CN102877451B - Tying and placing method for vertical sand barrier - Google Patents

Tying and placing method for vertical sand barrier Download PDF

Info

Publication number
CN102877451B
CN102877451B CN201210432033.4A CN201210432033A CN102877451B CN 102877451 B CN102877451 B CN 102877451B CN 201210432033 A CN201210432033 A CN 201210432033A CN 102877451 B CN102877451 B CN 102877451B
Authority
CN
China
Prior art keywords
sand
band
protecting barrier
barrier
grass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210432033.4A
Other languages
Chinese (zh)
Other versions
CN102877451A (en
Inventor
李生宇
雷加强
徐新文
王海峰
何志辉
庞营军
康向光
王宁波
王世杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Institute of Ecology and Geography of CAS
Original Assignee
Xinjiang Institute of Ecology and Geography of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Institute of Ecology and Geography of CAS filed Critical Xinjiang Institute of Ecology and Geography of CAS
Priority to CN201210432033.4A priority Critical patent/CN102877451B/en
Publication of CN102877451A publication Critical patent/CN102877451A/en
Application granted granted Critical
Publication of CN102877451B publication Critical patent/CN102877451B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention relates to a tying and placing method for a vertical sand barrier, which adopts a nonuniform structure, namely, the porosity or ventilation coefficients at the upper part and the lower part are different; the sand barrier is layered in the vertical direction; and the lower structure is compact, the middle structure is sparse, and the upper structure is ventilative. The high vertical structure tied and placed through adopting the method adapts to the vertical distribution of concentration of wind-drift sand, thereby not only effectively withholding the sand delivery of wind-drift sand, but also reducing the wind pressure on the sand barrier, reducing the breakage damage of wind power, meanwhile reducing the material consumption and sand-prevention cost; and the method provided by the invention can be applied in the mechanical sand-prevention engineering at all areas with sand storms.

