CN102878980B - 一种地铁隧道施工诱发地下管线沉降的间接测试方法 - Google Patents
一种地铁隧道施工诱发地下管线沉降的间接测试方法 Download PDFInfo
- Publication number
- CN102878980B CN102878980B CN201210350873.6A CN201210350873A CN102878980B CN 102878980 B CN102878980 B CN 102878980B CN 201210350873 A CN201210350873 A CN 201210350873A CN 102878980 B CN102878980 B CN 102878980B
- Authority
- CN
- China
- Prior art keywords
- sedimentation
- settlement
- underground utilities
- monitoring point
- monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
一种地铁隧道施工诱发地下管线沉降的间接测试方法,属于地下工程技术领域。步骤为:选择位于地铁隧道施工影响范围内的地下管线作为沉降监测对象;选定具备挖开上覆土条件的区域直接布设地下管线沉降主监测点,并在该地下管线沉降主监测点垂直对应地面上布设地表沉降主监测点;同步监测地下管线沉降主监测点和地表沉降主监测点的沉降值;将同一时刻监测得到的地表沉降值和地下管线沉降值分别作为横、纵坐标标绘制地下管线沉降和地表沉降换算关系曲线;依据该曲线,即可在此地下管线无法直接进行沉降监测的部位,通过监测该部位正上方对应地表点沉降值来推算地下管线沉降值。适用于仅在局部区域具备直接监测条件的地下管线沉降测试。
Description
技术领域
本发明涉及一种地铁隧道施工诱发地下管线沉降的间接测试方法,属于地下工程技术领域。
背景技术
地铁线路一般结合城市道路网和客流流向情况沿城市主干道方向布设,不可避免的会经过城市市中心区。而城市中心区地铁线路一般为地下线路,且地下管线密布,因此,修建地铁隧道时将面临邻近既有地下管线施工的问题。
由于地铁隧道工程开挖扰动会导致周围地层沉降,进而导致地层中埋设的各种地下管线也会发生相应沉降,严重者会影响到地下管线的正常使用甚至造成重大灾难性结果。如因沉降过大造成煤气泄露、爆炸、水管爆裂形成水患,电缆断裂造成停电或通讯中断的情况。因此,在地铁隧道施工过程中,采用有效方法对受施工影响的地下管线进行可靠的沉降监测,对地下管线的安全控制至关重要。
地下管线一般埋于地下一定深度内,要直接对它进行沉降监测必须将上覆土挖开,在人员和交通密集的繁华城区,对环境和交通影响较大,甚至根本就不具备直接监测的条件。因此,地下管线沉降监测就显得异常困难。在实际监测中为方便起见往往把地下管线沉降监测点直接布设在地表,用地表沉降代替地下管线沉降,如此测到的是地下管线上方对应的地表沉降而非地下管线沉降,因无法准确掌握地下管线的真实沉降,在地铁隧道施工期间很难对地下管线的安全性做出科学合理的评价。因此,选择一种简便有效的地下管线沉降监测方法是非常必要的。
地铁隧道一般为浅埋隧道,浅埋隧道开挖后地层中的应力扰动区延伸至地表,围岩力学性态的变化在很大程度上反映于地表沉降,地表沉降不但可以反映隧道开挖过程中地下管线沉降的全过程,而且地表沉降和地下管线沉降间具有一定对应关系。本发明试图利用地表沉降和地下管线沉降间的对应关系,通过地表沉降监测间接测试地下管线沉降。
发明内容
本发明的目的是通过以下技术方案实现的。
地铁隧道施工诱发地下管线沉降的间接测试方法包括以下5个步骤:
步骤1:选取待测地下管线,选择位于地铁隧道施工影响范围内且需要进行沉降监测的地下管线作为沉降监测对象;
步骤2:确定主监测区域,在被监测地下管线上选择具备挖开上覆土条件的区域作为主监测区域,在主监测区域内将地下管线上覆土挖开以暴露管线,采用抱箍的方法布设地下管线沉降主监测点以直接监测管线沉降,再将上覆土恢复原状,并在该地下管线沉降主监测点垂直对应的地面上布设地表沉降主监测点作为对比沉降监测点;
步骤3:地下管线沉降主监测点和地表沉降主监测点沉降数值同步采集,当地铁隧道开挖面距地下管线沉降主监测点等于30m时开始同时监测地下管线沉降主监测点和地表沉降主监测点的沉降值,根据沉降变化情况确定监测频率,并根据该频率进行沉降数据同步采集;
