CN102856404B - Erecting device and wall-hanging solar battery component - Google Patents

Erecting device and wall-hanging solar battery component Download PDF

Info

Publication number
CN102856404B
CN102856404B CN201210379569.4A CN201210379569A CN102856404B CN 102856404 B CN102856404 B CN 102856404B CN 201210379569 A CN201210379569 A CN 201210379569A CN 102856404 B CN102856404 B CN 102856404B
Authority
CN
China
Prior art keywords
installation material
fixed frame
material fixed
groove
chute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210379569.4A
Other languages
Chinese (zh)
Other versions
CN102856404A (en
Inventor
边超
梁玉杰
石斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yingli Energy China Co Ltd
Original Assignee
Yingli Energy China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yingli Energy China Co Ltd filed Critical Yingli Energy China Co Ltd
Priority to CN201210379569.4A priority Critical patent/CN102856404B/en
Publication of CN102856404A publication Critical patent/CN102856404A/en
Application granted granted Critical
Publication of CN102856404B publication Critical patent/CN102856404B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The invention provides a kind of erecting device and wall-hanging solar battery component.Erecting device comprises: installation material fixed frame; Fixed mount, fixed mount comprises chute, and installation material fixed frame is connected with fixed mount by chute.Thing to be installed is connected with installation material fixed frame by the present invention, and is arranged on to be installed by the fixed mount with chute, and installation material fixed frame can be connected with fixed mount by chute, thus thing to be installed firmly can be arranged on to be installed.The present invention has easy-to-dismount feature, when dismantling thing to be installed, only needs installation material fixed frame to skid off from chute and can complete dismounting.Meanwhile, the erecting device in the present invention also has low cost of manufacture, the simple feature of structure.

