CN102861881B - Switching trolley for mold for core making machine - Google Patents
Switching trolley for mold for core making machine Download PDFInfo
- Publication number
- CN102861881B CN102861881B CN201210407285.1A CN201210407285A CN102861881B CN 102861881 B CN102861881 B CN 102861881B CN 201210407285 A CN201210407285 A CN 201210407285A CN 102861881 B CN102861881 B CN 102861881B
- Authority
- CN
- China
- Prior art keywords
- frame
- suspension bracket
- cylinder
- stretching
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The invention provides a switching trolley for a mold for a core making machine. The switching trolley comprises a frame mechanism, a stretching frame mechanism, a moving lifting frame mechanism, a control mechanism and a lifting device, wherein the frame mechanism comprises a base frame, braking wheels, a vertical guide rail, a vertical frame and a cross beam; the stretching frame mechanism comprises a stretching frame hydraulic cylinder, a stretching frame lifting frame, a stretching frame, a stretching frame cylinder and stretching frame wheels; the moving lifting frame mechanism comprises a lifting frame hydraulic cylinder, a lifting frame elevating frame, a lifting frame and a lifting frame cylinder; the control mechanism comprises a stretching frame hydraulic pedal, a lifting frame hydraulic pedal, a stretching frame flexible control valve, a lifting frame flexible control valve and a rapid air connector; and the lifting device comprises a mold lifting rod, a long mold lifting cable, a short mold lifting cable and a mold lifting pole. The switching trolley has the advantages that the stretching frame stretched from the stretching frame mechanism is inserted into a base frame platform of the core making machine, supporting points are provided for the core making machine, receiving of the mold for the lifting frame is facilitated, the mold is horizontally placed in the core making machine for positioning installation, the operation is safe, and the working efficiency is improved.
Description
Technical field
The present invention relates to Casting Equipment field, specifically a kind of core making machine die switches car.
Background technology
At casting field, casting is mounted with sand hopper mobile device, has a core making machine body panel below with metal die top with precoated sand core making machine, fork truck cannot enter operation lifting, affect installation, the dismantlement work of lower mould, all to rise after mould with the manpower oblique operation of push-and-pull by force with traveling crane at present, not only dangerous but also difficult operation and hinder equipment.
Summary of the invention
The present invention is directed to above problem, provide a kind of core making machine die to switch car, this switching car can be stretched the strong point and insert on core making machine platform chassis, stretches out suspension bracket frame and accepts mould location and installation, handling safety, convenience.
According to technical scheme of the present invention: a kind of core making machine die switches car, comprise vehicle frame mechanism, stretch frame mechanism, travelling bridge mechanism, controlling organization and suspender.
Described vehicle frame mechanism comprises body frame, is with stop wheel wheel, vertical guide rail, stand, crossbeam; The described frame mechanism of stretching comprises and stretches frame hydraulic cylinder, stretches frame crane, stretches frame-saw, stretches frame cylinder, stretches frame wheel; Described travelling bridge mechanism comprises suspension bracket hydraulic cylinder, suspension bracket crane, suspension bracket frame, suspension bracket cylinder; Described controlling organization comprise stretch frame hydraulic pressure pedal, suspension bracket hydraulic pressure pedal, stretch frame extension and contraction control valve, suspension bracket extension and contraction control valve, quick air pipe connector; Described suspender comprises mould suspension rod, the long hanger rope of mould, mould drop shot cable, mold hoisting load.
Technique effect of the present invention is: employing is stretched frame mechanism and stretched out frame-saw insertion core making machine platform chassis, for switching car, core making machine stretches out the strong point, be convenient to suspension bracket frame and stretch out and accept mould, mould translation is put into location and installation in core making machine, handling safety, convenient and reasonable.
Accompanying drawing explanation
Fig. 1 is the structural representation that core making machine die switches car.
Fig. 2 is a kind of working state schematic representation that core making machine die switches car.
The specific embodiment
Below in conjunction with the specific embodiment in 1 couple of the present invention of accompanying drawing, be described further.