步骤4:绘制地下管线沉降和地表沉降的换算关系曲线,以地表沉降值为横轴、地下管线沉降值为纵轴绘制平面直角坐标系,将同一时刻监测得到的地表沉降主监测点的沉降值和地下管线沉降主监测点的沉降值分别作为横、纵坐标在平面直角坐标系中标记出点位,随着监测次数的增加将标记出多个点位,各点位间用直线连接形成地下管线沉降和地表沉降的换算关系曲线;
步骤5:不具备直接监测条件区域的地下管线沉降间接测试,依据步骤4得到的地下管线沉降和地表沉降换算关系曲线所反映的地下管线点及其正上方地表点之间的沉降对应关系,即可在此管线无法直接进行沉降监测的部位,通过监测该管线正上方地表点沉降值来推算管线的沉降值。
本发明的有益效果是:
(1)适用于受地铁隧道施工影响显著、且仅在局部区域具备直接进行沉降监测条件的地下管线;
(2)通过间接测试获取地下管线沉降值,避免了地下管线沉降直接测试方法需挖开管线上覆土的弊端;
(3)相对于直接用地表沉降代替地下管线沉降的方法,本方法更具科学性,可基本准确的测试出地下管线沉降值,因此在地铁隧道施工期间能够更加可靠地评价管线的安全状态。
附图说明
图1为本发明某地铁区间隧道下穿天然气地下管线剖面图;
图2为本发明地表沉降与地下管线沉降间换算关系曲线;
图3为采用本发明方法得到的天然气地下管线的沉降历时曲线。
图中:地下管线1;地铁区间隧道2;地铁隧道开挖面3;地表沉降主监测点4;地下管线沉降主监测点5;地表沉降监测点6;地下管线沉降监测点7。
具体实施方式
下面结合附图和具体实施例对本发明作进一步说明。
某地铁区间标准断面隧道下穿一条天然气地下管线,该地下管线位于隧道拱顶正上方且与隧道平行,隧道拱顶上覆地层厚度8.6m,为浅埋隧道。隧道结构与地下管线间夹层土体厚度4.6m,地下管线为钢管,壁厚14.3mm,外径1016mm,接口采用焊接方式,隧道与地下管线位置关系剖面图见图1。为了保证地铁隧道下穿施工期间该地下管线安全,采用了本发明中的地铁隧道施工诱发地下管线沉降的间接测试方法。
步骤1:选取待测地下管线,如图1所示,由于该天然气地下管线位于地铁区间隧道正上方且二者间距较近,地铁区间隧道施工必然会引起地下管线沉降且沉降显著,因此选择该天然气地下管线作为沉降监测对象;
步骤2:确定主监测区域,如图1所示,区域A具备直接开挖暴露地下管线的条件,因此将其作为主监测区域并将该区域内上覆土层挖开,采用抱箍的方法布设地下管线沉降主监测点5以直接监测地下管线沉降,再将上覆土恢复原状,并在地下管线沉降主监测点5垂直对应的地面上布设地表沉降主监测点4作为对比沉降监测点,地下管线沉降主监测点5采用抱箍的方法直接布设在管线上,通过固定在管线上的圆环将测杆与管线连接成整体,测杆伸至地面,并做好套筒及加盖保护装置,地表沉降监测点采用Φ20的钢筋,通过钻机成孔揭露至原状土内,将钢筋植入孔内,并于底部浇筑混凝土与原位土体接触,在顶部位置做好套筒及加盖保护装置;
步骤3:地下管线沉降主监测点5和地表沉降主监测点4沉降值的同步采集,当地铁隧道开挖面3距地下管线沉降主监测点5等于30m时开始同时监测地下管线沉降主监测点5和地表沉降主监测点4的沉降值,根据沉降变化情况确定监测频率,本实施例的监测频率为每天1次;
步骤4:地下管线沉降和地表沉降的换算关系曲线,如图2所示,以地表沉降值为横轴、地下管线沉降值为纵轴绘制平面直角坐标系,将同一时刻监测得到的地表沉降主监测点4的沉降值和地下管线沉降主监测点5的沉降值分别作为横、纵坐标在平面直角坐标系中标记出点位,随着监测次数的增加将标记出多个点位,各点位间用直线连接形成地下管线沉降和地表沉降的换算关系曲线;
步骤5:不具备进行直接监测条件的地下管线沉降间接测试,如图1所示,除区域A外,地下管线其他部位不具备直接挖开上覆土直接进行管线沉降监测的条件,可在需监测沉降的地下管线部位(如地下管线沉降监测点7)正上方地面对应布设地表沉降监测点(如地表沉降监测点6),通过监测地表沉降监测点6的沉降值并绘制该点的沉降历时曲线,再利用图2的地下管线沉降和地表沉降的换算关系曲线,即可推算出地下管线沉降监测点7的沉降历时曲线,如图3所示。
Claims (1)
1.一种地铁隧道施工诱发地下管线沉降的针对一条管线的间接测试方法,其特征在于,该方法包括以下步骤:
步骤1:选取待测地下管线
选择位于地铁隧道施工影响范围内且需要进行沉降监测的地下管线作为沉降监测对象;
步骤2:布设沉降主监测点
在被监测地下管线上选择具备挖开上覆土条件的区域内,将地下管线上覆土挖开以暴露管线,采用抱箍的方法布设地下管线沉降主监测点以直接监测地下管线沉降,再将上覆土恢复原状,并在地下管线沉降主监测点垂直对应的地面上布设地表沉降主监测点作为对比沉降监测点;
步骤3:沉降值同步采集
当地铁隧道开挖面距地下管线沉降主监测点等于30m时,开始同时监测地下管线沉降主监测点和地表沉降主监测点的沉降值;