Description

A kind of bundle equipment, method of vertical sand barrier
Technical field
The present invention relates to a kind of construction method of sediment control structure, be specifically related to a kind of bundle equipment, method of vertical sand barrier.
Background technology
Sandstorm not only affects arid and semi-arid regions, but also can involve other regions, has become global disaster.Sandstorm control a kind of important technological means be that engineering sand control measure is set, by " solid, hinder, defeated, lead " etc. effect, reach the object of sand-proof sand control.Hindering husky measure is a kind of important engineering sand control measure, is the important component part of sand-prevention system.Sand prevention is short in needed material, cost is higher and labour cost is high, is the subject matter that Current mechanical sediment control structure faces, and limits the extensive enforcement of sediment control structure.How effectively reducing the material cost of mechanical sand prevention, is the important thinking solving this problem.
Problems existing in building for above mechanical sediment control structure, the present invention intends changing the consistent homogeneous texture of vertical sand barrier, provides a kind of bundle equipment, method of vertical sand barrier of heterogeneous texture, reduces sand prevention cost by reducing sand prevention material usage.
Summary of the invention
The object of the invention is to, provide a kind of bundle equipment, method of vertical sand barrier, the vertical sand barrier that the method relates to is heterogeneous texture, i.e. upper and lower degree of porosity or coefficient of air infiltration difference.Adopt sand-protecting barrier is extremely lower and above divide band to arrange, substructure is tight type, and middle part is thin saturating type, and top is aeration type.Prick the vertical structure of establishing and stream concentration vertical by the method to distribute and adapt, effectively can not only tackle sand flow sediment transportation, and reduce the wind pressure on vertical sand barrier, alleviate wind-force breakage harm, also reduce material usage simultaneously, reduce sand prevention cost.The method of the invention can be applied in the mechanical sediment control structure of all wind sandy land.
The bundle equipment, method of a kind of vertical sand barrier of the present invention, relates to a kind of sand-protecting barrier of heterogeneous texture in the method, concrete operations follow these steps to carry out:
The making of a, sand-protecting barrier: straw is bundled into the grass of 2-5cm diameter (1), then grass is cut into (1) section of long 1-3m; Or be cut into the wide band of 10-60cm by the sand proof net (4) of three kinds of degree of porosity;
B, waiting lay earth's surface, sand-protecting barrier district, line determine sand-protecting barrier position, rule on spud pile (2) one end is imbedded in surface layer (3), length of embedment 30-40cm, the spacing of spud pile (2) is 1-6m;
C, the grass made by step a are put (1) or the earth's surface between sand proof net (4) band with two spud piles parallel, be fixed on spud pile (2), form sand-protecting barrier, the lower floor of sand-protecting barrier is tight band (5), the middle level of sand-protecting barrier is for dredging saturating band (6), and the upper strata of sand-protecting barrier is ventilation band (7).
Step b is when burying spud pile (2) underground, and fixing grass is 1.0-1.5m the spacing of the spud pile of (1) (2), and the spacing of the spud pile (2) of fixing sand proof net (4) is 3-6m.
The grass made in step c is 5-8mm the spacing of the tight band of (1) sand-protecting barrier lower floor (5), and the spacing that band (6) is dredged in sand-protecting barrier middle level is 8-15mm, and the spacing of sand-protecting barrier upper strata ventilation band (7) is 15-20mm.
In step c, the degree of porosity of the tight band of sand proof net (4) sand-protecting barrier lower floor (5) is 10%-30%, the degree of porosity that band (6) is dredged in middle level is 30%-45%, the degree of porosity of upper strata ventilation band (7) is 45%-60%, and three kinds of bands are woven to one or on-the-spot laying, splice and fix.
In step c sand proof net (4) three kinds of degree of porosity bands be arranged as overlapping 1-2cm between each band.
The arrangement mode forming the three types componental banding of sand-protecting barrier in step c is: three layers of arrangement of band (6) and upper strata ventilation band (7) are dredged in the tight band of lower floor (5), middle level, or the two-layer arrangement of the tight band of lower floor (5) and upper strata ventilation band (7) or be alternately arranged, or being alternately arranged of band (6) and upper strata ventilation band (7) is dredged in the tight band of lower floor (5), middle level.
The bundle equipment, method of a kind of vertical sand barrier of the present invention, the design philosophy of the method is: when sand proof net degree of porosity within the specific limits time, its protective action difference is little; Sand proof net lower floor protective capacities is very large on its initial stage protection benefit impact; Before and after sand proof net after sand, its protection benefit is not only relevant with upper strata sand proof net degree of porosity, also relevant with sand volume morphing.Therefore, the high vertical sand barrier Structure Adjustment Thought of " grab down and put, density combines, and band combines " is defined.
The bundle equipment, method of a kind of vertical sand barrier of the present invention, main feature is: the high vertical sand barrier up-down structure that (1) relates to is uneven, is combined by the band of multiple different aperture degree; (2) lower floor's band of the vertical sand barrier related to adopts comparatively dense structure, and upper strata adopts comparatively sparseness structure, and the width of each sand-protecting barrier is identical or different.The vertical sand barrier that this invention relates to changes the consistent tone patterns of up-down structure in the past, can save sand prevention material, reduce cost, be convenient to apply on a large scale; The band that degree of porosity is larger is simultaneously convenient to air-flow and is passed through, and sand-protecting barrier blast reduces, and alleviates wind-force breakage.
By showing in Vegetation in Center of Taklimakan Desert experimental data, the heterogeneous texture vertical sand barrier that method of the present invention obtains has played good benefit of checking winds and fixing drifting sand.
Accompanying drawing explanation
Fig. 1 is that biological straw formula heterogeneous texture sand-protecting barrier of the present invention lays schematic diagram;