Fig. 1, Fig. 2 comprises body frame 1, band is stopped and is taken turns wheel 1-1, perpendicular guide rail 1-2, stand 1-3, crossbeam 1-4, stretch frame hydraulic cylinder 2, stretch frame crane 2-1, stretch frame-saw 2-2, stretch frame cylinder 2-3, stretch frame-saw hole 2-4, stretch frame wheel 2-5, suspension bracket hydraulic cylinder 3, suspension bracket crane 3-1, suspension bracket 3-2, suspension bracket cylinder 3-3, suspension bracket cross-arm hole 3-4, hanging box 3-0, stretch frame lifting pedal 4, suspension bracket lifting pedal 4-1, stretch frame cylinder hand control valve 4-2, suspension bracket cylinder control valve 4-3, gas joint 4-4, gas source connector 4-0, mould 00, mould suspension rod 01, long hanger rope 02, drop shot cable 03, mold hoisting load 04, core making machine body panel 05 etc.
As shown in Figure 1 and Figure 2, the present invention is that a kind of core making machine die switches car, comprises vehicle frame mechanism, stretches frame mechanism, travelling bridge mechanism, controlling organization, suspender.
Described vehicle frame mechanism is provided with body frame 1, and body frame 1 bottom is provided with is with the wheel wheel 1-1 that stops, and body frame 1 top is equipped with perpendicular guide rail 1-2, stand 1-3, crossbeam 1-4, and frame mechanism, travelling bridge mechanism are stretched in the upper setting of perpendicular guide rail 1-2, and stand 1-3 is provided with controlling organization.
The described frame mechanism of stretching, comprises and stretches frame hydraulic cylinder 2, stretches frame crane 2-1, stretches frame-saw 2-2, stretches frame cylinder 2-3, stretches frame-saw hole 2-4, stretches frame wheel 2-5; Stretch frame hydraulic cylinder 2 and be arranged on body frame 1 middle part, stretching frame crane 2-1 two ends, to be arranged on perpendicular guide rail 1-2 upper, lower end, middle part with stretch frame hydraulic cylinder 2 hydraulic cylinder rod tops and be connected, stretching frame crane 2-1 can lifting on perpendicular guide rail 1-2; Middle part inner side arranges stretches frame cylinder 2-3, stretches frame-saw 2-2 and is arranged on and stretches frame crane 2-1 both sides, stretches frame-saw 2-2 front end and stretches frame-saw hole 2-4 and be connected with the cylinder rod top of stretching frame cylinder 2-3; Stretching frame-saw 2-2 front end is provided with two and stretches frame wheel 2-5.
Described travelling bridge mechanism comprise in suspension bracket hydraulic cylinder 3, suspension bracket crane 3-1, suspension bracket 3-2, suspension bracket cylinder 3-3, suspension bracket, carry on a shoulder pole hole 3-4; Suspension bracket hydraulic cylinder 3 is provided with two, be arranged on body frame 1 and stretch frame hydraulic cylinder 2 both sides, suspension bracket crane 3-1 two ends are placed in perpendicular guide rail 1-2 and go up, stretch frame crane 2-1 top, suspension bracket crane 3-1 lower end is connected with the hydraulic cylinder rod top of two suspension bracket hydraulic cylinders 3, and suspension bracket crane 3-1 can be in perpendicular guide rail 1-2 oscilaltion; Inner side, middle part is provided with suspension bracket cylinder 3-3; Suspension bracket 3-2 is arranged on suspension bracket crane 3-1 both sides, is provided with suspension bracket cross-arm hole 3-4 and is connected with the cylinder rod top of suspension bracket cylinder 3-3 in suspension bracket 3-2; Suspension bracket 3-2 front portion is hanging box 3-0, and mould 00 location and installation, for stretcher mold hoisting load 04, is accepted in hanging box 3-0 both sides.
Described controlling organization is stretched frame lifting pedal 4, suspension bracket lifting pedal 4-1 is arranged on body frame 1 one sides, stretches frame cylinder hand control valve 4-2, suspension bracket cylinder control valve 4-3, gas joint 4-4 are arranged on stand 1-3 mono-side; Gas source connector 4-0 is connected with air supply source on core making machine.
