CN102874646A - Method for processing and winding collar stays synchronously and equipment thereof - Google Patents

Method for processing and winding collar stays synchronously and equipment thereof Download PDF

Info

Publication number
CN102874646A
CN102874646A CN2012103980680A CN201210398068A CN102874646A CN 102874646 A CN102874646 A CN 102874646A CN 2012103980680 A CN2012103980680 A CN 2012103980680A CN 201210398068 A CN201210398068 A CN 201210398068A CN 102874646 A CN102874646 A CN 102874646A
Authority
CN
China
Prior art keywords
wheel
bamboo
adhesive tape
blanking units
package
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103980680A
Other languages
Chinese (zh)
Inventor
黎明高
程仕德
曾武
左波涛
王少卿
薛矛
黄水群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Esquel Textiles Co Ltd
Original Assignee
Guangdong Esquel Textiles Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Esquel Textiles Co Ltd filed Critical Guangdong Esquel Textiles Co Ltd
Priority to CN2012103980680A priority Critical patent/CN102874646A/en
Publication of CN102874646A publication Critical patent/CN102874646A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a method for processing and winding collar stays synchronously and equipment thereof. The method comprises the following steps of: outputting coiled materials by using a feed wheel, and outputting adhesive belts synchronously by using an adhesive belt supplying device, wherein the adhesive belts are positioned below the coiled materials; dragging the coiled materials into a punching device through a waste collecting wheel, and dragging the adhesive belts into the punching device synchronously by using a material receiving wheel; punching the coiled materials into collar stays and leftover bits by using the punching device, and sticking the collar stays to the adhesive belts; and coiling and collecting the adhesive belts to which the collar stays are stuck by using the material receiving wheel, and coiling and collecting the leftover bits by using a waste collecting wheel. Due to the adoption of the method, the processing efficiency of the collar stays can be increased greatly by using the equipment, labor force is saved, and wrong arrangement of the front and back sides of the collar stays are prevented simultaneously.