Description

Erecting device and wall-hanging solar battery component
Technical field
The present invention relates to solar cell installing area, more specifically, relate to a kind of erecting device and wall-hanging solar battery component.
Background technology
Photovoltaic generation directly can convert solar energy to electric energy, and being a kind ofly does not need fuel, do not have to pollute the new and high technology that just can obtain electric energy.At present, China greatly develops photovoltaic industry, and solar cell industry is developed rapidly.Along with market competition is growing more intense, solar cell is no longer only applied in surface power station, and extend to building surface gradually.Now widely used product mainly comprises photovoltaic roof, and photovoltaic curtain wall and the side elevation at building install solar module.
Solar module of the prior art comprises support and lamination part of solar cell.Lamination part of solar cell can be placed on after on support by solar module of the prior art, is fixed on installed position.Lamination part of solar cell of the prior art is stacked gradually formed by glass, EVA material (abbreviation of vinyl-vinyl acetate copolymer), cell piece, EVA material and backboard, then after high temperature, high pressure, cure package, makes lamination part of solar cell.
Photovoltaic roof sets up a photovoltaic plant on roof exactly.But because the roof area of routine building thing is limited, and roof is provided with usually the facility (such as air-conditioning, machine room etc.) of some other building functions, thus make the utilized space on roof very little, be difficult to set up photovoltaic plant, and install on roof that solar module can destroy existing building structure, causes potential safety hazard, installation cost is also higher.
The application difficulty of photovoltaic curtain wall is higher, need just to consider how photovoltaic curtain wall is installed and be arranged in architectural at the architecture construction initial stage, thus by the human and material resources of at substantial, and newly-built asd number is limited, and thus the application of photovoltaic curtain wall has certain limitation.
Pass through support installing in prior art on the side elevation of building, and lamination part of solar cell is connected with support, thus solar module can be realized to be arranged on the side elevation of building, but solar module of the prior art has the inconvenient problem of dismounting.Due to building each side elevation towards all not identical, if be provided with solar module on the side elevation in each direction of building, along with the difference of sunshine, seasonal variations or Adjacent Buildings circumstance of occlusion, make each side elevation of building unbalanced by the intensity of illumination of the sun, thus cause the conversion efficiency of the solar module on different directions all not identical, which decrease the generating efficiency of solar module.
Summary of the invention
The present invention aims to provide a kind of erecting device and wall-hanging solar battery component, with the problem that the solar module dismounting solving prior art is inconvenient.
For solving the problems of the technologies described above, according to an aspect of the present invention, provide a kind of erecting device, comprising: installation material fixed frame; Fixed mount, fixed mount comprises chute, and installation material fixed frame is connected with fixed mount by chute.
Further, installation material fixed frame comprises the first installation material fixed frame, and the first installation material fixed frame comprises the first installation material draw-in groove.
Further, first installation material fixed frame also comprises the first kink of the one or both sides being arranged on the first installation material draw-in groove highlightedly, fixed mount comprises the first chute, and the first chute comprises the second kink matched with the first kink of the first installation material fixed frame.
Further, the inwall of the first installation material draw-in groove is provided with the first storage glue groove and the first delay tank, the first storage glue groove is arranged on the diapire of the first installation material draw-in groove, and the first delay tank is arranged on the madial wall of the first installation material draw-in groove.
Further, the madial wall of the first installation material draw-in groove is also provided with the first resistance glue groove, the first resistance glue slot is between the first storage glue groove and the notch of the first installation material draw-in groove.
Further, the first storage glue groove, the first delay tank and the first resistance glue groove are all arranged along the bearing of trend of the first installation material fixed frame.
Further, fixed mount also comprises the second chute, and the first chute and the second chute are arranged symmetrically.
Further, the fixed mount securing member that comprises installing hole and be connected with installing hole.
Further, installation material fixed frame comprises the second installation material fixed frame, second installation material fixed frame comprises the second installation material draw-in groove of the through setting of bearing of trend along the second installation material fixed frame, installation material fixed frame comprises two the first installation material fixed frames and two the second installation material fixed frames, and two ends of a first installation material fixed frame connect respectively by the end that second installation material fixed frame is corresponding with two of another the first installation material fixed frame.
According to another aspect of the present invention, provide a kind of wall-hanging solar battery component, comprise lamination part of solar cell, wall-hanging solar battery component also comprises above-mentioned erecting device, and lamination part of solar cell is connected with the installation material fixed frame of erecting device.
Thing to be installed is connected with installation material fixed frame by the present invention, and is arranged on to be installed by the fixed mount with chute, and installation material fixed frame can be connected with fixed mount by chute, thus thing to be installed firmly can be arranged on to be installed.The present invention has easy-to-dismount feature, when dismantling thing to be installed, only needs installation material fixed frame to skid off from chute and can complete dismounting.Meanwhile, the erecting device in the present invention also has low cost of manufacture, the simple feature of structure.
Accompanying drawing explanation
The accompanying drawing forming a application's part is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 diagrammatically illustrates the structural representation of the installation material fixed frame in the present invention;