Described suspender comprises mould suspension rod 01, long hanger rope 02, drop shot cable 03, mold hoisting load 04; Drop shot cable 03 is provided with Liang Gencheng garden annular, and long hanger rope 02 two ends are connected with drop shot cable 03 respectively; Mould suspension rod 01 is provided with four, assigns in the electrical heating hole of mould 00 both sides, and for hanging drop shot cable 03, long hanger rope 02 middle-end is for travelling crane hook hanging; Mold hoisting load 04 is for accepting two drop shot cables 03 under the long hanger rope 02 under traveling crane, and the used time assigns in Liang Gen garden annular drop shot cable 03 and is placed in hanging box 3-0 both sides hanging mould 00.
The course of work of the present invention is as follows: core making machine die is switched to car and be placed in core making machine control surface, gas source connector 4-0 is connected with air supply source on core making machine, frame cylinder hand control valve 4-2 is stretched in unlatching, stretch frame cylinder 2-3 stretching frame-saw 2-2, stretch frame wheel 2-5 and stretch on core making machine body panel 05; With tiptoe, lift and stretch frame lifting pedal 4, put down and stretch frame-saw 2-2, stretch frame wheel 2-5, make to stretch frame wheel 2-5 and contact with core making machine body panel 05; Tramp with one's feet and step on suspension bracket lifting pedal 4-1, make hanging box 3-0 highly be applicable to hoisting height; With four mould suspension rods 01, assign in the electrical heating hole of mould 00 both sides, by drop shot cable 03Liang Gen garden annular, entangle respectively four relative suspension rods 01 firm, long hanger rope 02 is sling in driving, mould 00 is fallen in hanging box 3-0, by mold hoisting load 04, insert respectively in the two drop shot cables 03 that play, fall again driving and decontrol long hanger rope 02, mold hoisting load 04 is shelved on hanging box 3-0; Open suspension bracket cylinder control valve 4-3, suspension bracket cylinder 3-3 is pushed into core making machine hydraulic pilot plate top the mould 00 in hanging box 3-0, with tiptoe, lift suspension bracket lifting pedal 4-1, mould 00 is fallen into and in core making machine hydraulic pilot plate, penetrated bolt groove is compressed, with screw, emit the drop shot cable 03 that gets loose after mould 00 is installed; Close suspension bracket cylinder control valve 4-3, indentation hanging box 3-0; Tramp with one's feet to step on and stretch frame lifting pedal 4, rise and stretch frame-saw 2-2, close hand control valve 4-2, frame-saw 2-2 is stretched in indentation, takes out four mould suspension rods 01, hanger rope, mold hoisting load 04.
The present invention adopts and can stretch on carriage insertion core making machine platform chassis, with the suspension bracket frame stretching out, accepts mould location and installation, and handling safety, convenience, not only alleviate workpeople's labour intensity but also increase work efficiency.
Claims (1)
1. core making machine die switches a car, it is characterized in that: comprise vehicle frame mechanism, stretch frame mechanism, travelling bridge mechanism, controlling organization, suspender;
Described vehicle frame mechanism is provided with body frame (1), body frame (1) bottom is provided with is with the wheel wheel (1-1) of stopping, body frame (1) top is equipped with perpendicular guide rail (1-2), stand (1-3), crossbeam (1-4), the upper setting of perpendicular guide rail (1-2) stretched frame mechanism, travelling bridge mechanism, and stand (1-3) is provided with controlling organization;