Description

Method and the equipment thereof of bamboo is inserted in synchronous processing and package
Technical field
The present invention relates to the production and processing field of garment accessories, relate in particular to method and equipment thereof that bamboo is inserted in a kind of synchronous processing and package.
Background technology
Slotting bamboo is a kind of important packaging axiliary materials in the apparel industry, and it mainly is contained in the middle of the collar point of shirt, can play a part fixingly, and the shirt collar point can not be out of shape or wrinkling, and the size of inserting bamboo need to customize according to size, length, the shape of collar point usually.The slotting bamboo of shirt has pros and cons, the production and processing that tradition is inserted bamboo is the continuous feeding i.e. blocks of ground independent die cutting that intermittently connects material, can drop to unified holding groove after die-cut, finish the production and processing of inserting bamboo from following four steps by the workman again: position line and the adhesive plaster position position line of one, carrying out the socket bamboo at cardboard; Two, neat and differentiate the pros and cons discharging and insert bamboo; Three, plug in bamboo raft good after, stick sticker in the position of fixing; Four, a section ground cuts off packing on request, finishes finished product.Just enter afterwards the processing of subsequent processing or attractive in appearance transfer to the client.Not only operation is various but bamboo is inserted in this method processing, increases labour power, and inefficiency and degree of automation are low, and mistaken the pros and cons of inserting bamboo easily, and the probability of makeing mistakes strengthens.
Summary of the invention
Based on this, the invention reside in the defective that overcomes prior art, provide a kind of synchronous processing and package to insert method and the equipment thereof of bamboo, by described method, described equipment can improve the work efficiency of inserting bamboo greatly, has saved labour power, can also prevent from inserting makeing mistakes that the bamboo pros and cons puts simultaneously.
The method of bamboo is inserted in described synchronous processing and package, and its technical scheme is as follows:
Described applicator wheel is sent coiled material, and described adhesive tape-supplying device is sent adhesive tape synchronously, and this adhesive tape is positioned at described coiled material below;
The described coiled material of described garbage collection wheel traction enters described blanking units, and the described adhesive tape of described rewinding wheel traction enters described blanking units synchronously;
Described blanking units is slotting bamboo and leftover bits with described web diecut, and described slotting bamboo is sticked on the described adhesive tape;
The described adhesive tape of inserting bamboo that is pasted with is collected in the package of described rewinding wheel, and described leftover bits are collected in the package of described garbage collection wheel.
The below describes the further technical scheme of described method:
Described initiative driver drives described garbage collection wheel and the rotation of rewinding wheel, the described coiled material of described garbage collection wheel traction is advanced, the described adhesive tape of described rewinding wheel traction is advanced, and makes described coiled material and adhesive tape be in stretching tensioned state in traveling process.
Be provided with successively from front to back the first drop guide and the first feed appliance between described applicator wheel and the described blanking units, be provided with guide wheel between described garbage collection wheel and the described blanking units, be provided with successively from front to back the second feed appliance and the second drop guide between described blanking units and the described rewinding wheel, described coiled material enters described blanking units through described the first drop guide guiding and through the combined action level of described the first feed appliance and guide wheel, and described the second feed appliance and the second drop guide will describedly be pasted with the described rewinding of leading of the adhesive tape of inserting bamboo and take turns.
The present invention also provides a kind of synchronous processing and package to insert the equipment of bamboo, and its technical scheme is as follows:
The equipment that bamboo is inserted in described synchronous processing and package includes applicator wheel, adhesive tape-supplying device, blanking units, rewinding wheel and garbage collection wheel, described applicator wheel and adhesive tape-supplying device are located at the front end of described blanking units, described rewinding wheel and garbage collection wheel are located at the rear end of described blanking units, described applicator wheel, be formed with the first row stand in channel between blanking units and the garbage collection wheel, described adhesive tape-supplying device, be formed with the second path of travel between blanking units and the rewinding wheel, described the first row stand in channel is positioned at the top of described the second path of travel.
The below describes the further technical scheme of described equipment:
Be provided with successively from front to back the first drop guide and the first feed appliance between described applicator wheel and the described blanking units, be provided with guide wheel between described garbage collection wheel and the described blanking units, be provided with successively from front to back the second feed appliance and the second drop guide between described blanking units and the described rewinding wheel.
Described the first feed appliance and the second feed appliance are equipped with upper roller and bottom roller, are formed with the gap between described upper roller and the bottom roller.
