ring to push aside, owing to utilizing the time-out of waste heat, hot jacket method is counted out.And adopt mount pad 1 to carry out hot jacket installation to permanent-magnetic clamp 2, avoid the generation of above situation completely.
Because permanent-magnetic clamp 2 is interference fit with magnetic bearing rotor 3, must be within the extremely short time, in the time of 150 DEG C of suitable temperature, just can carry out hot jacket, grab operation if utilize hand, grab operation and center not in placely due to the effect hand of magnetic force, often lose operable time, or permanent-magnetic clamp 2 enters half just by locking, and can only scrap magnet ring, sometimes also can cause burning and crushing of hand.And adopt mount pad 1 to carry out hot jacket installation to permanent-magnetic clamp, owing to permanent-magnetic clamp 2 being pull-in on mount pad 1 before magnetic bearing rotor 3 and armature spindle 4 hot jackets, get ready in advance, in the time waiting for 150 DEG C of suitable temperature, can immediately permanent-magnetic clamp 2 be in place, its reason is to have positioning and guiding, the handle of mount pad 1 other end only need be controlled the downward speed of magnet ring and effectively overcome downward magnetic force, concrete operations facts have proved, utilize mount pad 1 to install permanent-magnetic clamp 2, convenient, reliable, safety, be successfully completed rate 100%.
This is a kind of assembly method of plane magnet ring, if the installation of anchor ring magnet ring can have been gone by the method too, only plane boss location need be made into arc surface location; If large-scale magnet ring is installed, its location and installation principle is all identical, and just magnet ring substitutes manually to advance to install with hydraulic damping propulsive mechanism when mounted and realizes.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, do not departing under the prerequisite of the technology of the present invention principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (10)

1. the installation component of a permanent magnetism ring, it is characterized in that, described assembly comprises mount pad, permanent-magnetic clamp, magnetic bearing rotor and armature spindle, described mount pad is tube-in-tube structure, is provided with ring flange in one end of described sleeve, is provided with bulge loop at the end face of described ring flange, the interior ring of described bulge loop and the inwall of sleeve form shoulder hole structure, the interior ring of the outer shroud of described bulge loop and permanent-magnetic clamp is suitable, on described ring flange, is evenly equipped with screw, screws in the bolt of existing nonmagnetic substance in described screw; Described magnetic bearing rotor is superimposed as tubular structure by some annular silicon steel sheets, two ends at described tubular structure silicon steel sheet are provided with pressing plate, therein the pressing plate of one end be provided with coordinate with permanent-magnetic clamp outer shroud must gram hole, the inwall interference fit of described armature spindle and tubular structure silicon steel sheet, described armature spindle moves and coordinates with the inwall of tube-in-tube structure mount pad.
2. the installation component of permanent magnetism ring as described in claim l, is characterized in that, is provided with bulge loop or must gram hole on the outer wall of the described sleeve other end, is provided with annular knurl at described bulge loop or the appearance shop front that must gram hole.
3. the installation component of permanent magnetism ring as claimed in claim 2, is characterized in that, described permanent-magnetic clamp is circular rings, and described sleeve is circular sleeve, and described tubular structure is rounded cylindrical structure.
4. the installation component of permanent magnetism ring as claimed in claim 3, is characterized in that, described some annular silicon steel sheets and pressing plate are serially connected by drift bolt.
5. the installation component of permanent magnetism ring as claimed in claim 4, is characterized in that, described armature spindle is multidiameter structure.
6. an assembly method for permanent magnetism ring, is characterized in that, described assembly method comprises:
S1: by the bolt of existing nonmagnetic substance described in claim 1, screw in several screws on the ring flange of mount pad one end, and the nut end of bolt is screwed in to sleeve one side of mount pad, the end face of ring flange is stretched out in the end of bolt;
S2: the end that permanent-magnetic clamp is placed on to bolt, because mount pad is made up of ferrous materials, make under the effect of magnetic force, can not come off between permanent-magnetic clamp and mount pad, adjust the position of permanent-magnetic clamp, the outer shroud of the bulge loop on the interior ring of permanent-magnetic clamp and the end face of ring flange is aligned;
S3: screw out several bolts simultaneously, the outer shroud of the bulge loop on the interior ring of permanent-magnetic clamp and the end face of ring flange is worked good; Ring flange and permanent-magnetic clamp are pulled together;
S4: magnetic bearing rotor is placed in electric furnace, heats under certain set temperature, and have dilation dimension after testing its endoporus heating;
S5: magnetic bearing rotor is inserted on armature spindle, and measure the surface temperature that magnetic bearing rotor top board must gram hole with thermal detector, in the time being down to 150 DEG C, at once by the permanent-magnetic clamp on mount pad by location and installation guiding mechanism by permanent-magnetic clamp pack into magnetic bearing rotor top board end must gram hole in;
S6: be cooled to after normal temperature until magnetic bearing rotor, magnetic bearing rotor and armature spindle and permanent-magnetic clamp form interference fit, then the bolt on the ring flange of mount pad is screwed in, departs from mount pad and permanent-magnetic clamp.
7. the assembly method of permanent magnetism ring as claimed in claim 6, is characterized in that, in described S1 step, the bolt of existing nonmagnetic substance is brass bolt.
8. the assembly method of permanent magnetism ring as claimed in claim 6, is characterized in that, in described S1 step, to stretch out the end face distance of ring flange be 6 ~ 8mm in the end of bolt.
9. the assembly method of permanent magnetism ring as claimed in claim 6, is characterized in that, the heating-up temperature in described S4 step is 380 DEG C.
10. the assembly method of permanent magnetism ring as claimed in claim 6, is characterized in that, the permanent-magnetic clamp in described S2 step is a kind ofly to make with samarium-cobalt material.
CN201210268181.7A 2012-07-30 2012-07-30 Installation component of permanent magnetic ring and assembly method thereof Active CN102882329B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210268181.7A CN102882329B (en) 2012-07-30 2012-07-30 Installation component of permanent magnetic ring and assembly method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210268181.7A CN102882329B (en) 2012-07-30 2012-07-30 Installation component of permanent magnetic ring and assembly method thereof