Fig. 2 diagrammatically illustrates the structural representation of the first installation material fixed frame in the present invention;
Fig. 3 diagrammatically illustrates the structural representation of the second installation material fixed frame in the present invention;
Fig. 4 diagrammatically illustrates the support bracket fastened structural representation in the present invention; And
Fig. 5 diagrammatically illustrates the structural representation of the erecting device in the present invention.
Embodiment
Below in conjunction with accompanying drawing, embodiments of the invention are described in detail, but the multitude of different ways that the present invention can be defined by the claims and cover is implemented.
As first aspect of the present invention, provide a kind of erecting device.As shown in Figure 5, erecting device comprises: installation material fixed frame; Fixed mount 10, fixed mount 10 comprises chute, and installation material fixed frame is connected with fixed mount 10 by chute.When using the erecting device in the present invention, first thing to be installed (such as lamination part of solar cell) is connected with installation material fixed frame, and the fixed mount 10 with chute is arranged on to be installed (side elevation of such as building), then installation material fixed frame is slipped in chute, thus installation material fixed frame is connected with fixed mount 10, now thing to be installed is firmly arranged on to be installed.Because installation material fixed frame is connected by chute with fixed mount 10, thus erecting device has easy-to-dismount feature.When dismantling thing to be installed, only need installation material fixed frame to skid off from chute and can complete unloading process.Meanwhile, the erecting device in the present invention also has low cost of manufacture, the simple feature of structure.
Preferably, as shown in Figures 2 and 3, installation material fixed frame comprises the first installation material fixed frame 20, first installation material fixed frame 20 and comprises the first installation material draw-in groove 21.Further, installation material fixed frame comprises the second installation material fixed frame 30, second installation material fixed frame 30 comprises the second installation material draw-in groove 31 of the through setting of bearing of trend along the second installation material fixed frame 30, two ends that installation material fixed frame comprises two the first installation material fixed frames 20 and two the second installation material fixed frames, 30, first installation material fixed frame 20 connect respectively by the end that second installation material fixed frame 30 is corresponding with two of another the first installation material fixed frame 20.When using installation material fixed frame, respectively thing to be installed edge card is connected in a first installation material draw-in groove 21 or a second installation material draw-in groove 31.In embodiment as shown in Figure 1, because thing to be installed has four edges, thus two edges up and down of thing to be installed are provided with the first installation material fixed frame 20, the edge, two, left and right of thing to be installed is provided with the second installation material fixed frame 30.Because the end of each first installation material fixed frame 20 is all connected with the end of the second installation material fixed frame 30, namely installation material fixed frame circumference is arranged on around thing to be installed continuously, thus makes installation material fixed frame to be securely fixed on thing to be installed and more attractive in appearance.Owing to avoiding using frame angle key in the junction of the first installation material fixed frame 20 and the second installation material fixed frame 30, thus reduce labour intensity and manufacturing cost.
Preferably, in the first installation material draw-in groove 21 and/or the second installation material draw-in groove 31, be provided with silica gel, fixed further by silica gel after in thing clamping first installation material draw-in groove to be installed 21 and/or the second installation material draw-in groove 31.Because the first installation material fixed frame 20 and/or the second installation material fixed frame 30 are connected with thing to be installed by silica gel, thus thing to be installed is made to be connected more firm with installation material fixed frame, thus when installation material fixed frame is connected with fixed mount 10, the problem that thing to be installed comes off and then the reliability that improve installation can not be there is.
Preferably, in embodiment as shown in Figure 2, the inwall of the first installation material draw-in groove 21 is provided with the first storage glue groove 23 and the first delay tank 24, first storage glue groove 23 is arranged on the diapire of the first installation material draw-in groove 21, the first delay tank 24 is arranged on the madial wall of the first installation material draw-in groove 21.Owing to being provided with the first storage glue groove 23, thus add the space holding silica gel in the first installation material draw-in groove 21, thus the silica gel of q.s can be added once at the first storage glue groove 23, and then the inconvenience that may cause when avoiding again adding silica gel.After thing to be installed to coordinate with the first installation material draw-in groove 21 and puts in place, usually make to leave certain distance between the diapire of the edge of thing to be installed and the first installation material draw-in groove 21.Owing to being provided with the first delay tank 24, thus the contact area of the inwall of thing to be installed and the first installation material draw-in groove 21 is added, and when installing thing to be installed, have a certain amount of silica gel to be attached in the first delay tank 24, thus improve cohesive force and installation strength between the first installation material fixed frame 20 and thing to be installed.
The madial wall of the first installation material draw-in groove 21 in the present invention is also provided with the first resistance glue groove 25, first and hinders glue groove 25 between the first storage glue groove 23 and the notch of the first installation material draw-in groove 21 (please refer to Fig. 2).Owing to being provided with the first resistance glue groove 25, thus when thing to be installed snaps in the first installation material draw-in groove 21, unnecessary silica gel in first installation material draw-in groove 21 can flow in the first resistance glue groove 25, thus avoids unnecessary silica gel to overflow from the notch of the first installation material draw-in groove 21, decreases the step of the unnecessary silica gel of wiping after installing, alleviates working strength, improves installation effectiveness.Preferably, the first storage glue groove 23, first delay tank 24 and the first resistance glue groove 25 are all arranged along the bearing of trend of the first installation material fixed frame 20.Further, the first delay tank 24 is two, and two the first delay tanks 24 are separately positioned on two madial walls that the first installation material draw-in groove 21 is oppositely arranged.Further, the first resistance glue groove 25 is two, and two first resistance glue grooves 25 are separately positioned on two madial walls that the first installation material draw-in groove 21 is oppositely arranged.
