CN102852130A - 基于不脱钩强夯机沉降量自动监测系统 - Google Patents
基于不脱钩强夯机沉降量自动监测系统 Download PDFInfo
- Publication number
- CN102852130A CN102852130A CN2011101804618A CN201110180461A CN102852130A CN 102852130 A CN102852130 A CN 102852130A CN 2011101804618 A CN2011101804618 A CN 2011101804618A CN 201110180461 A CN201110180461 A CN 201110180461A CN 102852130 A CN102852130 A CN 102852130A
- Authority
- CN
- China
- Prior art keywords
- controller
- dynamic compactor
- pressure sensor
- unhooking
- monitoring system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
本发明公开了一种基于不脱钩强夯机的基础上能自动测量、记录和分析强夯机作业参数的强夯机沉降量自动监测系统,包括安装于卷扬滚筒码盘上的相位差为90度的两个接近开关、安装于卷扬马达上的压力传感器、液晶显示器和控制器,所述的两接近开关A和B及所述的压力传感器通过线路与所述的控制器相连,所述控制器通过CAN数据总线与液晶显示器相连。本解决方案有效解决了强夯机夯击沉降量的实时监测,大大减少了操作人员的工作量;同时自动跟踪监测结果,及时提示操作人员减少不必要的重复夯击工作,提高了工作效率。具有可靠性高、操作简便的特点,减少现场人员工作量和避免人为因素对测量精度的影响。
Description
技术领域
本发明岩土工程施工设备技术领域,属于一种强夯用吊机连接的强夯法地基处理自动监控系统。
背景技术
强夯法,又称动力固结法(Dynamic Consolidation)。强夯法处理地基通常用起重设备反复将80-400kN的锤(最重的达2OOOkN)起吊到8-25m高处(最高的达40m),而后利用自动脱钩释放载荷或带锤自由落下,在土中形成强大的冲击波和高应力,从而提高地基的强度、降低压缩性、改善抵抗振(震)动液化能力、消除湿陷性、提高土的均匀程度、减少差异沉降等。按照中华人民共和国国家标准GB50202-2002《建筑地基基础工程施工质量验收规范》强夯地基质量检验标准的主控项目为地基的强度和承载力,一般项目为落距、锤重、夯击遍数和顺序、夯点间距、击数、每击夯沉量和累计夯沉量等。对于每击夯沉量和累计夯沉量是强夯信息化施工的基础,也是过程控制中可量化的技术指标。由于主控项目须在地基处理完成一段时间后通过静载、动探等才能得到检测,因此对一般项目进行过程控制对强夯质量的形成至关重要。目前,强夯能级、强夯击数、每击夯沉量和累计夯沉量等强夯作业参数的记录主要借助钢卷尺、水平仪、经纬仪、塔尺等仪器进行人工测量,人工记录来获得。
这种方法在实际使用中的问题是:
1.测量精度和数据记录准确性受测量记录人员的人为因素影响。
2.人工操作,现场测量条件复杂,测量记录传递过程繁琐需通过测量员计算、判定,因为通过仪器读到的是相对值,而每击下沉量和累计下沉量是一个绝对值,操作人员无法实时掌握设计要求停锤下沉量信息;而且现场资料须经整理后才能归档,导致效率低。
3.偏锤的实际存在、塔尺所立测点的变换和所立塔尺的垂直度误差,以及锤顶面上积土均使测量误差客观存在,又较难消除。
4.在光线较差,尤其需夜间施工时,测量很难进行。
5.测量仪器和人员距强夯和较近,安全受威胁。
6.在测量过程中,由于吊车的旋转和移动,有时会使测点与测量仪器的通视遭到破坏,这时需通过移动仪器架设位置来重新获得通视,从而增加了测量人员的工作量,导致架设时间内某些点无法进行监视测量或夯机需停工等待。
随着科技技术的发展,目前市场上已开发出不脱钩的强夯机,大大提高了施工效率,同时降低了工作强度,但是还没有关于自动监测强夯沉降量的成熟解决方案,还是需要人工去测量沉降量。关键技术难点是如何解决卷扬提升、下发过程中重锤的起落高度的测量、测量精度等问题。
发明内容
本发明目的在于提供一种基于不脱钩强夯机的基础上能自动测量、记录和分析强夯机作业参数的系统,解决重锤起落高度的测量问题,减少现场人员工作量和避免人为因素对测量精度的影响。
实现本发明目的的技术方案是:
一种基于不脱钩强夯机沉降量自动监测系统,包括安装于卷扬滚筒码盘上的相位差为90度的两个接近开关、安装于卷扬马达上的压力传感器、液晶显示器和控制器,其特征在于:所述的两接近开关和所述的压力传感器通过线路与所述的控制器相连,所述控制器通过CAN数据总线与液晶显示器相连。
本发明与现有技术相比具有如下优点:
1.本解决方案有效解决了强夯机夯击沉降量的实时监测,大大减少了操作人员的工作量。
2.具有可靠性高、操作简便的特点,减少现场人员工作量和避免人为因素对测量精度的影响。
3.提高了强夯作业对环境的适应性,使强夯作业即便在光线不良的夜间测量成为可能。
4.最大限度减少夯区内人员数量,使施工可能对人员的伤害进一步降低。
5.人员的减少,减少了施工人员的劳动力成本,使项目效益得到提高。
6.自动化程度的提高,提升了强夯机的整机科技含量和核心竟争力,使强夯机先进性得到体现。
附图说明:
图1为本发明所述的基于不脱钩强夯机沉降量自动监测系统的结构示意图;
1.接近开关A 2.接近开关B 3.压力传感器 4.控制器 5.液晶显示器。
具体实施方式
以下实施例用于说明本发明,但不用来限制本发明的范围,所有等同的技术方案也属于本发明的范畴,本发明的专利保护范围应由各项权利要求限定。
从图1中可以看出,一种基于不脱钩强夯机沉降量自动监测系统,包括安装于卷扬滚筒码盘上的相位差为90度的两个接近开关A1和B2、安装于卷扬马达上的压力传感器3、液晶显示器5和控制器4,其特征在于:所述的两接近开关A1和B2及所述的压力传感器3通过线路与所述的控制器4相连,所述控制器4通过CAN数据总线与液晶显示器5相连。
在强夯机开始强夯作业时,首先控制器4的程序进行数据初始化并通过判断压力传感器3的信号决定是否开始测量,当卷扬开始工作后(压力传感器3的数值大于某一设定值)判断重锤是起吊还是下落(判断h:重锤实时高度;h值为正时表示下落,数值为负时表示起吊),如果h<0,当重锤起吊到设定高度时记录h0值;如果h>0,当重锤落地后记录落锤深度h1,当一次夯击动作完成后(起吊—落锤)计算沉降量△h=h1-h0, 此时比较△h值与设定值的大小,若△h大于设定值,程序继续进行沉降量的监测,若△h小于设定值,程序输出提示信息给液晶显示器5并终止沉降量的监测。
Claims (1)
1.一种基于不脱钩强夯机沉降量自动监测系统,包括安装于卷扬滚筒码盘上的相位差为90度的两个接近开关A⑴和B⑵、安装于卷扬马达上的压力传感器⑶、液晶显示器⑸和控制器⑷,其特征在于:所述的两接近开关A⑴和B⑵及所述的压力传感器⑶通过线路与所述的控制器⑷相连,所述控制器⑷通过CAN数据总线与液晶显示器⑸相连。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101804618A CN102852130A (zh) | 2011-06-30 | 2011-06-30 | 基于不脱钩强夯机沉降量自动监测系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101804618A CN102852130A (zh) | 2011-06-30 | 2011-06-30 | 基于不脱钩强夯机沉降量自动监测系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102852130A true CN102852130A (zh) | 2013-01-02 |
Family
ID=47399074
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011101804618A Pending CN102852130A (zh) | 2011-06-30 | 2011-06-30 | 基于不脱钩强夯机沉降量自动监测系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102852130A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103106701A (zh) * | 2013-01-24 | 2013-05-15 | 中交水规院京华工程监理有限公司 | 强夯施工自动记录仪 |
CN103309276A (zh) * | 2013-06-17 | 2013-09-18 | 山东科技大学 | 不脱钩强夯机自动控制及自动检测系统 |
CN104609326A (zh) * | 2014-12-16 | 2015-05-13 | 北京南车时代机车车辆机械有限公司 | 一种强夯机及其卷扬装置 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1348036A (zh) * | 2000-10-10 | 2002-05-08 | 马烈 | 振冲碎石桩施工监控装置 |