Publications (2)

Publication Number Publication Date
CN102882329A CN102882329A (en) 2013-01-16
CN102882329B true CN102882329B (en) 2014-11-05

Family

ID=47483540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210268181.7A Active CN102882329B (en) 2012-07-30 2012-07-30 Installation component of permanent magnetic ring and assembly method thereof

Country Status (1)

Country Link
CN (1) CN102882329B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103836031B (en) * 2014-03-03 2016-01-27 哈尔滨工业大学 Annular permanent magnet assemble mechanism
CN105090229A (en) * 2015-08-12 2015-11-25 上海大学 External rotor electric machine and rotary shaft thereof
CN107834725B (en) * 2017-12-04 2023-10-20 南京磁谷科技有限公司 Mounting structure and mounting method of silicon steel sheet on magnetic suspension rotor

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2702514Y (en) * 2004-03-12 2005-05-25 浙江华辰电器股份有限公司 Rotor for motor
CN101867238A (en) * 2010-06-28 2010-10-20 吉林省埃尔顿电气有限公司 Integral permanent magnet ring embedding self-location permanent magnet structure
CN101961855A (en) * 2010-08-16 2011-02-02 河南理工大学 Clamp for assembling annular extruding permanent magnet magnetic system and assembly method thereof
CN202737685U (en) * 2012-07-30 2013-02-13 江阴市振江钢结构有限公司 Installation assembly of permanent magnetic ring

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3132142B2 (en) * 1992-05-11 2001-02-05 松下電器産業株式会社 Method of assembling magnetic disk drive

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2702514Y (en) * 2004-03-12 2005-05-25 浙江华辰电器股份有限公司 Rotor for motor
CN101867238A (en) * 2010-06-28 2010-10-20 吉林省埃尔顿电气有限公司 Integral permanent magnet ring embedding self-location permanent magnet structure
CN101961855A (en) * 2010-08-16 2011-02-02 河南理工大学 Clamp for assembling annular extruding permanent magnet magnetic system and assembly method thereof
CN202737685U (en) * 2012-07-30 2013-02-13 江阴市振江钢结构有限公司 Installation assembly of permanent magnetic ring

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开平5-316708A 1993.11.26 *

Also Published As

Publication number Publication date
CN102882329A (en) 2013-01-16

Similar Documents

Publication Publication Date Title
CN102882329B (en) Installation component of permanent magnetic ring and assembly method thereof
CN104175144B (en) Axle type gear fixture and axle type gear machining tool
CN202737685U (en) Installation assembly of permanent magnetic ring
CN102069344A (en) Variable-diameter bearing inner ring induction replacer
CN102101248A (en) Clamping method and clamping device for irregular non-metal workpiece
CN201157922Y (en) Apparatus for processing Nd-Fe-B big ring-shaped material
CN201970119U (en) Clamping device for irregular non-metal workpiece
CN201744835U (en) Dismounting device for close fit workpieces
CN206795307U (en) A kind of connecting rod processing clamp
CN201997903U (en) Large-sized sheet metal workpiece welding tilting device
CN102310252B (en) Welding gun
CN203409545U (en) Numerically-controlled boring machine
CN204195350U (en) For the centrifugal stationary fixture of turning
CN205590748U (en) Circular grinding apparatus quenches and uses anchor clamps
CN202592253U (en) Reparation assist device for ship hanging codes
CN208051807U (en) A kind of tools for pulling pin
CN105502155A (en) Hot-jacket large-scale bearing clamping tool
CN204397440U (en) The centrifugal vehicle clamper of cover board hole
CN203650246U (en) Inner bore fixture of grinding machine for processing power steering screw
CN204792287U (en) Multi -functional demagnetizer
CN204550648U (en) Arc furnace electrode fishing device
CN205183811U (en) Centre frame aligning device for lathe
CN202607521U (en) Square permanent magnet for bench worker
CN220856252U (en) Frock clamp for magnetizing magnetic workpiece
CN202318066U (en) Magnetic picking device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: JIANGSU ZHENJIANG NEW ENERGY EUQIPMENT CO., LTD.

Free format text: FORMER NAME: JIANGYIN ZHENJIANG STEEL STRUCTURE CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 214400 Jiangsu city of Wuxi Province Li Town Industrial Park of Jiangyin City Chengxi River Road No. 28

Patentee after: Jiangsu Zhenjiang New Energy Euqipment Co., Ltd.

Address before: 214400 Jiangsu city of Wuxi Province Li Town Industrial Park of Jiangyin City Chengxi River Road No. 28

Patentee before: Jiangyin Zhenjiang Steel Structure Co., Ltd.