步骤4:绘制地下管线沉降和地表沉降的换算关系曲线
以地表沉降值为横轴、地下管线沉降值为纵轴绘制平面直角坐标系,将同一时刻监测得到的地表沉降主监测点的沉降值和地下管线沉降主监测点的沉降值分别作为横、纵坐标,随着监测次数的增加在平面直角坐标系中标记出一系列点位,各点位间用直线连接形成地下管线沉降和地表沉降的换算关系曲线;
步骤5:不具备直接监测条件区域的地下管线沉降间接测试
依据步骤4得到的地下管线沉降和地表沉降换算关系曲线所反映的地下管线点及其正上方地表点之间的沉降对应关系,即可在此管线无法直接进行沉降监测的部位,通过监测该管线正上方地表点沉降值来推算管线的沉降值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210350873.6A CN102878980B (zh) | 2012-09-19 | 2012-09-19 | 一种地铁隧道施工诱发地下管线沉降的间接测试方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210350873.6A CN102878980B (zh) | 2012-09-19 | 2012-09-19 | 一种地铁隧道施工诱发地下管线沉降的间接测试方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102878980A CN102878980A (zh) | 2013-01-16 |
CN102878980B true CN102878980B (zh) | 2014-11-05 |
Family
ID=47480402
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210350873.6A Active CN102878980B (zh) | 2012-09-19 | 2012-09-19 | 一种地铁隧道施工诱发地下管线沉降的间接测试方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102878980B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103557826B (zh) * | 2013-11-15 | 2016-08-17 | 中交天航港湾建设工程有限公司 | 一种基于浅海吹填区海底管线的监测方法 |
CN107702688A (zh) * | 2017-09-28 | 2018-02-16 | 宁波工程学院 | 一种用于管线沉降观测点的埋设装置 |
CN108020204B (zh) * | 2017-12-15 | 2022-06-14 | 山东大学 | 一种基于曲线拟合的地表监控量测方法 |
CN110593883B (zh) * | 2019-09-27 | 2021-04-06 | 上海建工集团股份有限公司 | 一种间接评估盾构掘进下既有管线安全性态的方法 |
CN112069225A (zh) * | 2020-07-31 | 2020-12-11 | 武汉轻工大学 | 一种地铁施工多源异类监测数据相关关系的数据挖掘方法 |
CN112747715A (zh) * | 2020-12-29 | 2021-05-04 | 淮安市中球盾构技术服务有限公司 | 管线变形监测方法 |
CN113446994A (zh) * | 2021-06-10 | 2021-09-28 | 中铁隧道局集团路桥工程有限公司 | 一种新建地铁施工邻近既有车站结构的立体智能化监测方法 |
CN115950396B (zh) * | 2023-03-15 | 2023-06-09 | 山西金宝岛基础工程有限公司 | 一种地表与地下一体式沉降监测装置及方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1932243A (zh) * | 2006-09-28 | 2007-03-21 | 上海隧道工程股份有限公司 | 双圆盾构浅覆土施工方法 |
CN101793153A (zh) * | 2009-08-04 | 2010-08-04 | 上海隧道工程股份有限公司 | 盾构近距离穿越大口径管线的施工方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6069509A (ja) * | 1983-09-27 | 1985-04-20 | Hitachi Constr Mach Co Ltd | トンネル機械のレベル検出装置 |