Described the first feed appliance and the second feed appliance also are provided with rolling wheel regulator.
Described blanking units is provided with cutting head and punching press counterdie, this punching press counterdie is provided with port in the direction along described the second path of travel, leave the space between described cutting head and the punching press counterdie, the gap of described the first feed appliance, described space and described guide wheel are in equal height.
Described punching press counterdie includes support portion and pedestal, and described support portion surrounds sinking space, and described pedestal is covered with the flexible glue pad in the corresponding part of sinking space.
The equipment that bamboo is inserted in described synchronous processing and package also includes initiative driver, and described rewinding wheel and garbage collection wheel are equipped with the centre of gration wheel, and snare has belt between described initiative driver and the centre of gration wheel.
" front end " of above-mentioned blanking units refers to that coiled material enters that end of blanking units, and " rear end " of above-mentioned blanking units refers to that coiled material is from blanking units that end out.
The below describes advantage or the principle of aforementioned techniques scheme:
1, described synchronous processing and package are inserted in the method for bamboo, described blanking units constantly is after inserting bamboo with web diecut, slotting bamboo is attached on the described adhesive tape, and simultaneously, described rewinding wheel and garbage collection are taken turns again respectively constantly package and are collected described adhesive tape and the described leftover bits of inserting bamboo that are pasted with, thereby the method has realized carrying out synchronously of slotting bamboo processing and package, greatly improved the efficient of slotting bamboo processing, saved labour power, and on the other hand, coiled material is in the process of advancing, and its pros and cons has just set, bamboo is die-cut promptly to be attached on the adhesive tape after out and insert, thereby makeing mistakes of having prevented also that slotting bamboo pros and cons from putting.
2, described coiled material and adhesive tape are in stretching tensioned state in traveling process, then so that insert bamboo and can be attached on the described adhesive tape to marshalling after out punched.
3, the combined action of described the first drop guide, the first feed appliance and guide wheel is so that coiled material can pass through blanking units by on even keel, the combined action of described adhesive tape-supplying device, the second drop guide and the second feed appliance so that adhesive tape below coiled material also relative level ground pass through blanking units, also make simultaneously adhesive tape after sticking slotting bamboo, be directed to the rewinding wheel and carry out the package collection, and above-mentioned coiled material and adhesive tape all relative on even keel help to realize blanking units to the die-cut of coiled material and will plug in the bamboo raft row fitly to be attached on the adhesive tape by blanking units.
4, the equipment of bamboo is inserted in described synchronous processing and package, described the first row stand in channel is the path of travel of coiled material, described the second path of travel is the path of travel of adhesive tape, the first row stand in channel is positioned at the top of the second path of travel, coiled material is advanced above adhesive tape, adhesive tape is also advanced synchronously, thereby described blanking units can be with web diecut for inserting bamboo, and will plug in bamboo raft row and fitly stick on the described adhesive tape, and then the punched rear last leftover bits of coiled material are then collected by the package of garbage collection wheel, post the adhesive tape of inserting bamboo and collected by the package of described rewinding wheel, namely insert bamboo and collected by the package of rewinding wheel.Above-mentioned die-cut stickup and package are collected and are carried out synchronously, thereby the degree of automation of this equipment is high, has greatly improved the work efficiency of slotting bamboo, has saved labour power; In addition, coiled material is in the process of advancing, and its pros and cons has just set, and inserts that bamboo is punched promptly to be attached on the adhesive tape again after out, so this equipment can also prevent from inserting makeing mistakes that the bamboo pros and cons puts.
5, described the first feed appliance and the second feed appliance also are provided with rolling wheel regulator, then can suitably regulate gap between upper roller and the bottom roller by rolling wheel regulator, make things convenient for the coiled material of different-thickness or post passing through of the adhesive tape of inserting bamboo.
6, described punching press counterdie is provided with port in the direction along described the second path of travel, adhesive tape can be advanced by described punching press counterdie at the lower of coiled material, and the gap between the space between described cutting head and the punching press counterdie, described the first feed appliance upper roller and the bottom roller and described guide wheel are in equal height, then make coiled material pass through described space in relative level ground, thereby be conducive to realize above-mentioned die-cut and stickup.
7, described punching press counterdie includes support portion and pedestal, described support portion surrounds sinking space, from cross-sectional plane, this sinking space has correspondingly shape of slotting bamboo, thereby by being installed, different punching press counterdies can process difform slotting bamboo, described pedestal is covered with the flexible glue pad in the corresponding part of sinking space, and this flexible glue spacer has buffer action, can make cutting head make adhesive tape unlikely damaged when bamboo is attached on the adhesive tape will inserting.