Fig. 2 is that sand proof net formula heterogeneous texture sand-protecting barrier of the present invention lays schematic diagram;
Fig. 3 is the double-layer structure schematic diagram of the present invention two strip-type sand proof net;
Fig. 4 is the alternating structure schematic diagram of the present invention four strip-type sand proof net;
Fig. 5 is the structural representation that is alternately arranged of the present invention six strip-type sand proof net.
Detailed description of the invention
Embodiment 1:
The making of a, sand-protecting barrier: straw is bundled into the grass of 1cm diameter 1, then grass is cut into the section of long 1m 1;
B, waiting lay ground, sand-protecting barrier district line determine sand-protecting barrier position, rule on spud pile 2 one end is imbedded in surface layer 3, length of embedment 30cm, the spacing between spud pile 2 is 1m;
C, by step a make grass the earth's surface between 1 with two spud piles is put parallel, grass is fixed on 1 on spud pile 2 by root is parallel, form sand-protecting barrier, the lower floor of sand-protecting barrier is tight band 5, and spacing is 5mm, and the middle level of sand-protecting barrier is for dredging saturating band 6, spacing is 8mm, the upper strata of sand-protecting barrier is ventilation band 7, and spacing is 15mm, adopts same widths.
Embodiment 2:
The making of a, sand-protecting barrier: straw is bundled into the grass of 2cm diameter 1, then grass is cut into the section of long 2m 1;
B, waiting lay earth's surface, sand-protecting barrier district line determine sand-protecting barrier position, rule on spud pile 2 one end is imbedded in surface layer 3, length of embedment 35cm, the spacing between spud pile 2 is 1.2m;
C, by step a make grass the earth's surface between 1 with two spud piles is put parallel, grass is fixed on 1 on spud pile 2 by root is parallel, form sand-protecting barrier, the lower floor of sand-protecting barrier is tight band 5, and spacing is 7mm, and the middle level of sand-protecting barrier is for dredging saturating band 6, spacing is 12mm, the upper strata of sand-protecting barrier is ventilation band 7, and spacing is 18mm, adopts different width.
Embodiment 3:
The making of a, sand-protecting barrier: straw is bundled into the grass of 3cm diameter 1, then grass is cut into the section of long 1.5m 1;
B, waiting lay earth's surface, sand-protecting barrier district line determine sand-protecting barrier position, rule on spud pile 2 one end is imbedded in surface layer 3, length of embedment 40cm, the spacing between spud pile 2 is 1.5m;
C, by step a make grass the earth's surface between 1 with two spud piles is put parallel, again grass is fixed on spud pile 21 by root is parallel, form sand-protecting barrier, the lower floor of sand-protecting barrier is tight band 5, and spacing is 8mm, and the middle level of sand-protecting barrier is for dredging saturating band 6, spacing is 15mm, the upper strata of sand-protecting barrier is ventilation band 7, and spacing is 20mm, adopts identical width.
Embodiment 4:
The making of a, sand-protecting barrier: the sand proof net 4 that the band of three kinds of degree of porosity structures forms is cut into the wide band of 10cm respectively;
B, waiting lay earth's surface, sand-protecting barrier district line determine sand-protecting barrier position, rule on spud pile 2 one end is imbedded in surface layer 3, length of embedment 30cm, the spacing between spud pile 2 is 3m;
C, by step a make sand proof net 4 band put parallel with the earth's surface between two spud piles, be fixed on spud pile 2, form sand-protecting barrier, the lower floor of sand-protecting barrier is tight band 5, degree of porosity is 10%, the middle level of sand-protecting barrier is for dredging saturating band 6, degree of porosity is 30%, the upper strata of sand-protecting barrier is ventilation band 7, degree of porosity is 45%, during the permutation and combination of three kinds of degree of porosity bands of sand-protecting barrier, overlapping 1cm between each band, adopts identical width, three kinds of degree of porosity bands is woven to one by producer or scene is spliced fixing respectively.
Embodiment 5:
The making of a, sand-protecting barrier: the sand proof net 4 formed by the band by three kinds of degree of porosity structures is cut into the wide band of 30cm;
B, waiting lay earth's surface, sand-protecting barrier district line determine sand-protecting barrier position, rule on spud pile 2 one end is imbedded in surface layer 3, length of embedment 35cm, the spacing between spud pile 2 is 5m;
C, by step a make sand proof net 4 band put parallel with the earth's surface between two spud piles, be fixed on spud pile 2, form sand-protecting barrier, the lower floor of sand-protecting barrier is tight band 5, degree of porosity is 20%, the middle level of sand-protecting barrier is for dredging saturating band 6, degree of porosity is 40%, the upper strata of sand-protecting barrier is ventilation band 7, degree of porosity is 50%, during the permutation and combination of three kinds of degree of porosity bands, overlapping 2cm between each band, adopts different width, three kinds of degree of porosity bands is woven to one by producer or scene is spliced fixing respectively.
Embodiment 6:
The making of a, sand-protecting barrier: the sand proof net 4 that the band of three kinds of degree of porosity structures forms is cut into the wide band of 60cm;
B, waiting lay earth's surface, sand-protecting barrier district line determine sand-protecting barrier position, rule on spud pile 2 one end is imbedded in surface layer 3, length of embedment 40cm, the spacing of spud pile 2 is 6m;
C, by step a make sand proof net 4 band put parallel with the earth's surface between two spud piles, be fixed on spud pile 2, form sand-protecting barrier, the lower floor of sand-protecting barrier is tight band 5, degree of porosity is 30%, the middle level of sand-protecting barrier is for dredging saturating band 6, degree of porosity is 45%, the upper strata of sand-protecting barrier is ventilation band 7, degree of porosity is 60%, during the permutation and combination of the degree of porosity band of sand-protecting barrier, and overlapping 1.5cm between each band, adopt identical width, three kinds of degree of porosity bands are woven to one by producer or scene is spliced fixing respectively.
Embodiment 7
In embodiment 1-6, the arrangement mode of any one sand-protecting barrier is: the tight band 5 of lower floor, middle level dredge three layers of arrangement of band 6 and upper strata ventilation band 7; Or the two-layer arrangement of the tight band of lower floor 5 and upper strata ventilation band 7 or be alternately arranged; Or being alternately arranged of band 6 and upper strata ventilation band 7 is dredged in the tight band 5 of lower floor, middle level.