The described frame mechanism of stretching, comprise and stretch frame hydraulic cylinder (2), stretch frame crane (2-1), stretch frame-saw (2-2), stretch frame cylinder (2-3), stretch frame-saw hole (2-4), stretch frame wheel (2-5), stretch frame hydraulic cylinder (2) and be arranged on body frame (1) middle part, stretching frame crane (2-1) two ends is arranged on perpendicular guide rail (1-2), lower end, middle part with stretch frame hydraulic cylinder (2) hydraulic cylinder rod top and be connected, stretching frame crane (2-1) can be in the upper lifting of perpendicular guide rail (1-2), inner side, middle part arranges stretches frame cylinder (2-3), stretching frame-saw (2-2) is arranged on and stretches frame crane (2-1) both sides, stretching frame-saw (2-2) front end stretches frame-saw hole (2-4) and is connected with the cylinder rod top of stretching frame cylinder (2-3), stretching frame-saw (2-2) front end is provided with two and stretches frame wheel (2-5),
Described travelling bridge mechanism comprises suspension bracket hydraulic cylinder (3), suspension bracket crane (3-1), suspension bracket (3-2), suspension bracket cylinder (3-3), in suspension bracket, carry on a shoulder pole hole (3-4), suspension bracket hydraulic cylinder (3) is provided with two, be arranged on body frame (1) and stretch frame hydraulic cylinder (2) both sides, suspension bracket crane (3-1) two ends are placed on perpendicular guide rail (1-2), stretch frame crane (2-1) top, suspension bracket crane (3-1) lower end is connected with the hydraulic cylinder rod top of two suspension bracket hydraulic cylinders (3), suspension bracket crane (3-1) can be in perpendicular guide rail (1-2) oscilaltion, inner side, middle part is provided with suspension bracket cylinder (3-3), suspension bracket (3-2) is arranged on suspension bracket crane (3-1) both sides, in suspension bracket (3-2), being provided with suspension bracket cross-arm hole (3-4) is connected with the cylinder rod top of suspension bracket cylinder (3-3), suspension bracket (3-2) front portion is hanging box (3-0), and mould (00) location and installation, for stretcher mold hoisting load (04), is accepted in hanging box (3-0) both sides,
Described controlling organization is stretched frame lifting pedal (4), suspension bracket lifting pedal (4-1) is arranged on body frame (1) one side, stretch frame cylinder hand control valve (4-2), suspension bracket cylinder control valve (4-3), gas joint (4-4) and be arranged on stand (1-3) side, gas source connector (4-0) is connected with air supply source on core making machine;
Described suspender comprises mould suspension rod (01), long hanger rope (02), drop shot cable (03), mold hoisting load (04), drop shot cable (03) is provided with two and becomes annular, long hanger rope (02) two ends are connected with drop shot cable (03) respectively, mould suspension rod (01) is provided with four, assign in the electrical heating hole of mould (00) both sides, be used for hanging drop shot cable (03), long hanger rope (02) middle-end is for travelling crane hook hanging, mold hoisting load (04) is for accepting two drop shot cables (03) under the long hanger rope (02) under traveling crane, used time assigns into and in two annular drop shot cables (03), is placed in hanging box (3-0) both sides hanging mould (00).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210407285.1A CN102861881B (en) | 2012-10-24 | 2012-10-24 | Switching trolley for mold for core making machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210407285.1A CN102861881B (en) | 2012-10-24 | 2012-10-24 | Switching trolley for mold for core making machine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102861881A CN102861881A (en) | 2013-01-09 |
CN102861881B true CN102861881B (en) | 2014-07-16 |
Family
ID=47441157
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210407285.1A Active CN102861881B (en) | 2012-10-24 | 2012-10-24 | Switching trolley for mold for core making machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102861881B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103611890B (en) * | 2013-12-16 | 2015-06-17 | 衢州市依科达节能技术有限公司 | Claw type inner die assembly arm |
CN105234355B (en) * | 2015-10-09 | 2017-07-14 | 无锡蠡湖增压技术股份有限公司 | A kind of core making machine is switched fast device with mould |
CN106180662B (en) * | 2016-08-31 | 2018-01-12 | 无锡蠡湖增压技术股份有限公司 | A kind of easy gravity force casting machine is switched fast car with metal pattern |