Preferably, the inwall of the second installation material draw-in groove 31 is also provided with to store up with first of the first installation material draw-in groove 21 glue groove 23 structure identical second store up glue groove, and/or second delay tank identical with the first delay tank 24 structure of the first installation material draw-in groove 21, and/or with first of the first installation material draw-in groove 21 hinder glue groove 25 structure identical second hinder glue groove, second storage glue groove is arranged on the diapire of the second installation material draw-in groove 31, second delay tank is arranged on the madial wall of the second installation material draw-in groove 31, second resistance glue slot is between the second storage glue groove and the notch of the second installation material draw-in groove 31.The effect that second storage glue groove and first stores up glue groove 23 is identical, and the second delay tank is identical with the effect of the first delay tank 24, and second hinders glue groove and first to hinder the effect of glue groove 25 identical.Preferably, the second storage glue groove, the second delay tank and the second resistance glue groove are all arranged along the bearing of trend of the second installation material fixed frame 30.Further, the second delay tank is two, and two the second delay tanks are separately positioned on two madial walls that the second installation material draw-in groove 31 is oppositely arranged.Further, the second resistance glue groove is two, and two second resistance glue grooves are separately positioned on two madial walls that the second installation material draw-in groove 31 is oppositely arranged.
As shown in Figure 2 and Figure 5, the first installation material fixed frame 20 in the present invention also comprises the first kink 22 of the one or both sides being arranged on the first installation material draw-in groove 21 highlightedly, fixed mount 10 comprises the first chute 11, first chute 11 and comprises the second kink 12 matched with the first kink 22 of the first installation material fixed frame 20.When the first installation material fixed frame 20 slips into after in the first chute 11, first kink 22 of the first installation material fixed frame 20 and the second kink 12 clamping of the first chute 11, now thing to be installed is fixedly mounted on fixed mount 10 under the effect of the first kink 22 and the second kink 12, even if now have external force to draw, press thing to be installed the direction of the external force (should perpendicular to the direction slipped into when installing) that thing to be installed also can not be made to throw off from fixed mount 10.Preferably, the two ends sealing joint strip of fixed mount 10 is fixed.When the first installation material fixed frame 20 slips into after the first chute 11 puts in place, sealing joint strip can be adopted to be sealed at the two ends of fixed mount 10, thus prevent the first installation material fixed frame 20 from slippage in fixed mount 10.
Preferably, as shown in Figure 4, fixed mount 10 also comprises the second chute 15, first chute 11 and the second chute 15 is arranged symmetrically.Owing to being provided with the second chute 15, thus same fixed mount 10 simultaneously for fixing two the first installation material fixed frames 20, thus can add the utilance of fixed mount 10.In embodiment as shown in Figure 5, same to be installed can be provided with multiple fixed mount 10 simultaneously, between multiple fixed mount 10, compartment of terrain is arranged, and every two fixed mounts 10 are for fixing same thing to be installed.When using fixed mount 10, the number of the thing to be installed that user can install as required and size, fixed mount 10 needed for choice for use, if when some thing to be installed does not re-use certainly, user also can very easily by thing removal to be installed, and the length of fixed mount 10 can also be determined according to the area of the size of the thing to be installed of required installation, quantity and to be installed, thus erecting device of the present invention has the good feature of adaptability.
As shown in Figure 5, fixed mount 10 securing member 14 that comprises installing hole 13 and be connected with installing hole 13.Preferably, securing member 14 is expansion bolts.Further, fixed mount 10 is connected with to be installed by adhesive tape.On to be installed during mounting and fixing support 10, adhesive tape first can be used to paste on to be installed by fixed mount 10, then by expansion bolt, fixed mount 10 is fixed on to be installed further again.Owing to employing adhesive tape, thus improve the adhesive force between fixed mount 10 and to be installed, thus fixed mount 10 is more reliably arranged on to be installed.Preferably, fixed mount 10 is provided with lightening recesses 16.Owing to being provided with lightening recesses 16, thus reducing the weight of fixed mount 10, decrease use material, reduce manufacturing cost.And the support section formed after fixed mount 10 removing lightening recesses 16, be equivalent to brace summer, can be used for the intensity strengthening fixed mount 10.
Preferably, fixed mount 10, first installation material fixed frame 20 and the second installation material fixed frame 30 all can adopt pressing method to produce the technique of section bar.Because extrudate has the advantages such as intensity is high, machining amount is few, metal loss is little, manufacturing process is simple, thus used widely in mechanical processing technique.Meanwhile, pressing method produces the feature that the technique of section bar also has few, appearance looks elegant process time.
As second aspect of the present invention, provide a kind of wall-hanging solar battery component, comprise lamination part of solar cell, wall-hanging solar battery component also comprises above-mentioned erecting device, and lamination part of solar cell is connected with the installation material fixed frame of erecting device.Preferably, wall-hanging solar battery component is arranged on the side elevation of building.Owing to adopting wall-hanging mounting means, thus save installing space, thus make wall-hanging solar battery component have the high feature of applicability.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (8)

