CN102856834A - 一种带电绑扎导线绝缘线轴 - Google Patents
一种带电绑扎导线绝缘线轴 Download PDFInfo
- Publication number
- CN102856834A CN102856834A CN201210137693XA CN201210137693A CN102856834A CN 102856834 A CN102856834 A CN 102856834A CN 201210137693X A CN201210137693X A CN 201210137693XA CN 201210137693 A CN201210137693 A CN 201210137693A CN 102856834 A CN102856834 A CN 102856834A
- Authority
- CN
- China
- Prior art keywords
- spool
- baffle plate
- hole
- electrified
- insulated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Storage Of Web-Like Or Filamentary Materials (AREA)
Abstract
本发明涉及带电施工操作工具领域,特别涉及了一种带电绑扎导线绝缘线轴。本发明包括挡板和轴体,所述的轴体的两端分别设有左端挡板和右端挡板,轴体通孔设在轴体上,左端挡板和右端挡板上分别设置有挡板通孔。本发明采用环氧树脂制作而成的绝缘线轴,可以更有效的避免过去外漏金属线触碰带电体或接地体的安全隐患。对当前电力企业的生产经营具有十分重要的意义,可以从根本上解决绝缘工具被刮伤的问题,带电绑扎导线绝缘线轴实际应用,为人身和设备安全提供了有效技术保障。同时,也为电力企业节约了大量的资金投入,将节省下来的资金投入的线路改造中,这不仅推动了电力企业经济效益的增长,并取得巨大的社会效益。
Description
技术领域
本发明涉及带电施工操作工具领域,特别涉及了一种带电绑扎导线绝缘线轴。
背景技术
近年来供电可靠率做为考核供电企业的一项重要指标,从达标的99.7%到创国际一流的99.99%,在社会环境的大背景下,带电作业已成为保证供电可靠率的一项重要措施,开展带电作业,它具有既适用于计划检修,又适用于故障抢修的优点,但带电作业的风险与其所带来的经济和社会效益并存。
传统的工作方式中,通常采用单股金属绑线盘成直径为60mm的圈状体进行操作。带电绑扎导线时容易出现对绝缘遮蔽刮伤情况,造成危险。中间电位作业工作人员与10kV带电线路零距离接触,绑扎线直径大小不一,金属线头不易控制,容易划伤遮蔽物,对导线进行恢复性绑扎时,此阶段手部疲劳感明显,容易造成作业动作偏差。
发明内容
本发明为了解决上述现有技术中存在的技术问题,而提供了一种带电绑扎导线绝缘线轴。目的是为了在带电绑扎导线时,有效的避免过去外漏金属线触碰带电体或接地体的安全隐患。
本发明解决其技术问题所采用的技术方案是:
一种带电绑扎导线绝缘线轴,包括挡板和轴体,所述的轴体的两端分别设有左端挡板和右端挡板,轴体通孔设在轴体上,左端挡板和右端挡板上分别设置有挡板通孔。
所述的左端挡板与右端挡板端面为圆形或椭圆形。
所述的所述的轴体与两端设置的左端挡板和右端挡板为整体结构。
所述的轴体通孔的中心线垂直于轴体的轴心线。
所述的通孔的中心线与轴体的轴心线平行。
本发明的优点:
本发明所述的带电绑扎导线用绝缘线轴,是采用环氧树脂制作而成的绝缘线轴,将金属绑线缠绕其上固定,提高绝缘等级,线轴大小适中,符合人体力学,使用舒适便于摆放和使用,有效解决作业人员手部疲劳,使金属绑扎线划伤绝缘遮蔽工器具的概率降低。由于绝缘线轴的使用,可以更有效的避免过去外漏金属线触碰带电体或接地体的安全隐患。对当前电力企业的生产经营具有十分重要的意义,可以从根本上解决绝缘工具被刮伤的问题,带电绑扎导线绝缘线轴实际应用,为人身和设备安全提供了有效技术保障。同时,也为电力企业节约了大量的资金投入,将节省下来的资金投入的线路改造中,这不仅推动了电力企业经济效益的增长,并取得巨大的社会效益。
附图说明
下面结合附图及实施方式对本发明作进一步详细的说明。
图1是本发明的主视方向示意图;
图2是图1的左视方向示意图。
图中:左端挡板1,轴体2,右端挡板3,轴体通孔4,挡板通孔5。
具体实施方式
实施例1
本实施例提供了一种带电绑扎导线绝缘线轴,包括左端挡板1,轴体2,右端挡板3,轴体通孔4,挡板通孔5。其中左端挡板1、轴体2和右端挡板3为整体结构,轴体通孔4处于轴体2上,通孔4的中心线垂直轴体2的轴心线,挡板通孔5位于左端挡板1和右端挡板3上,通孔5的中心线与轴体2轴心线平行。
所述的左端挡板1与右端挡板3端面均为圆形。
具体使用操作流程:首先将选择适合的金属绑线其中一端插入轴体通孔4中,不露出金属线头为准,然后将金属绑线顺时针方向紧密缠绕在轴体2上,满足工作需要为止,金属绑线另一端卡扣在挡板通孔5中,操作前将金属线头从挡板通孔5抽出,即可按带电绑扎导线作业标准执行。
实施例2
本发明提供了一种带电绑扎导线绝缘线轴,其中所述的左端挡板1与右端挡板3的端面均为椭圆形,目的是便于放置,防止滚动。其它同实施例1相同。
Claims (5)
1.一种带电绑扎导线绝缘线轴,包括挡板和轴体,其特征是:所述的轴体(2)的两端分别设有左端挡板(1)和右端挡板(3),轴体通孔(4)设在轴体(2)上,左端挡板(1)和右端挡板(3)上分别设置有挡板通孔(5)。
2.根据权利要求1所述的带电绑扎导线绝缘线轴,其特征在于:所述的左端挡板(1)与右端挡板(3)端面为圆形或椭圆形。
3.根据权利要求1所述的带电绑扎导线绝缘线轴,其特征在于:所述的轴体(2)与两端设置的左端挡板(1)和右端挡板(3)为整体结构。
4.根据权利要求1所述的带电绑扎导线绝缘线轴,其特征在于:所述的轴体通孔(4)的中心线垂直于轴体(2)的轴心线。
5.根据权利要求1所述的带电绑扎导线绝缘线轴,其特征在于:所述的通孔(5)的中心线与轴体(2)的轴心线平行。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210137693XA CN102856834A (zh) | 2012-05-07 | 2012-05-07 | 一种带电绑扎导线绝缘线轴 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210137693XA CN102856834A (zh) | 2012-05-07 | 2012-05-07 | 一种带电绑扎导线绝缘线轴 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102856834A true CN102856834A (zh) | 2013-01-02 |