CN114087501B (en) * | 2021-11-12 | 2023-08-04 | 国网江苏省电力有限公司泰州供电分公司 | Portable power distribution facility lifting tool for construction |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1083741A (en) * | 1992-05-18 | 1994-03-16 | 加利福尼亚制片机公司 | A kind of rapid die change system that is used for pelletizer |
CN2271940Y (en) * | 1996-04-30 | 1998-01-07 | 长春华英高新技术公司 | Full-automatic vertical parting hot core box core making machine |
CN1244144A (en) * | 1997-11-26 | 2000-02-09 | 石川岛播磨重工业株式会社 | Apparatus and method for changing metal molds for plate thickness reducing presses, and press metal die |
DE10017315A1 (en) * | 2000-04-10 | 2001-10-18 | Bbg Braunsberger Gmbh & Co Kg | Device for the movable mounting of an upper mold |
CN2917863Y (en) * | 2006-05-24 | 2007-07-04 | 比亚迪股份有限公司 | Punch workbench casting exchange guide rail and guide bracket used with the same |
CN201087029Y (en) * | 2007-10-15 | 2008-07-16 | 佛山市南海鸿明号服装配料有限公司 | Automatic charging equipment for die cast |
CN201455117U (en) * | 2009-05-28 | 2010-05-12 | 湖北汽车工业学院 | Adjustable electric quick model changing vehicle |
-
2012
- 2012-10-24 CN CN201210407285.1A patent/CN102861881B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1083741A (en) * | 1992-05-18 | 1994-03-16 | 加利福尼亚制片机公司 | A kind of rapid die change system that is used for pelletizer |
CN2271940Y (en) * | 1996-04-30 | 1998-01-07 | 长春华英高新技术公司 | Full-automatic vertical parting hot core box core making machine |
CN1244144A (en) * | 1997-11-26 | 2000-02-09 | 石川岛播磨重工业株式会社 | Apparatus and method for changing metal molds for plate thickness reducing presses, and press metal die |
DE10017315A1 (en) * | 2000-04-10 | 2001-10-18 | Bbg Braunsberger Gmbh & Co Kg | Device for the movable mounting of an upper mold |
CN2917863Y (en) * | 2006-05-24 | 2007-07-04 | 比亚迪股份有限公司 | Punch workbench casting exchange guide rail and guide bracket used with the same |
CN201087029Y (en) * | 2007-10-15 | 2008-07-16 | 佛山市南海鸿明号服装配料有限公司 | Automatic charging equipment for die cast |
CN201455117U (en) * | 2009-05-28 | 2010-05-12 | 湖北汽车工业学院 | Adjustable electric quick model changing vehicle |
Also Published As
Publication number | Publication date |
---|---|
CN102861881A (en) | 2013-01-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202186848U (en) | Universal movable maintenance gantry crane | |
CN102861881B (en) | Switching trolley for mold for core making machine | |
CN203826828U (en) | Maintenance and conveyance platform for switch cabinet breaker | |
CN202148909U (en) | Operation vehicle for mounting tunnel arch trusses | |
CN102556854B (en) | Mine hydraulic hoisting traveling crane | |
CN104195903A (en) | Sleeper hoisting device | |
CN202729631U (en) | Mobile gantry crane | |
CN104167677A (en) | Adjustable special hydraulic moving lifting truck | |
CN204689550U (en) | The support of the hanging suspension hook of scissor lift | |
CN201381177Y (en) | Board lifting machine for high density wallboard | |
CN202346632U (en) | Mine hydraulic type lifting crane | |
CN201195668Y (en) | Movable cable saddle | |
CN205380260U (en) | Longmen box turnover machine | |
CN204873574U (en) | Hoist girder construction of stretching out and drawing back | |
CN205045732U (en) | Portable lifting device | |
CN106395640A (en) | Installation-detachment support for transformer | |
CN218290174U (en) | Double-beam bridge crane lifting mechanism | |
CN103663236A (en) | Heavy-type cover plate lifting device | |
CN215249164U (en) | Device height limiting passing device | |
CN203159073U (en) | Special multi-fulcrum overhang crane for maintaining hangar ceiling appliances | |
CN109236211A (en) | A kind of production rig | |
CN202518953U (en) | Crossed hoisting device for table-board weight of horizontal test stand | |
CN214456262U (en) | Concrete pump truck translation device and lining trolley | |
CN201276408Y (en) | Precast beam mobile device | |
CN204125032U (en) | A kind of material tool hoisting mechanism |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: WUXI LIHU PRESSURIZATION TECHNOLOGY CO., LTD. Free format text: FORMER NAME: WUXI LIHU WHEEL MANUFACTURE CO., LTD. |
|
CP03 | Change of name, title or address |