1. an erecting device, is characterized in that, comprising:
Installation material fixed frame;
Fixed mount (10), described fixed mount (10) comprises chute, described installation material fixed frame is connected with described fixed mount (10) by described chute, wherein, described installation material fixed frame comprises the first installation material fixed frame (20), described first installation material fixed frame (20) comprises the first installation material draw-in groove (21), described first installation material fixed frame (20) also comprises first kink (22) of the one or both sides being arranged on described first installation material draw-in groove (21) highlightedly, described fixed mount (10) comprises the first chute (11), described first chute (11) comprises the second kink (12) matched with described first kink (22) of described first installation material fixed frame (20), described first chute (11) takes the shape of the letter U, described first kink (22) coordinates with described second kink (12) hook to make described first kink (22) spacing with mutual backstop on the direction of described second kink (12) vertical wall in vertical direction and horizontal direction.
2. erecting device according to claim 1, it is characterized in that, the inwall of described first installation material draw-in groove (21) is provided with the first storage glue groove (23) and the first delay tank (24), described first storage glue groove (23) is arranged on the diapire of described first installation material draw-in groove (21), and described first delay tank (24) is arranged on the madial wall of described first installation material draw-in groove (21).
3. erecting device according to claim 2, it is characterized in that, the madial wall of described first installation material draw-in groove (21) is also provided with the first resistance glue groove (25), and described first resistance glue groove (25) is positioned between described first storage glue groove (23) and the notch of described first installation material draw-in groove (21).
4. erecting device according to claim 3, it is characterized in that, described first storage glue groove (23), described first delay tank (24) and described first resistance glue groove (25) are all arranged along the bearing of trend of described first installation material fixed frame (20).
5. erecting device according to claim 1, is characterized in that, described fixed mount (10) also comprises the second chute (15), and described first chute (11) and described second chute (15) are arranged symmetrically.
6. erecting device according to any one of claim 1 to 5, is characterized in that, the securing member (14) that described fixed mount (10) comprises installing hole (13) and is connected with described installing hole (13).
7. erecting device according to any one of claim 1 to 5, it is characterized in that, described installation material fixed frame comprises the second installation material fixed frame (30), described second installation material fixed frame (30) comprises the second installation material draw-in groove (31) of the through setting of bearing of trend along described second installation material fixed frame (30), described installation material fixed frame comprises two described first installation material fixed frames (20) and two described second installation material fixed frames (30), two ends of a described first installation material fixed frame (20) connect respectively by the end that described second installation material fixed frame (30) is corresponding with two of the first installation material fixed frame (20) described in another.
8. a wall-hanging solar battery component, comprise lamination part of solar cell, it is characterized in that, described wall-hanging solar battery component also comprises the erecting device according to any one of claim 1 to 7, and described lamination part of solar cell is connected with the installation material fixed frame of described erecting device.
CN201210379569.4A 2012-10-09 2012-10-09 Erecting device and wall-hanging solar battery component Expired - Fee Related CN102856404B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210379569.4A CN102856404B (en) 2012-10-09 2012-10-09 Erecting device and wall-hanging solar battery component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210379569.4A CN102856404B (en) 2012-10-09 2012-10-09 Erecting device and wall-hanging solar battery component

