CN102881440B CN201210416272.0A CN201210416272A CN102881440B CN 102881440 B CN102881440 B CN 102881440B CN 201210416272 A CN201210416272 A CN 201210416272A CN 102881440 B CN102881440 B CN 102881440B
Authority
CN
China
Prior art keywords
fixed
outgoing line
fixing
transformer bushing
installation frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210416272.0A
Other languages
English (en)
Other versions
CN102881440A (zh
Inventor
段伦峰
李鹏
方圆
程鹏
张孝利
葛华
亓立红
李娜
王玥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210416272.0A priority Critical patent/CN102881440B/zh
Publication of CN102881440A publication Critical patent/CN102881440A/zh
Application granted granted Critical
Publication of CN102881440B publication Critical patent/CN102881440B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了变压器套管出线安装架,包括固定圆盘、牵引绳和出线固定头,牵引绳的前端部固定上出线固定头,固定圆盘的中部设有穿绳孔,其特征在于:在固定圆盘上通过轴承固定设有定滑轮,牵引绳的前端部绕过定滑轮,穿入穿绳孔内,在固定圆盘的周边沿上对称固定上三个铰座,每个铰座上通过销轴固定上固定连杆,在固定连杆的下端固定上定位板,定位板的中部设有弧形滑槽,所述的定位板的形状为三分之一圆环。该变压器套管出线安装架,结构简单、成本低廉、安装容易,在安装变压器套管的过程中,避免了损伤绕组引线,同时缩短了安装时间,提高了检修效率。

Description

变压器套管出线安装架
技术领域
本发明涉及一种变压器套管出线安装时用的辅助工具,具体地说是一种变压器套管出线安装架,以利于在安装过程中保持套管引线和瓷套的水平,起到缩短套管安装时间和防止引线损伤的作用。
背景技术
在变压器的安装过程中,变压器套管安装是比较重要的环节,因为变压器绝缘套管将内部的高低压绕组的出线头引到油箱外部,起到对地绝缘和使引线与外电路相连接的作用,因此,绝缘套管必须具有规定的电器强度和机械强度,同时套管中间的导电体也是载流原件,运行中长期通过负载电流,因此必须具有良好的热稳定性,还需要能承受短路时的瞬间过热。在变压器套管安装过程中,传统的方式是用牵引绳一端系住绕组出线,在套管就位的时候通过拉拽把绕组出线头拉出,由于220kV变压器的高低压侧套管以45度左右倾斜安装在油箱上,造成拉拽的过程中绕组出线和套管内壁摩擦,如果套管就位角度出现偏差,极易造成绕组引线的损伤,给日后运行埋下重大安全隐患。
发明内容
本发明的目的在于提供一种结构简单、成本低廉、操作简便,可以避免安装套管过程中损伤出线的变压器套管出线安装架。
在拉拽绕组出线时,通过使出线和套管的位置相对固定,避免安装套管过程中损伤出线。
为了达到以上目的,本发明所采用的技术方案是:该变压器套管出线安装架,包括固定圆盘、牵引绳和出线固定头,牵引绳的前端部固定上出线固定头,固定圆盘的中部设有穿绳孔,其特征在于:在固定圆盘上通过轴承固定设有定滑轮,牵引绳的前端部绕过定滑轮,穿入穿绳孔内,在固定圆盘的周边沿上均匀分布固定三个铰座,每个铰座上通过销轴固定上固定连杆,在固定连杆的下端固定上定位板,定位板的中部设有弧形滑槽,所述的定位板的形状为三分之一圆环。
所述的定滑轮上设有挡板。
本发明的有益效果在于:结构简单、成本低廉、安装容易,在安装变压器套管的过程中,避免了损伤绕组引线,同时缩短了安装时间,提高了检修效率。
附图说明
图1为本发明的结构主视示意图;
图中:1、固定圆盘;2、穿绳孔;3、定滑轮;4、铰座;5、固定连杆;6、定位板;7、弧形滑槽;8、牵引绳;9、出线固定头;10、挡板。
具体实施方式
参照附图1制作本发明。该变压器套管出线安装架,包括固定圆盘1、牵引绳8和出线固定头9,牵引绳8的前端部固定上出线固定头9,固定圆盘1的中部设有穿绳孔2,其特征在于:在固定圆盘1上通过轴承固定设有定滑轮3,牵引绳8的前端部绕过定滑轮3,穿入穿绳孔2内,在固定圆盘1的周边沿上均匀分布固定三个铰座4,每个铰座4上通过销轴固定上固定连杆5,在固定连杆5的下端固定上定位板6,定位板6的中部设有弧形滑槽7,所述的定位板6的形状为三分之一圆环,这样可以通过三个定位板6拼成一个整的圆环,牵引绳8前端的出线固定头9可以穿过由三个定位板6组成的圆环的中部通孔。
所述的定滑轮3上设有挡板10,以防止牵引绳8从定滑轮3的槽中脱出。
在使用本发明时,用螺栓穿过3个弧形滑槽7将定位板6固定在变压器套管的顶部,绕组出线头固定在牵引绳8前端的出线固定头9上,牵引绳8绕过定滑轮3,牵引绳8的外端由作业人员拉住,套管吊装开始后,作业人员通过拉拽牵引绳8将绕组出线头穿过套管往外拉,由于本发明和套管相对固定,可保证在拉拽过程中绕组出线头一直保持在套管的中间位置,避免和套管壁发生摩擦和挤压,从而保护了绕组出线免受损伤。

