CN102855376A
CN102855376A CN201210148887XA CN201210148887A CN102855376A CN 102855376 A CN102855376 A CN 102855376A CN 201210148887X A CN201210148887X A CN 201210148887XA CN 201210148887 A CN201210148887 A CN 201210148887A CN 102855376 A CN102855376 A CN 102855376A
Authority
CN
China
Prior art keywords
power house
level
unit
power plant
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210148887XA
Other languages
English (en)
Chinese (zh)
Inventor
A·K·潘迪
M·K·阿萨蒂
K·曼纳
D·纳拉莫图
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Co
Original Assignee
General Electric Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Electric Co filed Critical General Electric Co
Publication of CN102855376A publication Critical patent/CN102855376A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid

Landscapes

  • Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Development Economics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Testing And Monitoring For Control Systems (AREA)
CN201210148887XA 2011-05-03 2012-05-03 用于实现发电站操作的单元级和集体级基准测试的自动化系统和方法 Pending CN102855376A (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US13/099,661 2011-05-03
US13/099,661 US20120283988A1 (en) 2011-05-03 2011-05-03 Automated system and method for implementing unit and collective level benchmarking of power plant operations

Publications (1)

Publication Number Publication Date
CN102855376A true CN102855376A (zh) 2013-01-02

Family

ID=46125173

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210148887XA Pending CN102855376A (zh) 2011-05-03 2012-05-03 用于实现发电站操作的单元级和集体级基准测试的自动化系统和方法

Country Status (4)

Country Link
US (1) US20120283988A1 (https=)
EP (1) EP2521083A1 (https=)
CN (1) CN102855376A (https=)
IN (1) IN2012DE01112A (https=)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107077135A (zh) * 2014-11-21 2017-08-18 西门子公司 用于识别设备中的干扰的方法和辅助系统
CN109242300A (zh) * 2018-08-31 2019-01-18 阿里巴巴集团控股有限公司 一种业务指标值的展示方法、装置、及计算机设备
CN114730183A (zh) * 2019-11-14 2022-07-08 西门子股份公司 具有视觉编码的趋势曲线图的技术设施的控制系统