Publications (2)

Publication Number Publication Date
CN102856404A CN102856404A (en) 2013-01-02
CN102856404B true CN102856404B (en) 2016-03-23

Family

ID=47402801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210379569.4A Expired - Fee Related CN102856404B (en) 2012-10-09 2012-10-09 Erecting device and wall-hanging solar battery component

Country Status (1)

Country Link
CN (1) CN102856404B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105186320A (en) * 2015-09-11 2015-12-23 广西南宁桂变电气有限公司 Wall switch cabinet

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201374337Y (en) * 2009-03-31 2009-12-30 常州天合光能有限公司 High-load resistant packaging frame of solar cell assembly
CN102347386A (en) * 2010-07-29 2012-02-08 第一阳光公司 Slider clip and mounting system of photovoltaic structure
CN202363484U (en) * 2011-11-25 2012-08-01 合肥晶澳太阳能科技有限公司 Frame for mounting of solar photovoltaic module
CN202816975U (en) * 2012-10-09 2013-03-20 英利能源(中国)有限公司 Installation device and wall-hanging type solar module

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3806534B2 (en) * 1999-02-24 2006-08-09 三洋電機株式会社 Solar cell module
JP2003336357A (en) * 2002-05-20 2003-11-28 Sekisui Chem Co Ltd Attaching construction for solar energy collecting device
CN201910435U (en) * 2011-04-08 2011-07-27 金坛正信光伏电子有限公司 Aluminium frame for packaging solar battery component

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201374337Y (en) * 2009-03-31 2009-12-30 常州天合光能有限公司 High-load resistant packaging frame of solar cell assembly
CN102347386A (en) * 2010-07-29 2012-02-08 第一阳光公司 Slider clip and mounting system of photovoltaic structure
CN202363484U (en) * 2011-11-25 2012-08-01 合肥晶澳太阳能科技有限公司 Frame for mounting of solar photovoltaic module
CN202816975U (en) * 2012-10-09 2013-03-20 英利能源(中国)有限公司 Installation device and wall-hanging type solar module

Also Published As

Publication number Publication date
CN102856404A (en) 2013-01-02

Similar Documents

Publication Publication Date Title
CN102832279A (en) Solar energy equipment and assembling system thereof
CN106059453A (en) Roof photovoltaic module support
CN204498060U (en) Solar panel frame module
CN215934770U (en) Frameless photovoltaic assembly installation device and photovoltaic roof combined system
CN102856404B (en) Erecting device and wall-hanging solar battery component
CN202816975U (en) Installation device and wall-hanging type solar module
CN208272918U (en) A kind of installation system of the two-sided solar double-glass assemblies of photovoltaic
CN202307937U (en) Solar battery pack and aluminium profile
CN206004594U (en) A kind of novel metalloid photovoltaic module
CN205160441U (en) Solar energy component's connection mounting structure
CN206004578U (en) A kind of mounting bracket system
CN203230072U (en) Composite board curtain wall installation system
CN206401333U (en) photovoltaic module and photovoltaic generating system
CN203134830U (en) Solar cell module provided with installation structure
CN204304903U (en) A kind of photovoltaic system
CN110661481A (en) Mounting structure and method of large-area power generation glass
CN216819751U (en) Roof distributed photovoltaic panel clamp splice and photovoltaic system
CN205218924U (en) Equipment frock of reactive compensation module
CN218997971U (en) Integral building photovoltaic assembly
CN221081248U (en) Auxiliary installation device for surface of photovoltaic module
CN201598782U (en) Light steel surface solar energy battery panel installation clamp
CN210622032U (en) Novel photovoltaic shutter system
CN203038953U (en) Lightweight photovoltaic component
CN221081236U (en) Monocrystalline photovoltaic module
CN217590662U (en) Buckle formula photovoltaic module

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160323