CN201546244U (zh) * | 2009-11-27 | 2010-08-11 | 长安大学 | 基于光电编码器的强夯深度检测系统 |
-
2011
- 2011-06-30 CN CN2011101804618A patent/CN102852130A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1348036A (zh) * | 2000-10-10 | 2002-05-08 | 马烈 | 振冲碎石桩施工监控装置 |
CN201546244U (zh) * | 2009-11-27 | 2010-08-11 | 长安大学 | 基于光电编码器的强夯深度检测系统 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103106701A (zh) * | 2013-01-24 | 2013-05-15 | 中交水规院京华工程监理有限公司 | 强夯施工自动记录仪 |
CN103106701B (zh) * | 2013-01-24 | 2015-11-18 | 中交水运规划设计院有限公司 | 强夯施工自动记录仪 |
CN103309276A (zh) * | 2013-06-17 | 2013-09-18 | 山东科技大学 | 不脱钩强夯机自动控制及自动检测系统 |
CN104609326A (zh) * | 2014-12-16 | 2015-05-13 | 北京南车时代机车车辆机械有限公司 | 一种强夯机及其卷扬装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103558006B (zh) | 冲击力可控式冲击矿压巷道支护物理模拟冲击试验方法及装置 | |
US20210032833A1 (en) | Method and system for determining in real time bearing capacity of foundation tamped by high-speed hydraulic tamper | |
CN102251510A (zh) | 强夯机夯沉量检测系统 | |
CN111636406B (zh) | 用于强夯机的智能监控系统 | |
CN103510502B (zh) | 基于夯锤冲击加速度测量的强夯机施工实时监测方法与系统 | |
CN104328776A (zh) | 一种预测动力强夯对土体及周边环境影响的方法 | |
CN104609326B (zh) | 一种强夯机及其卷扬装置 | |
CN105277353A (zh) | 一种高空吊篮类机械安全锁测试实验台及测试方法 | |
CN102852130A (zh) | 基于不脱钩强夯机沉降量自动监测系统 | |
CN2677881Y (zh) | 强夯作业参数自动测量记录分析装置 | |
CN105649001A (zh) | 强夯施工自动监控系统 | |
CN204177676U (zh) | 一种用于盐渍土盐胀研究的监测系统 | |
CN104495622A (zh) | 一种风载控制系统、方法、装置及起重设备 | |
CN201532275U (zh) | 锚下预应力的反拉检测装置 | |
CN205444155U (zh) | 强夯施工自动监控装置 | |
CN102852127A (zh) | 基于不脱钩强夯机沉降量自动监测方法 | |
CN107843743B (zh) | 一种基于冲击加速度的强夯施工数据采集方法 | |
CN106703003B (zh) | 一种强夯机智能测量监控系统及其控制方法 | |
CN101692014A (zh) | 锚索锚下预应力的反拉检测方法 | |
CN107451726B (zh) | 强夯施工质量在线实时管控方法及强夯信息化施工方法 | |
CN203672642U (zh) | 高处作业吊篮安全锁试验装置 | |
CN204356820U (zh) | 用于高应变法桩基检测的自由落锤锤击装置 | |
CN206736984U (zh) | 现场地基沉降模拟装置 | |
CN107202611B (zh) | 用于强夯作业过程监测的传感型定滑轮测试系统及其方法 | |
CN103292724A (zh) | 一种履带式强夯机及其深度检测方法、深度检测装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130102 |