Families Citing this family (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITMI20102463A1 (it) * 2010-12-30 2012-07-01 Stamicarbon Metodo per l'avviamento e la gestione di un impianto termico a ciclo combinato per la produzione di energia e relativo impianto
US20120283885A1 (en) * 2011-05-04 2012-11-08 General Electric Company Automated system and method for implementing statistical comparison of power plant operations
US8756180B2 (en) * 2011-11-28 2014-06-17 General Electric Company Method and system for managing plant operation
US9863836B2 (en) * 2011-12-30 2018-01-09 Spirax-Sarco Limited Monitoring apparatus for a steam plant and a method of operating such an apparatus
US20130282190A1 (en) * 2012-04-24 2013-10-24 General Electric Company System and method for configuration and management of power plant assets
US8966325B2 (en) * 2012-09-06 2015-02-24 Ca, Inc. Identifying unreliable parts in an IT infrastructure
CN103257923B (zh) * 2013-04-16 2016-12-28 中国科学院计算技术研究所 数据中心数据分析类基准测试程序的应用选取方法及系统
CN105325023B (zh) * 2013-05-14 2018-11-16 诺基亚通信公司 用于小区异常检测的方法和网络设备
US9940599B2 (en) 2013-08-20 2018-04-10 General Electric Company Systems and methods for generating solution recommendations for power plant operation
US9378256B2 (en) * 2013-11-15 2016-06-28 Ut-Battelle, Llc Industrial geospatial analysis tool for energy evaluation
US20160314264A1 (en) * 2013-12-20 2016-10-27 Sca Hygiene Products Ab Method and system for monitoring excrement data
US20160314263A1 (en) * 2013-12-20 2016-10-27 Sca Hygiene Products Ab Method and system for monitoring excrement data
US10956014B2 (en) 2013-12-27 2021-03-23 Baker Hughes, A Ge Company, Llc Systems and methods for dynamically grouping data analysis content
US10545986B2 (en) * 2013-12-27 2020-01-28 General Electric Company Systems and methods for dynamically grouping data analysis content
US10539934B2 (en) * 2014-03-17 2020-01-21 General Electric Technology Gmbh Outage and switch management for a power grid system
US10116165B2 (en) * 2014-03-17 2018-10-30 General Electric Technology Gmbh Powergrid operation and supervision system
US10614531B2 (en) * 2014-04-11 2020-04-07 S&C Electric Company Filter-based dynamic power system operation dashboards
US9984133B2 (en) 2014-10-16 2018-05-29 Palantir Technologies Inc. Schematic and database linking system
US20160179063A1 (en) * 2014-12-17 2016-06-23 Microsoft Technology Licensing, Llc Pipeline generation for data stream actuated control
US20170052957A1 (en) * 2015-08-20 2017-02-23 Honeywell International Inc. System and method for providing high-level graphical feedback related to overall site performance and health
US9951704B2 (en) * 2015-09-08 2018-04-24 GM Global Technology Operations LLC No start event monitoring
US10831162B2 (en) * 2016-06-28 2020-11-10 General Electric Company Systems and methods for providing an integrated power plant advisor
EP3282333B1 (en) * 2016-08-12 2021-05-19 Siemens Aktiengesellschaft A technique for monitoring technical equipment
AU2017201714A1 (en) * 2016-09-23 2018-04-12 Singh, Sant Sevak MR Combine an array of logically grouped micro power generation & retention sites (residential & commercial) to create a cumulative power site of commercial grade.
US20180218277A1 (en) * 2017-01-30 2018-08-02 General Electric Company Systems and methods for reliability monitoring
JP7179444B2 (ja) * 2017-03-29 2022-11-29 三菱重工業株式会社 予兆検知システム及び予兆検知方法
US20200200035A1 (en) * 2018-12-21 2020-06-25 General Electric Company Methods and systems for monitoring gas turbine startups
US20220300682A1 (en) * 2021-03-18 2022-09-22 Pratt & Whitney Canada Corp. Methods and systems for assessing compliance of aircraft engines
CN114548815B (zh) * 2022-03-02 2025-09-26 天津国能津能滨海热电有限公司 机组启停监控管理方法、装置及系统
USD1031772S1 (en) * 2022-03-22 2024-06-18 Mitsubishi Heavy Industries, Ltd. Display screen with graphical user interface for fuel valve diagnosis
US12455075B2 (en) 2022-03-24 2025-10-28 Solar Turbines Incorporated Gas turbine predictive emissions modeling, reporting, and model management via a remote framework
CN119644828B (zh) * 2024-11-22 2025-10-24 广东电网有限责任公司 一种过程层设备调试方法、装置、电子设备及存储介质

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4039804A (en) * 1972-03-14 1977-08-02 Westinghouse Electric Corporation System and method for monitoring industrial gas turbine operating parameters and for providing gas turbine power plant control system inputs representative thereof
CN2054918U (zh) * 1989-11-11 1990-03-21 北京市西城新开通用试验厂 一种燃机电站机电一体化控制装置
US20050144537A1 (en) * 2003-11-12 2005-06-30 Siemens Corporate Research Inc. Method to use a receiver operator characteristics curve for model comparison in machine condition monitoring
CN1866140A (zh) * 2005-02-10 2006-11-22 通用电气公司 优化联合循环/联合生产设备的方法和装置
US20090012653A1 (en) * 2007-03-12 2009-01-08 Emerson Process Management Power & Water Solutions, Inc. Use of statistical analysis in power plant performance monitoring
US20100076809A1 (en) * 2003-03-18 2010-03-25 Fisher-Rosemount Systems, Inc. Asset optimization reporting in a process plant