Claims (1)

1. a bundle equipment, method for vertical sand barrier, is characterized in that the sand-protecting barrier relating to a kind of heterogeneous texture in the method, and concrete operations follow these steps to carry out:
The making of a, sand-protecting barrier: straw is bundled into the grass of 2-5cm diameter (1), then grass is cut into (1) section of long 1-3m;
B, waiting lay earth's surface, sand-protecting barrier district, line determine sand-protecting barrier position, rule on spud pile (2) one end is imbedded in surface layer (3), length of embedment 30-40cm, when burying spud pile (2) underground, fixing grass is 1-6m the spacing of the spud pile of (1) (2);
C, the grass made by step a is put (1) parallel with the earth's surface between two spud piles, be fixed on spud pile (2), form sand-protecting barrier, described sand-protecting barrier is tight band (5), dredge the three types structure of saturating band (6) and ventilation band (7), the arrangement mode of described sand-protecting barrier is: the tight band of lower floor (5), three layers of arrangement of band (6) and upper strata ventilation band (7) are dredged in middle level, or the two-layer arrangement of the tight band of lower floor (5) and upper strata ventilation band (7) or be alternately arranged, or the tight band of lower floor (5), being alternately arranged of band (6) and upper strata ventilation band (7) is dredged in middle level, the grass made is 5-8mm the spacing of the tight band of (1) sand-protecting barrier lower floor (5), the spacing that band (6) is dredged in sand-protecting barrier middle level is 8-15mm, the spacing of sand-protecting barrier upper strata ventilation band (7) is 15-20mm.
CN201210432033.4A 2012-11-02 2012-11-02 Tying and placing method for vertical sand barrier Expired - Fee Related CN102877451B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210432033.4A CN102877451B (en) 2012-11-02 2012-11-02 Tying and placing method for vertical sand barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210432033.4A CN102877451B (en) 2012-11-02 2012-11-02 Tying and placing method for vertical sand barrier

Publications (2)

Publication Number Publication Date
CN102877451A CN102877451A (en) 2013-01-16
CN102877451B true CN102877451B (en) 2015-07-01

Family

ID=47478952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210432033.4A Expired - Fee Related CN102877451B (en) 2012-11-02 2012-11-02 Tying and placing method for vertical sand barrier