Claims (2)

1.变压器套管出线安装架,包括固定圆盘(1)、牵引绳(8)和出线固定头(9),牵引绳(8)的前端部固定上出线固定头(9),固定圆盘(1)的中部设有穿绳孔(2),其特征在于:在固定圆盘(1)上通过轴承固定设有定滑轮(3),牵引绳(8)的前端部绕过定滑轮(3),穿入穿绳孔(2)内,在固定圆盘(1)的周边沿上均匀分布固定三个铰座(4),每个铰座(4)上通过销轴固定上固定连杆(5),在固定连杆(5)的下端固定上定位板(6),定位板(6)的中部设有弧形滑槽(7),所述的定位板(6)的形状为三分之一圆环。
2.根据权利要求1所述的变压器套管出线安装架,其特征在于:所述的定滑轮(3)上设有挡板(10)。
CN201210416272.0A 2012-10-26 2012-10-26 变压器套管出线安装架 Active CN102881440B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210416272.0A CN102881440B (zh) 2012-10-26 2012-10-26 变压器套管出线安装架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210416272.0A CN102881440B (zh) 2012-10-26 2012-10-26 变压器套管出线安装架

Publications (2)

Publication Number Publication Date
CN102881440A CN102881440A (zh) 2013-01-16
CN102881440B true CN102881440B (zh) 2014-06-25

Family

ID=47482732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210416272.0A Active CN102881440B (zh) 2012-10-26 2012-10-26 变压器套管出线安装架

Country Status (1)

Country Link
CN (1) CN102881440B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103325560A (zh) * 2013-07-23 2013-09-25 国家电网公司 变压器套管穿引线专用工具
KR101947298B1 (ko) * 2014-11-13 2019-02-12 하얼빈 엔지니어링 유니버시티 복합 자기회로 이중 영구자석 전자석 및 복합 자기회로 이중 영구자석 고속전자밸브
CN106548860A (zh) * 2015-09-21 2017-03-29 王明强 变压器套管引线辅助牵引工具
CN108002271B (zh) * 2017-11-20 2023-11-10 山东泰开高压开关有限公司 一种sf6电器设备扣罩用车以及扣罩方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100890660B1 (ko) * 2008-07-07 2009-03-26 이건식 지상변압기 엘보 접속보강 클램프
CN201489967U (zh) * 2009-09-11 2010-05-26 河南省电力公司平顶山供电公司 变压器高压绕组套管抽头引出导向装置
CN202042338U (zh) * 2011-01-04 2011-11-16 保定天威集团有限公司 一种变压器油-油套管电缆头引线固定结构
CN202134354U (zh) * 2011-06-30 2012-02-01 中国西电电气股份有限公司 一种高压变压器套管升高座内的引线夹持装置
CN202905452U (zh) * 2012-10-26 2013-04-24 山东电力集团公司莱芜供电公司 变压器套管出线安装架

Also Published As

Publication number Publication date
CN102881440A (zh) 2013-01-16

Similar Documents

Publication Publication Date Title
CN102881440B (zh) 变压器套管出线安装架
RU2016128578A (ru) Способ управления группой гидроэлектрических турбин
CN102403674B (zh) 一种带电作业绝缘横担
CN202905452U (zh) 变压器套管出线安装架
CN204333317U (zh) 绝缘验电接地环
CN103681142B (zh) 一种令克绝缘隔板
CN203859248U (zh) 架空线路检修用短路接地装置
CN202260340U (zh) 配电网架空线路绝缘塔头吊装工具
CN210042257U (zh) 水电站热套式推力头加热装置
CN201398034Y (zh) 一种验电接地装置
CN203456188U (zh) 农网35kV配电化线路用复合横担绝缘子
CN203377426U (zh) 一种防爆插销
CN203339607U (zh) 封闭母线与变压器接线端子连接出线箱
CN202308978U (zh) 带电作业绝缘横担
CN203175138U (zh) 高压电线杆
US20150084439A1 (en) Shorting assembly and method for wind turbine power supply
CN105449612A (zh) 一种导线绝缘支撑板装置
CN203674671U (zh) 基于避雷线及避雷线支架的10kV架空绝缘线路
CN202758768U (zh) 一种隔离开关触头凡士林添加器
CN205081393U (zh) 带电绝缘子串提升器
CN220421389U (zh) 电力设施用的镀铜铁附件
CN203465992U (zh) 可卸式避雷器绝缘护套
CN209723806U (zh) 一种配电网检修用接电杆
CN202564901U (zh) 快速组装绝缘型放线及支撑架
CN104638596A (zh) 封闭母线与变压器接线端子连接出线箱结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model