8, described rewinding wheel and garbage collection wheel is equipped with the centre of gration wheel, snare has belt between described initiative driver and the centre of gration wheel, then this initiative driver drives the rotation of rewinding wheel and garbage collection wheel by belt, thereby the described adhesive tape of rewinding wheel traction is advanced and the slotting bamboo of continuous package collection, the described coiled material of garbage collection wheel traction is advanced and continuous package collection leftover bits.
Description of drawings
Fig. 1 is the structural representation that the equipment of bamboo is inserted in the described synchronous processing of the embodiment of the invention and package.
Fig. 2 is the partial enlarged drawing of A among Fig. 1.
Description of reference numerals:
1, applicator wheel, 2, adhesive tape-supplying device, 3, blanking units, 301, cutting head, 302, the punching press counterdie, 4, the rewinding wheel, 401, the first centre of gration wheel, 5, the garbage collection wheel, the 501, second centre of gration wheel, 6, initiative driver, 7, the first drop guide, the 8, first feed appliance, 801, upper roller, 802, bottom roller, 803, rolling wheel regulator, 9, guide wheel, the 10, second drop guide, 11, the second feed appliance, 12, belt, 13, tension wheel, 14, coiled material, 15, adhesive tape, 16, the flexible glue pad.
The specific embodiment
The below is elaborated to embodiments of the invention:
The equipment of bamboo is inserted in a kind of synchronous processing and package, as shown in Figure 1, it includes applicator wheel 1, adhesive tape-supplying device 2, blanking units 3, rewinding wheel 4 and garbage collection wheel 5, described applicator wheel 1 and adhesive tape-supplying device 2 are located at the front end of described blanking units 3, described rewinding wheel 4 and garbage collection wheel 5 are located at the rear end of described blanking units 3, described applicator wheel 1, be formed with the first row stand in channel between blanking units 3 and the garbage collection wheel 5, described adhesive tape-supplying device 2, be formed with the second path of travel between blanking units 3 and the rewinding wheel 4, described the first row stand in channel is positioned at the top of described the second path of travel.
Wherein, be provided with successively from front to back the first drop guide 7 and the first feed appliance 8 between described applicator wheel 1 and the described blanking units 3, be provided with guide wheel 9 between described garbage collection wheel 5 and the described blanking units 3, be provided with successively from front to back the second feed appliance 11 and the second drop guide 10 between described blanking units 3 and the described rewinding wheel 4.Described the first feed appliance 8 and the second feed appliance 11 are equipped with upper roller 801 and bottom roller 802, are formed with the gap between described upper roller 801 and the bottom roller 802.Described the first feed appliance 8 and the second feed appliance 11 also are provided with rolling wheel regulator 803.The equipment that bamboo is inserted in described synchronous processing and package also includes initiative driver 6 and tension wheel 13, described rewinding wheel 4 is provided with the first centre of gration wheel 401, described garbage collection wheel 5 is provided with the second centre of gration wheel 501, and snare has belt 12 between described initiative driver 6, the first centre of gration wheel the 401 or second centre of gration wheel 501 and the tension wheel 13.
Further, as shown in Figure 2, described blanking units 3 is provided with cutting head 301 and punching press counterdie 302, this punching press counterdie 302 is provided with port in the direction along described the second path of travel, leave the space between described cutting head 301 and the punching press counterdie 302, the gap of described the first feed appliance 8, described space and described guide wheel 9 are in equal height.Described punching press counterdie 302 includes support portion and pedestal, and described support portion surrounds sinking space, and described pedestal is covered with flexible glue pad 16 in the corresponding part of sinking space.
" front end " of above-mentioned blanking units 3 refers to that coiled material 14 enters that end of blanking units 3, and " rear end " of above-mentioned blanking units 3 refers to that coiled material 14 is from blanking units 3 that end out.
Present embodiment also provides a kind of synchronous processing corresponding with the said equipment and the method for the slotting bamboo of package, the method has following steps: described applicator wheel 1 is sent coiled material 14, described adhesive tape-supplying device 2 is sent adhesive tape 15 synchronously, and this adhesive tape 15 is positioned at described coiled material 14 belows; The described coiled material 14 of described garbage collection wheel 5 tractions enters described blanking units 3, and the described adhesive tape 15 of described rewinding wheel 4 tractions enters described blanking units 3 synchronously; Described blanking units 3 is punched to described coiled material 14 and inserts bamboo and leftover bits, and described slotting bamboo is sticked on the described adhesive tape 15; Described rewinding is taken turns 4 packages and is collected the described adhesive tape 15 of inserting bamboo that is pasted with, and described garbage collection is taken turns 5 packages and collected described leftover bits.
Wherein, described coiled material 14 and adhesive tape 15 are in stretching tensioned state in traveling process.Described coiled material 14 enters described blanking units 3 through described the first drop guide 7 guiding and through the combined action level of described the first feed appliance 8 and guide wheel 9, and described the second feed appliance 11 and the second drop guide 10 will describedly be pasted with the described rewinding of adhesive tape 15 guiding of inserting bamboo and take turns 4.
Present embodiment has the following advantages:
1, described synchronous processing and package are inserted in the method for bamboo, after described blanking units 3 constantly is punched to coiled material 14 and inserts bamboo, slotting bamboo is attached on the described adhesive tape 15, and simultaneously, described rewinding wheel 4 and garbage collection wheel 5 again respectively constantly package collect described adhesive tape 15 and the described leftover bits of inserting bamboo that are pasted with, thereby the method has realized carrying out synchronously of slotting bamboo processing and package, greatly improved the efficient of slotting bamboo processing, saved labour power, and on the other hand, coiled material 14 is in the process of advancing, its pros and cons has just set, bamboo is die-cut promptly to be attached on the adhesive tape 15 after out and insert, and what prevented then that slotting bamboo pros and cons from putting makes mistakes.
2, described coiled material 14 and adhesive tape 15 are in stretching tensioned state in traveling process, then so that insert bamboo and can be attached to marshalling on the described adhesive tape 15 after out punched.
3, described the first drop guide 7, the combined action of the first feed appliance 8 and guide wheel 9 is so that coiled material 14 can pass through blanking units 3 by on even keel, described adhesive tape-supplying device 2, the combined action of the second drop guide 10 and the second feed appliance 11 so that adhesive tape 15 below coiled material 14 also relative level ground by blanking units 3, also make simultaneously adhesive tape 15 after sticking slotting bamboo, be directed to rewinding wheel 4 and carry out the package collection, above-mentioned coiled material 14 and adhesive tape 15 all relative on even keel help to realize the die-cut of 3 pairs of coiled materials 14 of blanking units and will plug in the bamboo raft row fitly to be attached on the adhesive tape 15 by blanking units 3.
4, the equipment of bamboo is inserted in described synchronous processing and package, described the first row stand in channel is the path of travel of coiled material 14, described the second path of travel is the path of travel of adhesive tape 15, the first row stand in channel is positioned at the top of the second path of travel, coiled material 14 is advanced above adhesive tape 15, and adhesive tape 15 is also advanced synchronously, thereby being punched to coiled material 14, described blanking units 3 inserts bamboo, and will plug in bamboo raft row and fitly stick on the described adhesive tape 15, and then coiled material 14 punched rear last leftover bits are taken turns 5 packages collection by garbage collection, post the adhesive tape 15 of inserting bamboo and take turns 4 packages collection by described rewinding, namely insert bamboo and take turns 4 packages collection by rewinding.Above-mentioned die-cut stickup and package are collected and are carried out synchronously, thereby the degree of automation of this equipment is high, greatly improved the work efficiency of slotting bamboo, saved labour power, in addition, coiled material 14 is in the process of advancing, and its pros and cons has just set, insert that bamboo is punched promptly to be attached to again on the adhesive tape 15 after out, then this equipment can also prevent from inserting makeing mistakes that the bamboo pros and cons puts.
5, described the first feed appliance 8 and the second feed appliance 11 also are provided with rolling wheel regulator 803, then can suitably regulate gaps between upper rollers 801 and the bottom roller 802 by this rolling wheel regulator 803, make things convenient for the coiled material 14 of different-thickness or post passing through of the adhesive tape 15 of inserting bamboo.
6, described punching press counterdie 302 is provided with port in the direction along described the second path of travel, adhesive tape 15 can be advanced by described punching press counterdie 302 at the lower of coiled material 14, and the gap between the space between described cutting head 301 and the punching press counterdie 302, described the first feed appliance 8 upper rollers 801 and the bottom roller 802 and described guide wheel 9 are in equal height, then can make coiled material 14 relative level ground by described space, thereby be conducive to realize above-mentioned die-cut and stickup.
7, described punching press counterdie 302 includes support portion and pedestal, described support portion surrounds sinking space, from cross-sectional plane, this sinking space has correspondingly shape of slotting bamboo, thereby can process difform slotting bamboo by different punching press counterdies 302 is installed, described pedestal is covered with flexible glue pad 16 in the corresponding part of sinking space, and this flexible glue pad 16 has buffer action, can make cutting head 301 make adhesive tape 15 unlikely damaged when bamboo is attached on the adhesive tape 15 will inserting.
8, described rewinding wheel 4 is provided with the first centre of gration wheel 401, described garbage collection wheel 5 is provided with the second centre of gration wheel 501, snare has belt 12 between described initiative driver 6, the first centre of gration wheel the 401 or second centre of gration wheel 501 and the tension wheel 13, then this initiative driver 6 drives the rotation of rewinding wheel 4 and garbage collection wheel 5 by belt 12, thereby the described adhesive tape 15 of rewinding wheel 4 tractions is advanced and the slotting bamboo of continuous package collection, the described coiled material 14 of garbage collection wheel 5 tractions is advanced and continuous package collection leftover bits.
The above embodiment has only expressed the specific embodiment of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to claim of the present invention.Should be pointed out that for the person of ordinary skill of the art without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.