Family
ID=47403152
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210137693XA Pending CN102856834A (zh) | 2012-05-07 | 2012-05-07 | 一种带电绑扎导线绝缘线轴 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102856834A (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2055817U (zh) * | 1989-08-17 | 1990-04-11 | 杨松涛 | 一种电线架 |
CN1085872A (zh) * | 1992-07-21 | 1994-04-27 | 贝克特股份有限公司 | 缠绕的方法 |
US20020023984A1 (en) * | 2000-08-31 | 2002-02-28 | J. L. Clark, Inc. | Three piece spool |
JP3640535B2 (ja) * | 1998-07-17 | 2005-04-20 | 日鐵住金溶接工業株式会社 | スプールへの溶接用細径ワイヤ始端部の係止構造および係止方法 |
WO2009118116A1 (en) * | 2008-03-28 | 2009-10-01 | Gimax S.R.L. | Reel for an automatic machine for spool rewinding having approached spiral coils |
CN201882713U (zh) * | 2010-11-29 | 2011-06-29 | 江苏省电力公司镇江供电公司 | 变电站接地线存放装置 |
CN202602165U (zh) * | 2012-05-07 | 2012-12-12 | 辽宁省电力有限公司沈阳供电公司 | 一种带电绑扎导线绝缘线轴 |
-
2012
- 2012-05-07 CN CN201210137693XA patent/CN102856834A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2055817U (zh) * | 1989-08-17 | 1990-04-11 | 杨松涛 | 一种电线架 |
CN1085872A (zh) * | 1992-07-21 | 1994-04-27 | 贝克特股份有限公司 | 缠绕的方法 |
JP3640535B2 (ja) * | 1998-07-17 | 2005-04-20 | 日鐵住金溶接工業株式会社 | スプールへの溶接用細径ワイヤ始端部の係止構造および係止方法 |
US20020023984A1 (en) * | 2000-08-31 | 2002-02-28 | J. L. Clark, Inc. | Three piece spool |
WO2009118116A1 (en) * | 2008-03-28 | 2009-10-01 | Gimax S.R.L. | Reel for an automatic machine for spool rewinding having approached spiral coils |
CN201882713U (zh) * | 2010-11-29 | 2011-06-29 | 江苏省电力公司镇江供电公司 | 变电站接地线存放装置 |
CN202602165U (zh) * | 2012-05-07 | 2012-12-12 | 辽宁省电力有限公司沈阳供电公司 | 一种带电绑扎导线绝缘线轴 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203645246U (zh) | 10kV带电作业绝缘遮蔽工具 | |
CN202602165U (zh) | 一种带电绑扎导线绝缘线轴 | |
CN203529605U (zh) | 接地线收纳装置 | |
CN203497856U (zh) | 一种新型接地线架 | |
CN202737356U (zh) | 高压隔离开关带电润滑装置 | |
CN102856834A (zh) | 一种带电绑扎导线绝缘线轴 | |
CN208189819U (zh) | 一种接地线夹 | |
CN204241645U (zh) | 一种应用于开关小车机构特性试验的接驳装置 | |
CN204030733U (zh) | 一种无线供电设备 | |
CN203365556U (zh) | 公变接地电阻测量临时接地装置 | |
CN203433033U (zh) | 一种简易安全高压验电器 | |
CN204189496U (zh) | 自发光试验短路线 | |
CN205183200U (zh) | 一种用于避雷器带电测试的绝缘杆 | |
CN203455394U (zh) | 一种验电器 | |
CN205429193U (zh) | 一种复合型防雷接地体 | |
CN205595474U (zh) | 10kV #1杆运维操作辅助装置 | |
CN202524020U (zh) | 一种防止相线间短路用绝缘挡板 | |
CN202939215U (zh) | 加长型110kV高压验电笔 | |
CN203522017U (zh) | 一种绝缘防护伞用防脱挂钩 | |
CN203918989U (zh) | 配电多功能作业平台 | |
CN203787860U (zh) | 一种针式绝缘子带电更换工具 | |
CN102983527A (zh) | 10kV带电断接引专用卡具和用其进行断接引的方法 | |
CN205157632U (zh) | 综合高压验电器 | |
CN203135308U (zh) | 多用提升顶套 | |
CN203760876U (zh) | 一种简易接地网检修装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130102 |