Country Status (1)

Country Link
CN (1) CN102877451B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541341B (en) * 2013-11-04 2015-02-25 中国科学院新疆生态与地理研究所 Repeatedly utilized grass grid sand fixing method
CN104727239A (en) * 2013-12-20 2015-06-24 甘肃金海新材料有限公司 High and vertical type sand-preventing barrier for high-wind-speed sandy areas
CN106320315B (en) * 2016-10-28 2018-05-22 中国科学院新疆生态与地理研究所 A kind of method of construction of high vertical stalk sand-protecting barrier suitable for strong wind area
CN109837885A (en) * 2019-03-21 2019-06-04 陆福 A kind of windbreak and building method
CN110387835B (en) * 2019-08-06 2021-12-28 中铁西北科学研究院有限公司 Assembled dredging sand blocking wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201305845Y (en) * 2008-11-29 2009-09-09 中国人民解放军海军后勤部军港机场营房部 Wind-proof sand stablization barrier
CN201915338U (en) * 2011-01-08 2011-08-03 常州市鹏腾土工复合材料工程有限公司 Wind breaking and sand fixing screen
CN102322053A (en) * 2011-06-16 2012-01-18 娄志平 Sand fixing fence net made from weedtrees, bamboos and reeds and manufacture method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101786096A (en) * 2010-03-03 2010-07-28 中国科学院东北地理与农业生态研究所 Method for transforming saline and alkaline grassland by utilizing sand-protecting barriers

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201305845Y (en) * 2008-11-29 2009-09-09 中国人民解放军海军后勤部军港机场营房部 Wind-proof sand stablization barrier
CN201915338U (en) * 2011-01-08 2011-08-03 常州市鹏腾土工复合材料工程有限公司 Wind breaking and sand fixing screen
CN102322053A (en) * 2011-06-16 2012-01-18 娄志平 Sand fixing fence net made from weedtrees, bamboos and reeds and manufacture method

Also Published As

Publication number Publication date
CN102877451A (en) 2013-01-16

Similar Documents

Publication Publication Date Title
CN102877451B (en) Tying and placing method for vertical sand barrier
CN103643672B (en) A kind of Soft Ground Improved By Vacuum Preloading is processed construction method
CN103898870B (en) A kind of gabion net Ecotypic Stone Mesh-box river course slope protection construction method
CN103233444B (en) Underwater dumped rockfill bedding and side slope Anti-scouring structure and construction method thereof
CN104895111A (en) Construction method of integrated pipe trench in soft soil
TW201114981A (en) Underground structure having an overlaid structure of resin-made layers
CN203716064U (en) Roadbed sewer convenient for dredging
CN204530519U (en) A kind of Novel wind-proof sand-fixing device
CN202055251U (en) Landform stack construction structure of gardens high filling earth larger than angle of repose
CN218204453U (en) Intelligent expansive soil side slope protection structure
CN106758892A (en) A kind of Seasonal freezing areas Freeway draining means of defence
CN202881924U (en) Sand-prevention mesh
CN205975653U (en) Independent bearing platform structure of soil child mould construction
CN108149698A (en) Guiding solid drainage and construction method and system inside a kind of airport high fill foundation
CN211228563U (en) Assembled groundwater drainage blind ditch drainage system that oozes
CN103235379A (en) Method for laying new pipeline and communication optical cable in same ditch or single ditch across embedded optical cable
CN204456151U (en) Bamboo raft dowel super large cofferdam
CN103352458A (en) Method for efficiently absorbing water and solidifying under films through controllable vacuum negative pressure well
CN203890954U (en) Submarine cable landing shoal scour prevention protection structure
CN108374392B (en) River seepage-proofing method and river seepage-proofing structure
CN207537994U (en) The underground erosion control wall construction of trraning pole is set
CN104594368A (en) Bamboo raft pile oversized cofferdam and construction method for sea reclamation by adopting same
CN205529777U (en) Unilateral crack escape canal structure
CN113652998B (en) Construction method for waste puddle treatment and water system landscape reconstruction
JP4482859B2 (en) Stabilization method behind the revetment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150701