JP2000130068A (ja) * | 1998-10-29 | 2000-05-09 | Okumura Corp | 地山沈下計測装置および地山沈下計測方法 |
-
2012
- 2012-09-19 CN CN201210350873.6A patent/CN102878980B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1932243A (zh) * | 2006-09-28 | 2007-03-21 | 上海隧道工程股份有限公司 | 双圆盾构浅覆土施工方法 |
CN101793153A (zh) * | 2009-08-04 | 2010-08-04 | 上海隧道工程股份有限公司 | 盾构近距离穿越大口径管线的施工方法 |
Non-Patent Citations (6)
Title |
---|
JP昭60-69509A 1985.04.20 * |
JP特开2000-130068A 2000.05.09 * |
地下管线变形的间接监测技术;焦永强;《首届长三角科技论坛数字区域建设与地理空间技术论坛优秀论文集》;20041001;第149页倒数第4段 * |
地铁施工引发周围管线沉降的预测;杨超等;《山西建筑》;20100901;第119页第2栏第4段,第120页表1上面的文字描述、第2栏第10-14段,图1 * |
杨超等.地铁施工引发周围管线沉降的预测.《山西建筑》.2010, * |
焦永强.地下管线变形的间接监测技术.《首届长三角科技论坛数字区域建设与地理空间技术论坛优秀论文集》.2004, * |
Also Published As
Publication number | Publication date |
---|---|
CN102878980A (zh) | 2013-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102878980B (zh) | 一种地铁隧道施工诱发地下管线沉降的间接测试方法 | |
CN106641440B (zh) | 一种横向穿越铁路线地下管道顶进施工方法 | |
CN104452809B (zh) | 一种超浅埋隧道盖挖施工方法 | |
CN103924975B (zh) | 一种用于采煤过程中的保水方法 | |
CN101270666B (zh) | 隧道掌子面前方地质情况扩大断面水平钻孔预测预报法 | |
CN105443132A (zh) | 浅埋暗挖十字横撑隧道施工方法 | |
CN211692490U (zh) | 一种盾构浅覆土下穿河道的加固结构 | |
CN103046523B (zh) | 一种基坑及边坡支护水平变形监测方法 | |
CN105137488B (zh) | 基于人工注液的地下水流场描述方法 | |
CN105041345A (zh) | 一种隧道突涌水全寿命周期治理方法 | |
CN103471647B (zh) | 一种盾构隧道远程自动化监测方法 | |
CN108843333A (zh) | 湿陷性黄土地区暗挖双连拱隧道穿越既有铁路的施工方法 | |
CN105134219B (zh) | 软岩地层冻结井筒井壁施工工艺 | |
CN109611156A (zh) | 一种重叠隧道信息化施工的监测方法 | |
CN102733812B (zh) | 城市江底分岔段小净距隧道侧壁扩挖的隧道施工方法 | |
CN102628372A (zh) | 一种基于工程控制措施的水下隧道最小埋深确定方法 | |
CN108678753B (zh) | 反坡隧道施工方法 | |
CN111810198A (zh) | 隧道地表定向大口径深孔注浆装置及注浆方法 | |
CN110487243A (zh) | 一种机场跑道沉降监测系统及其布设和使用方法 | |
CN106840016A (zh) | 松散堆积体安全监测预警方法 | |
CN106295114B (zh) | 双线盾构隧道施工对地下管线安全造成影响的评估方法 | |
CN103174123B (zh) | 一种基于反开挖沉降板的软基沉降观测方法 | |
CN109944635B (zh) | 工作面深部隐伏导水构造探查及治理方法 | |
CN111335904A (zh) | 一种盾构下穿建构筑物施工监测方法 | |
CN103777235B (zh) | 一种分层开挖深埋硬岩隧道微震监测传感器布置方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |