Summary of the invention
The technical problem that the present invention will solve is:
1, solves the high problem of the big maintenance cost of submersible pump power consumption;
The problem of 2, isolating the leaf duckweed that settling tank top layer oil descends slowly and lightly;
3, solve the problem of quantitative draining;
The present invention also should solve simultaneously in the technical barrier of implementing to overcome, 1 in addition) problem of slideway and sleeve jam; 2) deformation problems of support slideway; 3) expansion pipe is prevented the problem that disconnects by the pulling force of floating drum; 4) expansion pipe guarantees the problem of sealing at telescopic process; 5) reach the problem that the upper and lower limit water level stops, opening discharging automatically; 6) problem of fine setting water displacement.
In order to solve above-mentioned all problems, the present invention adopts following technical scheme:
Comprise every the quantitatively unsteady discharging device of duckweed formula: slideway upper holder 1, inductance approach switch a2, floating drum 3, cloth weir board 4, drain box 5, floating drum setting device 6, draining expansion pipe 7, header 8, motorized valve 9, settling tank 10, pre-buried mount pad 11, support slideway base 12, lower retainer 13, support slideway 14, drain box orienting sleeve 15, upper limit device 16, bolt 17, inductance approach switch b18, drain box rising pipe 5-1, drain box end plate 5-2, floating drum is regulated bolt 6-1, floating drum is regulated upper bracket 6-2, regulate locknut 6-3, floating drum holding nut 6-4, floating drum is regulated undersetting 6-5, spring washer 6-6, screwed retaining ring 6-7, expansion pipe a7-1, expansion pipe b7-2, gland bolt 7-3, gland 7-4, O RunddichtringO 7-5, tight fixed bolt 7-6, header joint 8-1, body 8-2 catchments, pre-buried mount pad bolt 11-1; It is characterized in that described four pack support slideway bases 12 are connected with four pre-buried mount pads 11 of settling tank 10 bottoms, pre-buried mount pad 11 is connected by bolt 17 with support slideway base 12; 4 pack support slideways 14 are vertically mounted on the support slideway base 12 with horizontal plane; Slideway upper holder 1 is equipped with on support slideway 14 tops, and drain box orienting sleeve 15 is welded to connect with drain box end plate 5-2; 4 groups of drain box orienting sleeves 15 are enclosed within on the 4 pack support slideways 14 on the drain box 5; Being welded to connect 3 drain box rising pipe 5-1 that are welded to connect on 3 header joint 8-1 and the drain box 5 on the header 8 is connected by 3 groups of draining expansion pipes 7; Drain box 5 front and back Packed drain box end plate 5-2, drain box end plate 5-2 are equipped with both sides the cloth weir board 4 of symmetry; Center, the floating drum 3 two ends floating drum holding nut 6-4 that has been welded, floating drum is regulated upper and lower bearing 6-2,6-5 and is welded on drain box end plate 5-2, floating drum 3 is positioned at floating drum to be regulated in the middle of upper bracket 6-2 and the floating drum adjusting undersetting 6-5, regulate bolt 6-1, floating drum by floating drum and regulate upper bracket 6-2, spring washer 6-6, locknut 6-3, floating drum holding nut 6-4, floating drum and regulate undersetting 6-5, screwed retaining ring 6-7 and connect firmly, screwed retaining ring 6-7 is 2mm with the gap of floating drum adjusting lower bracket; Inductance is positioned at the drain box 5-2 end plate two ends of close support slideway 14 near switch b18 near switch a2 and inductance, lower retainer 13 is welded to connect at the support slideway 14 lower end lowest water level place of inductance near switch a2 one end, and upper limit device 16 is welded to connect at the support slideway 14 upper end top water-level place of inductance near switch b18 one end; Motorized valve 9 is contained in header 8 and leans out on the settling tank 10 outer pipelines.
2, described slideway upper holder 1 is characterized in that 1 two angle bar intersections of anchor are welded to connect, and slideway upper holder 1 is connected fastening by bolt 17 with support slideway 14.
3, described support slideway 14 and drain box orienting sleeve 15 is characterized in that one-sided gap 3 ~ 4mm total backlash, the 6 ~ 8mm of support slideway 14 and drain box orienting sleeve 15, and drain box orienting sleeve 15 upper and lower port angle α=15 ° are welded to connect at the hydraucone of inductance near the lowest water level place, support slideway 14 lower end of switch a2 one end.
4, described draining expansion pipe 7 has 3 groups it is characterized in that, every group by 3 the joint form, each draining expansion pipe b7-2 junction is embedded with 2 road O RunddichtringOs, there is tight fixed bolt 7-6 the fixed connection place, the active connection place is provided with gland 7-4, draining expansion pipe b7-2 has boss at upper track O RunddichtringO place, and gland 7-4 axial cross section endoporus is rectangle, and upper track O RunddichtringO boss place axial cross section outside surface is rectangle; Cover fits over single face gap 1.5mm together, total backlash 3mm between every joint.
5, described cloth weir board 4 and drain box 5 is characterized in that but the every end in drain box 5 both sides has Gong the cloth weir board 4 of two above-below directions by the slotted hole of bolt up-down adjustment, and 2 cloth weir boards 4 are installed in drain box 5 both sides respectively by bolt on slotted hole.
6, described floating drum 3 and drain box 5 equal in length.
Every duckweed formula quantitatively float installation and the adjustment method of discharging device
Comprise slideway upper holder 1 every quantitatively the float installation method of discharging device of duckweed formula, inductance approach switch a2, floating drum 3, cloth weir board 4, drain box 5, floating drum setting device 6, draining expansion pipe 7, header 8, motorized valve 9, settling tank 10, pre-buried mount pad 11, support slideway base 12, lower retainer 13, support slideway 14, drain box orienting sleeve 15, upper limit device 16, bolt 17, inductance approach switch b18, drain box rising pipe 5-1, drain box end plate 5-2, floating drum is regulated bolt 6-1, floating drum is regulated upper bracket 6-2, regulate locknut 6-3, floating drum holding nut 6-4, floating drum is regulated undersetting 6-5, spring washer 6-6, screwed retaining ring 6-7, expansion pipe a7-1, expansion pipe b7-2, gland bolt 7-3, gland 7-4, O RunddichtringO 7-5, tight fixed bolt 7-6, header joint 8-1, body 8-2 catchments, the installation of pre-buried mount pad bolt 11-1 equipment is characterized in that installing by following steps:
Step 1: 4 pack support slideway bases 12 are installed on 4 pre-buried mount pads 11 of equalizing tank, connect by pre-buried mount pad bolt 11-1, the band upper nut, not fastening, a pretension stays a certain amount of gap;
Step 2: drain box 5 and slideway upper holder 1 are installed, pre-buried mount pad 11 and slideway upper holder 1 are used for guaranteeing the parallelism of each support slideway 14, drain box orienting sleeve 15 is welded on drain box end plate 5-2, slideway upper holder 1 is to have two angle bar to intersect to be welded, 4 groups of orienting sleeves on the drain box 5 are passed 4 pack support slideways 14, again slideway upper holder 1 is installed to support slideway 14 upper surfaces, and connect fastening with bolt 17, and then check between the junction surface of 4 pack support slideway bases 12 and 4 pre-buried mount pads 11 of equalizing tank whether pre-buried mount pad 11 is arranged, constructions such as support slideway base 12 welding, make the gap that error causes, as gapped, by could 4 nuts of foregoing support slideway base 12 on pretension are tightly firm after adding pad the gap being eliminated; One-sided gap digit 3 ~ 4mm total backlash 6 ~ 8mm of support slideway 14 and drain box orienting sleeve 15, the hydraucone of drain box orienting sleeve 15 upper and lower port angle α=15 ° the jam phenomenon occurs to prevent drain box orienting sleeve 15 when support slideway 14 moves up and down;
Step 3: header 8 is installed, 3 header joint 8-1 have been welded on the header 8, drain box rising pipe 5-1 has been welded on the drain box 5, header 8 is in place, calibrate the concentricity of 3 drain box rising pipe 5-1 and corresponding 3 header joint 8-1, adjust header 8 positions, make its both concentricity deviation≤1mm, fixed set water pipe 8;
Step 4: draining expansion pipe 7 is installed, draining expansion pipe 7 has 3 groups, every group by 3 the joint form, cover fits over single face gap 1.5mm together between every joint, total backlash 3mm, draining expansion pipe 7 each junction are embedded with 2 road O sealing-rings, the fixed connection place is provided with tight fixed bolt 7-6, the active connection place is provided with gland 7-4, and upper track O RunddichtringO 7-5 is provided with boss, stops mutually, gland 7-4 axial bore cross section is rectangle, upper track O RunddichtringO 7-5 boss place axial cross section outside surface is rectangle, and to prevent that respectively saving expansion pipe is pulled by the pulling force that floating drum floats, draining expansion pipe 7 is installed from bottom to top one by one; Back tightening gland bolt 7-3, and connect header joint 8-1 with tight fixed bolt 7-6;
Step 5: install and fix cloth weir board 4, the every end in drain box 5 both sides has the slotted hole of two above-below directions, 2 cloth weir boards 4 utilize slotted hole to be installed in drain box 5 both sides respectively, 2 cloth weir boards 4 are installed the lowest part that is fastened on slotted hole, slotted hole is set realizes cloth weir board 4 up-down adjustment, when floating drum 3 when up regulated quantity is not enough, can be by reducing aquifer yields toward adjusted water distribution weir plate 4;
Step 6: floating drum 3 is installed, the floating drum 3 two ends centers floating drum holding nut 6-4 that has been welded, on floating drum is regulated, undersetting is welded on drain box end plate 5-2, floating drum is placed in floating drum to be regulated upper bracket 6-2 and floating drum and regulates in the middle of the undersetting 6-5, floating drum is regulated bolt 6-1 pass floating drum adjusting upper bracket 6-2, put spring washer 6-6, screw on and regulate locknut 6-3, screw in floating drum holding nut 6-4, regulate undersetting 6-5 until passing floating drum, again a screwed retaining ring 6-7 is screwed on, the total backlash of adjusting screwed retaining ring 6-7 and floating drum adjusting lower bracket is 2mm, the shock mount pad, put on second screwed retaining ring 6-7, and rather fasten, the rotation floating drum is regulated bolt 6-1 can make floating drum move up and down along floating drum adjusting bolt 6-1, in use when drain box 5 drain discharges transfer to design discharge, fastening adjustment locknut 6-3;
Step 7: after the floating drum assembling, zone and settling tank 10 top layers that two floating drums and two drain box end plate 5-2 surround separate, and make the clear liquid under the top layer enter drain box 5 by turning on the floating drum 3 times;
Step 8: inductance approach switch is installed, on, lower retainer, motorized valve 9, inductance approach switch a2 is installed near near the drain box end plate 5-2 one of them support slideway 14, lower retainer 13 is positioned near the inductance approach switch a2 lowest water level place, support slideway 14 lower end, horizontal adjustment makes it in the distance h=6 ± 1mm of inductance approach switch a2 contact and lower retainer vertical line, then lower retainer 13 is welded on the support slideway 14, inductance approach switch b18 is installed in opposite side near near the drain box end plate 5-2 the support slideway 14, upper limit device 16 is positioned near the inductance approach switch b18 top water-level place, support slideway 14 upper end, horizontal adjustment make its in the inductance approach switch contact with the distance h=6 ± 1mm of upper limit device vertical line, then upper limit device 16 is welded on the support slideway 14, motorized valve 9 is installed in header 8 leans out on the outer pipeline of equalizing tank.
Step 1: debugging aquifer yield, open motorized valve 9, observe sewage works drain discharge meter, when water displacement during greater than the sewage works design discharge, the rotation floating drum is regulated bolt 6-1, adjusts floating drum 3 downwards, drain box 5 come-ups, cloth weir board 4 draft amounts reduce, and namely cloth weir board 4 degree of depth of descending point to dive beneath the water most reduces, and drain discharge reduces, otherwise, to adjusted floating drum 3, increase the draft of cloth weir board 4, drain discharge increases, equal design discharge until regulating drain discharge, fastening adjustment locknut 6-3, the relative position of maintenance floating drum 3 and cloth weir board 4 guarantees stable aquifer yield;
Step 2: in the use, when settling tank 10 flooding quantitys equaled the drain box drain discharge, drain box 5 was stabilized on the certain liquid, when less than drain discharge, settling tank 10 liquid levels constantly descend, drain box 5 can constantly descend thereupon, to lower retainer 13, namely during lowest water level, inductance approach switch a2 is near lower retainer 13, lower retainer 13 is sent signal, closes motorized valve 9, stops draining, drain box 5 namely stops, along with continuing water inlet, liquid level rises, and settling tank 10 liquid levels constantly rise, drain box 5 can constantly rise thereupon, during supreme stopper 16, namely during top water-level, inductance approach switch b18 is near upper limit device 16, upper limit device 16 sends signal, deliver to sewage works pump sump sump pump and and motorized valve 9, make its termination of pumping, stop to send water and opening motorized valve 9 to settling tank, the beginning draining, drain box 5 is along with the continuation of draining, and liquid level begins to descend, and has guaranteed that liquid level is no more than top water-level.
Beneficial effect
Facility investment, operation expense every the quantitatively unsteady unpowered energy consumption of discharging device of duckweed formula, saving submersible pump are low; Need not safeguard almost do not have maintenance cost after disposable the adjusting; And because the water of discharging is the clear liquid of settling tank all the time, its effluent quality is better than the water that submersible pump is discharged, and then has alleviated the load of next stage treatment facility.
Because isometric every quantitatively float floating drum and the drain box of discharging device of duckweed formula, the water that enters drain box enters drain box by turning on the floating drum bottom, so greasy dirt or the drift on top layer separated the assurance effluent characteristics by floating drum during draining.
Quantitatively floating every the duckweed formula, to have the surplus of adjusting big for discharging device, and a covering device need not to increase the needs of the quantitative discharging of the advection oil partiting precipitation pool that facility investment can solve the treatment capacity that varies in size.
Every the quantitatively unsteady discharging device of duckweed formula, fixing solid firm to the slideway upper holder from base to the support slideway base, the jam of avoiding support slideway generation deformation to cause drain box up and down reciprocatingly to move.
Preset clearance and drain box orienting sleeve port angle α between support slideway and drain box orienting sleeve=15 ° can effectively avoid the jam that drain box slides up and down.
Each draining expansion pipe junction is embedded with the O RunddichtringO and guarantees sealing, and there is boss at the sealing-ring place, can prevent effectively that expansion pipe from being prevented disconnection problem by the pulling force of floating drum.
When reaching the lower limit water level, the water of settling tank can stop automatically.
Adjusting by cloth weir board altitude mixture control and float-level height can realize quantitative draining, can be to floating drum upper-lower position fine setting by the floating drum setting device, and fine setting operation is simple.
Embodiment
Embodiment 1
Be described further every the quantitatively unsteady discharging device of duckweed formula of the present invention below in conjunction with embodiment
Comprise every the quantitatively unsteady discharging device of duckweed formula: slideway upper holder 1, inductance approach switch a2, floating drum 3, cloth weir board 4, drain box 5, floating drum setting device 6, draining expansion pipe 7, header 8, motorized valve 9, settling tank 10, pre-buried mount pad 11, support slideway base 12, lower retainer 13, support slideway 14, drain box orienting sleeve 15, upper limit device 16, bolt 17, inductance approach switch b18, drain box rising pipe 5-1, drain box end plate 5-2, floating drum is regulated bolt 6-1, floating drum is regulated upper bracket 6-2, regulate locknut 6-3, floating drum holding nut 6-4, floating drum is regulated undersetting 6-5, spring washer 6-6, screwed retaining ring 6-7, expansion pipe a7-1, expansion pipe b7-2, gland bolt 7-3, gland 7-4, O RunddichtringO 7-5, tight fixed bolt 7-6, header joint 8-1, body 8-2 catchments, pre-buried mount pad bolt 11-1; It is characterized in that described four pack support slideway bases 12 are connected with four pre-buried mount pads 11 of settling tank 10 bottoms, pre-buried mount pad 11 is connected by bolt 17 with support slideway base 12; 4 pack support slideways 14 are vertically mounted on the support slideway base 12 with horizontal plane; Slideway upper holder 1 is equipped with on support slideway 14 tops, and drain box orienting sleeve 15 is welded to connect with drain box end plate 5-2; 4 groups of drain box orienting sleeves 15 are enclosed within on the 4 pack support slideways 14 on the drain box 5; Being welded to connect 3 drain box rising pipe 5-1 that are welded to connect on 3 header joint 8-1 and the drain box 5 on the header 8 is connected by 3 groups of draining expansion pipes 7; Drain box 5 front and back Packed drain box end plate 5-2, drain box end plate 5-2 are equipped with both sides the cloth weir board 4 of symmetry; Center, the floating drum 3 two ends floating drum holding nut 6-4 that has been welded, on floating drum is regulated, undersetting 6-2,6-5 is welded on drain box end plate 5-2, floating drum 3 is positioned at floating drum to be regulated in the middle of upper bracket 6-2 and the floating drum adjusting undersetting 6-5, regulate bolt 6-1 by floating drum, floating drum is regulated upper bracket 6-2, spring washer 6-6, locknut 6-3, floating drum holding nut 6-4, floating drum is regulated undersetting 6-5, screwed retaining ring 6-7 connects firm, the gap that screwed retaining ring 6-7 and floating drum are regulated lower bracket is 2mm, the rotation floating drum is regulated bolt 6-1 can make floating drum move up and down along floating drum adjusting bolt 6-1, in use when drain box 5 drain discharges transfer to design discharge, fastening adjustment locknut 6-3, the relative position that can keep floating drum and cloth weir board 4 guarantees stable aquifer yield; Inductance is positioned at the drain box 5-2 end plate two ends of close support slideway 14 near switch b18 near switch a2 and inductance, lower retainer 13 is welded to connect at the support slideway 14 lower end lowest water level place of inductance near switch a2 one end, and upper limit device 16 is welded to connect at the support slideway 14 upper end top water-level place of inductance near switch b18 one end; Motorized valve 9 is contained in header 8 and leans out on the settling tank 10 outer pipelines.
2, described slideway upper holder 1 is characterized in that 1 two angle bar intersections of anchor are welded to connect, and slideway upper holder 1 is connected fastening by bolt 17 with support slideway 14.
3, described support slideway 14 and drain box orienting sleeve 15 is characterized in that one-sided gap 3 ~ 4mm total backlash, the 6 ~ 8mm of support slideway 14 and drain box orienting sleeve 15, and drain box orienting sleeve 15 upper and lower port angle α=15 ° are welded to connect at the hydraucone of inductance near the lowest water level place, support slideway 14 lower end of switch a2 one end.
4, described draining expansion pipe 7 has 3 groups it is characterized in that, every group by 3 the joint form, each draining expansion pipe b7-2 junction is embedded with 2 road O RunddichtringOs, there is tight fixed bolt 7-6 the fixed connection place, the active connection place is provided with gland 7-4, draining expansion pipe b7-2 has boss at upper track O RunddichtringO place, and gland 7-4 axial cross section endoporus is rectangle, and upper track O RunddichtringO boss place axial cross section outside surface is rectangle; Cover fits over single face gap 1.5mm together, total backlash 3mm between every joint.
5, described cloth weir board 4 and drain box 5 is characterized in that but the every end in drain box 5 both sides has Gong the cloth weir board 4 of two above-below directions by the slotted hole of bolt up-down adjustment, and 2 cloth weir boards 4 are installed in drain box 5 both sides respectively by bolt on slotted hole.
6, described floating drum 3 and drain box 5 equal in length.
Embodiment 2
Comprise slideway upper holder 1 every quantitatively the float installation method of discharging device of duckweed formula, inductance approach switch a2, floating drum 3, cloth weir board 4, drain box 5, floating drum setting device 6, draining expansion pipe 7, header 8, motorized valve 9, settling tank 10, pre-buried mount pad 11, support slideway base 12, lower retainer 13, support slideway 14, drain box orienting sleeve 15, upper limit device 16, bolt 17, inductance approach switch b18, drain box rising pipe 5-1, drain box end plate 5-2, floating drum is regulated bolt 6-1, floating drum is regulated upper bracket 6-2, regulate locknut 6-3, floating drum holding nut 6-4, floating drum is regulated undersetting 6-5, spring washer 6-6, screwed retaining ring 6-7, expansion pipe a7-1, expansion pipe b7-2, gland bolt 7-3, gland 7-4, O RunddichtringO 7-5, tight fixed bolt 7-6, header joint 8-1, body 8-2 catchments, the installation of pre-buried mount pad bolt 11-1 equipment is characterized in that installing by following steps:
Step 1: 4 pack support slideway bases 12 are installed on 4 pre-buried mount pads 11 of equalizing tank, connect by pre-buried mount pad bolt 11-1, the band upper nut, not fastening, pretension stays a certain amount of gap, in order to be convenient to adjust support slideway 14 when slideway upper holder 1 is installed;
Step 2: drain box 5 and slideway upper holder 1 are installed, pre-buried mount pad 11 and slideway upper holder 1 are used for guaranteeing the parallelism of each support slideway 14, drain box orienting sleeve 15 is welded on drain box end plate 5-2, slideway upper holder 1 is to have two angle bar to intersect to be welded, 4 groups of orienting sleeves on the drain box 5 are passed 4 pack support slideways 14, again slideway upper holder 1 is installed to support slideway 14 upper surfaces, and connect fastening with bolt 17, and then check between the junction surface of 4 pack support slideway bases 12 and 4 pre-buried mount pads 11 of equalizing tank whether pre-buried mount pad 11 is arranged, constructions such as support slideway base 12 welding, make the gap that error causes, as gapped, must the gap be eliminated by adding pad, could 4 nuts of foregoing support slideway base 12 on pretension are tightly firm, shimming not, directly fitting nut is eliminated the gap, easily cause support slideway 14 to produce interior curve stress, interior curve stress can cause 14 bendings of support slideway again, make that the parallelism of each support slideway 14 is overproof, influence drain box 5 easy on and off liftings;
The one-sided gap digit 3mm total backlash 6mm of support slideway 14 and drain box orienting sleeve 15, when this equipment design water displacement is big, dimensions increases thereupon, selecting for use bigger gap to be conducive to drain box 5 easy on and off moves, the hydraucone of drain box orienting sleeve 15 upper and lower port angle α=15 ° the jam phenomenon occurs to prevent drain box orienting sleeve 15 when support slideway 14 moves up and down;
Step 3: header 8 is installed, 3 header joint 8-1 have been welded on the header 8, drain box rising pipe 5-1 has been welded on the drain box 5, header 8 is in place, calibrate the concentricity of 3 drain box rising pipe 5-1 and corresponding 3 header joint 8-1, adjust header 8 positions, make its both concentricity deviation≤1mm, fixed set water pipe 8;
Step 4: draining expansion pipe 7 is installed, draining expansion pipe 7 has 3 groups, every group by 3 the joint form, cover fits over single face gap 1.5mm together between every joint, total backlash 3mm, draining expansion pipe 7 each junction are embedded with 2 road O sealing-rings, the fixed connection place is provided with tight fixed bolt 7-6, the active connection place is provided with gland 7-4, and upper track O RunddichtringO 7-5 is provided with boss, stops mutually, gland 7-4 axial bore cross section is rectangle, upper track O RunddichtringO 7-5 boss place axial cross section outside surface is rectangle, and to prevent that respectively saving expansion pipe is pulled by the pulling force that floating drum floats, draining expansion pipe 7 is installed from bottom to top one by one; Back tightening gland bolt 7-3, and connect header joint 8-1 with tight fixed bolt 7-6;
Step 5: install and fix cloth weir board 4, the every end in drain box 5 both sides has the slotted hole of two above-below directions, 2 cloth weir boards 4 utilize slotted hole to be installed in drain box 5 both sides respectively, 2 cloth weir boards 4 are installed the lowest part that is fastened on slotted hole, slotted hole is set realizes cloth weir board 4 up-down adjustment, when floating drum 3 when up regulated quantity is not enough, can be by reducing aquifer yields toward adjusted water distribution weir plate 4;
Step 6: floating drum 3 is installed, the floating drum 3 two ends centers floating drum holding nut 6-4 that has been welded, on floating drum is regulated, undersetting is welded on drain box end plate 5-2, floating drum is placed in floating drum to be regulated upper bracket 6-2 and floating drum and regulates in the middle of the undersetting 6-5, floating drum is regulated bolt 6-1 pass floating drum adjusting upper bracket 6-2, put spring washer 6-6, screw on and regulate locknut 6-3, screw in floating drum holding nut 6-4, regulate undersetting 6-5 until passing floating drum, again a screwed retaining ring 6-7 is screwed on, the total backlash of adjusting screwed retaining ring 6-7 and floating drum adjusting lower bracket is 2mm, the shock mount pad, put on second screwed retaining ring 6-7, and rather fasten, the rotation floating drum is regulated bolt 6-1 can make floating drum move up and down along floating drum adjusting bolt 6-1, in use can finely tune float draft, when drain box 5 drain discharges transfer to design discharge, fastening adjustment locknut 6-3 can keep the relative position of floating drum and cloth weir board 4, guarantees stable aquifer yield;
Step 7: after the floating drum assembling, zone and settling tank 10 top layers that two floating drums and two drain box end plate 5-2 surround separate, and make the clear liquid under the top layer enter drain box by turning on the floating drum 3 times, thereby the floating foreign material of prevention water surface enter drain box 5;
Step 8: inductance approach switch is installed, on, lower retainer, motorized valve 9, inductance approach switch a2 is installed near near the drain box end plate 5-2 one of them support slideway 14, lower retainer 13 is positioned near the inductance approach switch a2 lowest water level place, support slideway 14 lower end, horizontal adjustment makes it in the distance h=6 ± 1mm of inductance approach switch a2 contact and lower retainer vertical line, then lower retainer 13 is welded on the support slideway 14, inductance approach switch b18 is installed in opposite side near near the drain box end plate 5-2 the support slideway 14, upper limit device 16 is positioned near the inductance approach switch b18 top water-level place, support slideway 14 upper end, horizontal adjustment make its in the inductance approach switch contact with the distance h=6 ± 1mm of upper limit device vertical line, then upper limit device 16 is welded on the support slideway 14, motorized valve 9 is installed in header 8 leans out on the outer pipeline of equalizing tank.
2, may further comprise the steps every the quantitatively unsteady discharging device of duckweed formula, it is characterized in that,
Step 1: debugging aquifer yield, open motorized valve 9, observe sewage works drain discharge meter, when water displacement during greater than the sewage works design discharge, the rotation floating drum is regulated bolt 6-1, adjusts floating drum 3 downwards, drain box 5 come-ups, cloth weir board 4 draft amounts reduce, and namely cloth weir board 4 degree of depth of descending point to dive beneath the water most reduces, and drain discharge reduces, otherwise, to adjusted floating drum 3, increase the draft of cloth weir board 4, drain discharge increases, equal design discharge until regulating drain discharge, fastening adjustment locknut 6-3, the relative position of maintenance floating drum 3 and cloth weir board 4 guarantees stable aquifer yield;
Step 2: in the use, when settling tank 10 flooding quantitys equaled the drain box drain discharge, drain box 5 was stabilized on the certain liquid, when less than drain discharge, settling tank 10 liquid levels constantly descend, drain box 5 can constantly descend thereupon, to lower retainer 13, namely during lowest water level, inductance approach switch a2 is near lower retainer 13, lower retainer 13 is sent signal, closes motorized valve 9, stops draining, drain box 5 namely stops, along with continuing water inlet, liquid level rises, and settling tank 10 liquid levels constantly rise, drain box 5 can constantly rise thereupon, during supreme stopper 16, namely during top water-level, inductance approach switch b18 is near upper limit device 16, upper limit device 16 sends signal, deliver to sewage works pump sump sump pump and and motorized valve 9, make its termination of pumping, stop to send water and opening motorized valve 9 to settling tank, the beginning draining, drain box 5 is along with the continuation of draining, and liquid level begins to descend, and has guaranteed that liquid level is no more than top water-level.
Embodiment 3
Quantitatively installation and the adjustment method of unsteady discharging device comprise slideway upper holder 1 every the duckweed formula, inductance approach switch a2, floating drum 3, cloth weir board 4, drain box 5, floating drum setting device 6, draining expansion pipe 7, header 8, motorized valve 9, settling tank 10, pre-buried mount pad 11, support slideway base 12, lower retainer 13, support slideway 14, drain box orienting sleeve 15, upper limit device 16, bolt 17, inductance approach switch b18, drain box rising pipe 5-1, drain box end plate 5-2, floating drum is regulated bolt 6-1, floating drum is regulated upper bracket 6-2, regulate locknut 6-3, floating drum holding nut 6-4, floating drum is regulated undersetting 6-5, spring washer 6-6, screwed retaining ring 6-7, expansion pipe a7-1, expansion pipe b7-2, gland bolt 7-3, gland 7-4, O RunddichtringO 7-5, tight fixed bolt 7-6, header joint 8-1, body 8-2 catchments, the installation of pre-buried mount pad bolt 11-1 equipment is characterized in that installing by following steps:
Step 1: 4 pack support slideway bases 12 are installed on 4 pre-buried mount pads 11 of equalizing tank, connect by pre-buried mount pad bolt 11-1, the band upper nut, not fastening, pretension stays a certain amount of gap, in order to be convenient to adjust support slideway 14 when slideway upper holder 1 is installed;
Step 2: drain box 5 and slideway upper holder 1 are installed, pre-buried mount pad 11 and slideway upper holder 1 are used for guaranteeing the parallelism of each support slideway 14, drain box orienting sleeve 15 is welded on drain box end plate 5-2, slideway upper holder 1 is to have two angle bar to intersect to be welded, 4 groups of orienting sleeves on the drain box 5 are passed 4 pack support slideways 14, again slideway upper holder 1 is installed to support slideway 14 upper surfaces, and connect fastening with bolt 17, and then check between the junction surface of 4 pack support slideway bases 12 and 4 pre-buried mount pads 11 of equalizing tank whether pre-buried mount pad 11 is arranged, constructions such as support slideway base 12 welding, make the gap that error causes, as gapped, must the gap be eliminated by adding pad, could 4 nuts of foregoing support slideway base 12 on pretension are tightly firm, shimming not, directly fitting nut is eliminated the gap, easily cause support slideway 14 to produce interior curve stress, interior curve stress can cause 14 bendings of support slideway again, make that the parallelism of each support slideway 14 is overproof, influence drain box 5 easy on and off liftings;
The one-sided gap digit 4mm total backlash 8mm of support slideway 14 and drain box orienting sleeve 15, when this equipment design water displacement is big, dimensions increases thereupon, selecting for use bigger gap to be conducive to drain box 5 easy on and off moves, the hydraucone of drain box orienting sleeve 15 upper and lower port angle α=15 ° the jam phenomenon occurs to prevent drain box orienting sleeve 15 when support slideway 14 moves up and down;
Step 3: header 8 is installed, 3 header joint 8-1 have been welded on the header 8, drain box rising pipe 5-1 has been welded on the drain box 5, header 8 is in place, calibrate the concentricity of 3 drain box rising pipe 5-1 and corresponding 3 header joint 8-1, adjust header 8 positions, make its both concentricity deviation≤1mm, fixed set water pipe 8;
Step 4: draining expansion pipe 7 is installed, draining expansion pipe 7 has 3 groups, every group by 3 the joint form, cover fits over single face gap 1.5mm together between every joint, total backlash 3mm, draining expansion pipe 7 each junction are embedded with 2 road O sealing-rings, the fixed connection place is provided with tight fixed bolt 7-6, the active connection place is provided with gland 7-4, and upper track O RunddichtringO 7-5 is provided with boss, stops mutually, gland 7-4 axial bore cross section is rectangle, upper track O RunddichtringO 7-5 boss place axial cross section outside surface is rectangle, and to prevent that respectively saving expansion pipe is pulled by the pulling force that floating drum floats, draining expansion pipe 7 is installed from bottom to top one by one; Back tightening gland bolt 7-3, and connect header joint 8-1 with tight fixed bolt 7-6;
Step 5: install and fix cloth weir board 4, the every end in drain box 5 both sides has the slotted hole of two above-below directions, 2 cloth weir boards 4 utilize slotted hole to be installed in drain box 5 both sides respectively, 2 cloth weir boards 4 are installed the lowest part that is fastened on slotted hole, slotted hole is set realizes cloth weir board 4 up-down adjustment, when floating drum 3 when up regulated quantity is not enough, can be by reducing aquifer yields toward adjusted water distribution weir plate 4;
Step 6: floating drum 3 is installed, the floating drum 3 two ends centers floating drum holding nut 6-4 that has been welded, on floating drum is regulated, undersetting is welded on drain box end plate 5-2, floating drum is placed in floating drum to be regulated upper bracket 6-2 and floating drum and regulates in the middle of the undersetting 6-5, floating drum is regulated bolt 6-1 pass floating drum adjusting upper bracket 6-2, put spring washer 6-6, screw on and regulate locknut 6-3, screw in floating drum holding nut 6-4, regulate undersetting 6-5 until passing floating drum, again a screwed retaining ring 6-7 is screwed on, the total backlash of adjusting screwed retaining ring 6-7 and floating drum adjusting lower bracket is 2mm, the shock mount pad, put on second screwed retaining ring 6-7, and rather fasten, the rotation floating drum is regulated bolt 6-1 can make floating drum move up and down along floating drum adjusting bolt 6-1, in use can finely tune float draft, when drain box 5 drain discharges transfer to design discharge, fastening adjustment locknut 6-3 can keep the relative position of floating drum and cloth weir board 4, guarantees stable aquifer yield;
Step 7: after the floating drum assembling, zone and settling tank 10 top layers that two floating drums and two drain box end plate 5-2 surround separate, and make the clear liquid under the top layer enter drain box by turning on the floating drum 3 times, thereby the floating foreign material of prevention water surface enter drain box 5;
Step 8: inductance approach switch is installed, on, lower retainer, motorized valve 9, inductance approach switch a2 is installed near near the drain box end plate 5-2 one of them support slideway 14, lower retainer 13 is positioned near the inductance approach switch a2 lowest water level place, support slideway 14 lower end, horizontal adjustment makes it in the distance h=6 ± 1mm of inductance approach switch a2 contact and lower retainer vertical line, then lower retainer 13 is welded on the support slideway 14, inductance approach switch b18 is installed in opposite side near near the drain box end plate 5-2 the support slideway 14, upper limit device 16 is positioned near the inductance approach switch b18 top water-level place, support slideway 14 upper end, horizontal adjustment make its in the inductance approach switch contact with the distance h=6 ± 1mm of upper limit device vertical line, then upper limit device 16 is welded on the support slideway 14, motorized valve 9 is installed in header 8 leans out on the outer pipeline of equalizing tank.
2, may further comprise the steps every the quantitatively unsteady discharging device of duckweed formula, it is characterized in that,
Step 1: debugging aquifer yield, open motorized valve 9, observe sewage works drain discharge meter, when water displacement during greater than the sewage works design discharge, the rotation floating drum is regulated bolt 6-1, adjusts floating drum 3 downwards, drain box 5 come-ups, cloth weir board 4 draft amounts reduce, and namely cloth weir board 4 degree of depth of descending point to dive beneath the water most reduces, and drain discharge reduces, otherwise, to adjusted floating drum 3, increase the draft of cloth weir board 4, drain discharge increases, equal design discharge until regulating drain discharge, fastening adjustment locknut 6-3, the relative position of maintenance floating drum 3 and cloth weir board 4 guarantees stable aquifer yield;
Step 2: in the use, when settling tank 10 flooding quantitys equaled the drain box drain discharge, drain box 5 was stabilized on the certain liquid, when less than drain discharge, settling tank 10 liquid levels constantly descend, drain box 5 can constantly descend thereupon, to lower retainer 13, namely during lowest water level, inductance approach switch a2 is near lower retainer 13, lower retainer 13 is sent signal, closes motorized valve 9, stops draining, drain box 5 namely stops, along with continuing water inlet, liquid level rises, and settling tank 10 liquid levels constantly rise, drain box 5 can constantly rise thereupon, during supreme stopper 16, namely during top water-level, inductance approach switch b18 is near upper limit device 16, upper limit device 16 sends signal, deliver to sewage works pump sump sump pump and and motorized valve 9, make its termination of pumping, stop to send water and opening motorized valve 9 to settling tank, the beginning draining, drain box 5 is along with the continuation of draining, and liquid level begins to descend, and has guaranteed that liquid level is no more than top water-level.