Claims (10)

1. the method for bamboo is inserted in a synchronous processing and package, it is characterized in that the method includes following steps:
Described applicator wheel is sent coiled material, and described adhesive tape-supplying device is sent adhesive tape synchronously, and this adhesive tape is positioned at described coiled material below;
The described coiled material of described garbage collection wheel traction enters described blanking units, and the described adhesive tape of described rewinding wheel traction enters described blanking units synchronously;
Described blanking units is slotting bamboo and leftover bits with described web diecut, and described slotting bamboo is sticked on the described adhesive tape;
The described adhesive tape of inserting bamboo that is pasted with is collected in the package of described rewinding wheel, and described leftover bits are collected in the package of described garbage collection wheel.
2. the method for bamboo is inserted in synchronous processing according to claim 1 and package, it is characterized in that, described initiative driver drives described garbage collection wheel and the rotation of rewinding wheel, the described coiled material of described garbage collection wheel traction is advanced, the described adhesive tape of described rewinding wheel traction is advanced, and makes described coiled material and adhesive tape be in stretching tensioned state in traveling process.
3. the method for bamboo is inserted in synchronous processing according to claim 1 and package, it is characterized in that, be provided with successively from front to back the first drop guide and the first feed appliance between described applicator wheel and the described blanking units, be provided with guide wheel between described garbage collection wheel and the described blanking units, be provided with successively from front to back the second feed appliance and the second drop guide between described blanking units and the described rewinding wheel, described coiled material enters described blanking units through described the first drop guide guiding and through the combined action level of described the first feed appliance and guide wheel, and described the second feed appliance and the second drop guide will describedly be pasted with the described rewinding of leading of the adhesive tape of inserting bamboo and take turns.
4. the equipment of bamboo is inserted in a synchronous processing and package, it is characterized in that, it includes applicator wheel, adhesive tape-supplying device, blanking units, rewinding wheel and garbage collection wheel, described applicator wheel and adhesive tape-supplying device are located at the front end of described blanking units, described rewinding wheel and garbage collection wheel are located at the rear end of described blanking units, described applicator wheel, be formed with the first row stand in channel between blanking units and the garbage collection wheel, described adhesive tape-supplying device, be formed with the second path of travel between blanking units and the rewinding wheel, described the first row stand in channel is positioned at the top of described the second path of travel.
5. the equipment of bamboo is inserted in synchronous processing according to claim 4 and package, it is characterized in that, be provided with successively from front to back the first drop guide and the first feed appliance between described applicator wheel and the described blanking units, be provided with guide wheel between described garbage collection wheel and the described blanking units, be provided with successively from front to back the second feed appliance and the second drop guide between described blanking units and the described rewinding wheel.
6. the equipment of bamboo is inserted in synchronous processing according to claim 5 and package, it is characterized in that described the first feed appliance and the second feed appliance are equipped with upper roller and bottom roller, are formed with the gap between described upper roller and the bottom roller.
7. the equipment of bamboo is inserted in synchronous processing according to claim 6 and package, it is characterized in that described the first feed appliance and the second feed appliance also are provided with rolling wheel regulator.
8. the equipment of bamboo is inserted in synchronous processing according to claim 6 and package, it is characterized in that, described blanking units is provided with cutting head and punching press counterdie, this punching press counterdie is provided with port in the direction along described the second path of travel, leave the space between described cutting head and the punching press counterdie, the gap of described the first feed appliance, described space and described guide wheel are in equal height.
9. the equipment of bamboo is inserted in synchronous processing according to claim 8 and package, it is characterized in that described punching press counterdie includes support portion and pedestal, and described support portion surrounds sinking space, and described pedestal is covered with the flexible glue pad in the corresponding part of sinking space.
10. the equipment of bamboo is inserted in synchronous processing according to claim 4 and package, it is characterized in that, it also includes initiative driver, and described rewinding wheel and garbage collection wheel are equipped with the centre of gration wheel, and snare has belt between described initiative driver and the centre of gration wheel.
CN2012103980680A 2012-10-18 2012-10-18 Method for processing and winding collar stays synchronously and equipment thereof Pending CN102874646A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103980680A CN102874646A (en) 2012-10-18 2012-10-18 Method for processing and winding collar stays synchronously and equipment thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103980680A CN102874646A (en) 2012-10-18 2012-10-18 Method for processing and winding collar stays synchronously and equipment thereof