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3944723A (en) * 1974-12-05 1976-03-16 General Electric Company Station for power line access data system
US7337183B2 (en) * 2002-11-19 2008-02-26 Siemens Power Generation, Inc. Customer extranet portal
US20040230541A1 (en) * 2003-05-16 2004-11-18 Lefton Steven A. Process for estimating and reducing cost of cycling
WO2005015366A2 (en) * 2003-08-08 2005-02-17 Electric Power Group, Llc Real-time performance monitoring and management system
US20050108261A1 (en) * 2003-11-04 2005-05-19 Joseph Glassy Geodigital multimedia data processing system and method
JP4115958B2 (ja) * 2004-03-26 2008-07-09 株式会社東芝 プラントの運転スケジュール最適化方法および最適化システム
US7221987B2 (en) * 2004-06-15 2007-05-22 Kimberly-Clark Worldwide, Inc. Generating a reliability analysis by identifying casual relationships between events in an event-based manufacturing system
US7801660B2 (en) * 2006-07-31 2010-09-21 General Electric Company Methods and systems for estimating compressor fouling impact to combined cycle power plants
EP2012209A1 (de) * 2007-07-02 2009-01-07 Siemens Aktiengesellschaft Verfahren zum Ermitteln der Lebensdauer einer Kraftwerkskomponente
US7627454B2 (en) * 2007-10-16 2009-12-01 General Electric Company Method and system for predicting turbomachinery failure events employing genetic algorithm
US20110022430A1 (en) * 2009-07-24 2011-01-27 Uwe Held Method and an apparatus for calculating a risk reserve value for a machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4039804A (en) * 1972-03-14 1977-08-02 Westinghouse Electric Corporation System and method for monitoring industrial gas turbine operating parameters and for providing gas turbine power plant control system inputs representative thereof
CN2054918U (zh) * 1989-11-11 1990-03-21 北京市西城新开通用试验厂 一种燃机电站机电一体化控制装置
US20100076809A1 (en) * 2003-03-18 2010-03-25 Fisher-Rosemount Systems, Inc. Asset optimization reporting in a process plant
US20050144537A1 (en) * 2003-11-12 2005-06-30 Siemens Corporate Research Inc. Method to use a receiver operator characteristics curve for model comparison in machine condition monitoring
CN1866140A (zh) * 2005-02-10 2006-11-22 通用电气公司 优化联合循环/联合生产设备的方法和装置
US20090012653A1 (en) * 2007-03-12 2009-01-08 Emerson Process Management Power & Water Solutions, Inc. Use of statistical analysis in power plant performance monitoring

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107077135A (zh) * 2014-11-21 2017-08-18 西门子公司 用于识别设备中的干扰的方法和辅助系统
CN107077135B (zh) * 2014-11-21 2020-04-07 西门子公司 用于识别设备中的干扰的方法和辅助系统
CN109242300A (zh) * 2018-08-31 2019-01-18 阿里巴巴集团控股有限公司 一种业务指标值的展示方法、装置、及计算机设备
CN114730183A (zh) * 2019-11-14 2022-07-08 西门子股份公司 具有视觉编码的趋势曲线图的技术设施的控制系统

Also Published As

Publication number Publication date
IN2012DE01112A (https=) 2015-09-25
US20120283988A1 (en) 2012-11-08
EP2521083A1 (en) 2012-11-07

Similar Documents

Publication Publication Date Title
CN102855376A (zh) 用于实现发电站操作的单元级和集体级基准测试的自动化系统和方法
AU2019201086B2 (en) Method and system for condition monitoring of a group of plants
US11340774B1 (en) Anomaly detection based on a predicted value
US10776719B2 (en) Adaptive key performance indicator thresholds updated using training data
US10503348B2 (en) Graphical user interface for static and adaptive thresholds
US10474680B2 (en) Automatic entity definitions
US11501238B2 (en) Per-entity breakdown of key performance indicators
JP6411769B2 (ja) 状態監視装置
CN102982488A (zh) 用于实现发电厂操作的统计比较的自动化系统和方法
Amjad et al. AI-powered fault detection in gas turbine engines: Enhancing predictive maintenance in the US energy sector
US8756180B2 (en) Method and system for managing plant operation
Beduschi et al. Optimizing rotating equipment maintenance through machine learning algorithm
US20100023887A1 (en) Systems and methods for collecting and processing diagnostics and statistics for a fleet of turbines
US8612059B2 (en) Power generation unit startup evaluation
Blumenthal et al. Generating Green Value from Data: Applying AI–Based Analytics to Monitor and Manage Energy Usage Across Oil and Gas Operations
AlSulaimani et al. Centralized Predictive Analytics & Diagnostics Value Creation
Al-Jazzaf et al. Integrated Performance Workflow to Optimize ESP Daily Operations
Al-Jazzaf et al. ESP Field Operational Score–A Unified Approach to ESP Performance Benchmarking
CN117425831A (zh) 用于分析警报以解决电气系统问题的系统和方法
Fernandez De Bobadilla et al. Savings Achieved From Installation of an On-Line Performance Monitoring System at the Naco Nogales Combined Cycle Plant
Smith Remote monitoring: utilities and original equipment manufacturers are beginning to" see" benefits from remote monitoring and diagnostics

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130102