Publications (1)

Publication Number Publication Date
CN102874646A true CN102874646A (en) 2013-01-16

Family

ID=47476214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103980680A Pending CN102874646A (en) 2012-10-18 2012-10-18 Method for processing and winding collar stays synchronously and equipment thereof

Country Status (1)

Country Link
CN (1) CN102874646A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3191557A (en) * 1962-12-26 1965-06-29 Moore Verda Marie Shirt collar and cuff forming machine
GB1528225A (en) * 1976-02-23 1978-10-11 Excello Shirt Prod Ltd Method for the manufacture of collar stiffeners
US4223815A (en) * 1978-09-25 1980-09-23 Oxford Industries, Inc. Post form stay inserter for shirt collars
CN101269495A (en) * 2008-04-30 2008-09-24 徐剑锋 Spacing mould beam cutter for button cell production
CN201272056Y (en) * 2008-09-30 2009-07-15 潘泽民 Continuous splitting molding machine for anti-theft label
CN201342686Y (en) * 2008-08-07 2009-11-11 天津北科精工自动化科技发展有限责任公司 Adhesive tape blanking and adhering device
CN201473107U (en) * 2009-09-04 2010-05-19 武汉市源发塑料制品有限公司 Multi-head traction machine for nylon heat-insulating strip production line
CN201644675U (en) * 2010-01-11 2010-11-24 南通大地电气有限公司 Automatic feeding and cutting-off device for fixed-length wire
CN102059458A (en) * 2010-12-28 2011-05-18 惠州市正峰激光设备有限公司 Laser cutting machine of roll-shaped glue film
CN202864556U (en) * 2012-10-18 2013-04-10 广东溢达纺织有限公司 Package collar stay device capable of synchronous machining

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3191557A (en) * 1962-12-26 1965-06-29 Moore Verda Marie Shirt collar and cuff forming machine
GB1528225A (en) * 1976-02-23 1978-10-11 Excello Shirt Prod Ltd Method for the manufacture of collar stiffeners
US4223815A (en) * 1978-09-25 1980-09-23 Oxford Industries, Inc. Post form stay inserter for shirt collars
CN101269495A (en) * 2008-04-30 2008-09-24 徐剑锋 Spacing mould beam cutter for button cell production
CN201342686Y (en) * 2008-08-07 2009-11-11 天津北科精工自动化科技发展有限责任公司 Adhesive tape blanking and adhering device
CN201272056Y (en) * 2008-09-30 2009-07-15 潘泽民 Continuous splitting molding machine for anti-theft label
CN201473107U (en) * 2009-09-04 2010-05-19 武汉市源发塑料制品有限公司 Multi-head traction machine for nylon heat-insulating strip production line
CN201644675U (en) * 2010-01-11 2010-11-24 南通大地电气有限公司 Automatic feeding and cutting-off device for fixed-length wire
CN102059458A (en) * 2010-12-28 2011-05-18 惠州市正峰激光设备有限公司 Laser cutting machine of roll-shaped glue film
CN202864556U (en) * 2012-10-18 2013-04-10 广东溢达纺织有限公司 Package collar stay device capable of synchronous machining

Similar Documents

Publication Publication Date Title
CN203331090U (en) Flat board die-cutting machine
CN204150320U (en) Roll labeling head and high-precision full-automatic electronic cigarette labelling machine at a high speed
CN104741927B (en) Slicing machine for producing laminated pole pieces
CN204278623U (en) Reeled paper gold-stamping, embossing, cross cutting, stripping all-in-one
CN106081216B (en) Cillin bottle high-speed packaging production line
CN103950621B (en) A kind of Bag Making Machine making bundle pocket
CN202540806U (en) Paper bag port folding and bonding device
CN202593947U (en) Automatic paper spreading device
CN203726900U (en) Paper bag snapping mechanism of paper bag machine
CN202864556U (en) Package collar stay device capable of synchronous machining
CN105292553B (en) A kind of automatic bag sponge device
CN104029867B (en) A kind of formation filling machine enter to mark label device
CN206519512U (en) A kind of shaping unit of drawer connecting piece
CN102874646A (en) Method for processing and winding collar stays synchronously and equipment thereof
CN104210719A (en) Label separation device of non-dry sticker labeling machine
CN205380727U (en) Flat two -seater cross cutting machine of high -speed concora crush
CN204383888U (en) Label automatic separator
CN203937897U (en) A kind of automatic coating head mechanism
CN108557207A (en) Super large width curved surface labelling machine
CN205602269U (en) Full -automatic PE sticker machine
CN203767253U (en) Opening binding bag and bag making machine
CN204453114U (en) A kind of full automaticity bottle holder equipment for coating film
CN208531863U (en) A kind of contraposition Kun knife and the multilayer tape process units with contraposition Kun knife
CN104554955B (en) A kind of full-automatic bottle holder film covering method and equipment
CN203418584U (en) Die-cutting machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130116